Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Corporate Presentation MRS

465 views

Published on

  • Be the first to comment

  • Be the first to like this

Corporate Presentation MRS

  1. 1. Corporate Presentation
  2. 2. Agenda 1. Who are we? 2. Project Phases 3. Services in a Nutshell? 4. Standards - ISO 5. Any Questions?
  3. 3. Overview MRS full tu ey so ut o s S u turnkey solutions Quality Assurance and Quality Control Data and Document management Health Safety and Environment Recruitment Quality System Implementation and auditing including ISO 9001, ISO 14001, ISO 17025
  4. 4. Our Locations
  5. 5. Project Phases – Pre EPCM Feasibility Conceptual Basic Design Study Design This phase focuses This phase focuses This phase focuses on the identification on selecting the on finalizing project of new beneficial best identified technology and business business objectives. Develop opportunities. Each opportunity and Execution Plan to opportunity is preparing a support budget cost carefully analysed preliminary cost estimate and funding and assessed using estimate. required. a predefined model. p
  6. 6. Project Phases – EPCM & Beyond Commissioning EPCM Close Out & Start-Up This phase is composed of This phase is This phase focuses on three primary sub-phases: 1. Detailed Design - composed of two performing Management and primary sub phases sub-phases regulatory, contractual regulatory contractual, coordination activities 1. Commissioning and archival and other related to design activities Start-up required and equipment Perform commissioning activities to close the procurement. and start-up activities project in an 2. Procurement of 2 P t f 2. Initial Operations orderly fashion. equipment and materials. and Performance 3. Construction - Testing Mobilization and Perform regulatory, management of contractual and the th construction work force t ti kf including other related archival procedures off site construction procurement activities.
  7. 7. MRS Full Turnkey Solutions Complete tailored solution from project management through to recruitment Front-end and back-end Sectors are – Oil and G S t d Gas, Mining, Pharmaceutical and P t h i l d Petrochemical.
  8. 8. Quality Assurance and Quality Control Implementation of QA Systems p y Coordinate QC Inspections for p Develop and implement a Principle Supplied Equipment Project Quality Assurance Plan and Fabricated Materials Monitor Project Discipline Review Procedures (technical) audits and reviews (Weld/NDT/UT/Hydro etc) of all Monitor the effectiveness of the constructors Quality System by conducting Ensure that all Standards audits outlining minimum testing Progress close-out of audit requirements (Pressure vessels, findings, monitor and report steam lines/welds, structural trends steel ) are adhered to Development and D l d Onsite QC Inspection implementation of the project Coordination Quality Control Inspection program
  9. 9. Data and Document Management Review and evaluation of Document Management systems g y Assist in development & implementation of Document Management system with IT systems providers Create management guidelines for Document Control Liaise with management and staff to ensure Document Control area is managed in accordance with project QA systems Training & Facilitation Monthly reporting to client Archiving and transitioning of project documents to owner through f handover FTP implementation p Internal audits of department
  10. 10. Health Safety and Environment Implementation of HSE Syste s p e e tat o o S Systems Develop and implement a Project HS and E Plans Monitor the effectiveness of the Quality System by conducting audits Progress close-out of audit findings, monitor and report t d fi di it d t trends Environmental Monitoring Assistance – Source Ambient Source, Ambient, Fugitive, Static and OH&S
  11. 11. Recruitment Secto specific expertise Sector spec c e pe t se Project management, engineering, QA/QC, HSE, g g document and data management and auditors for ISO 9001 14001 and 17025 9001, d Expats from Australia and the Philippines Uniting talent with opportunity
  12. 12. Quality System Implementation Application a d Project-Planning pp cat o and oject a g Gap Analysis Preliminary Audit Activities (Document Review/Preliminary Audit) Audit Action Trackingg Data Management System Implementation and roll out Procedure writing assistance g Familiarisation Sessions and Inductions to the quality system Follow Up Audit of System Certification by external 3rd party body y p y y
  13. 13. ISO 9001 Requirements Customer focus Leadership Involvement of people I l t f l Process approach Systems approach to management Continual improvement Factual approach to decision making Mutually beneficial supplier relationships. M t ll b fi i l li l ti hi
  14. 14. What should a quality management system do for your company? Inspiring t e co de ce o custo e s a d sta , b ea g sp g the confidence of customers and staff, breaking down barriers between departments, and reaching defined business objectives - all of these goals are achievable through the implementation of a dynamic and robust Quality Management System. Quality Management S t Q lit M t Systems certified t ISO 9001 the tifi d to 9001, th world’s most recognised business management standard, standard has been adopted across all industry types types, from manufacturing through professional service organizations, to achieve consistent business processes and drive measurable, cost-saving performance improvements.
  15. 15. ISO 14001 Develop an environmental policy for your organization. Establish an environmental management system (EMS). Identify the most significant environmental aspects of your past, present, and future activities, products, and services. Clarify and respect the legal and other requirements that apply to your organization’s environmental aspects. Set environmental objectives and targets for all relevant functions and levels within your organization. Create programs to implement your Environmental policy and achieve your environmental objectives and targets targets. Evaluate your environmental management system in order to identify opportunities for improvement. ISO 14001 expects you to monitor, measure, audit, and review your EMS in order to identify corrective and preventive actions and to improve your overall environmental performance.
  16. 16. ISO 17025 Specifies the general requirements for the competence to carry out p g q p y tests and/or calibrations, including sampling. It covers testing and calibration performed using standard methods, non-standard methods, and laboratory-developed methods. laboratory developed It is applicable to all organizations performing tests and/or calibrations. These include, for example, first-, second- and third- party laboratories and laboratories where testing and/or calibration laboratories, forms part of inspection and product certification. Applicable to all laboratories regardless of the number of personnel or the extent of the scope of testing and/or calibration activities. For use by laboratories in developing their management system for quality, quality administrative and technical operations Laboratory operations. customers, regulatory authorities and accreditation bodies may also use it in confirming or recognizing the competence of laboratories.
  17. 17. A Few of Our Clients
  18. 18. Questions?

×