LABOUR
PRODUCTIVITY
LABOUR PRODUCTIVITY
 A large proportion of the high cost
in construction work is as a result of
excessive labour costs.
 These costs can be reduced if
productivity on site is increased by
improving labour efficiency.
LABOUR PRODUCTIVITY
 Labour productivity is determined by a
complexity of factors.
 One of these factors is the type and size
of the project.
 It includes the layout and complexity of the
project.
 A large construction site requiring a large
number of workers will be relatively harder
to manage than a smaller size.
LABOUR PRODUCTIVITY
 The difficulties in managing manpower on a
large scale may result in productivity loss
(Thomas and Jansma, 1985).
 There are four main factors that affect labour
productivity;
1. The duration of worker’s effort.
2. The intensity of worker’s effort.
3. The effectiveness of worker’s effort combined
with the technology used.
4. The efficiency of worker’s effort, which can be
described as a measure of how much the
worker is utilising his ability.
LABOUR PRODUCTIVITY
 Work on a complex project (e.g. such as the
construction of a major shopping centre)
becomes more difficult as the project advances.
 Off-site pre-fabrication units will reduce the
number of labour hours required.
Other factors such as:
 the level of skill amongst the workers;
 the length of the workday;
 Innovative work practices can increase
productivity.
LABOUR PRODUCTIVITY
 In view of Olomolaiye et al (1998):
 The personal attribution of workers contribute to
the factors that directly affect productivity.
These attributes as:
 worker’s skills
 experience
 training
 qualifications
 Innate (inborn) physical and mental ability.
 The intensity of the application of both skills and
innate ability to the production process.
LABOUR PRODUCTIVITY
Thomas et al (1992) investigated the level of labour
productivity for masonry activities from seven countries.
Case study showed that:
 little difference in productivity amongst the seven
countries.
 The aim of investigation was to show that productivity in
 Australia
 Canada
 England
 Finland,
 Scotland
 Sweden and the United State-was similar.
LABOUR PRODUCTIVITY
 The site with the highest level of
disruption will have the worse level of
productivity.
 Other investigations show that labour
disruption accounts for more than
50% of the variability in daily crew
productivity.
LABOUR PRODUCTIVITY
 An excessive number of staff can be disruptive.
 It also has the effect of reducing the level of
productivity.
The results of a model based survey of contractors
(planning engineers) in France, Germany and UK
Showed that :
 the working schedule of UK and German
contractors may be excessive;
 can have an impact on construction productivity
level.
LABOUR PRODUCTIVITY
 The survey also identified that in the UK the
labour force employed on site are:
 26% directly employed
 74% sub-contracted
 In France 93% of the labour force on site are
directly employed.
 In France 7% are sub-contractors.
 This trend goes back to year 2000 to 2003
and recently there has been some changes
to above figures.
LABOUR PRODUCTIVITY
 Employment practice has an impact on
the cohesiveness amongst the workforce.
Some of the Important contributors towards
Labour productivity are:
 a culture of cohesiveness
 common goal
 strong sense of a team working
 towards a common goal
LABOUR PRODUCTIVITY
 A culture of team working involving all
workers is to achieve a common goal.
 A common goal on construction site is to
achieve KPIs.
 Labour productivity can also be improved
if operatives on site avoid conflict.
 Conflict on site can hamper the progress
of work.
 Team working reduces conflict and will
greatly facilitate increased productivity.
LABOUR PRODUCTIVITY
 The importance of a directly or indirectly
employed workforce.
 and the effect on the dynamics of
productivity is reiterated in several
research work.
 The growth in the construction sector is
relatively stagnant.
 The job security can be very bad during
any recession for construction workforce.
LABOUR PRODUCTIVITY
 This is based on a number of observations.
 One such observation is the limited use of
mass production.
 The reasons for high productivity amongst
major contractors are:
 Scheduled overtime is avoided
 The labour force is directly employed
 They are a mainly skilled work force
LABOUR PRODUCTIVITY
 Maximum 40 hour per week is the norm
rather than the exception.
 There are also other factors such as:
 high salary
 job security
which are also important reasons for high
productivity amongst major construction
firms.
LABOUR PRODUCTIVITY
Impact of Changes on Labour
Productivity
 Any changes made to the original
scope of work are costly.
 They will have an effect on labour
productivity.
 Although some changes are inevitable,
the impact on site productivity is
nonetheless significant.
LABOUR PRODUCTIVITY
 The impact of changes in quantitative
terms has been measured by researchers.
 Changes impacts on the labour force’s
efficiency.
 The relationship between change and
various types of disruption would result in
productivity decline.
LABOUR PRODUCTIVITY
 The increase in the percentage of work
hours spent on changes will lead to a 10-
20% loss in productivity.
 Changes are considered an indirect factor
influencing productivity.
 It has also been realised that changes in
themselves do not decrease productivity
or efficiency.
 It is the manpower involved in the process.
LABOUR PRODUCTIVITY
 If a change occurs in the final stage of a
construction project:
 the crew must stop working until the
changes are carried out first.
 Also the work method may require
changes as well as more co-ordination
being required.
LABOUR PRODUCTIVITY
 If changes occur:
 routine work will change,
 processes will slow down
 the total work hours will be several times
greater.
 On average, there is a 30% loss of
efficiency when changes are being
performed, although it is possible to carry
out many changes without a loss of
efficiency.
LABOUR PRODUCTIVITY
 The variables affecting efficiency are
believed to be the time of the change.
 Productivity can decline if there are:
 repeat works
 disruption
 the presence of change
LABOUR PRODUCTIVITY
 The impact of change on the construction site
will often result in disputes.
 Changes should be kept to a minimum.
Improving Productivity by Training Methods
 Training is considered to be an influential factor
in high productivity on construction sites.
 The growth in labour only sub-contracting in UK
construction sector.
 The level and quality of training within the
industry.
LABOUR PRODUCTIVITY
 Productivity within the UK construction
industry compared with West Germany
and France is partly the result of low levels
of training labour force receive in UK
amongst small firms.
 Large UK firms have a good training
policy.
LABOUR PRODUCTIVITY
 Improving the knowledge and skill of
workers on construction sites.
 Motivated work force.
 Including the quality of management all
can improve the productivity.
 Site worker’s training is considered to be
an important factor in improving site
productivity.
LABOUR PRODUCTIVITY
 Therefore, organisational performance (P)
can be considered to be dependent on:
 the aggregate sums of performance of
each worker (F)
 and each manager (M)
 and the external factor (e)
 and the organisational performance is
shown as; P = f (F, M, e).
LABOUR PRODUCTIVITY
 The individual performance is dependent
on individual knowledge (K)
 skill (S)
 and the attitude to the work (a) of each
worker and manager
 P= f (K,S, a), M =f (K, S, a). Performance
of workers is linked to both quality
(qualitative) and output (quantitative) rate.
LABOUR PRODUCTIVITY
 Productivity and the quality of work can be
improved by:
 giving appropriate training to upgrade the:
 knowledge
 skills
 and attitude of workers and managers.
056 labour productivity
056 labour productivity

More Related Content

What's hot

1. bussiness process diagonistic tool for cpm
1. bussiness process diagonistic tool for cpm1. bussiness process diagonistic tool for cpm
1. bussiness process diagonistic tool for cpmJyoti Trivedi
 
Machine & materials managment
Machine & materials managmentMachine & materials managment
Machine & materials managmentMarites Teope
 
IRJET- Study on Scope Variances in Construction Projects
IRJET- Study on Scope Variances in Construction ProjectsIRJET- Study on Scope Variances in Construction Projects
IRJET- Study on Scope Variances in Construction ProjectsIRJET Journal
 
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regionImprovement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regioneSAT Publishing House
 
Productivity management
Productivity management Productivity management
Productivity management NsbmUcd
 
Productivity improvement technique using work study in rmg sector
Productivity improvement technique using work study in rmg sectorProductivity improvement technique using work study in rmg sector
Productivity improvement technique using work study in rmg sectorEmdadul Haque
 
Productivity and performance in an organization
Productivity and performance in an organizationProductivity and performance in an organization
Productivity and performance in an organizationAswii007
 
Production mgt(productivity ppt)
Production mgt(productivity ppt)Production mgt(productivity ppt)
Production mgt(productivity ppt)Swapnil Mayekar
 
022 Construction Productivity (PART 1)
022 Construction Productivity (PART 1)022 Construction Productivity (PART 1)
022 Construction Productivity (PART 1)Dr Fereidoun Dejahang
 
Work study might be the paramount methodology to improve productivity in the ...
Work study might be the paramount methodology to improve productivity in the ...Work study might be the paramount methodology to improve productivity in the ...
Work study might be the paramount methodology to improve productivity in the ...Alexander Decker
 
Productivity of human resources
Productivity of human resourcesProductivity of human resources
Productivity of human resourcesSelva Prakash
 
Productivity improvement slide share
Productivity improvement slide shareProductivity improvement slide share
Productivity improvement slide shareK. M. Hasan Ripon
 
A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...IRJET Journal
 
Lean Manufacturing and employee Performance in Malysia
Lean Manufacturing and employee Performance in MalysiaLean Manufacturing and employee Performance in Malysia
Lean Manufacturing and employee Performance in MalysiakhalidGGG
 
Work measurement and productivity
Work measurement and productivityWork measurement and productivity
Work measurement and productivityMd Nazir Ansari
 
Minimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleMinimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleIAEME Publication
 

What's hot (20)

1. bussiness process diagonistic tool for cpm
1. bussiness process diagonistic tool for cpm1. bussiness process diagonistic tool for cpm
1. bussiness process diagonistic tool for cpm
 
Productivity Improvement R
Productivity Improvement RProductivity Improvement R
Productivity Improvement R
 
Machine & materials managment
Machine & materials managmentMachine & materials managment
Machine & materials managment
 
IRJET- Study on Scope Variances in Construction Projects
IRJET- Study on Scope Variances in Construction ProjectsIRJET- Study on Scope Variances in Construction Projects
IRJET- Study on Scope Variances in Construction Projects
 
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regionImprovement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal region
 
Productivity management
Productivity management Productivity management
Productivity management
 
Productivity improvement technique using work study in rmg sector
Productivity improvement technique using work study in rmg sectorProductivity improvement technique using work study in rmg sector
Productivity improvement technique using work study in rmg sector
 
Productivity and performance in an organization
Productivity and performance in an organizationProductivity and performance in an organization
Productivity and performance in an organization
 
Productivity concepts
Productivity conceptsProductivity concepts
Productivity concepts
 
Productivity
ProductivityProductivity
Productivity
 
Production mgt(productivity ppt)
Production mgt(productivity ppt)Production mgt(productivity ppt)
Production mgt(productivity ppt)
 
022 Construction Productivity (PART 1)
022 Construction Productivity (PART 1)022 Construction Productivity (PART 1)
022 Construction Productivity (PART 1)
 
Work study might be the paramount methodology to improve productivity in the ...
Work study might be the paramount methodology to improve productivity in the ...Work study might be the paramount methodology to improve productivity in the ...
Work study might be the paramount methodology to improve productivity in the ...
 
Productivity of human resources
Productivity of human resourcesProductivity of human resources
Productivity of human resources
 
Productivity improvement slide share
Productivity improvement slide shareProductivity improvement slide share
Productivity improvement slide share
 
A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...
 
Managing productivity
Managing productivityManaging productivity
Managing productivity
 
Lean Manufacturing and employee Performance in Malysia
Lean Manufacturing and employee Performance in MalysiaLean Manufacturing and employee Performance in Malysia
Lean Manufacturing and employee Performance in Malysia
 
Work measurement and productivity
Work measurement and productivityWork measurement and productivity
Work measurement and productivity
 
Minimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleMinimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principle
 

Similar to 056 labour productivity

Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...IRJET Journal
 
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regionImprovement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regioneSAT Journals
 
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...IRJET Journal
 
Five ways to improve productivity at the construction site
Five ways to improve productivity at the construction siteFive ways to improve productivity at the construction site
Five ways to improve productivity at the construction siteVikaslal2006
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
Productivity planning and management
Productivity planning and managementProductivity planning and management
Productivity planning and managementpriyam141
 
Operations-Management-and-TQM_ESC-1LESSON-1 (1).pptx
Operations-Management-and-TQM_ESC-1LESSON-1 (1).pptxOperations-Management-and-TQM_ESC-1LESSON-1 (1).pptx
Operations-Management-and-TQM_ESC-1LESSON-1 (1).pptxGebethBaadera
 
Limits+of+the+learning+curve
Limits+of+the+learning+curveLimits+of+the+learning+curve
Limits+of+the+learning+curvereagan22
 
040 Integrating Financial Incentives
040 Integrating Financial Incentives040 Integrating Financial Incentives
040 Integrating Financial IncentivesDr Fereidoun Dejahang
 
040 integrating financial incentives
040 integrating financial incentives040 integrating financial incentives
040 integrating financial incentivesdrdej19
 
8. chapter 7 work study (time and motion study)
8. chapter 7   work study (time and motion study)8. chapter 7   work study (time and motion study)
8. chapter 7 work study (time and motion study)sundar sivam
 
Factors Affecting Laborers’ Productivity in the Construction Companies
Factors Affecting Laborers’ Productivity in the Construction CompaniesFactors Affecting Laborers’ Productivity in the Construction Companies
Factors Affecting Laborers’ Productivity in the Construction CompaniesIJAEMSJORNAL
 
cost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeriacost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeriaNewman Jonathan
 
Downsizing & Business Reorganisation
Downsizing & Business ReorganisationDownsizing & Business Reorganisation
Downsizing & Business ReorganisationRAHAYU TASNIM
 
downsizing & business reorganisation
downsizing & business reorganisationdownsizing & business reorganisation
downsizing & business reorganisationRAHAYU TASNIM
 
Overall Equipment Effectiveness in Construction Equipments
Overall Equipment Effectiveness in Construction EquipmentsOverall Equipment Effectiveness in Construction Equipments
Overall Equipment Effectiveness in Construction EquipmentsIRJET Journal
 
IRJET-A Review of Impact on Labour Management in Construction Industry
IRJET-A Review of Impact on Labour Management in Construction IndustryIRJET-A Review of Impact on Labour Management in Construction Industry
IRJET-A Review of Impact on Labour Management in Construction IndustryIRJET Journal
 
Manufacturing differently
Manufacturing differentlyManufacturing differently
Manufacturing differentlyHendrik Lourens
 
034 INNOVATION DELAY AND DISRUPTION, WASTE ON SITE
034 INNOVATION DELAY AND DISRUPTION, WASTE ON SITE 034 INNOVATION DELAY AND DISRUPTION, WASTE ON SITE
034 INNOVATION DELAY AND DISRUPTION, WASTE ON SITE Dr Fereidoun Dejahang
 

Similar to 056 labour productivity (20)

092 Productivity Improvement
092 Productivity Improvement092 Productivity Improvement
092 Productivity Improvement
 
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
 
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regionImprovement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal region
 
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
 
Five ways to improve productivity at the construction site
Five ways to improve productivity at the construction siteFive ways to improve productivity at the construction site
Five ways to improve productivity at the construction site
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)
 
Productivity planning and management
Productivity planning and managementProductivity planning and management
Productivity planning and management
 
Operations-Management-and-TQM_ESC-1LESSON-1 (1).pptx
Operations-Management-and-TQM_ESC-1LESSON-1 (1).pptxOperations-Management-and-TQM_ESC-1LESSON-1 (1).pptx
Operations-Management-and-TQM_ESC-1LESSON-1 (1).pptx
 
Limits+of+the+learning+curve
Limits+of+the+learning+curveLimits+of+the+learning+curve
Limits+of+the+learning+curve
 
040 Integrating Financial Incentives
040 Integrating Financial Incentives040 Integrating Financial Incentives
040 Integrating Financial Incentives
 
040 integrating financial incentives
040 integrating financial incentives040 integrating financial incentives
040 integrating financial incentives
 
8. chapter 7 work study (time and motion study)
8. chapter 7   work study (time and motion study)8. chapter 7   work study (time and motion study)
8. chapter 7 work study (time and motion study)
 
Factors Affecting Laborers’ Productivity in the Construction Companies
Factors Affecting Laborers’ Productivity in the Construction CompaniesFactors Affecting Laborers’ Productivity in the Construction Companies
Factors Affecting Laborers’ Productivity in the Construction Companies
 
cost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeriacost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeria
 
Downsizing & Business Reorganisation
Downsizing & Business ReorganisationDownsizing & Business Reorganisation
Downsizing & Business Reorganisation
 
downsizing & business reorganisation
downsizing & business reorganisationdownsizing & business reorganisation
downsizing & business reorganisation
 
Overall Equipment Effectiveness in Construction Equipments
Overall Equipment Effectiveness in Construction EquipmentsOverall Equipment Effectiveness in Construction Equipments
Overall Equipment Effectiveness in Construction Equipments
 
IRJET-A Review of Impact on Labour Management in Construction Industry
IRJET-A Review of Impact on Labour Management in Construction IndustryIRJET-A Review of Impact on Labour Management in Construction Industry
IRJET-A Review of Impact on Labour Management in Construction Industry
 
Manufacturing differently
Manufacturing differentlyManufacturing differently
Manufacturing differently
 
034 INNOVATION DELAY AND DISRUPTION, WASTE ON SITE
034 INNOVATION DELAY AND DISRUPTION, WASTE ON SITE 034 INNOVATION DELAY AND DISRUPTION, WASTE ON SITE
034 INNOVATION DELAY AND DISRUPTION, WASTE ON SITE
 

More from drdej19

069 managing people
069 managing people069 managing people
069 managing peopledrdej19
 
070 material management
070 material management070 material management
070 material managementdrdej19
 
068 managing fundamentals
068 managing fundamentals068 managing fundamentals
068 managing fundamentalsdrdej19
 
067 management
067 management067 management
067 managementdrdej19
 
066 management structure-the design
066 management structure-the design066 management structure-the design
066 management structure-the designdrdej19
 
062 logistics and productivity
062 logistics and productivity062 logistics and productivity
062 logistics and productivitydrdej19
 
065 management information system
065 management information system065 management information system
065 management information systemdrdej19
 
064 management accounting
064 management accounting064 management accounting
064 management accountingdrdej19
 
063 management theory
063 management theory063 management theory
063 management theorydrdej19
 
061 logistics and productivity
061 logistics and productivity061 logistics and productivity
061 logistics and productivitydrdej19
 
059 lean construction
059 lean construction059 lean construction
059 lean constructiondrdej19
 
060 lean supply chain
060 lean supply chain060 lean supply chain
060 lean supply chaindrdej19
 
055 kpi's-success factor
055 kpi's-success factor055 kpi's-success factor
055 kpi's-success factordrdej19
 
057 lean and environment
057 lean and environment057 lean and environment
057 lean and environmentdrdej19
 
058 lean construction (2)
058 lean construction (2)058 lean construction (2)
058 lean construction (2)drdej19
 
054 jit and quality management system
054 jit and quality management system054 jit and quality management system
054 jit and quality management systemdrdej19
 
050 intergrating constructability
050 intergrating constructability050 intergrating constructability
050 intergrating constructabilitydrdej19
 
049 integration of constructability
049 integration of constructability049 integration of constructability
049 integration of constructabilitydrdej19
 
048 integrating workers motivation
048 integrating workers motivation048 integrating workers motivation
048 integrating workers motivationdrdej19
 
047 integrating tqm-cons-ve
047 integrating tqm-cons-ve047 integrating tqm-cons-ve
047 integrating tqm-cons-vedrdej19
 

More from drdej19 (20)

069 managing people
069 managing people069 managing people
069 managing people
 
070 material management
070 material management070 material management
070 material management
 
068 managing fundamentals
068 managing fundamentals068 managing fundamentals
068 managing fundamentals
 
067 management
067 management067 management
067 management
 
066 management structure-the design
066 management structure-the design066 management structure-the design
066 management structure-the design
 
062 logistics and productivity
062 logistics and productivity062 logistics and productivity
062 logistics and productivity
 
065 management information system
065 management information system065 management information system
065 management information system
 
064 management accounting
064 management accounting064 management accounting
064 management accounting
 
063 management theory
063 management theory063 management theory
063 management theory
 
061 logistics and productivity
061 logistics and productivity061 logistics and productivity
061 logistics and productivity
 
059 lean construction
059 lean construction059 lean construction
059 lean construction
 
060 lean supply chain
060 lean supply chain060 lean supply chain
060 lean supply chain
 
055 kpi's-success factor
055 kpi's-success factor055 kpi's-success factor
055 kpi's-success factor
 
057 lean and environment
057 lean and environment057 lean and environment
057 lean and environment
 
058 lean construction (2)
058 lean construction (2)058 lean construction (2)
058 lean construction (2)
 
054 jit and quality management system
054 jit and quality management system054 jit and quality management system
054 jit and quality management system
 
050 intergrating constructability
050 intergrating constructability050 intergrating constructability
050 intergrating constructability
 
049 integration of constructability
049 integration of constructability049 integration of constructability
049 integration of constructability
 
048 integrating workers motivation
048 integrating workers motivation048 integrating workers motivation
048 integrating workers motivation
 
047 integrating tqm-cons-ve
047 integrating tqm-cons-ve047 integrating tqm-cons-ve
047 integrating tqm-cons-ve
 

Recently uploaded

Shrambal_Distributors_Newsletter_Apr-2024 (1).pdf
Shrambal_Distributors_Newsletter_Apr-2024 (1).pdfShrambal_Distributors_Newsletter_Apr-2024 (1).pdf
Shrambal_Distributors_Newsletter_Apr-2024 (1).pdfvikashdidwania1
 
VIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
VIP Call Girls Thane Sia 8617697112 Independent Escort Service ThaneVIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
VIP Call Girls Thane Sia 8617697112 Independent Escort Service ThaneCall girls in Ahmedabad High profile
 
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Dividend Policy and Dividend Decision Theories.pptx
Dividend Policy and Dividend Decision Theories.pptxDividend Policy and Dividend Decision Theories.pptx
Dividend Policy and Dividend Decision Theories.pptxanshikagoel52
 
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Delhi Call girls
 
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service AizawlVip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawlmakika9823
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Pooja Nehwal
 
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...Suhani Kapoor
 
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130Suhani Kapoor
 
How Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of ReportingHow Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of ReportingAggregage
 
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...Suhani Kapoor
 
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Pooja Nehwal
 
Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfAdnet Communications
 
Quarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of MarketingQuarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of MarketingMaristelaRamos12
 
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...Call Girls in Nagpur High Profile
 
Chapter 2.ppt of macroeconomics by mankiw 9th edition
Chapter 2.ppt of macroeconomics by mankiw 9th editionChapter 2.ppt of macroeconomics by mankiw 9th edition
Chapter 2.ppt of macroeconomics by mankiw 9th editionMuhammadHusnain82237
 
Andheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot ModelsAndheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot Modelshematsharma006
 

Recently uploaded (20)

Shrambal_Distributors_Newsletter_Apr-2024 (1).pdf
Shrambal_Distributors_Newsletter_Apr-2024 (1).pdfShrambal_Distributors_Newsletter_Apr-2024 (1).pdf
Shrambal_Distributors_Newsletter_Apr-2024 (1).pdf
 
VIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
VIP Call Girls Thane Sia 8617697112 Independent Escort Service ThaneVIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
VIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
 
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Dividend Policy and Dividend Decision Theories.pptx
Dividend Policy and Dividend Decision Theories.pptxDividend Policy and Dividend Decision Theories.pptx
Dividend Policy and Dividend Decision Theories.pptx
 
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
 
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service AizawlVip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
 
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...
 
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
 
How Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of ReportingHow Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of Reporting
 
Veritas Interim Report 1 January–31 March 2024
Veritas Interim Report 1 January–31 March 2024Veritas Interim Report 1 January–31 March 2024
Veritas Interim Report 1 January–31 March 2024
 
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
 
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
 
Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdf
 
Quarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of MarketingQuarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of Marketing
 
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
 
Chapter 2.ppt of macroeconomics by mankiw 9th edition
Chapter 2.ppt of macroeconomics by mankiw 9th editionChapter 2.ppt of macroeconomics by mankiw 9th edition
Chapter 2.ppt of macroeconomics by mankiw 9th edition
 
Andheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot ModelsAndheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot Models
 

056 labour productivity

  • 1. FROM PRODUCTIVITY BRIEFCASES HELP DESK LABOUR PRODUCTIVITY
  • 2. LABOUR PRODUCTIVITY  A large proportion of the high cost in construction work is as a result of excessive labour costs.  These costs can be reduced if productivity on site is increased by improving labour efficiency.
  • 3. LABOUR PRODUCTIVITY  Labour productivity is determined by a complexity of factors.  One of these factors is the type and size of the project.  It includes the layout and complexity of the project.  A large construction site requiring a large number of workers will be relatively harder to manage than a smaller size.
  • 4. LABOUR PRODUCTIVITY  The difficulties in managing manpower on a large scale may result in productivity loss (Thomas and Jansma, 1985).  There are four main factors that affect labour productivity; 1. The duration of worker’s effort. 2. The intensity of worker’s effort. 3. The effectiveness of worker’s effort combined with the technology used. 4. The efficiency of worker’s effort, which can be described as a measure of how much the worker is utilising his ability.
  • 5. LABOUR PRODUCTIVITY  Work on a complex project (e.g. such as the construction of a major shopping centre) becomes more difficult as the project advances.  Off-site pre-fabrication units will reduce the number of labour hours required. Other factors such as:  the level of skill amongst the workers;  the length of the workday;  Innovative work practices can increase productivity.
  • 6. LABOUR PRODUCTIVITY  In view of Olomolaiye et al (1998):  The personal attribution of workers contribute to the factors that directly affect productivity. These attributes as:  worker’s skills  experience  training  qualifications  Innate (inborn) physical and mental ability.  The intensity of the application of both skills and innate ability to the production process.
  • 7. LABOUR PRODUCTIVITY Thomas et al (1992) investigated the level of labour productivity for masonry activities from seven countries. Case study showed that:  little difference in productivity amongst the seven countries.  The aim of investigation was to show that productivity in  Australia  Canada  England  Finland,  Scotland  Sweden and the United State-was similar.
  • 8. LABOUR PRODUCTIVITY  The site with the highest level of disruption will have the worse level of productivity.  Other investigations show that labour disruption accounts for more than 50% of the variability in daily crew productivity.
  • 9. LABOUR PRODUCTIVITY  An excessive number of staff can be disruptive.  It also has the effect of reducing the level of productivity. The results of a model based survey of contractors (planning engineers) in France, Germany and UK Showed that :  the working schedule of UK and German contractors may be excessive;  can have an impact on construction productivity level.
  • 10. LABOUR PRODUCTIVITY  The survey also identified that in the UK the labour force employed on site are:  26% directly employed  74% sub-contracted  In France 93% of the labour force on site are directly employed.  In France 7% are sub-contractors.  This trend goes back to year 2000 to 2003 and recently there has been some changes to above figures.
  • 11. LABOUR PRODUCTIVITY  Employment practice has an impact on the cohesiveness amongst the workforce. Some of the Important contributors towards Labour productivity are:  a culture of cohesiveness  common goal  strong sense of a team working  towards a common goal
  • 12. LABOUR PRODUCTIVITY  A culture of team working involving all workers is to achieve a common goal.  A common goal on construction site is to achieve KPIs.  Labour productivity can also be improved if operatives on site avoid conflict.  Conflict on site can hamper the progress of work.  Team working reduces conflict and will greatly facilitate increased productivity.
  • 13. LABOUR PRODUCTIVITY  The importance of a directly or indirectly employed workforce.  and the effect on the dynamics of productivity is reiterated in several research work.  The growth in the construction sector is relatively stagnant.  The job security can be very bad during any recession for construction workforce.
  • 14. LABOUR PRODUCTIVITY  This is based on a number of observations.  One such observation is the limited use of mass production.  The reasons for high productivity amongst major contractors are:  Scheduled overtime is avoided  The labour force is directly employed  They are a mainly skilled work force
  • 15. LABOUR PRODUCTIVITY  Maximum 40 hour per week is the norm rather than the exception.  There are also other factors such as:  high salary  job security which are also important reasons for high productivity amongst major construction firms.
  • 16. LABOUR PRODUCTIVITY Impact of Changes on Labour Productivity  Any changes made to the original scope of work are costly.  They will have an effect on labour productivity.  Although some changes are inevitable, the impact on site productivity is nonetheless significant.
  • 17. LABOUR PRODUCTIVITY  The impact of changes in quantitative terms has been measured by researchers.  Changes impacts on the labour force’s efficiency.  The relationship between change and various types of disruption would result in productivity decline.
  • 18. LABOUR PRODUCTIVITY  The increase in the percentage of work hours spent on changes will lead to a 10- 20% loss in productivity.  Changes are considered an indirect factor influencing productivity.  It has also been realised that changes in themselves do not decrease productivity or efficiency.  It is the manpower involved in the process.
  • 19. LABOUR PRODUCTIVITY  If a change occurs in the final stage of a construction project:  the crew must stop working until the changes are carried out first.  Also the work method may require changes as well as more co-ordination being required.
  • 20. LABOUR PRODUCTIVITY  If changes occur:  routine work will change,  processes will slow down  the total work hours will be several times greater.  On average, there is a 30% loss of efficiency when changes are being performed, although it is possible to carry out many changes without a loss of efficiency.
  • 21. LABOUR PRODUCTIVITY  The variables affecting efficiency are believed to be the time of the change.  Productivity can decline if there are:  repeat works  disruption  the presence of change
  • 22. LABOUR PRODUCTIVITY  The impact of change on the construction site will often result in disputes.  Changes should be kept to a minimum. Improving Productivity by Training Methods  Training is considered to be an influential factor in high productivity on construction sites.  The growth in labour only sub-contracting in UK construction sector.  The level and quality of training within the industry.
  • 23. LABOUR PRODUCTIVITY  Productivity within the UK construction industry compared with West Germany and France is partly the result of low levels of training labour force receive in UK amongst small firms.  Large UK firms have a good training policy.
  • 24. LABOUR PRODUCTIVITY  Improving the knowledge and skill of workers on construction sites.  Motivated work force.  Including the quality of management all can improve the productivity.  Site worker’s training is considered to be an important factor in improving site productivity.
  • 25. LABOUR PRODUCTIVITY  Therefore, organisational performance (P) can be considered to be dependent on:  the aggregate sums of performance of each worker (F)  and each manager (M)  and the external factor (e)  and the organisational performance is shown as; P = f (F, M, e).
  • 26. LABOUR PRODUCTIVITY  The individual performance is dependent on individual knowledge (K)  skill (S)  and the attitude to the work (a) of each worker and manager  P= f (K,S, a), M =f (K, S, a). Performance of workers is linked to both quality (qualitative) and output (quantitative) rate.
  • 27. LABOUR PRODUCTIVITY  Productivity and the quality of work can be improved by:  giving appropriate training to upgrade the:  knowledge  skills  and attitude of workers and managers.