QUALITY DEFINITION:
Quality control (QC): The operational
techniques or a system of maintaining
standards by reviewing, checking,
inspecting and testing.
Quality Assurance (QA): The planned and
systematic actions and implementations
necessary to provide adequate confidence that
the work will satisfy quality requirements
• Quality System (QS): A set of documented
processes, which seek to provide satisfaction that
the project outputs will fulfill all the requirements
for which it is being planned. The Quality System
should fully incorporate the organization, human
resources, materials, equipments, processes,
inspections, testing and other parameters of the
project. A key element of QS is the QA/QC
Manual
• Quality Surveillance
• : This normally covers two aspects.
• At the project level, a review is required to
ensure that the quality practices are
implemented and documented to ensure in
relation to the quality system.
• At the contract package level, inspection and
testing is required to ensure that the works
executed meet the required quality standards.
QA/QC MANUAL
This QA/QC Manual focuses on the implementation
activities of the project following contract award,
primarily on supervision and quality control of
construction works It will provide a base outline
towards, procedure, responsibilities, compliance
acceptance criteria and documentation for carrying
out inspection, testing and reporting on various
materials, The QA/QC Manual for the Construction
activity does not attempt to suggest technical
specifications, since these are stated in the contract
documents
• Key Parameters Of Quality Assurance
• Site documents
• Mandatory and optional testing
• Availability of field and departmental laboratories
• Manufacturing test certificates
• Departmental team inspections
• Checklist guide for works
• Site inspections
• Post quality testing of finished works
• Quality certification
• Monthly reporting and review meetings
• HEALTH SAFETY & ENVIRONMENT
• Display of Notices
• Warning tape, lighting arrangement at location of any
excavated trench, electrical installation or mechanical
erection.
• Fire Prevention and Protection
• Environment & Health
• House Keeping
• Lighting
• Monsoon Precaution
• Noise and Vibration
• Personnel protective equipment (PPE) for field staff
• Designs/Drawings for contract
• Maintain design / drawing register at site
• Use only approved drawings for construction
•
• Test laboratory and equipment
• Intimate the details, date of completion with requisite
manufacturers’ and calibration certificates of equipments.
• Maintain the equipments in good condition and calibrate as
necessary
•
• Material receipts Materials testing
• Enter receipts in material register
• Materials to be tested only in approved laboratories
• Prepare concrete mix proportions as per volume as required by
contract and submit test results
• Take test samples in presence of QCwhen requested
• Perform material tests
• Submit test reports to QCwith monthly reports
• Rejected materials
• Entries to be made in material register at site
• Tag and record all rejected materials
• Intimate QCin writing the proposed date of removal of material
from site and confirm after removal
•
• Material consumption
• Enter daily consumption of materials in material register and
indicate balance quantity
•
• Construction equipment
• Intimate ownerthe details, date of mobilization along with
requisite insurance certificate
• Maintain equipments in good working condition
• Intimate breakdown of construction equipments
•
Construction
•
• Intimate owner in writing when construction is going to
commence and what activities are proposed to be
undertaken
• Intimate owner in advance when critical works, such as
concreting, embankment, paving, pipeline laying and
jointing, testing, etc., would be undertaken, along with the
test certificates of the materials proposed to be used in
these works. No critical activity shall start unless the
material is tested. Certificates are verified and approved by
the Engineer.
• Concreting to take place only after pour card is signed.
• To provide any other necessary QA/QC requirement.
•
• Daily work progress
• To maintain in daily log.
•
• Testing of works in progress
• Perform tests as per contract requirements.
• Submit test reports to QC
• Maintain test log during the execution of works.
•
• Rejected work items
• Intimate GPWSC/DWSS in writing the proposed
date of removal from site and confirm after
removal.
• Rectify defective work and invite QC for re-
inspection.
•
• Instructions from Engineer
• Enter change orders, site instructions, letter
and minutes of meetings issued by the Engineer
and Consultants in the Instruction Log.
•
• Inspection of Engineer
• Take instructions in Site Order Book.
• Intimate QCof compliance.
•
• Progress scheduling and control
• Prepare and maintain project schedules and
undertake work in accordance with approved schedule.
•
• Reporting
• Prepare and submit Monthly Progress Reports and
other reports as per contractual requirements.
•
•
• Records Maintain the following records on
Site/Contractor’s Office/Laboratory as given in Annexure C.
• Site Order book
• Material Register
• Daily Progress Report.
• Concrete pour Register
• Test Record
• Design &Drawing Record
• Non conforming item record
• Cube test record
•
• Workmanship All the work executed against the
contract shall be of good workmanship.
• Disposal Of Debris All the Debris should be disposed
of properly after completion of construction work.
Engineer’s Diary
Sample Register
• The register can consist of a ruled book which has columns
ruled vertically, headed in sequence from the left to right
across both pages as follows:
• Col. 1. Sample number
• 2. Source
• 3. Location
• 4. Description (brief only)
• 5. Depth
• 6. Date taken
• 7. Where tested
• 8. Remarks/references
• Construction Quality Control (CQC) is intended
to provide a comprehensive, common and
consistent framework for quality control
across various contract packages. CQC
comprises two main elements of quality
control:
• Testing
• Inspections
CQC should be affected at five stages:
• Input Materials and Equipment Components
• In-process Activities
• Stage Completion
• Interfacing (of special importance in water and
sewerage contract packages)
• Final completion
• The contractor is responsible for informing EIC
giving sufficient notice time so that they can
witness the tests.
Periodical Inspection For Quality
Random Checks
Process chart for concrete with stages
of inspection
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction

More Related Content

What's hot

QUALITY CONTROL AND SAFETY DURING CONSTRUCTIONIjmet 08 03_012
QUALITY CONTROL AND SAFETY DURING CONSTRUCTIONIjmet 08 03_012QUALITY CONTROL AND SAFETY DURING CONSTRUCTIONIjmet 08 03_012
QUALITY CONTROL AND SAFETY DURING CONSTRUCTIONIjmet 08 03_012IAEME Publication
 
Non destructive test on concrete (ndt)
Non destructive test on concrete (ndt)Non destructive test on concrete (ndt)
Non destructive test on concrete (ndt)Abhishek Gupta
 
Quality control of concrete
Quality control of concreteQuality control of concrete
Quality control of concreteGaurang Kakadiya
 
Quality management for civil engineering
Quality management for civil engineeringQuality management for civil engineering
Quality management for civil engineeringJayanta Sen
 
Civil Engineering Measurment
Civil Engineering MeasurmentCivil Engineering Measurment
Civil Engineering MeasurmentSultan M Muzahir
 
Chapter 3 materials & techniques for repairs
Chapter 3 materials & techniques for repairsChapter 3 materials & techniques for repairs
Chapter 3 materials & techniques for repairsAnkit Patel
 
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITY
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITYTHUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITY
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITYSSudhaVelan
 
Construction Management & Equipments
Construction Management & EquipmentsConstruction Management & Equipments
Construction Management & EquipmentsGAURAV. H .TANDON
 
Quality control of concrete
Quality control of concreteQuality control of concrete
Quality control of concreteGaurang Kakadiya
 
Non-Destructive Testing of Concrete In Structures
Non-Destructive Testing of Concrete In StructuresNon-Destructive Testing of Concrete In Structures
Non-Destructive Testing of Concrete In Structures26032015
 
MEASUREMENT PDF
MEASUREMENT PDFMEASUREMENT PDF
MEASUREMENT PDFIDHAMUKI
 
total quality management in construction industry
total quality management in construction industrytotal quality management in construction industry
total quality management in construction industryMohammed Faazil
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project ManagementAravind Samala
 

What's hot (20)

QUALITY CONTROL AND SAFETY DURING CONSTRUCTIONIjmet 08 03_012
QUALITY CONTROL AND SAFETY DURING CONSTRUCTIONIjmet 08 03_012QUALITY CONTROL AND SAFETY DURING CONSTRUCTIONIjmet 08 03_012
QUALITY CONTROL AND SAFETY DURING CONSTRUCTIONIjmet 08 03_012
 
Quality management
Quality managementQuality management
Quality management
 
Non destructive test on concrete (ndt)
Non destructive test on concrete (ndt)Non destructive test on concrete (ndt)
Non destructive test on concrete (ndt)
 
Quality control of concrete
Quality control of concreteQuality control of concrete
Quality control of concrete
 
Quality management for civil engineering
Quality management for civil engineeringQuality management for civil engineering
Quality management for civil engineering
 
Civil Engineering Measurment
Civil Engineering MeasurmentCivil Engineering Measurment
Civil Engineering Measurment
 
Chapter 3 materials & techniques for repairs
Chapter 3 materials & techniques for repairsChapter 3 materials & techniques for repairs
Chapter 3 materials & techniques for repairs
 
Bar bending schedule
Bar bending scheduleBar bending schedule
Bar bending schedule
 
Bar bending schedule
Bar bending scheduleBar bending schedule
Bar bending schedule
 
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITY
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITYTHUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITY
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITY
 
Construction Management & Equipments
Construction Management & EquipmentsConstruction Management & Equipments
Construction Management & Equipments
 
Quality control of concrete
Quality control of concreteQuality control of concrete
Quality control of concrete
 
Non-Destructive Testing of Concrete In Structures
Non-Destructive Testing of Concrete In StructuresNon-Destructive Testing of Concrete In Structures
Non-Destructive Testing of Concrete In Structures
 
Contractor Best Practices in Construction Quality Assurance
Contractor Best Practices in Construction Quality AssuranceContractor Best Practices in Construction Quality Assurance
Contractor Best Practices in Construction Quality Assurance
 
MEASUREMENT PDF
MEASUREMENT PDFMEASUREMENT PDF
MEASUREMENT PDF
 
Fresh Concrete
Fresh ConcreteFresh Concrete
Fresh Concrete
 
Rebound hammer test
Rebound hammer testRebound hammer test
Rebound hammer test
 
Quantity Surveyors (Practice)
Quantity Surveyors (Practice)Quantity Surveyors (Practice)
Quantity Surveyors (Practice)
 
total quality management in construction industry
total quality management in construction industrytotal quality management in construction industry
total quality management in construction industry
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 

Similar to Qaqc in civil construction

Similar to Qaqc in civil construction (20)

Presentation1
Presentation1Presentation1
Presentation1
 
Waji Ul Hassan_original
Waji Ul Hassan_originalWaji Ul Hassan_original
Waji Ul Hassan_original
 
RESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORRESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTOR
 
Saqib Shahzad CV updated
Saqib Shahzad CV updatedSaqib Shahzad CV updated
Saqib Shahzad CV updated
 
RESUME
RESUMERESUME
RESUME
 
ROGELIO DE GUZMAN Piping welding Inspector
ROGELIO DE GUZMAN  Piping  welding InspectorROGELIO DE GUZMAN  Piping  welding Inspector
ROGELIO DE GUZMAN Piping welding Inspector
 
Khurshid WI cswip 3.1
Khurshid WI cswip 3.1Khurshid WI cswip 3.1
Khurshid WI cswip 3.1
 
Umar iqbal qc.cv
Umar iqbal qc.cvUmar iqbal qc.cv
Umar iqbal qc.cv
 
PRAKASH VIJAYAN NEW CV 2015
PRAKASH VIJAYAN NEW CV 2015PRAKASH VIJAYAN NEW CV 2015
PRAKASH VIJAYAN NEW CV 2015
 
arun megarme
arun megarmearun megarme
arun megarme
 
Praneshkumar QC Supervisor
Praneshkumar QC SupervisorPraneshkumar QC Supervisor
Praneshkumar QC Supervisor
 
Mechanical Projects.pptx
Mechanical Projects.pptxMechanical Projects.pptx
Mechanical Projects.pptx
 
SHAMSHAD QAQC RESUME
SHAMSHAD QAQC RESUMESHAMSHAD QAQC RESUME
SHAMSHAD QAQC RESUME
 
ANAND CV
ANAND CVANAND CV
ANAND CV
 
K PRAJIN RESUME - 2015
K PRAJIN  RESUME - 2015K PRAJIN  RESUME - 2015
K PRAJIN RESUME - 2015
 
ars resume
ars resumears resume
ars resume
 
CV
CVCV
CV
 
SANPPT
SANPPTSANPPT
SANPPT
 
Muhammed Riswan-QC rev1
Muhammed Riswan-QC rev1Muhammed Riswan-QC rev1
Muhammed Riswan-QC rev1
 
Qc
QcQc
Qc
 

More from kaladharan pillai

More from kaladharan pillai (7)

The uk construction industry
The uk construction industryThe uk construction industry
The uk construction industry
 
Tendeing
TendeingTendeing
Tendeing
 
Finial accont
Finial accontFinial accont
Finial accont
 
Contract stu1
Contract stu1Contract stu1
Contract stu1
 
Radiography introduction
Radiography introductionRadiography introduction
Radiography introduction
 
Magnetic particle test
Magnetic particle testMagnetic particle test
Magnetic particle test
 
Radiography ndt
Radiography ndtRadiography ndt
Radiography ndt
 

Recently uploaded

Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024The Digital Insurer
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsRoshan Dwivedi
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 

Recently uploaded (20)

Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 

Qaqc in civil construction

  • 1. QUALITY DEFINITION: Quality control (QC): The operational techniques or a system of maintaining standards by reviewing, checking, inspecting and testing. Quality Assurance (QA): The planned and systematic actions and implementations necessary to provide adequate confidence that the work will satisfy quality requirements
  • 2. • Quality System (QS): A set of documented processes, which seek to provide satisfaction that the project outputs will fulfill all the requirements for which it is being planned. The Quality System should fully incorporate the organization, human resources, materials, equipments, processes, inspections, testing and other parameters of the project. A key element of QS is the QA/QC Manual
  • 3. • Quality Surveillance • : This normally covers two aspects. • At the project level, a review is required to ensure that the quality practices are implemented and documented to ensure in relation to the quality system. • At the contract package level, inspection and testing is required to ensure that the works executed meet the required quality standards.
  • 4. QA/QC MANUAL This QA/QC Manual focuses on the implementation activities of the project following contract award, primarily on supervision and quality control of construction works It will provide a base outline towards, procedure, responsibilities, compliance acceptance criteria and documentation for carrying out inspection, testing and reporting on various materials, The QA/QC Manual for the Construction activity does not attempt to suggest technical specifications, since these are stated in the contract documents
  • 5. • Key Parameters Of Quality Assurance • Site documents • Mandatory and optional testing • Availability of field and departmental laboratories • Manufacturing test certificates • Departmental team inspections • Checklist guide for works • Site inspections • Post quality testing of finished works • Quality certification • Monthly reporting and review meetings
  • 6. • HEALTH SAFETY & ENVIRONMENT • Display of Notices • Warning tape, lighting arrangement at location of any excavated trench, electrical installation or mechanical erection. • Fire Prevention and Protection • Environment & Health • House Keeping • Lighting • Monsoon Precaution • Noise and Vibration • Personnel protective equipment (PPE) for field staff
  • 7. • Designs/Drawings for contract • Maintain design / drawing register at site • Use only approved drawings for construction • • Test laboratory and equipment • Intimate the details, date of completion with requisite manufacturers’ and calibration certificates of equipments. • Maintain the equipments in good condition and calibrate as necessary • • Material receipts Materials testing • Enter receipts in material register • Materials to be tested only in approved laboratories • Prepare concrete mix proportions as per volume as required by contract and submit test results • Take test samples in presence of QCwhen requested • Perform material tests • Submit test reports to QCwith monthly reports
  • 8. • Rejected materials • Entries to be made in material register at site • Tag and record all rejected materials • Intimate QCin writing the proposed date of removal of material from site and confirm after removal • • Material consumption • Enter daily consumption of materials in material register and indicate balance quantity • • Construction equipment • Intimate ownerthe details, date of mobilization along with requisite insurance certificate • Maintain equipments in good working condition • Intimate breakdown of construction equipments •
  • 9. Construction • • Intimate owner in writing when construction is going to commence and what activities are proposed to be undertaken • Intimate owner in advance when critical works, such as concreting, embankment, paving, pipeline laying and jointing, testing, etc., would be undertaken, along with the test certificates of the materials proposed to be used in these works. No critical activity shall start unless the material is tested. Certificates are verified and approved by the Engineer. • Concreting to take place only after pour card is signed. • To provide any other necessary QA/QC requirement. •
  • 10. • Daily work progress • To maintain in daily log. • • Testing of works in progress • Perform tests as per contract requirements. • Submit test reports to QC • Maintain test log during the execution of works. •
  • 11. • Rejected work items • Intimate GPWSC/DWSS in writing the proposed date of removal from site and confirm after removal. • Rectify defective work and invite QC for re- inspection. • • Instructions from Engineer • Enter change orders, site instructions, letter and minutes of meetings issued by the Engineer and Consultants in the Instruction Log. •
  • 12. • Inspection of Engineer • Take instructions in Site Order Book. • Intimate QCof compliance. • • Progress scheduling and control • Prepare and maintain project schedules and undertake work in accordance with approved schedule. • • Reporting • Prepare and submit Monthly Progress Reports and other reports as per contractual requirements. • •
  • 13. • Records Maintain the following records on Site/Contractor’s Office/Laboratory as given in Annexure C. • Site Order book • Material Register • Daily Progress Report. • Concrete pour Register • Test Record • Design &Drawing Record • Non conforming item record • Cube test record • • Workmanship All the work executed against the contract shall be of good workmanship. • Disposal Of Debris All the Debris should be disposed of properly after completion of construction work.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 20. Sample Register • The register can consist of a ruled book which has columns ruled vertically, headed in sequence from the left to right across both pages as follows: • Col. 1. Sample number • 2. Source • 3. Location • 4. Description (brief only) • 5. Depth • 6. Date taken • 7. Where tested • 8. Remarks/references
  • 21. • Construction Quality Control (CQC) is intended to provide a comprehensive, common and consistent framework for quality control across various contract packages. CQC comprises two main elements of quality control: • Testing • Inspections
  • 22. CQC should be affected at five stages: • Input Materials and Equipment Components • In-process Activities • Stage Completion • Interfacing (of special importance in water and sewerage contract packages) • Final completion • The contractor is responsible for informing EIC giving sufficient notice time so that they can witness the tests.
  • 23.
  • 24.
  • 26.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43. Process chart for concrete with stages of inspection