Introduction to building
The Bechtler Museum, located in downtown Charlotte, North
Carolina, was designed by Swiss architect Mario Botta. Established on the 2nd
of January 2010, Bechtler museum exhibits modern artworks from the mid 20th
century. This 3390 square meter four-story structure has a soaring glass atrium
that extends throughout the museum’s core and diffuses natural light into the
building. The dominant feature of this solid structure is its fourth floor which
extends from the core of the building, cantilevered and supported by the
signature column rising from the open atrium below.
A rigorous, yet elegant simplicity selection has been made by Botta
in the palette of materials used which includes the combination of glass, steel,
black granite, terracotta, polished concrete and wood. Botta had designed
intending for a strong, contemporary structures that layer the colours, texture
and materials for a solid architectural and sculptural power that connects to
the dynamic art inside it.
1
Orthographic drawings
Second Floor Plan
Third Floor Plan
Fourth Floor Plan
A A
First Floor Plan
B
B
2
Front elevation Section A-A
3
1
2
4
5
Section B-B
3
4
1. Skylight
2. Terracotta Cladding
3. Wall
4. Composite Concrete Slab
5. Column with Terracotta
Tile
Load Distributions
The cantilever of the building is
supported by W40 x 362 wide flange
steel beams installed in the roof
structure and fourth floor. Above and
below each walls at the cantilever
there will be a cross beam.
The loads from the top are
transferred downward through the
load transferring walls to the
foundation footings.
The column is an important part of
the structure to support the fourth
floor. It is placed in the middle of the
cantilever and directly under the steel
beams
To transfer the load more effectively.
The longer the span of the cantilever and the further it is from the supporting structure, the larger the load.
The cross bracing tension cables are used to strengthen the structure of the glass atrium especially when
large loads are transferred from the top.
5
Detailing
1. Skylight
The load from the top is distributed to the
wide flange steel girders that spans across
the roof and is transferred to the wall
system.
The coffered design of the skylight is used
to lighten the roof weight while concealing
the large steel beams and mechanical
structures.
Front section of skylight
Side section of skylight
Air conditioning duct
Wide flange
steel girder
Water resistant
roof membrane
Wall
Terracotta tile
cladding
Metal
decking
Parapet
Wall
6
Detailing
2. Terracotta cladding
The custom engineered TerraClad™ used is
composed of fire clays, colored aggregate,
and fluxes that were fired to a specific firing
curve allowing the terracotta to be frost
resistant and high freeze thaw.
Sectional view of the
cladding system
1
2
3
1
Clip with isolator
Installation of cladding system
7
Ship lapped design
The incorporation of ship lapped open joint design of the
panel had shield the structure from moisture that enter the
ventilated cavity. Gaskets and isolators of the rain screen
provide a snug fit between panels and the framing system
to prevent wind induced rattle and allow for movement of
the aluminum framing due to thermal expansion.
2
3
8
Detailing
3. Wall
Gypsum Board
Insulation
Plaster
Plywood
The drywalls of the Bechtler Museum allow
for equal load transfers as the walls are more
stable. The insulation also maintains the
temperature in the interior due to the four
seasons experienced in North Carolina. The
gypsum board on the drywall is also fire-
proof and acoustically beneficial causing it to
be a preferable building material.
9
Construction detail of
Drywall
Terracotta
Cladding
Waterproof
Membrane
Metal Stud
Granite Flooring
Concrete
Wide flange steel
girder
C-Channel
4. Composite Concrete Slab
Metal Decking
The composite concrete wall slab acts as a support
for Bechtler museum. It works by increasing the load
capacity of flooring system. The concrete slab
together with in-situ infill in conjunction with welded
shear studs onto I-beam to enable the slabs and the
steel beams to act compositely.
Construction detail of
composite floor system
10
Detailing
Wide flange steel girders are set up to
form the structure of the cantilever. Then
metal decking are fixed to the steel beams
using shear studs. The edge of the metal
decking was folded up to prevent the
poured concrete from flowing out. A layer
of black granite and insulation is used as
the floor finishes.
For the exterior wall, steel studs used as
terracotta tile tracks system are fixed onto
the c-channel.
Detailing
5. Column with terracotta tile cladding
(Pic) The column was first assembled for
visual inspection prior to its disassembly
and transportation to site.
The sculptural column rising up 3 story
(47 feet tall) was constructed with the use
of hot dipped galvanized attachments in
place of stainless steel fasteners onto the
concrete column.
The column is made of concrete with
specified 28-days compressive strength
of 12,000 psi. The reason concrete is
used because it could support larger load
with a slender frame compared to other
materials.
Corrugated Decking
Crossbeam
Flange Girder
Flange Steel
Terra-cotta Pavers
Concrete Floor Slab Aluminum Cladding
Convex Steel Frame
Aluminum Cladding
Column connects with
Steel Anchor Bolts
Terra-cotta Ceiling
Cladding
11
Before applying the cement to the decking, concrete
ratio experiments had been done to find out the most
suitable ratio for the concrete flooring. First trials of
concrete mixing used no sands as the binding agent,
the ratio of cement to water is 2: 1.
After mixing it, the mixture
was left for several hours
under the sun to let it dry.
The final product of the cement
was smooth and powdery. It was
easily crack as it did not has
aggregates such as sand to hold
the concrete mixture.
Corrugated paper was used as metal decking as it
has corrugated surface similar to the metal
decking. Smooth sand was added into the
concrete mixture. The ratio of cement to sand to
water is 2: 1.5: 1.
As the result, the mixture did not go under the wire mesh as the sand
particles are not small enough to pass through the wire mesh. The
corrugated paper was not suitable as metal decking as it absorbs the
water of the concrete mixture.
Modelling process Composite concrete flooring
12
Corrugated paper had been replaced with
plastic board. Plastic board is more suitable
than corrugated paper as it is light and
waterproof. It had been cut into metal
decking shape and sprayed for metallic
surface purpose.
The sand mixture was filtered by using
wire mesh to enable smoother surface
for the final product compared to
previous batches of concrete mixtures.
The ratio of cement to sand to water is
2: 1: 0.5.
During the process of drying,
many bubbles appeared on the
surface of concrete as the
narrow gap between the metal
decking was not completely
filled in with concrete. As the
result, the concrete cracked on
the next day.
The ratio of cement to sand to
water is adjusted to 5: 1.5.
Wood shreds were added into
the concrete mixture to reduce
the possibility of cracking of
concrete.
Composite concrete flooring
13
Metal Decking Process
Balsa wood is used as the material for I-beam
under the metal decking. This is because balsa
wood is available in different type of thickness. It
is also a light material hence the floor system will
not be too heavy as the cantilever section is only
supported by one column.
After aligning, both structural system is ready to be glued. Each
connections of the structural systems was connected using hot
glue gun to increase the durability and strength of the structures.
Plastic model pipes are
used as c-channels as it
is light and available in
different sizes. Cutting
mat was used to make
sure all the c-channels
are aligned.
The floor system with materials representing
the black granite, concrete with metal
decking, steel girders, c-channels and metal
studs.
Composite concrete flooring
14
Column making
A white modelling board I-beam was
added in the center of the column
acting as the load structural system
and to also hold the concrete
together.
First trial of the concrete column
without an I-beam in the middle. The
column was made by filling up the
straw mold. It broke off into pieces.
First trial of the frame for the
terracotta tiles of the column.
Soldering tool and alloy were used to
combine the alloy rings. The alloy
could not combine properly and it
took too much time.
Hot glue gun was used instead for
the joint of the frames. A protractor
was used to determine the position of
the vertical frames on the rings.
Load bearing column
After completion of the internal
framing, excess glue stains were
removed with nail polish remover. It
was then sprayed with gray paint.
The column was then inserted into
the alloy frame and column specific
terracotta cladding were attached
onto frame.
15
Grey board was used as a
substitute for the Terracotta
cladding. This is due to the texture
and thickness. Different colours
and paint to water ratio were
tested on the board.
The grey board was cut upon the
surface, the measurements were
scaled from the length and width
to simulate the gaps between
alternating cladding.
A separate set of grey board was cut
into individual pieces to be used as the
ship-lapped design of the panels.
The grey boards was then
painted with brown with a slight
addition of peach in order to
match the colour of the original
cladding.
An issue faced during the cutting of
the cladding is that the pieces tend
to come loose, or break completely
mainly because each cladding were
cut individually and the minute scale
of the cladding.
Due to the cutting of the coloured grey board
into individual strips of cladding, the grey board
was repainted . This caused excess water
from the paint to be absorbed by the board
making the strips flimsy during the assembly
and completion of the cladding.
Terracotta cladding
16
Dry wall composed of several
layers; the first exterior layer was
made of a 0.2mm thick balsa wood
to represent ply wood, 0.1mm balsa
wood as gypsum board and wool in
between the two as insulation.
Long plastic sticks matching the
height of the wall are placed in
intervals along the wall as steel
studs
Putty filler was applied onto the 0.1mm
balsa as the internal plastering and was
smoothened out.
The tile cladding tracks system
made with plastic sticks was
glued onto the external wall.
The terracotta cladding was then
attached to the exterior surface of the
wall.
Dry wall
17
White model making board was
used for the flat surface whereas
the curved surface of the skylight
uses white card as it is more
flexible.
Plastic sheets were curved and
attached onto the gaps of the
upper surface of the skylight.
A difficulty faced during
construction of the curved surface
was the accurate gradient of the
curve causing numerous attempts
of different measurements in
order to achieve the proper
curvature.
The plastic sheets were then
engraved with vertical lines to
allow bending of the sheets.
Due to the fact that the skylight spans horizontally over the whole model with
minimal support from the wall, the weight distribution of the roof and skylight
were an initial problem. It was then solved with the addition of I-beams made
from mounting boards inserted in between the skylight to act as support.
Skylight
18
After this project, we realized appropriate construction method is important to avoid uneven load distribution and
cause structural failure of the building. The materials used should be considerate and tested first before applying
it in final model. In this case, concrete is hard to handle as it may crack easily due to the improper mixture.
During the modelling phase, parts that are made separately required thorough planning to ensure premade parts
are able to connect to one another accurately. This applies to real life construction too as precast parts must be
precise to avoid problems.
In addition, the progress of the model and report should be simultaneous. The materials and model should be
kept properly to avoid loss or damage as this is also a common issue on actual construction sites. As such, our
group should work systematically and on time to meet the deadline requirements.
19
Conclusion & Final Model
Architecture Week, (2010). Bechtler Museum. [image] Available at: http://www.architectureweek.com/2010/0407/design_4-3.html [Accessed
14 Jun. 2014].
Architecture Week, (2010). Bechtler Museum by Botta. [image] Available at: http://www.architectureweek.com/2010/0217/design_1-2.html
[Accessed 13 Jun. 2014].
ArchwebDWG, (2014). Bechtler Museum of Modern Art. [image] Available at:
http://www.archweb.it/dwg/arch_arredi_famosi/mario_botta/Bechtler_Museum/Bechtler_museum_dwg.htm [Accessed 10 Jun. 2014].
Bechtler Museum of Modern Art. (n.d.). 1st ed. [ebook] Available at: http://www.kingguinn.com/libraries/portfolio/publications/317.pdf
[Accessed 13 Jun. 2014].
Boston Valley Terra Cotta. (2014). 1st ed. [ebook] Institute. Available at:
http://www.swrionline.org/UserFiles/File/Fall09/Project%20Showcase%20Presentations/Architectural%20Terra%20Cotta%20Ventilated%20
Ceramic%20Screen%20Wall%20Systems%20by%20Sheri%20Carter.pdf [Accessed 14 Jun. 2014].
Innovative Manufacturing in Architectural Ceramics. (n.d.). 1st ed. [ebook] New York: Boston Valley. Available at: http://www.triton-
ca.com/pdf_files/BV_TerraClad%20Design%20Guide.pdf [Accessed 13 Jun. 2014].
Steelconstruction.info, (2014). Acoustic performance of floors. [online] Available at:
http://www.steelconstruction.info/Acoustic_performance_of_floors [Accessed 15 Jun. 2014].
Worldarchitecturemap.org, (2014). WAM | Bechtler Museum of Modern Art | Charlotte. [online] Available at:
http://www.worldarchitecturemap.org/buildings/bechtler-museum-of-modern-art [Accessed 15 Jun. 2014].
Reference
20

More Related Content

What's hot

Rehabilation and retrofitting of structure
Rehabilation and retrofitting of structure   Rehabilation and retrofitting of structure
Rehabilation and retrofitting of structure harminderkaur35
 
B tech project 2
B tech project 2B tech project 2
B tech project 2Pei Di
 
Ceramic Presentation of Building Materials
Ceramic Presentation of Building MaterialsCeramic Presentation of Building Materials
Ceramic Presentation of Building MaterialsI'mMiss Lily
 
vacation work report 2
vacation work report 2vacation work report 2
vacation work report 2Deepayan Mazumder
 
Repair and strengthening of concrete structures
Repair and strengthening of concrete structuresRepair and strengthening of concrete structures
Repair and strengthening of concrete structuresAbdallah Shaheen
 
WHEN FIELD PERFORMANCE OF MASONRY DOES NOT CORRELATE WITH LAB TEST RESULTS
WHEN FIELD PERFORMANCE OF MASONRY DOES NOT CORRELATE WITH LAB TEST RESULTSWHEN FIELD PERFORMANCE OF MASONRY DOES NOT CORRELATE WITH LAB TEST RESULTS
WHEN FIELD PERFORMANCE OF MASONRY DOES NOT CORRELATE WITH LAB TEST RESULTSPeter Meijer Architect, PC
 
Unit 5 maintenance and repair methods for rcc mrs
Unit 5 maintenance and repair methods for rcc mrsUnit 5 maintenance and repair methods for rcc mrs
Unit 5 maintenance and repair methods for rcc mrsAbhay Abhale
 
Defects in buildings & remedies
Defects in buildings & remediesDefects in buildings & remedies
Defects in buildings & remediesSOUMYA KHANDELWAL
 
Specifications for rcc
Specifications for rcc Specifications for rcc
Specifications for rcc Prabhat chhirolya
 
Defects in construction
Defects in constructionDefects in construction
Defects in constructionShivangi Saini
 
Detailing : Exterior Wall Assemblies
Detailing : Exterior Wall AssembliesDetailing : Exterior Wall Assemblies
Detailing : Exterior Wall AssembliesTodd Wyatt
 
Defects and remedies of building
Defects and remedies of buildingDefects and remedies of building
Defects and remedies of buildingtoshi gupta
 
Rc ccracks_repair(rev) 93
 Rc ccracks_repair(rev) 93 Rc ccracks_repair(rev) 93
Rc ccracks_repair(rev) 93NikHil NicK's
 
Building Construction
Building ConstructionBuilding Construction
Building ConstructionJuhi Shah
 

What's hot (18)

Tiles
TilesTiles
Tiles
 
product seminar
product seminarproduct seminar
product seminar
 
Rehabilation and retrofitting of structure
Rehabilation and retrofitting of structure   Rehabilation and retrofitting of structure
Rehabilation and retrofitting of structure
 
B tech project 2
B tech project 2B tech project 2
B tech project 2
 
Ceramic Presentation of Building Materials
Ceramic Presentation of Building MaterialsCeramic Presentation of Building Materials
Ceramic Presentation of Building Materials
 
vacation work report 2
vacation work report 2vacation work report 2
vacation work report 2
 
Repair and strengthening of concrete structures
Repair and strengthening of concrete structuresRepair and strengthening of concrete structures
Repair and strengthening of concrete structures
 
WHEN FIELD PERFORMANCE OF MASONRY DOES NOT CORRELATE WITH LAB TEST RESULTS
WHEN FIELD PERFORMANCE OF MASONRY DOES NOT CORRELATE WITH LAB TEST RESULTSWHEN FIELD PERFORMANCE OF MASONRY DOES NOT CORRELATE WITH LAB TEST RESULTS
WHEN FIELD PERFORMANCE OF MASONRY DOES NOT CORRELATE WITH LAB TEST RESULTS
 
Unit 5 maintenance and repair methods for rcc mrs
Unit 5 maintenance and repair methods for rcc mrsUnit 5 maintenance and repair methods for rcc mrs
Unit 5 maintenance and repair methods for rcc mrs
 
Defects in buildings & remedies
Defects in buildings & remediesDefects in buildings & remedies
Defects in buildings & remedies
 
Specifications for rcc
Specifications for rcc Specifications for rcc
Specifications for rcc
 
Defects in construction
Defects in constructionDefects in construction
Defects in construction
 
Glass panel design for skyscrapers glass facade
Glass panel design for skyscrapers glass facadeGlass panel design for skyscrapers glass facade
Glass panel design for skyscrapers glass facade
 
Detailing : Exterior Wall Assemblies
Detailing : Exterior Wall AssembliesDetailing : Exterior Wall Assemblies
Detailing : Exterior Wall Assemblies
 
Defects and remedies of building
Defects and remedies of buildingDefects and remedies of building
Defects and remedies of building
 
CONCRETE
CONCRETE CONCRETE
CONCRETE
 
Rc ccracks_repair(rev) 93
 Rc ccracks_repair(rev) 93 Rc ccracks_repair(rev) 93
Rc ccracks_repair(rev) 93
 
Building Construction
Building ConstructionBuilding Construction
Building Construction
 

Viewers also liked

Nanyang report
Nanyang reportNanyang report
Nanyang reportElaine Bong
 
Finalbtech 1
Finalbtech 1Finalbtech 1
Finalbtech 1Elaine Bong
 
bscience Board
bscience Boardbscience Board
bscience BoardElaine Bong
 
Green Roofed University Building
Green Roofed University BuildingGreen Roofed University Building
Green Roofed University Buildingarqperezarriola
 
Building Science 1: Project 1 Nanyang
Building Science 1: Project 1 Nanyang Building Science 1: Project 1 Nanyang
Building Science 1: Project 1 Nanyang hiewyennee
 
Nanyang Technological University School of Art Design and Media Building Scie...
Nanyang Technological University School of Art Design and Media Building Scie...Nanyang Technological University School of Art Design and Media Building Scie...
Nanyang Technological University School of Art Design and Media Building Scie...Adila Zaas
 

Viewers also liked (8)

Nanyang report
Nanyang reportNanyang report
Nanyang report
 
Finalbtech 1
Finalbtech 1Finalbtech 1
Finalbtech 1
 
bscience Board
bscience Boardbscience Board
bscience Board
 
restaurant development + design: green building strategies
restaurant development + design: green building strategies restaurant development + design: green building strategies
restaurant development + design: green building strategies
 
green building ppt
green building pptgreen building ppt
green building ppt
 
Green Roofed University Building
Green Roofed University BuildingGreen Roofed University Building
Green Roofed University Building
 
Building Science 1: Project 1 Nanyang
Building Science 1: Project 1 Nanyang Building Science 1: Project 1 Nanyang
Building Science 1: Project 1 Nanyang
 
Nanyang Technological University School of Art Design and Media Building Scie...
Nanyang Technological University School of Art Design and Media Building Scie...Nanyang Technological University School of Art Design and Media Building Scie...
Nanyang Technological University School of Art Design and Media Building Scie...
 

Similar to Bechtlerconstruction2 140718020052-phpapp02

Building Materials- Concrete.pdf
Building Materials- Concrete.pdfBuilding Materials- Concrete.pdf
Building Materials- Concrete.pdfshahriararch
 
Finishingworks.pptx
Finishingworks.pptxFinishingworks.pptx
Finishingworks.pptxJUBIN ADHIKARI
 
Building Technology Design Solution
Building Technology Design SolutionBuilding Technology Design Solution
Building Technology Design SolutionJia Xin Chee
 
Post Mortem Design Report (featuring Building Structures)
Post Mortem Design Report (featuring Building Structures)Post Mortem Design Report (featuring Building Structures)
Post Mortem Design Report (featuring Building Structures)Carmen Chan
 
Ch 10 Fire-Resistive Construction
Ch 10 Fire-Resistive ConstructionCh 10 Fire-Resistive Construction
Ch 10 Fire-Resistive Constructionsnoshoesam
 
Comparison Presentation Between Light Gauge Steel Frame Construction System a...
Comparison Presentation Between Light Gauge Steel Frame Construction System a...Comparison Presentation Between Light Gauge Steel Frame Construction System a...
Comparison Presentation Between Light Gauge Steel Frame Construction System a...Sankar Anand
 
concrete block properties & types
concrete block properties & typesconcrete block properties & types
concrete block properties & typesAli Rizgar
 
Final steel framing system report
Final steel framing system reportFinal steel framing system report
Final steel framing system reportshensin1015
 
ct3 group assignment
ct3 group assignment ct3 group assignment
ct3 group assignment shensin1015
 
Steel framing system report
Steel framing system reportSteel framing system report
Steel framing system reportw ss
 
Case studies for strengthening of existing structures
Case studies for strengthening of existing structuresCase studies for strengthening of existing structures
Case studies for strengthening of existing structuresParamaAthmeka
 
Experimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor SlabExperimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor SlabIRJET Journal
 
Building Materials Manuel Y Nacho 3ÂşA
Building Materials  Manuel Y Nacho 3ÂşABuilding Materials  Manuel Y Nacho 3ÂşA
Building Materials Manuel Y Nacho 3ÂşAManuel
 
Late Shri Sanat Mehta's low cost house at gandhinagar, india
Late Shri Sanat Mehta's low cost house at gandhinagar, indiaLate Shri Sanat Mehta's low cost house at gandhinagar, india
Late Shri Sanat Mehta's low cost house at gandhinagar, indiaShirish Avrani
 
Structural elements
Structural elementsStructural elements
Structural elementsvigyanashram
 

Similar to Bechtlerconstruction2 140718020052-phpapp02 (20)

Building Materials- Concrete.pdf
Building Materials- Concrete.pdfBuilding Materials- Concrete.pdf
Building Materials- Concrete.pdf
 
RCC
RCCRCC
RCC
 
Finishingworks.pptx
Finishingworks.pptxFinishingworks.pptx
Finishingworks.pptx
 
Building Technology Design Solution
Building Technology Design SolutionBuilding Technology Design Solution
Building Technology Design Solution
 
Post Mortem Design Report (featuring Building Structures)
Post Mortem Design Report (featuring Building Structures)Post Mortem Design Report (featuring Building Structures)
Post Mortem Design Report (featuring Building Structures)
 
Temporary Works (Form Work)
Temporary Works (Form Work)Temporary Works (Form Work)
Temporary Works (Form Work)
 
Ch 10 Fire-Resistive Construction
Ch 10 Fire-Resistive ConstructionCh 10 Fire-Resistive Construction
Ch 10 Fire-Resistive Construction
 
Comparison Presentation Between Light Gauge Steel Frame Construction System a...
Comparison Presentation Between Light Gauge Steel Frame Construction System a...Comparison Presentation Between Light Gauge Steel Frame Construction System a...
Comparison Presentation Between Light Gauge Steel Frame Construction System a...
 
concrete block properties & types
concrete block properties & typesconcrete block properties & types
concrete block properties & types
 
Final steel framing system report
Final steel framing system reportFinal steel framing system report
Final steel framing system report
 
ct3 group assignment
ct3 group assignment ct3 group assignment
ct3 group assignment
 
Steel framing system report
Steel framing system reportSteel framing system report
Steel framing system report
 
Case studies for strengthening of existing structures
Case studies for strengthening of existing structuresCase studies for strengthening of existing structures
Case studies for strengthening of existing structures
 
Experimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor SlabExperimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor Slab
 
Building Materials Manuel Y Nacho 3ÂşA
Building Materials  Manuel Y Nacho 3ÂşABuilding Materials  Manuel Y Nacho 3ÂşA
Building Materials Manuel Y Nacho 3ÂşA
 
assignment two civil
assignment two civilassignment two civil
assignment two civil
 
RCC Floor
RCC FloorRCC Floor
RCC Floor
 
Late Shri Sanat Mehta's low cost house at gandhinagar, india
Late Shri Sanat Mehta's low cost house at gandhinagar, indiaLate Shri Sanat Mehta's low cost house at gandhinagar, india
Late Shri Sanat Mehta's low cost house at gandhinagar, india
 
Structural elements
Structural elementsStructural elements
Structural elements
 
the house
 the house the house
the house
 

More from Elaine Bong

Merged document
Merged documentMerged document
Merged documentElaine Bong
 
B science project 2
B science project 2B science project 2
B science project 2Elaine Bong
 
A2 final boards
A2 final boardsA2 final boards
A2 final boardsElaine Bong
 
B.science report 1.2
B.science report 1.2B.science report 1.2
B.science report 1.2Elaine Bong
 
Synopsis 3
Synopsis 3Synopsis 3
Synopsis 3Elaine Bong
 
Towards a new architecture
Towards a new architectureTowards a new architecture
Towards a new architectureElaine Bong
 
Synopsis 4
Synopsis 4Synopsis 4
Synopsis 4Elaine Bong
 
Preschool proposal
Preschool proposalPreschool proposal
Preschool proposalElaine Bong
 
Contradictory levels the double functioning element final
Contradictory levels the double functioning element finalContradictory levels the double functioning element final
Contradictory levels the double functioning element finalElaine Bong
 
Elaine bong 0310432 (complexity and contradiction in architecture)
Elaine bong 0310432 (complexity and contradiction in architecture)Elaine bong 0310432 (complexity and contradiction in architecture)
Elaine bong 0310432 (complexity and contradiction in architecture)Elaine Bong
 
3 theories complexity and contradiction in architecture
3 theories complexity and contradiction in architecture3 theories complexity and contradiction in architecture
3 theories complexity and contradiction in architectureElaine Bong
 
Structure report
Structure reportStructure report
Structure reportElaine Bong
 
Bridge report
Bridge reportBridge report
Bridge reportElaine Bong
 
Building service board
Building service boardBuilding service board
Building service boardElaine Bong
 
Bservices report
Bservices reportBservices report
Bservices reportElaine Bong
 
Completed aa photobook 2.0
Completed aa photobook 2.0Completed aa photobook 2.0
Completed aa photobook 2.0Elaine Bong
 
Aa case study project 1 (elaine bong 0310432)
Aa case study project 1 (elaine bong 0310432)Aa case study project 1 (elaine bong 0310432)
Aa case study project 1 (elaine bong 0310432)Elaine Bong
 
Gtower report
Gtower reportGtower report
Gtower reportElaine Bong
 

More from Elaine Bong (20)

Merged document
Merged documentMerged document
Merged document
 
B science project 2
B science project 2B science project 2
B science project 2
 
A2 final boards
A2 final boardsA2 final boards
A2 final boards
 
B.science report 1.2
B.science report 1.2B.science report 1.2
B.science report 1.2
 
precedent
precedentprecedent
precedent
 
Both (1)
Both (1)Both (1)
Both (1)
 
Synopsis 3
Synopsis 3Synopsis 3
Synopsis 3
 
Towards a new architecture
Towards a new architectureTowards a new architecture
Towards a new architecture
 
Synopsis 4
Synopsis 4Synopsis 4
Synopsis 4
 
Preschool proposal
Preschool proposalPreschool proposal
Preschool proposal
 
Contradictory levels the double functioning element final
Contradictory levels the double functioning element finalContradictory levels the double functioning element final
Contradictory levels the double functioning element final
 
Elaine bong 0310432 (complexity and contradiction in architecture)
Elaine bong 0310432 (complexity and contradiction in architecture)Elaine bong 0310432 (complexity and contradiction in architecture)
Elaine bong 0310432 (complexity and contradiction in architecture)
 
3 theories complexity and contradiction in architecture
3 theories complexity and contradiction in architecture3 theories complexity and contradiction in architecture
3 theories complexity and contradiction in architecture
 
Structure report
Structure reportStructure report
Structure report
 
Bridge report
Bridge reportBridge report
Bridge report
 
Building service board
Building service boardBuilding service board
Building service board
 
Bservices report
Bservices reportBservices report
Bservices report
 
Completed aa photobook 2.0
Completed aa photobook 2.0Completed aa photobook 2.0
Completed aa photobook 2.0
 
Aa case study project 1 (elaine bong 0310432)
Aa case study project 1 (elaine bong 0310432)Aa case study project 1 (elaine bong 0310432)
Aa case study project 1 (elaine bong 0310432)
 
Gtower report
Gtower reportGtower report
Gtower report
 

Recently uploaded

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 

Recently uploaded (20)

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 

Bechtlerconstruction2 140718020052-phpapp02

  • 1. Introduction to building The Bechtler Museum, located in downtown Charlotte, North Carolina, was designed by Swiss architect Mario Botta. Established on the 2nd of January 2010, Bechtler museum exhibits modern artworks from the mid 20th century. This 3390 square meter four-story structure has a soaring glass atrium that extends throughout the museum’s core and diffuses natural light into the building. The dominant feature of this solid structure is its fourth floor which extends from the core of the building, cantilevered and supported by the signature column rising from the open atrium below. A rigorous, yet elegant simplicity selection has been made by Botta in the palette of materials used which includes the combination of glass, steel, black granite, terracotta, polished concrete and wood. Botta had designed intending for a strong, contemporary structures that layer the colours, texture and materials for a solid architectural and sculptural power that connects to the dynamic art inside it. 1
  • 2. Orthographic drawings Second Floor Plan Third Floor Plan Fourth Floor Plan A A First Floor Plan B B 2
  • 4. 1 2 4 5 Section B-B 3 4 1. Skylight 2. Terracotta Cladding 3. Wall 4. Composite Concrete Slab 5. Column with Terracotta Tile
  • 5. Load Distributions The cantilever of the building is supported by W40 x 362 wide flange steel beams installed in the roof structure and fourth floor. Above and below each walls at the cantilever there will be a cross beam. The loads from the top are transferred downward through the load transferring walls to the foundation footings. The column is an important part of the structure to support the fourth floor. It is placed in the middle of the cantilever and directly under the steel beams To transfer the load more effectively. The longer the span of the cantilever and the further it is from the supporting structure, the larger the load. The cross bracing tension cables are used to strengthen the structure of the glass atrium especially when large loads are transferred from the top. 5
  • 6. Detailing 1. Skylight The load from the top is distributed to the wide flange steel girders that spans across the roof and is transferred to the wall system. The coffered design of the skylight is used to lighten the roof weight while concealing the large steel beams and mechanical structures. Front section of skylight Side section of skylight Air conditioning duct Wide flange steel girder Water resistant roof membrane Wall Terracotta tile cladding Metal decking Parapet Wall 6
  • 7. Detailing 2. Terracotta cladding The custom engineered TerraClad™ used is composed of fire clays, colored aggregate, and fluxes that were fired to a specific firing curve allowing the terracotta to be frost resistant and high freeze thaw. Sectional view of the cladding system 1 2 3 1 Clip with isolator Installation of cladding system 7
  • 8. Ship lapped design The incorporation of ship lapped open joint design of the panel had shield the structure from moisture that enter the ventilated cavity. Gaskets and isolators of the rain screen provide a snug fit between panels and the framing system to prevent wind induced rattle and allow for movement of the aluminum framing due to thermal expansion. 2 3 8
  • 9. Detailing 3. Wall Gypsum Board Insulation Plaster Plywood The drywalls of the Bechtler Museum allow for equal load transfers as the walls are more stable. The insulation also maintains the temperature in the interior due to the four seasons experienced in North Carolina. The gypsum board on the drywall is also fire- proof and acoustically beneficial causing it to be a preferable building material. 9 Construction detail of Drywall Terracotta Cladding Waterproof Membrane Metal Stud
  • 10. Granite Flooring Concrete Wide flange steel girder C-Channel 4. Composite Concrete Slab Metal Decking The composite concrete wall slab acts as a support for Bechtler museum. It works by increasing the load capacity of flooring system. The concrete slab together with in-situ infill in conjunction with welded shear studs onto I-beam to enable the slabs and the steel beams to act compositely. Construction detail of composite floor system 10 Detailing Wide flange steel girders are set up to form the structure of the cantilever. Then metal decking are fixed to the steel beams using shear studs. The edge of the metal decking was folded up to prevent the poured concrete from flowing out. A layer of black granite and insulation is used as the floor finishes. For the exterior wall, steel studs used as terracotta tile tracks system are fixed onto the c-channel.
  • 11. Detailing 5. Column with terracotta tile cladding (Pic) The column was first assembled for visual inspection prior to its disassembly and transportation to site. The sculptural column rising up 3 story (47 feet tall) was constructed with the use of hot dipped galvanized attachments in place of stainless steel fasteners onto the concrete column. The column is made of concrete with specified 28-days compressive strength of 12,000 psi. The reason concrete is used because it could support larger load with a slender frame compared to other materials. Corrugated Decking Crossbeam Flange Girder Flange Steel Terra-cotta Pavers Concrete Floor Slab Aluminum Cladding Convex Steel Frame Aluminum Cladding Column connects with Steel Anchor Bolts Terra-cotta Ceiling Cladding 11
  • 12. Before applying the cement to the decking, concrete ratio experiments had been done to find out the most suitable ratio for the concrete flooring. First trials of concrete mixing used no sands as the binding agent, the ratio of cement to water is 2: 1. After mixing it, the mixture was left for several hours under the sun to let it dry. The final product of the cement was smooth and powdery. It was easily crack as it did not has aggregates such as sand to hold the concrete mixture. Corrugated paper was used as metal decking as it has corrugated surface similar to the metal decking. Smooth sand was added into the concrete mixture. The ratio of cement to sand to water is 2: 1.5: 1. As the result, the mixture did not go under the wire mesh as the sand particles are not small enough to pass through the wire mesh. The corrugated paper was not suitable as metal decking as it absorbs the water of the concrete mixture. Modelling process Composite concrete flooring 12
  • 13. Corrugated paper had been replaced with plastic board. Plastic board is more suitable than corrugated paper as it is light and waterproof. It had been cut into metal decking shape and sprayed for metallic surface purpose. The sand mixture was filtered by using wire mesh to enable smoother surface for the final product compared to previous batches of concrete mixtures. The ratio of cement to sand to water is 2: 1: 0.5. During the process of drying, many bubbles appeared on the surface of concrete as the narrow gap between the metal decking was not completely filled in with concrete. As the result, the concrete cracked on the next day. The ratio of cement to sand to water is adjusted to 5: 1.5. Wood shreds were added into the concrete mixture to reduce the possibility of cracking of concrete. Composite concrete flooring 13
  • 14. Metal Decking Process Balsa wood is used as the material for I-beam under the metal decking. This is because balsa wood is available in different type of thickness. It is also a light material hence the floor system will not be too heavy as the cantilever section is only supported by one column. After aligning, both structural system is ready to be glued. Each connections of the structural systems was connected using hot glue gun to increase the durability and strength of the structures. Plastic model pipes are used as c-channels as it is light and available in different sizes. Cutting mat was used to make sure all the c-channels are aligned. The floor system with materials representing the black granite, concrete with metal decking, steel girders, c-channels and metal studs. Composite concrete flooring 14
  • 15. Column making A white modelling board I-beam was added in the center of the column acting as the load structural system and to also hold the concrete together. First trial of the concrete column without an I-beam in the middle. The column was made by filling up the straw mold. It broke off into pieces. First trial of the frame for the terracotta tiles of the column. Soldering tool and alloy were used to combine the alloy rings. The alloy could not combine properly and it took too much time. Hot glue gun was used instead for the joint of the frames. A protractor was used to determine the position of the vertical frames on the rings. Load bearing column After completion of the internal framing, excess glue stains were removed with nail polish remover. It was then sprayed with gray paint. The column was then inserted into the alloy frame and column specific terracotta cladding were attached onto frame. 15
  • 16. Grey board was used as a substitute for the Terracotta cladding. This is due to the texture and thickness. Different colours and paint to water ratio were tested on the board. The grey board was cut upon the surface, the measurements were scaled from the length and width to simulate the gaps between alternating cladding. A separate set of grey board was cut into individual pieces to be used as the ship-lapped design of the panels. The grey boards was then painted with brown with a slight addition of peach in order to match the colour of the original cladding. An issue faced during the cutting of the cladding is that the pieces tend to come loose, or break completely mainly because each cladding were cut individually and the minute scale of the cladding. Due to the cutting of the coloured grey board into individual strips of cladding, the grey board was repainted . This caused excess water from the paint to be absorbed by the board making the strips flimsy during the assembly and completion of the cladding. Terracotta cladding 16
  • 17. Dry wall composed of several layers; the first exterior layer was made of a 0.2mm thick balsa wood to represent ply wood, 0.1mm balsa wood as gypsum board and wool in between the two as insulation. Long plastic sticks matching the height of the wall are placed in intervals along the wall as steel studs Putty filler was applied onto the 0.1mm balsa as the internal plastering and was smoothened out. The tile cladding tracks system made with plastic sticks was glued onto the external wall. The terracotta cladding was then attached to the exterior surface of the wall. Dry wall 17
  • 18. White model making board was used for the flat surface whereas the curved surface of the skylight uses white card as it is more flexible. Plastic sheets were curved and attached onto the gaps of the upper surface of the skylight. A difficulty faced during construction of the curved surface was the accurate gradient of the curve causing numerous attempts of different measurements in order to achieve the proper curvature. The plastic sheets were then engraved with vertical lines to allow bending of the sheets. Due to the fact that the skylight spans horizontally over the whole model with minimal support from the wall, the weight distribution of the roof and skylight were an initial problem. It was then solved with the addition of I-beams made from mounting boards inserted in between the skylight to act as support. Skylight 18
  • 19. After this project, we realized appropriate construction method is important to avoid uneven load distribution and cause structural failure of the building. The materials used should be considerate and tested first before applying it in final model. In this case, concrete is hard to handle as it may crack easily due to the improper mixture. During the modelling phase, parts that are made separately required thorough planning to ensure premade parts are able to connect to one another accurately. This applies to real life construction too as precast parts must be precise to avoid problems. In addition, the progress of the model and report should be simultaneous. The materials and model should be kept properly to avoid loss or damage as this is also a common issue on actual construction sites. As such, our group should work systematically and on time to meet the deadline requirements. 19 Conclusion & Final Model
  • 20. Architecture Week, (2010). Bechtler Museum. [image] Available at: http://www.architectureweek.com/2010/0407/design_4-3.html [Accessed 14 Jun. 2014]. Architecture Week, (2010). Bechtler Museum by Botta. [image] Available at: http://www.architectureweek.com/2010/0217/design_1-2.html [Accessed 13 Jun. 2014]. ArchwebDWG, (2014). Bechtler Museum of Modern Art. [image] Available at: http://www.archweb.it/dwg/arch_arredi_famosi/mario_botta/Bechtler_Museum/Bechtler_museum_dwg.htm [Accessed 10 Jun. 2014]. Bechtler Museum of Modern Art. (n.d.). 1st ed. [ebook] Available at: http://www.kingguinn.com/libraries/portfolio/publications/317.pdf [Accessed 13 Jun. 2014]. Boston Valley Terra Cotta. (2014). 1st ed. [ebook] Institute. Available at: http://www.swrionline.org/UserFiles/File/Fall09/Project%20Showcase%20Presentations/Architectural%20Terra%20Cotta%20Ventilated%20 Ceramic%20Screen%20Wall%20Systems%20by%20Sheri%20Carter.pdf [Accessed 14 Jun. 2014]. Innovative Manufacturing in Architectural Ceramics. (n.d.). 1st ed. [ebook] New York: Boston Valley. Available at: http://www.triton- ca.com/pdf_files/BV_TerraClad%20Design%20Guide.pdf [Accessed 13 Jun. 2014]. Steelconstruction.info, (2014). Acoustic performance of floors. [online] Available at: http://www.steelconstruction.info/Acoustic_performance_of_floors [Accessed 15 Jun. 2014]. Worldarchitecturemap.org, (2014). WAM | Bechtler Museum of Modern Art | Charlotte. [online] Available at: http://www.worldarchitecturemap.org/buildings/bechtler-museum-of-modern-art [Accessed 15 Jun. 2014]. Reference 20