 Structural strengthening is the process of upgrading structures to improve
performance under existing loads or to increase the strength
of structural members to carry additional loads.
 Two case studies are discussed
1. A case study on the restoration and strengthening of a historic stadium in
china
2. Case studies of strengthening of existing reinforced concrete building in
Mexico city
2
 The Jiangwan Stadium, which is a Municipal Level Cultural Relic Preservation
Site in Shanghai, was built up in 1935.
 The structure members were deteriorating with aging although they were
repaired for several times.
 There are some defects in the structure members, such as:
1. severe carbonation of concrete;
2. corrosion of steel rebar and
3. breakdown of concrete coverage.
 In order to eliminate these defects and make it a safe state of the structure, the
relative solutions are adopted.
3
 Jiangwan Stadium is approximately 28000 square meters in area, and it was the
biggest and most well-found stadium in Far East area when it was built up.
 Jiangwan Stadium comprises three fields:
1. Playing field,
2. Gymnasium and
3. Natatorium.
 The Playing field is the main part of Jiangwan Stadium. A one-kilometer-long annular
stand forms the body of the playing field.
 Natatorium is also a annular architecture, in the middle of which is a 50×20m
swimming pool. The main body of the playing field and the gymnasium are both
reinforced concrete framing structures.
 Gymnasium’s stand is also reinforced concrete framing structure, and it has steel truss
structure as roof system, which is separated from the stand’s concrete framing
structure.
4
5
 In 1930’s, Jiangwan Stadium has suffered from severe derogation by the war.
 Although it was repaired for several times, but the structure members were still
deteriorating with aging and weathering during the last 70 years.
 For the upgrading of existing Jiangwan Stadium and its surrounding sporting
facilities, a plan named Jiangwan sports park was put forward
 Three fields of Jiangwan Stadium were constructed on timber pile-supported
footing, which restricted the non uniform settlement between different sectors
effectively.
 Therefore the settlement of three fields remains stable and incline of structure
member is not severe
 Strength grading of concrete is very low in general. In several concrete members,
Strength grade of concrete is even lower than C15.
 The process of carbonation has developed out of concrete coverage depth in
almost all of beams and columns, which directly led to the accelerative
development of steel rebar’s rusting.
 It seems that concrete carbonation and the side effect caused by it occurred more
popular in the hypaethral stand of the playing field
6
 An inspection of the building itself revealed that there were some steel rebar exposed
in the air with breakdown of concrete coverage
 obvious vertical cracks were investigated in some beams’ side surface
 A conclusion could be drawn that concrete carbonation was the primary cause of
concrete member’s deterioration.
 So carbonation rehabilitation should be regarded as the first step and also the most
important step of the concrete member’s repairing work.
7
 Strength grade of sand mortar in the brick wall is very low.
 Fortunately, the cracks were almost stable according to site observation.
 The filler brick wall hasn’t been connected to the reinforced concrete frame by
tie bars when it was laid.
 It seems possible that the filler wall would collapse if earthquake occurs,
especially for the external wall somewhere which has inclined outwards
slightly.
8
 The structure of Gymnasium’s roof is steel truss of three-hinged arch
 The whole steel truss structure looks fair
 The steel truss structure is still normal in work until now except that few
steel members were deformed by accidental outside force and some
members became corroded slightly.
9
The techniques used were
 Carbonation rehabilitation
 Steel truss repairs
 Surface repairs
 Cracks solution
 Filler wall strengthening
 Reinforced concrete flexural members strengthening
10
Carbonation
rehabilitation
 To prevent development of concrete
carbonation and corrosion of steel
rebar, corrosion inhibitor is
delivered in a liquid form and
spray-applied over the surface of
concrete members that are subject to
corrosion.
 Corrosion inhibitor form a
protective coating over the steel
rebar’s surface, in which steel rebar
is prevent from corrosion and
concrete carbonation is slowed
down
Steel truss repairs
 All corroded steel members were
cleaned by abrasive methods, then
corrosion-proof paint were painted all
over the surface.
 Few steel member which was deformed
severely by accidental outside force
was taken placed by new section.
 Static analysis of steel truss was
carried out and the results showed that
some lower chords of the steel truss
are lack of strength in buckling out
of plane.
 In order to strengthen it, two pieces of
longitudinal bracing truss were
added at the relative segment.
 The longitudinal bracing truss was
connected to upper and lower chord
of steel roof truss with high strength
bolt . 11
Surface repairs
 In the surface area where concrete
coverage breakdown was severe,
unsound concrete were removed
entirely.
 To the corroded steel rebar exposed
in the air, abrasive method was taken
to clean it, and spreader corrosion
inhibitor all over the surface.
 Then high strength mortar was
painted to mend it
Cracks solution
 A static load test was carried out in
the site to find the reason why cracks
occurred in some beam’s side
surface.
 No development tendency of cracks
was found during the test. It can be
implied that the cracks were brought
out by the temperature stress or the
construction joint due to the fact that
waist steel was absent in the beams.
 Therefore the cracks can be considered
stable. Cracks on the surface of
concrete members were sealed by
epoxy resin so that the steel rebar
inside the structure would not
corrode.
 To the cracks which were deep and
wide (>0.3mm), grout-injector method
was adopted and epoxy resin was
poured deeply into the cracks by the
use of grout pipe
12
Filler wall strengthening
 Strengthening method of bar-mat and
cement mortar was applied.
 Cement mortar surface with steel bar-
mat, was about 35mm in thick, was
attached on the wall’s inner side to
strengthen it.
 Steel bar-mat was connected tightly
with both the filler wall and the
concrete columns and beams
Reinforced concrete flexural
members strengthening
13
 Some beams and slabs are under
reinforced under the service load
according to the existing specification.
 To the beams and slabs which were lack
of strength or were deteriorated by the
corrosion of reinforcing steel rebar,
carbon fiber reinforced polymer (CFRP)
wrap system is applied to strengthen
them
 The restoration and strengthening of Jiangwan Stadium brought the old
architecture an entirely new look and improved the safety degree of the
whole structure.
 The application of CFRP system improved the bearing capacity of
flexural members which are lack of strength.
 Corrosion inhibitor’s application can restrict the development of steel
rebar’s corrosion.
 By the application of the above structural solutions, the safe state of the
structure has been improved remarkably
14
 This case study is on ,One of the building in Mexico city which was subjected to
the 1957 earthquake.
 The building is a reinforced concrete structure with fourteen floors and a
basement.
 It is a long narrow building (1 bay by 7 bays) with an area approximately 420 m2
per floor
 The structure consists of reinforced concrete frames with a solid concrete slab.
 The second floor concrete slab is supported by steel beams in both directions.
 The foundation is supported by 26 m long piles.
 The building is located in the lake bed zone of Mexico City.
15
16
 In the 1957 earthquake, the building suffered severe structural damage to
the columns.
 It was repaired and strengthened by increasing the size of some columns
but without additional reinforcement.
 The exterior frame in column line 8 was stiffened with reinforced
concrete braces and masonry infill walls.
 The columns at lines 1 and 2 near the elevators suffered severe damage in
all stories. The rest of the columns had lighter damage.
 The slab and beams were extensively cracked in all stories.
 The partition masonry walls had large cracks. The most damage was in
the two top stories.
17
 Following the 1985 earthquake, a structural review of the building
recommended removal of the two upper levels of the building and
removal of the floor finishes to reduce the weight of all the slabs.
 However, it was decided to develop a rehabilitation alternative which
would increase the stiffness of the building without adding excessive
mass or reducing the floor area.
 The strengthening approach consisted of installing a steel bracing system
or walls and steel jacketing of beams and columns
18
 The frame on boundary line “B” which faced an adjacent building was
strengthened with reinforced concrete walls and masonry infill walls
in the five lower levels.
 The upper levels were stiffened with steel X-braces between lines 4-5
and 7-8
19
 Frame “A” which faced the street was strengthened with X-braces between
lines 2-3, 4-5 and 6-7 in all the stories
 A reinforced concrete wall was added between lines 1 and 2 in all stories.
 The new wall was connected to column line 2 with coupling beams
20
 In the short direction in frames 3,4,5 and 6, W-braces were constructed
on alternate floors creating a staggered brace system
21
 The connections between the braces and beams were made using steel
base plates.
 The base plates were bolted to a steel box around the bottom of the beams
 The damaged concrete braces and masonry walls in line 8 were
removed and rebuilt increasing the reinforcement in the braces
 The masonry infill walls on line 1 were restored without changes.
22
 Columns and beams along column lines 1,2,4,5 were jacketed with steel
elements and connected to the bracing system
 The thickness of the slabs was increased with a reinforced concrete
layer over the existing slabs in all floors.
 The new slab was attached to the existing slab using 1/2” steel
connectors at 1 m. in both directions
 Because of the changes in the superstructure, 56 new piles were added to
the 26 existing piles and new foundation beams were constructed
23
 The uniqueness of the soil and the dynamic response of structures in Mexico City
were an important factor in the solutions used in the Case Studies and may not be
applicable elsewhere.
 Damage studies are vital to design of a rehabilitation scheme.
 Causes of damage need to be understood to develop a proper rehabilitation.
 Load paths for lateral forces must be clearly and carefully considered in designing
the rehabilitation scheme.
 Critical elements in the load path are connections between new and existing
elements location of shear walls and materials used
 The strengthening schemes that resulted in the upgrading of the foundations
 Foundation modifications are an important economic factor to be considered in the
assessment of a rehabilitation project.
24
 Comprehensive concrete jacketing of columns in medium rise buildings,
with a high density of columns, is a rehabilitation alternative that may not
demand major changes in the foundation.
 The addition of shear walls, in most cases, required the addition of piles.
 Documentation of rehabilitation projects is needed all over the world so that
when earthquakes strike rehabilitated buildings, performance can be
studied in considerable detail
25
 First case study - Structural Analysis of Historical Constructions by Jia
Zhu and Ming-Zhong Wang (2006)
 Second case study - THESIS by JORGE ALFREDO AGUILAR
26
27

More Related Content

What's hot

What's hot (20)

RETROFITTING OF CONCRETE STRUCTURE
RETROFITTING OFCONCRETE STRUCTURERETROFITTING OFCONCRETE STRUCTURE
RETROFITTING OF CONCRETE STRUCTURE
 
Shear walls
Shear wallsShear walls
Shear walls
 
Repair and strengthening of concrete structures
Repair and strengthening of concrete structuresRepair and strengthening of concrete structures
Repair and strengthening of concrete structures
 
Crack repair in building construction
Crack repair in building constructionCrack repair in building construction
Crack repair in building construction
 
TALL BUILDINGS
TALL BUILDINGSTALL BUILDINGS
TALL BUILDINGS
 
Retrofitting of concrete structure
Retrofitting of concrete structureRetrofitting of concrete structure
Retrofitting of concrete structure
 
Shear wall
Shear wallShear wall
Shear wall
 
Seismic Retrofitting Techniques & Rehabilitation
 Seismic Retrofitting Techniques & Rehabilitation Seismic Retrofitting Techniques & Rehabilitation
Seismic Retrofitting Techniques & Rehabilitation
 
Retrofitting case study of RCC structure
Retrofitting case study of RCC structureRetrofitting case study of RCC structure
Retrofitting case study of RCC structure
 
Shear wall
Shear wallShear wall
Shear wall
 
Retaining walls
Retaining walls Retaining walls
Retaining walls
 
Seismic Retrofitting Techniques
Seismic Retrofitting TechniquesSeismic Retrofitting Techniques
Seismic Retrofitting Techniques
 
Composite slab
Composite slabComposite slab
Composite slab
 
Retrofitting
RetrofittingRetrofitting
Retrofitting
 
Shear wall ppt
Shear wall ppt Shear wall ppt
Shear wall ppt
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
Expansion joints
Expansion jointsExpansion joints
Expansion joints
 
Composite column
Composite columnComposite column
Composite column
 
Different types of damages that have been observed in masonry buildings durin...
Different types of damages that have been observed in masonry buildings durin...Different types of damages that have been observed in masonry buildings durin...
Different types of damages that have been observed in masonry buildings durin...
 
Cracks in Buildings
Cracks in BuildingsCracks in Buildings
Cracks in Buildings
 

Similar to Case studies for strengthening of existing structures

Seismic Retrofitting of RC Building with Jacketing and Shear Wall Seismic Ret...
Seismic Retrofitting of RC Buildingwith Jacketing and Shear Wall Seismic Ret...Seismic Retrofitting of RC Buildingwith Jacketing and Shear Wall Seismic Ret...
Seismic Retrofitting of RC Building with Jacketing and Shear Wall Seismic Ret...Bala murali
 
Final paper for thesis on Steel tubular column
Final paper for thesis on Steel tubular columnFinal paper for thesis on Steel tubular column
Final paper for thesis on Steel tubular columnAL AMIN AZIZ
 
Design of Retaining Wall
Design of Retaining WallDesign of Retaining Wall
Design of Retaining WallAnanthakumar75
 
Cfst columns
Cfst columns Cfst columns
Cfst columns amits2280
 
Cast in situ bridge superstracture
Cast in situ bridge superstractureCast in situ bridge superstracture
Cast in situ bridge superstracturekhushal tadas
 
The Structural Behaviour of Concrete Filled Steel Tubular columns
The Structural Behaviour of Concrete Filled Steel Tubular columnsThe Structural Behaviour of Concrete Filled Steel Tubular columns
The Structural Behaviour of Concrete Filled Steel Tubular columnsIRJET Journal
 
Steel uses in buildings
Steel uses in buildingsSteel uses in buildings
Steel uses in buildingsRajat Rana
 
compositestructure31-38.pdf
compositestructure31-38.pdfcompositestructure31-38.pdf
compositestructure31-38.pdfPrakashM970621
 
Seismic rehabilitation of beam column joint using gfrp sheets-2002
Seismic rehabilitation of beam column joint using gfrp sheets-2002Seismic rehabilitation of beam column joint using gfrp sheets-2002
Seismic rehabilitation of beam column joint using gfrp sheets-2002Yara Mouna
 
Seismic rehabilitation of beam column joint using gfrp sheets-2002
Seismic rehabilitation of beam column joint using gfrp sheets-2002Seismic rehabilitation of beam column joint using gfrp sheets-2002
Seismic rehabilitation of beam column joint using gfrp sheets-2002Yara Mouna
 
Strenghtening measures sm
Strenghtening measures smStrenghtening measures sm
Strenghtening measures smsafna k.a
 
RCSDD_PPT editing format.pdf
RCSDD_PPT editing format.pdfRCSDD_PPT editing format.pdf
RCSDD_PPT editing format.pdfUMESHVerma100
 
Lecture 3-Composites construction (1).pptx
Lecture 3-Composites construction (1).pptxLecture 3-Composites construction (1).pptx
Lecture 3-Composites construction (1).pptxanik7nziza
 
Seismic retrofitting of heritage building- case study
Seismic retrofitting of heritage building- case studySeismic retrofitting of heritage building- case study
Seismic retrofitting of heritage building- case studyashlinvilson
 
Experimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor SlabExperimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor SlabIRJET Journal
 
Details of RCC Building
Details of RCC BuildingDetails of RCC Building
Details of RCC Buildingppt_master
 
1-Basics of Prestressed Concrete.pdforgs
1-Basics of Prestressed Concrete.pdforgs1-Basics of Prestressed Concrete.pdforgs
1-Basics of Prestressed Concrete.pdforgs632k18BilalAhmad
 

Similar to Case studies for strengthening of existing structures (20)

Seismic Retrofitting of RC Building with Jacketing and Shear Wall Seismic Ret...
Seismic Retrofitting of RC Buildingwith Jacketing and Shear Wall Seismic Ret...Seismic Retrofitting of RC Buildingwith Jacketing and Shear Wall Seismic Ret...
Seismic Retrofitting of RC Building with Jacketing and Shear Wall Seismic Ret...
 
Final paper for thesis on Steel tubular column
Final paper for thesis on Steel tubular columnFinal paper for thesis on Steel tubular column
Final paper for thesis on Steel tubular column
 
Design of Retaining Wall
Design of Retaining WallDesign of Retaining Wall
Design of Retaining Wall
 
Cfst columns
Cfst columns Cfst columns
Cfst columns
 
Cast in situ bridge superstracture
Cast in situ bridge superstractureCast in situ bridge superstracture
Cast in situ bridge superstracture
 
The Structural Behaviour of Concrete Filled Steel Tubular columns
The Structural Behaviour of Concrete Filled Steel Tubular columnsThe Structural Behaviour of Concrete Filled Steel Tubular columns
The Structural Behaviour of Concrete Filled Steel Tubular columns
 
Steel uses in buildings
Steel uses in buildingsSteel uses in buildings
Steel uses in buildings
 
compositestructure31-38.pdf
compositestructure31-38.pdfcompositestructure31-38.pdf
compositestructure31-38.pdf
 
Seismic rehabilitation of beam column joint using gfrp sheets-2002
Seismic rehabilitation of beam column joint using gfrp sheets-2002Seismic rehabilitation of beam column joint using gfrp sheets-2002
Seismic rehabilitation of beam column joint using gfrp sheets-2002
 
Seismic rehabilitation of beam column joint using gfrp sheets-2002
Seismic rehabilitation of beam column joint using gfrp sheets-2002Seismic rehabilitation of beam column joint using gfrp sheets-2002
Seismic rehabilitation of beam column joint using gfrp sheets-2002
 
Prestressed construction
Prestressed constructionPrestressed construction
Prestressed construction
 
Rcc
RccRcc
Rcc
 
Retrofitting of buildings
Retrofitting of buildingsRetrofitting of buildings
Retrofitting of buildings
 
Strenghtening measures sm
Strenghtening measures smStrenghtening measures sm
Strenghtening measures sm
 
RCSDD_PPT editing format.pdf
RCSDD_PPT editing format.pdfRCSDD_PPT editing format.pdf
RCSDD_PPT editing format.pdf
 
Lecture 3-Composites construction (1).pptx
Lecture 3-Composites construction (1).pptxLecture 3-Composites construction (1).pptx
Lecture 3-Composites construction (1).pptx
 
Seismic retrofitting of heritage building- case study
Seismic retrofitting of heritage building- case studySeismic retrofitting of heritage building- case study
Seismic retrofitting of heritage building- case study
 
Experimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor SlabExperimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor Slab
 
Details of RCC Building
Details of RCC BuildingDetails of RCC Building
Details of RCC Building
 
1-Basics of Prestressed Concrete.pdforgs
1-Basics of Prestressed Concrete.pdforgs1-Basics of Prestressed Concrete.pdforgs
1-Basics of Prestressed Concrete.pdforgs
 

Recently uploaded

Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 

Recently uploaded (20)

Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 

Case studies for strengthening of existing structures

  • 1. Paramathmeka S M.E Structural Engineering P.S.G College of technology 1
  • 2.  Structural strengthening is the process of upgrading structures to improve performance under existing loads or to increase the strength of structural members to carry additional loads.  Two case studies are discussed 1. A case study on the restoration and strengthening of a historic stadium in china 2. Case studies of strengthening of existing reinforced concrete building in Mexico city 2
  • 3.  The Jiangwan Stadium, which is a Municipal Level Cultural Relic Preservation Site in Shanghai, was built up in 1935.  The structure members were deteriorating with aging although they were repaired for several times.  There are some defects in the structure members, such as: 1. severe carbonation of concrete; 2. corrosion of steel rebar and 3. breakdown of concrete coverage.  In order to eliminate these defects and make it a safe state of the structure, the relative solutions are adopted. 3
  • 4.  Jiangwan Stadium is approximately 28000 square meters in area, and it was the biggest and most well-found stadium in Far East area when it was built up.  Jiangwan Stadium comprises three fields: 1. Playing field, 2. Gymnasium and 3. Natatorium.  The Playing field is the main part of Jiangwan Stadium. A one-kilometer-long annular stand forms the body of the playing field.  Natatorium is also a annular architecture, in the middle of which is a 50×20m swimming pool. The main body of the playing field and the gymnasium are both reinforced concrete framing structures.  Gymnasium’s stand is also reinforced concrete framing structure, and it has steel truss structure as roof system, which is separated from the stand’s concrete framing structure. 4
  • 5. 5
  • 6.  In 1930’s, Jiangwan Stadium has suffered from severe derogation by the war.  Although it was repaired for several times, but the structure members were still deteriorating with aging and weathering during the last 70 years.  For the upgrading of existing Jiangwan Stadium and its surrounding sporting facilities, a plan named Jiangwan sports park was put forward  Three fields of Jiangwan Stadium were constructed on timber pile-supported footing, which restricted the non uniform settlement between different sectors effectively.  Therefore the settlement of three fields remains stable and incline of structure member is not severe  Strength grading of concrete is very low in general. In several concrete members, Strength grade of concrete is even lower than C15.  The process of carbonation has developed out of concrete coverage depth in almost all of beams and columns, which directly led to the accelerative development of steel rebar’s rusting.  It seems that concrete carbonation and the side effect caused by it occurred more popular in the hypaethral stand of the playing field 6
  • 7.  An inspection of the building itself revealed that there were some steel rebar exposed in the air with breakdown of concrete coverage  obvious vertical cracks were investigated in some beams’ side surface  A conclusion could be drawn that concrete carbonation was the primary cause of concrete member’s deterioration.  So carbonation rehabilitation should be regarded as the first step and also the most important step of the concrete member’s repairing work. 7
  • 8.  Strength grade of sand mortar in the brick wall is very low.  Fortunately, the cracks were almost stable according to site observation.  The filler brick wall hasn’t been connected to the reinforced concrete frame by tie bars when it was laid.  It seems possible that the filler wall would collapse if earthquake occurs, especially for the external wall somewhere which has inclined outwards slightly. 8
  • 9.  The structure of Gymnasium’s roof is steel truss of three-hinged arch  The whole steel truss structure looks fair  The steel truss structure is still normal in work until now except that few steel members were deformed by accidental outside force and some members became corroded slightly. 9
  • 10. The techniques used were  Carbonation rehabilitation  Steel truss repairs  Surface repairs  Cracks solution  Filler wall strengthening  Reinforced concrete flexural members strengthening 10
  • 11. Carbonation rehabilitation  To prevent development of concrete carbonation and corrosion of steel rebar, corrosion inhibitor is delivered in a liquid form and spray-applied over the surface of concrete members that are subject to corrosion.  Corrosion inhibitor form a protective coating over the steel rebar’s surface, in which steel rebar is prevent from corrosion and concrete carbonation is slowed down Steel truss repairs  All corroded steel members were cleaned by abrasive methods, then corrosion-proof paint were painted all over the surface.  Few steel member which was deformed severely by accidental outside force was taken placed by new section.  Static analysis of steel truss was carried out and the results showed that some lower chords of the steel truss are lack of strength in buckling out of plane.  In order to strengthen it, two pieces of longitudinal bracing truss were added at the relative segment.  The longitudinal bracing truss was connected to upper and lower chord of steel roof truss with high strength bolt . 11
  • 12. Surface repairs  In the surface area where concrete coverage breakdown was severe, unsound concrete were removed entirely.  To the corroded steel rebar exposed in the air, abrasive method was taken to clean it, and spreader corrosion inhibitor all over the surface.  Then high strength mortar was painted to mend it Cracks solution  A static load test was carried out in the site to find the reason why cracks occurred in some beam’s side surface.  No development tendency of cracks was found during the test. It can be implied that the cracks were brought out by the temperature stress or the construction joint due to the fact that waist steel was absent in the beams.  Therefore the cracks can be considered stable. Cracks on the surface of concrete members were sealed by epoxy resin so that the steel rebar inside the structure would not corrode.  To the cracks which were deep and wide (>0.3mm), grout-injector method was adopted and epoxy resin was poured deeply into the cracks by the use of grout pipe 12
  • 13. Filler wall strengthening  Strengthening method of bar-mat and cement mortar was applied.  Cement mortar surface with steel bar- mat, was about 35mm in thick, was attached on the wall’s inner side to strengthen it.  Steel bar-mat was connected tightly with both the filler wall and the concrete columns and beams Reinforced concrete flexural members strengthening 13  Some beams and slabs are under reinforced under the service load according to the existing specification.  To the beams and slabs which were lack of strength or were deteriorated by the corrosion of reinforcing steel rebar, carbon fiber reinforced polymer (CFRP) wrap system is applied to strengthen them
  • 14.  The restoration and strengthening of Jiangwan Stadium brought the old architecture an entirely new look and improved the safety degree of the whole structure.  The application of CFRP system improved the bearing capacity of flexural members which are lack of strength.  Corrosion inhibitor’s application can restrict the development of steel rebar’s corrosion.  By the application of the above structural solutions, the safe state of the structure has been improved remarkably 14
  • 15.  This case study is on ,One of the building in Mexico city which was subjected to the 1957 earthquake.  The building is a reinforced concrete structure with fourteen floors and a basement.  It is a long narrow building (1 bay by 7 bays) with an area approximately 420 m2 per floor  The structure consists of reinforced concrete frames with a solid concrete slab.  The second floor concrete slab is supported by steel beams in both directions.  The foundation is supported by 26 m long piles.  The building is located in the lake bed zone of Mexico City. 15
  • 16. 16
  • 17.  In the 1957 earthquake, the building suffered severe structural damage to the columns.  It was repaired and strengthened by increasing the size of some columns but without additional reinforcement.  The exterior frame in column line 8 was stiffened with reinforced concrete braces and masonry infill walls.  The columns at lines 1 and 2 near the elevators suffered severe damage in all stories. The rest of the columns had lighter damage.  The slab and beams were extensively cracked in all stories.  The partition masonry walls had large cracks. The most damage was in the two top stories. 17
  • 18.  Following the 1985 earthquake, a structural review of the building recommended removal of the two upper levels of the building and removal of the floor finishes to reduce the weight of all the slabs.  However, it was decided to develop a rehabilitation alternative which would increase the stiffness of the building without adding excessive mass or reducing the floor area.  The strengthening approach consisted of installing a steel bracing system or walls and steel jacketing of beams and columns 18
  • 19.  The frame on boundary line “B” which faced an adjacent building was strengthened with reinforced concrete walls and masonry infill walls in the five lower levels.  The upper levels were stiffened with steel X-braces between lines 4-5 and 7-8 19
  • 20.  Frame “A” which faced the street was strengthened with X-braces between lines 2-3, 4-5 and 6-7 in all the stories  A reinforced concrete wall was added between lines 1 and 2 in all stories.  The new wall was connected to column line 2 with coupling beams 20
  • 21.  In the short direction in frames 3,4,5 and 6, W-braces were constructed on alternate floors creating a staggered brace system 21
  • 22.  The connections between the braces and beams were made using steel base plates.  The base plates were bolted to a steel box around the bottom of the beams  The damaged concrete braces and masonry walls in line 8 were removed and rebuilt increasing the reinforcement in the braces  The masonry infill walls on line 1 were restored without changes. 22
  • 23.  Columns and beams along column lines 1,2,4,5 were jacketed with steel elements and connected to the bracing system  The thickness of the slabs was increased with a reinforced concrete layer over the existing slabs in all floors.  The new slab was attached to the existing slab using 1/2” steel connectors at 1 m. in both directions  Because of the changes in the superstructure, 56 new piles were added to the 26 existing piles and new foundation beams were constructed 23
  • 24.  The uniqueness of the soil and the dynamic response of structures in Mexico City were an important factor in the solutions used in the Case Studies and may not be applicable elsewhere.  Damage studies are vital to design of a rehabilitation scheme.  Causes of damage need to be understood to develop a proper rehabilitation.  Load paths for lateral forces must be clearly and carefully considered in designing the rehabilitation scheme.  Critical elements in the load path are connections between new and existing elements location of shear walls and materials used  The strengthening schemes that resulted in the upgrading of the foundations  Foundation modifications are an important economic factor to be considered in the assessment of a rehabilitation project. 24
  • 25.  Comprehensive concrete jacketing of columns in medium rise buildings, with a high density of columns, is a rehabilitation alternative that may not demand major changes in the foundation.  The addition of shear walls, in most cases, required the addition of piles.  Documentation of rehabilitation projects is needed all over the world so that when earthquakes strike rehabilitated buildings, performance can be studied in considerable detail 25
  • 26.  First case study - Structural Analysis of Historical Constructions by Jia Zhu and Ming-Zhong Wang (2006)  Second case study - THESIS by JORGE ALFREDO AGUILAR 26
  • 27. 27