Constructability is the integration of
expertise into all phases of the project.
For Improving factors such as:
Cost
Schedule
Quality
Profitability
Safety
Customer satisfaction
and overall objectives.
IMPLEMENTING PROJECTIMPLEMENTING PROJECT
CONSTRUCTABILITYCONSTRUCTABILITY
The proper use of the knowledge gained
by participants such as:
Managers
Designers/Production Managers
Site shop floor and on site workers
Other contributors
Learning from their past experience
increases the level of productivity and
overall success.
IMPLEMENTING PROJECTIMPLEMENTING PROJECT
CONSTRUCTABILITYCONSTRUCTABILITY
Constructability must be used at key
points in the project life cycle. This
includes:
in the planning phase;
early in the design phase;
prior to the procurement phase;
prior to the mobilization phase for
construction.
IMPLEMENTING PROJECTIMPLEMENTING PROJECT
CONSTRUCTABILITYCONSTRUCTABILITY
Constructability process considers a
detailed review of:
Design drawings;
Models;
Specifications;
and construction processes.
IMPLEMENTING PROJECTIMPLEMENTING PROJECT
CONSTRUCTABILITYCONSTRUCTABILITY
The purpose of the constructability review
is to identify the following items:
• Design errors (both material selection or
dimensions)
• Un clear specifications
• Unnecessary work
• Complexity that does not serve the
project objectives
IMPLEMENTING PROJECTIMPLEMENTING PROJECT
CONSTRUCTABILITYCONSTRUCTABILITY
• Project features-difficult and very
costly to construct.
• Project complexity- that exceed the
capability of industry to properly
build.
• Project features that are difficult to
interpret and will be hard to
accurately bid.
QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS)
Steps to take:
 Identify the processes needed for the
Quality Management System
 Its application in the organization
 Its customers
 Determine the sequence and interaction
of these processes
 Determine the criteria and methods
required to ensure that the operation
runs well
QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS)
Determine the criteria and methods
required to ensure that controls of these
processes are effective.
Ensure that the necessary resources,
information necessary to support the
operation are in place.
Make sure monitoring of these processes
will be provided.
Set up systems to monitor measure and
analyse the processes.
QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS)
Total Quality Management
QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS)
The construction industry has embraced
the ISO 9000 standard since its inception.
The QMS has become the benchmark for
successful construction companies.
The QMS has also become the
benchmarking for successful construction
companies worldwide.
QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS)
QMS has helped many companies to
structure their management and
processes to consistently meet the
client’s requirements.
QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS)
The eight Quality Management Principles
stated in ISO 9000:2000 and ISO
9004:2000 provide the basis for the
performance improvement.
Focusing on the Customer to increase
revenue and market share.
 Choose Effective Leaders to motivate
the organization towards achieving
organisational goals. 
QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS)
 Involving People to become:
1.Innovative
2.Creative
3.Accountable
 Understanding Processes. This will help
to define activities necessary to obtain a
desirable result.
 Valuing a Systems Approach-Structuring a
system to achieve the organisation's
objectives in the most effective and
efficient way. 
Wheel of QMSWheel of QMS
QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS)
JIT & Quality Management SystemsJIT & Quality Management Systems
The existing quality management systems
-ISO 9000 should include JIT.
It is practical to integrate ISO 9000 (20
clauses) with the 7 JIT concepts
Successful firms are using 7 concepts of
JIT with ISO 9000 quality management
systems in order to improve their
productivity.
JIT & Quality Management SystemsJIT & Quality Management Systems
To have high quality product and high
productivity is a challenging task for
project management team.
All large construction companies have
already established quality management
systems within their organisation to meet
ISO 9000 requirements.
Some companies are implementing the
concepts of JIT and ISO 9000 separately.
JIT & Quality Management SystemsJIT & Quality Management Systems
Both ISO 9000 and JIT objectives are:
1) high productivity
2) perfect product each time and every
time.
ISO has no any clause related to project
time.
 It is a tool for productivity improvement.
JIT & Quality ManagementJIT & Quality Management
Systems-waste reductionSystems-waste reduction
Quality and productivity are inter-
related.
High quality product will eliminate repeat
work and increases productivity.
Overproduction
Long waiting times
Poor transportation schedules
JIT & Quality Management SystemsJIT & Quality Management Systems
Processing failures
High inventories
Excessive movement of materials on
site
Poor workmanship
Defective products
JIT & Quality Management SystemsJIT & Quality Management Systems
INTEGRATING CONSTRUCTABLITYINTEGRATING CONSTRUCTABLITY
WITH QMS & JITWITH QMS & JIT
Cost savings derive from:
Fewer delays.
Fewer disruptions.
Shortened duration of activities.
Less work at higher elevations.
Less material required.
Decreased likelihood of labour conflicts.
INTEGRATING CONSTRUCTABLITYINTEGRATING CONSTRUCTABLITY
WITH QMS & JITWITH QMS & JIT
One must initially invest to earn the cost
savings from better constructability, such
as:
More effort for design and procurement.
More communication among builders,
designers, and the client.
More communication among supply
chain(including customers)
INTEGRATING CONSTRUCTABLITYINTEGRATING CONSTRUCTABLITY
WITH QMS & JITWITH QMS & JIT
Improve constructability reduces
costs by:
Mitigating the effects of adverse site
conditions.
Implementing better design, better
buildings.
Advance technologies.
INTEGRATING CONSTRUCTABLITYINTEGRATING CONSTRUCTABLITY
WITH QMS & JITWITH QMS & JIT
Offering assembly-line conditions.
Accelerating the schedule by decoupling
sequential workface activities.
Reducing the number of workers and
costlier skills.
Better constructability methods can
include:
• Prefabrication.
• Economies and quality via manufacturing
process.
INTEGRATING CONSTRUCTABLITYINTEGRATING CONSTRUCTABLITY
WITH QMS & JITWITH QMS & JIT
• Preassembly-Join components into
subunit at the factory.
• Under more advance and better-
controlled location.
• Modularization-Assembly operations
create the largest unit logistically possible.
• Contains all components of final state.

More Related Content

What's hot

Quality Assurance & Quality Control
Quality Assurance & Quality ControlQuality Assurance & Quality Control
Quality Assurance & Quality ControlPintu Badatiya
 
construction quality improvement- Presentation
construction quality improvement- Presentationconstruction quality improvement- Presentation
construction quality improvement- PresentationManjunatha L.R
 
Introduction to Quality Engineering / Quality Control
Introduction to Quality Engineering / Quality ControlIntroduction to Quality Engineering / Quality Control
Introduction to Quality Engineering / Quality ControlAFAQAHMED JAMADAR
 
Quality Control and Quality Assurance
Quality Control and Quality Assurance Quality Control and Quality Assurance
Quality Control and Quality Assurance Mohamed Saber
 
Managerial skills required for Civil engineers
Managerial skills required for Civil engineersManagerial skills required for Civil engineers
Managerial skills required for Civil engineersThanigaivel Asokan
 
1. STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
1.	STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...1.	STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
1. STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...AELC
 
Total construction quality management by mobile technology mtech
Total construction quality management by mobile technology   mtechTotal construction quality management by mobile technology   mtech
Total construction quality management by mobile technology mtechStephen Au
 
Quality Assurance and Quality Control systems
Quality Assurance and Quality Control systemsQuality Assurance and Quality Control systems
Quality Assurance and Quality Control systemsMithila Eranda
 
Quality in Construction
Quality in ConstructionQuality in Construction
Quality in ConstructionDr K M SONI
 
The concept of quality assurance
The concept of quality assuranceThe concept of quality assurance
The concept of quality assuranceSajid Ali
 
00 safety_quality_construction
00  safety_quality_construction00  safety_quality_construction
00 safety_quality_constructionAdhitomo Wirawan
 
Construction quality control site inspection training (2) pages-deleted
Construction quality control  site inspection training (2) pages-deletedConstruction quality control  site inspection training (2) pages-deleted
Construction quality control site inspection training (2) pages-deletedSanjana Khound
 
Insepction and quality control
Insepction and quality controlInsepction and quality control
Insepction and quality controlSOURAV4798
 
Baldwin Dias resume
Baldwin Dias resumeBaldwin Dias resume
Baldwin Dias resumeBaldwin Dias
 

What's hot (20)

Quality Assurance & Quality Control
Quality Assurance & Quality ControlQuality Assurance & Quality Control
Quality Assurance & Quality Control
 
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
 
construction quality improvement- Presentation
construction quality improvement- Presentationconstruction quality improvement- Presentation
construction quality improvement- Presentation
 
Quality assurance
Quality assuranceQuality assurance
Quality assurance
 
Introduction to Quality Engineering / Quality Control
Introduction to Quality Engineering / Quality ControlIntroduction to Quality Engineering / Quality Control
Introduction to Quality Engineering / Quality Control
 
Quality Control and Quality Assurance
Quality Control and Quality Assurance Quality Control and Quality Assurance
Quality Control and Quality Assurance
 
Managerial skills required for Civil engineers
Managerial skills required for Civil engineersManagerial skills required for Civil engineers
Managerial skills required for Civil engineers
 
106 quality assurance
106 quality assurance106 quality assurance
106 quality assurance
 
Quality management
Quality managementQuality management
Quality management
 
1. STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
1.	STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...1.	STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
1. STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
 
Total construction quality management by mobile technology mtech
Total construction quality management by mobile technology   mtechTotal construction quality management by mobile technology   mtech
Total construction quality management by mobile technology mtech
 
Quality Assurance and Quality Control systems
Quality Assurance and Quality Control systemsQuality Assurance and Quality Control systems
Quality Assurance and Quality Control systems
 
Contractor Best Practices in Construction Quality Assurance
Contractor Best Practices in Construction Quality AssuranceContractor Best Practices in Construction Quality Assurance
Contractor Best Practices in Construction Quality Assurance
 
Quality in Construction
Quality in ConstructionQuality in Construction
Quality in Construction
 
The concept of quality assurance
The concept of quality assuranceThe concept of quality assurance
The concept of quality assurance
 
Manufacturing
ManufacturingManufacturing
Manufacturing
 
00 safety_quality_construction
00  safety_quality_construction00  safety_quality_construction
00 safety_quality_construction
 
Construction quality control site inspection training (2) pages-deleted
Construction quality control  site inspection training (2) pages-deletedConstruction quality control  site inspection training (2) pages-deleted
Construction quality control site inspection training (2) pages-deleted
 
Insepction and quality control
Insepction and quality controlInsepction and quality control
Insepction and quality control
 
Baldwin Dias resume
Baldwin Dias resumeBaldwin Dias resume
Baldwin Dias resume
 

Similar to 039 integrating constructability-short

039 integrating construct-ability
039 integrating construct-ability039 integrating construct-ability
039 integrating construct-abilitydrdej19
 
Quality managment impacts in construction
Quality managment impacts in constructionQuality managment impacts in construction
Quality managment impacts in constructionKhaled Eid
 
047 INTERGRATING TQM WITH CONSTRUCTABILITY/VE
047  INTERGRATING TQM WITH CONSTRUCTABILITY/VE047  INTERGRATING TQM WITH CONSTRUCTABILITY/VE
047 INTERGRATING TQM WITH CONSTRUCTABILITY/VEDr Fereidoun Dejahang
 
047 integrating tqm-cons-ve
047 integrating tqm-cons-ve047 integrating tqm-cons-ve
047 integrating tqm-cons-vedrdej19
 
Strategic Project Selection in Oil & Gas Industry
Strategic Project Selection in Oil & Gas IndustryStrategic Project Selection in Oil & Gas Industry
Strategic Project Selection in Oil & Gas Industrynaveen_ncn
 
Quality Management System
Quality Management SystemQuality Management System
Quality Management Systemintellisenseit
 
A project report on TQM by Abhinandan Kumar
A project report on TQM by Abhinandan KumarA project report on TQM by Abhinandan Kumar
A project report on TQM by Abhinandan KumarAbhinandan Kumar
 
Quality management at construction projects: Case study of a stormwater netwo...
Quality management at construction projects: Case study of a stormwater netwo...Quality management at construction projects: Case study of a stormwater netwo...
Quality management at construction projects: Case study of a stormwater netwo...IRJET Journal
 
IRJET- Construction Quality Management on Site
IRJET-  	  Construction Quality Management on SiteIRJET-  	  Construction Quality Management on Site
IRJET- Construction Quality Management on SiteIRJET Journal
 
Reducing timeincreasingvalue0503
Reducing timeincreasingvalue0503Reducing timeincreasingvalue0503
Reducing timeincreasingvalue0503Omnex Inc.
 
Quality Management In Construction
Quality Management In ConstructionQuality Management In Construction
Quality Management In ConstructionIsidro Sid Calayag
 
Workshop on ISO 9001 2008
Workshop on ISO 9001 2008Workshop on ISO 9001 2008
Workshop on ISO 9001 2008Adnan Masood
 
Quality Control Report
Quality Control ReportQuality Control Report
Quality Control ReportEzevillo Zim
 
Corporate Presentation MRS
Corporate Presentation MRSCorporate Presentation MRS
Corporate Presentation MRSPaul Morffew
 

Similar to 039 integrating constructability-short (20)

039 integrating construct-ability
039 integrating construct-ability039 integrating construct-ability
039 integrating construct-ability
 
120 tqm-constructability-bar chart
120 tqm-constructability-bar chart120 tqm-constructability-bar chart
120 tqm-constructability-bar chart
 
Quality managment impacts in construction
Quality managment impacts in constructionQuality managment impacts in construction
Quality managment impacts in construction
 
047 INTERGRATING TQM WITH CONSTRUCTABILITY/VE
047  INTERGRATING TQM WITH CONSTRUCTABILITY/VE047  INTERGRATING TQM WITH CONSTRUCTABILITY/VE
047 INTERGRATING TQM WITH CONSTRUCTABILITY/VE
 
047 integrating tqm-cons-ve
047 integrating tqm-cons-ve047 integrating tqm-cons-ve
047 integrating tqm-cons-ve
 
Strategic Project Selection in Oil & Gas Industry
Strategic Project Selection in Oil & Gas IndustryStrategic Project Selection in Oil & Gas Industry
Strategic Project Selection in Oil & Gas Industry
 
Quality Management System
Quality Management SystemQuality Management System
Quality Management System
 
A project report on TQM by Abhinandan Kumar
A project report on TQM by Abhinandan KumarA project report on TQM by Abhinandan Kumar
A project report on TQM by Abhinandan Kumar
 
Quality management at construction projects: Case study of a stormwater netwo...
Quality management at construction projects: Case study of a stormwater netwo...Quality management at construction projects: Case study of a stormwater netwo...
Quality management at construction projects: Case study of a stormwater netwo...
 
A project report on TQM
A project report on TQMA project report on TQM
A project report on TQM
 
IRJET- Construction Quality Management on Site
IRJET-  	  Construction Quality Management on SiteIRJET-  	  Construction Quality Management on Site
IRJET- Construction Quality Management on Site
 
Resume Giridhar
Resume GiridharResume Giridhar
Resume Giridhar
 
Reducing timeincreasingvalue0503
Reducing timeincreasingvalue0503Reducing timeincreasingvalue0503
Reducing timeincreasingvalue0503
 
Project Quality Management
Project Quality ManagementProject Quality Management
Project Quality Management
 
Quality Management In Construction
Quality Management In ConstructionQuality Management In Construction
Quality Management In Construction
 
Workshop on ISO 9001 2008
Workshop on ISO 9001 2008Workshop on ISO 9001 2008
Workshop on ISO 9001 2008
 
Quality Control Report
Quality Control ReportQuality Control Report
Quality Control Report
 
Corporate Presentation MRS
Corporate Presentation MRSCorporate Presentation MRS
Corporate Presentation MRS
 
SOFTWARE RELIABILITY AND QUALITY ASSURANCE
SOFTWARE RELIABILITY AND QUALITY ASSURANCESOFTWARE RELIABILITY AND QUALITY ASSURANCE
SOFTWARE RELIABILITY AND QUALITY ASSURANCE
 
Software Quality.pptx
Software Quality.pptxSoftware Quality.pptx
Software Quality.pptx
 

More from drdej19

069 managing people
069 managing people069 managing people
069 managing peopledrdej19
 
070 material management
070 material management070 material management
070 material managementdrdej19
 
068 managing fundamentals
068 managing fundamentals068 managing fundamentals
068 managing fundamentalsdrdej19
 
067 management
067 management067 management
067 managementdrdej19
 
066 management structure-the design
066 management structure-the design066 management structure-the design
066 management structure-the designdrdej19
 
062 logistics and productivity
062 logistics and productivity062 logistics and productivity
062 logistics and productivitydrdej19
 
065 management information system
065 management information system065 management information system
065 management information systemdrdej19
 
064 management accounting
064 management accounting064 management accounting
064 management accountingdrdej19
 
063 management theory
063 management theory063 management theory
063 management theorydrdej19
 
061 logistics and productivity
061 logistics and productivity061 logistics and productivity
061 logistics and productivitydrdej19
 
059 lean construction
059 lean construction059 lean construction
059 lean constructiondrdej19
 
060 lean supply chain
060 lean supply chain060 lean supply chain
060 lean supply chaindrdej19
 
055 kpi's-success factor
055 kpi's-success factor055 kpi's-success factor
055 kpi's-success factordrdej19
 
057 lean and environment
057 lean and environment057 lean and environment
057 lean and environmentdrdej19
 
058 lean construction (2)
058 lean construction (2)058 lean construction (2)
058 lean construction (2)drdej19
 
056 labour productivity
056 labour productivity056 labour productivity
056 labour productivitydrdej19
 
054 jit and quality management system
054 jit and quality management system054 jit and quality management system
054 jit and quality management systemdrdej19
 
050 intergrating constructability
050 intergrating constructability050 intergrating constructability
050 intergrating constructabilitydrdej19
 
049 integration of constructability
049 integration of constructability049 integration of constructability
049 integration of constructabilitydrdej19
 
048 integrating workers motivation
048 integrating workers motivation048 integrating workers motivation
048 integrating workers motivationdrdej19
 

More from drdej19 (20)

069 managing people
069 managing people069 managing people
069 managing people
 
070 material management
070 material management070 material management
070 material management
 
068 managing fundamentals
068 managing fundamentals068 managing fundamentals
068 managing fundamentals
 
067 management
067 management067 management
067 management
 
066 management structure-the design
066 management structure-the design066 management structure-the design
066 management structure-the design
 
062 logistics and productivity
062 logistics and productivity062 logistics and productivity
062 logistics and productivity
 
065 management information system
065 management information system065 management information system
065 management information system
 
064 management accounting
064 management accounting064 management accounting
064 management accounting
 
063 management theory
063 management theory063 management theory
063 management theory
 
061 logistics and productivity
061 logistics and productivity061 logistics and productivity
061 logistics and productivity
 
059 lean construction
059 lean construction059 lean construction
059 lean construction
 
060 lean supply chain
060 lean supply chain060 lean supply chain
060 lean supply chain
 
055 kpi's-success factor
055 kpi's-success factor055 kpi's-success factor
055 kpi's-success factor
 
057 lean and environment
057 lean and environment057 lean and environment
057 lean and environment
 
058 lean construction (2)
058 lean construction (2)058 lean construction (2)
058 lean construction (2)
 
056 labour productivity
056 labour productivity056 labour productivity
056 labour productivity
 
054 jit and quality management system
054 jit and quality management system054 jit and quality management system
054 jit and quality management system
 
050 intergrating constructability
050 intergrating constructability050 intergrating constructability
050 intergrating constructability
 
049 integration of constructability
049 integration of constructability049 integration of constructability
049 integration of constructability
 
048 integrating workers motivation
048 integrating workers motivation048 integrating workers motivation
048 integrating workers motivation
 

Recently uploaded

(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 

Recently uploaded (20)

(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 

039 integrating constructability-short

  • 1. INTEGRATINGINTEGRATING CONSTRUCTABLITYCONSTRUCTABLITY WITH QMS & JITWITH QMS & JIT helpdesk@construction-productivity.co.uk htt://www.construction-productivity.
  • 3. IMPLEMENTING PROJECTIMPLEMENTING PROJECT CONSTRUCTABILITYCONSTRUCTABILITY Constructability is the integration of expertise into all phases of the project. For Improving factors such as: Cost Schedule Quality Profitability Safety Customer satisfaction and overall objectives.
  • 4. IMPLEMENTING PROJECTIMPLEMENTING PROJECT CONSTRUCTABILITYCONSTRUCTABILITY The proper use of the knowledge gained by participants such as: Managers Designers/Production Managers Site shop floor and on site workers Other contributors Learning from their past experience increases the level of productivity and overall success.
  • 5. IMPLEMENTING PROJECTIMPLEMENTING PROJECT CONSTRUCTABILITYCONSTRUCTABILITY Constructability must be used at key points in the project life cycle. This includes: in the planning phase; early in the design phase; prior to the procurement phase; prior to the mobilization phase for construction.
  • 6. IMPLEMENTING PROJECTIMPLEMENTING PROJECT CONSTRUCTABILITYCONSTRUCTABILITY Constructability process considers a detailed review of: Design drawings; Models; Specifications; and construction processes.
  • 7. IMPLEMENTING PROJECTIMPLEMENTING PROJECT CONSTRUCTABILITYCONSTRUCTABILITY The purpose of the constructability review is to identify the following items: • Design errors (both material selection or dimensions) • Un clear specifications • Unnecessary work • Complexity that does not serve the project objectives
  • 8. IMPLEMENTING PROJECTIMPLEMENTING PROJECT CONSTRUCTABILITYCONSTRUCTABILITY • Project features-difficult and very costly to construct. • Project complexity- that exceed the capability of industry to properly build. • Project features that are difficult to interpret and will be hard to accurately bid.
  • 9. QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS) Steps to take:  Identify the processes needed for the Quality Management System  Its application in the organization  Its customers  Determine the sequence and interaction of these processes  Determine the criteria and methods required to ensure that the operation runs well
  • 10. QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS) Determine the criteria and methods required to ensure that controls of these processes are effective. Ensure that the necessary resources, information necessary to support the operation are in place. Make sure monitoring of these processes will be provided. Set up systems to monitor measure and analyse the processes.
  • 11. QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS) Total Quality Management
  • 12. QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS) The construction industry has embraced the ISO 9000 standard since its inception. The QMS has become the benchmark for successful construction companies. The QMS has also become the benchmarking for successful construction companies worldwide.
  • 13. QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS) QMS has helped many companies to structure their management and processes to consistently meet the client’s requirements.
  • 14. QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS) The eight Quality Management Principles stated in ISO 9000:2000 and ISO 9004:2000 provide the basis for the performance improvement. Focusing on the Customer to increase revenue and market share.  Choose Effective Leaders to motivate the organization towards achieving organisational goals. 
  • 15. QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS)  Involving People to become: 1.Innovative 2.Creative 3.Accountable  Understanding Processes. This will help to define activities necessary to obtain a desirable result.  Valuing a Systems Approach-Structuring a system to achieve the organisation's objectives in the most effective and efficient way. 
  • 17. QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS)
  • 18. JIT & Quality Management SystemsJIT & Quality Management Systems The existing quality management systems -ISO 9000 should include JIT. It is practical to integrate ISO 9000 (20 clauses) with the 7 JIT concepts Successful firms are using 7 concepts of JIT with ISO 9000 quality management systems in order to improve their productivity.
  • 19. JIT & Quality Management SystemsJIT & Quality Management Systems To have high quality product and high productivity is a challenging task for project management team. All large construction companies have already established quality management systems within their organisation to meet ISO 9000 requirements. Some companies are implementing the concepts of JIT and ISO 9000 separately.
  • 20. JIT & Quality Management SystemsJIT & Quality Management Systems Both ISO 9000 and JIT objectives are: 1) high productivity 2) perfect product each time and every time. ISO has no any clause related to project time.  It is a tool for productivity improvement.
  • 21. JIT & Quality ManagementJIT & Quality Management Systems-waste reductionSystems-waste reduction Quality and productivity are inter- related. High quality product will eliminate repeat work and increases productivity. Overproduction Long waiting times Poor transportation schedules
  • 22. JIT & Quality Management SystemsJIT & Quality Management Systems Processing failures High inventories Excessive movement of materials on site Poor workmanship Defective products
  • 23. JIT & Quality Management SystemsJIT & Quality Management Systems
  • 24.
  • 25. INTEGRATING CONSTRUCTABLITYINTEGRATING CONSTRUCTABLITY WITH QMS & JITWITH QMS & JIT Cost savings derive from: Fewer delays. Fewer disruptions. Shortened duration of activities. Less work at higher elevations. Less material required. Decreased likelihood of labour conflicts.
  • 26. INTEGRATING CONSTRUCTABLITYINTEGRATING CONSTRUCTABLITY WITH QMS & JITWITH QMS & JIT One must initially invest to earn the cost savings from better constructability, such as: More effort for design and procurement. More communication among builders, designers, and the client. More communication among supply chain(including customers)
  • 27. INTEGRATING CONSTRUCTABLITYINTEGRATING CONSTRUCTABLITY WITH QMS & JITWITH QMS & JIT Improve constructability reduces costs by: Mitigating the effects of adverse site conditions. Implementing better design, better buildings. Advance technologies.
  • 28. INTEGRATING CONSTRUCTABLITYINTEGRATING CONSTRUCTABLITY WITH QMS & JITWITH QMS & JIT Offering assembly-line conditions. Accelerating the schedule by decoupling sequential workface activities. Reducing the number of workers and costlier skills. Better constructability methods can include: • Prefabrication. • Economies and quality via manufacturing process.
  • 29. INTEGRATING CONSTRUCTABLITYINTEGRATING CONSTRUCTABLITY WITH QMS & JITWITH QMS & JIT • Preassembly-Join components into subunit at the factory. • Under more advance and better- controlled location. • Modularization-Assembly operations create the largest unit logistically possible. • Contains all components of final state.