SlideShare a Scribd company logo
1 of 3
Download to read offline
Methods of Documentation and Measured Drawings (ARC60305/ARC2323/ARC1215): January 2016 1
SCHOOL OF ARCHITECTURE, BUILDING & DESIGN
Centre for Modern Architecture Studies in Southeast Asia (MASSA)
_________________________________________________________________________________________
Bachelor of Science (Honours) in Architecture / (Architecture)
Module: METHODS OF DOCUMENTATION AND MEASURED DRAWINGS
(ARC60305/ARC2323/ARC1215)
Instructor: Dr. Nor Hayati Hussain (603-56295754; norhayati.hussain@taylors.edu.my)
Project 3: Measured Drawings & Model (Group work with 15% individual components)
Due Date: 7 March 2016
Introduction
The project will be carried out throughout the semester where students will be assigned to measure and document
a historical / architecturally significant or heritage building and translate all the data into a set of drawings. Each
group will have to only measure one particular building assigned by the course coordinator. Apart from doing the
measuring exercise on site, students will also need to do additional research in order to piece together all the
important data about the building. The model will provide additional physical information of the building.
Objectives of Project
This project aims to produce a set of measure drawings of a historical and/or architecturally significant building or
structure in a specific location. A report containing important and historical information of the building will complement
the drawings. It is an on-site exercise where students are required to execute fieldwork and hands-on measuring
exercise.
Learning Outcomes of this Project
 Recommend the appropriate method or architectural historic documentation
 Recognize and recall techniques of measured drawing and documentation
 Explain the as-built building constructions, architectural details and elements
 Interpret historic architectural element, structure and building
 Execute fieldwork and hands-on measurement exercise
 Translate measure data into scaled drawings
 Produce a report on the building highlighting its importance and historical significance
Tasks
In groups of assigned number of members, depending on the size and complexity of the building to be measured,
students are to do a measuring exercise on the particular building, taking all physical information of the building, from
its location to its spatial layout as well as details. Each group will be given laser measuring devices and a 30 meter
measuring tape. Students may bring along additional tools such as papers, pencils, clay and camera that may be
useful in getting and recording all the data obtained.
It is COMPULSORY for all students to attend this field work as it is the most important part of this module.
Methods of Documentation and Measured Drawings (ARC60305/ARC2323/ARC1215): January 2016 2
Submission Requirements
2 set of A1 sized drawings (one with dimensions and one without dimensions) and 2 sets of
A3 sized drawings (both without dimensions) comprising the following;
 Key plan
 Location plan
 Site plan incorporating the roof plan
 Floor plans
 Elevations
 Sections
 Site sections
 Exploded isometric / axonometric
 A physical model to show the construction / structure of the buildings using ONLY balsa wood OR white
model boards as either one section OR an open-able full model
 Details – construction, architectural, decorative elements / ornaments (minimum one each)
All annotations should be made in bilingual for traditional terminologies such as ‘tebar layar’, ‘dou-gong’ or ‘sikhara’.
Assessment Criteria
The assessment for this assignment will be based on
 Methods, accuracy and efficiency of collecting information during fieldwork
 Completeness of the drawings submitted
 Application of drawing convention, line thickness, symbols, abbreviation, layout , scale, labelling, annotation etc
 Progress – constant and / or increased development in the production of drawings and model
 Accuracy – ability to translate physical data into drawings and model
 Clarity – readable and comprehensive drawings and model
 Efficiency and consistency of the group performance
 Individual contribution on the drawings and models
Marking Criteria
Marks shall be distributed as follows:
Progress marks (20%)
 On site performance – individual (10 marks)
- Methods, accuracy and efficiency of collecting information during fieldwork
 Interim submission (drawings & model) (10 marks)
- Application of drawing convention, line thickness, symbols, abbreviation, layout, scale, labelling,
annotation etc. (5%)
- Accuracy and clarity – ability to translate physical data into drawings (5%)
Final submission (30%)
 Completeness, Drawing Application, Accuracy and Clarity of drawings (15 marks)
- Completeness of the drawings submitted & Application of drawing convention, line thickness, symbols,
abbreviation, layout, scale, labelling, annotation etc. (10%)
- Accuracy & clarity – ability to translate physical data into drawings (5%)
 Model (10 marks)
Methods of Documentation and Measured Drawings (ARC60305/ARC2323/ARC1215): January 2016 3
- Accuracy – ability to translate physical data into model (5%)
- Clarity – readable and well-crafted model (5%)
 Individual performance and contribution (peer assessment) (5 marks)
- Individual contribution on the drawings and models
Reference
1. Biefeld, Bert. 2007. Basic Technical Drawing. Germany. Birkhauser
2. John, Burn ed. 2004. Recording Historic Structure. New Jersey. John Wiley & Sons
3. KALAM-UTM, Risalah Panduan (Program Kajian Lukisan Terukur). UTM
4. Arnold, Dana. 2002. Reading Architectural History. London. Routledge
5. Hanafi, Zulkifli. 1999. Lukisan Terukur Rumah Tradisional Melayu Pulau Pinang. Kedah. Amber-Solara
Publication
6. Hanafi, Zulkifli. 2004. Lukisan Terukur Rumah Tradisional Melayu Melayu Perak. Kedah. Amber-Solara
Publication

More Related Content

What's hot

Arc60103 (arc1313) 1 april 2014 project brief final
Arc60103 (arc1313) 1 april 2014 project brief finalArc60103 (arc1313) 1 april 2014 project brief final
Arc60103 (arc1313) 1 april 2014 project brief finalPreston Liew
 
Building con 1 (arc1523) project 2 brief
Building con 1 (arc1523) project 2 brief   Building con 1 (arc1523) project 2 brief
Building con 1 (arc1523) project 2 brief Darshiini Vig
 
Building con 1 (arc1523) project 1 brief
Building con 1 (arc1523) project 1 brief  Building con 1 (arc1523) project 1 brief
Building con 1 (arc1523) project 1 brief Darshiini Vig
 
Arc60205 arc1126 project 1 famous people, familiar faces (august 2016)
Arc60205 arc1126    project 1 famous people, familiar faces (august 2016)Arc60205 arc1126    project 1 famous people, familiar faces (august 2016)
Arc60205 arc1126 project 1 famous people, familiar faces (august 2016)Lau Hui Ming Belinda
 
Building con 1 (arc 1523) project 2 brief aug 2014
Building con 1 (arc 1523) project 2 brief aug 2014Building con 1 (arc 1523) project 2 brief aug 2014
Building con 1 (arc 1523) project 2 brief aug 2014Preston Liew
 
Project 1 brief precedent studies
Project 1 brief precedent studiesProject 1 brief precedent studies
Project 1 brief precedent studiesAnthony Chew
 
Arc1126 project 2 pavilion @ national botanical garden shah alam
Arc1126 project 2 pavilion @ national botanical garden shah alamArc1126 project 2 pavilion @ national botanical garden shah alam
Arc1126 project 2 pavilion @ national botanical garden shah alamLau Hui Ming Belinda
 
CT3 Individual assignment brief-2016-8
CT3 Individual assignment brief-2016-8CT3 Individual assignment brief-2016-8
CT3 Individual assignment brief-2016-8Est
 
Arc1126 project 1 famous people, familiar faces
Arc1126 project 1 famous people, familiar faces Arc1126 project 1 famous people, familiar faces
Arc1126 project 1 famous people, familiar faces Darshiini Vig
 

What's hot (11)

Arc60103 (arc1313) 1 april 2014 project brief final
Arc60103 (arc1313) 1 april 2014 project brief finalArc60103 (arc1313) 1 april 2014 project brief final
Arc60103 (arc1313) 1 april 2014 project brief final
 
Building con 1 (arc1523) project 2 brief
Building con 1 (arc1523) project 2 brief   Building con 1 (arc1523) project 2 brief
Building con 1 (arc1523) project 2 brief
 
Building con 1 (arc1523) project 1 brief
Building con 1 (arc1523) project 1 brief  Building con 1 (arc1523) project 1 brief
Building con 1 (arc1523) project 1 brief
 
Arc60205 arc1126 project 1 famous people, familiar faces (august 2016)
Arc60205 arc1126    project 1 famous people, familiar faces (august 2016)Arc60205 arc1126    project 1 famous people, familiar faces (august 2016)
Arc60205 arc1126 project 1 famous people, familiar faces (august 2016)
 
Building con 1 (arc 1523) project 2 brief aug 2014
Building con 1 (arc 1523) project 2 brief aug 2014Building con 1 (arc 1523) project 2 brief aug 2014
Building con 1 (arc 1523) project 2 brief aug 2014
 
Project 1 brief precedent studies
Project 1 brief precedent studiesProject 1 brief precedent studies
Project 1 brief precedent studies
 
Project 1 cube
Project 1   cubeProject 1   cube
Project 1 cube
 
Arc1126 project 2 pavilion @ national botanical garden shah alam
Arc1126 project 2 pavilion @ national botanical garden shah alamArc1126 project 2 pavilion @ national botanical garden shah alam
Arc1126 project 2 pavilion @ national botanical garden shah alam
 
Ge6152
Ge6152Ge6152
Ge6152
 
CT3 Individual assignment brief-2016-8
CT3 Individual assignment brief-2016-8CT3 Individual assignment brief-2016-8
CT3 Individual assignment brief-2016-8
 
Arc1126 project 1 famous people, familiar faces
Arc1126 project 1 famous people, familiar faces Arc1126 project 1 famous people, familiar faces
Arc1126 project 1 famous people, familiar faces
 

Viewers also liked

SEM 4 : 3 CITIES PROJECT 2 BRIEF
SEM 4 : 3 CITIES PROJECT 2 BRIEFSEM 4 : 3 CITIES PROJECT 2 BRIEF
SEM 4 : 3 CITIES PROJECT 2 BRIEFDarshiini Vig
 
Le corbusier presentation project 1 studio
Le corbusier presentation project 1 studio Le corbusier presentation project 1 studio
Le corbusier presentation project 1 studio Darshiini Vig
 
Arc1126 project 2b retreat house (aug 2015)
Arc1126 project 2b retreat house (aug 2015)Arc1126 project 2b retreat house (aug 2015)
Arc1126 project 2b retreat house (aug 2015)Darshiini Vig
 
Arc1126 project 2a brief observation deck @ cape rachado
Arc1126 project 2a brief observation deck @ cape rachadoArc1126 project 2a brief observation deck @ cape rachado
Arc1126 project 2a brief observation deck @ cape rachadoDarshiini Vig
 
Mapping the Townscape - Central Market Petaling Street KL
Mapping the Townscape - Central Market Petaling Street KLMapping the Townscape - Central Market Petaling Street KL
Mapping the Townscape - Central Market Petaling Street KLJoe Onn Lim
 
SEMESTER 4.5 : INTERNSHIP MODULE OUTLINE
SEMESTER 4.5 : INTERNSHIP MODULE OUTLINESEMESTER 4.5 : INTERNSHIP MODULE OUTLINE
SEMESTER 4.5 : INTERNSHIP MODULE OUTLINEDarshiini Vig
 

Viewers also liked (6)

SEM 4 : 3 CITIES PROJECT 2 BRIEF
SEM 4 : 3 CITIES PROJECT 2 BRIEFSEM 4 : 3 CITIES PROJECT 2 BRIEF
SEM 4 : 3 CITIES PROJECT 2 BRIEF
 
Le corbusier presentation project 1 studio
Le corbusier presentation project 1 studio Le corbusier presentation project 1 studio
Le corbusier presentation project 1 studio
 
Arc1126 project 2b retreat house (aug 2015)
Arc1126 project 2b retreat house (aug 2015)Arc1126 project 2b retreat house (aug 2015)
Arc1126 project 2b retreat house (aug 2015)
 
Arc1126 project 2a brief observation deck @ cape rachado
Arc1126 project 2a brief observation deck @ cape rachadoArc1126 project 2a brief observation deck @ cape rachado
Arc1126 project 2a brief observation deck @ cape rachado
 
Mapping the Townscape - Central Market Petaling Street KL
Mapping the Townscape - Central Market Petaling Street KLMapping the Townscape - Central Market Petaling Street KL
Mapping the Townscape - Central Market Petaling Street KL
 
SEMESTER 4.5 : INTERNSHIP MODULE OUTLINE
SEMESTER 4.5 : INTERNSHIP MODULE OUTLINESEMESTER 4.5 : INTERNSHIP MODULE OUTLINE
SEMESTER 4.5 : INTERNSHIP MODULE OUTLINE
 

Similar to SEMESTER 2.5 : PROJECT 3 BRIEF

Project 2 measured drawing jan2015 rev
Project 2 measured drawing jan2015 revProject 2 measured drawing jan2015 rev
Project 2 measured drawing jan2015 revPreston Liew
 
Project 2 measured drawing jan2015
Project 2 measured drawing jan2015Project 2 measured drawing jan2015
Project 2 measured drawing jan2015huisim7
 
Itdproject3brief 150625045740-lva1-app6892
Itdproject3brief 150625045740-lva1-app6892Itdproject3brief 150625045740-lva1-app6892
Itdproject3brief 150625045740-lva1-app6892Darryl Harvey
 
ITD Drawing final project studio unit living_january 2015
ITD Drawing final project studio unit living_january 2015ITD Drawing final project studio unit living_january 2015
ITD Drawing final project studio unit living_january 2015Madeline Liew
 
ITD Drawing final project studio unit living
ITD Drawing final project studio unit livingITD Drawing final project studio unit living
ITD Drawing final project studio unit livingashleyyeap
 
ITD FINAL PROJECT BRIEF
ITD FINAL PROJECT BRIEFITD FINAL PROJECT BRIEF
ITD FINAL PROJECT BRIEFIAMLETTY
 
Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015Joeylau97
 
Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015howcyong1011
 
Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015brandonliaw97
 
Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015gjj97
 
ITD Drawing final project studio unit living_march 2015
ITD Drawing final project studio unit living_march 2015ITD Drawing final project studio unit living_march 2015
ITD Drawing final project studio unit living_march 2015Carol Tang
 
Drawing studio unit living
Drawing studio unit livingDrawing studio unit living
Drawing studio unit livingLY97
 
Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015Dana Kan
 
Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015ALISON TANG
 
Itd drawing final project studio unit living_march 2015
Itd drawing final project studio unit living_march 2015Itd drawing final project studio unit living_march 2015
Itd drawing final project studio unit living_march 2015Lau Hui Ming Belinda
 
Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015apongmalik
 
ITD FINAL PROJECT BRIEF
ITD FINAL PROJECT BRIEFITD FINAL PROJECT BRIEF
ITD FINAL PROJECT BRIEFSheng Zhe
 
Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015温 庄壁
 

Similar to SEMESTER 2.5 : PROJECT 3 BRIEF (20)

Project 2 measured drawing jan2015 rev
Project 2 measured drawing jan2015 revProject 2 measured drawing jan2015 rev
Project 2 measured drawing jan2015 rev
 
Project 2 measured drawing jan2015
Project 2 measured drawing jan2015Project 2 measured drawing jan2015
Project 2 measured drawing jan2015
 
Itdproject3brief 150625045740-lva1-app6892
Itdproject3brief 150625045740-lva1-app6892Itdproject3brief 150625045740-lva1-app6892
Itdproject3brief 150625045740-lva1-app6892
 
ITD Drawing final project studio unit living_january 2015
ITD Drawing final project studio unit living_january 2015ITD Drawing final project studio unit living_january 2015
ITD Drawing final project studio unit living_january 2015
 
ITD Drawing final project studio unit living
ITD Drawing final project studio unit livingITD Drawing final project studio unit living
ITD Drawing final project studio unit living
 
Project2 brief
Project2 briefProject2 brief
Project2 brief
 
Bcon 2 proj 2
Bcon 2 proj 2Bcon 2 proj 2
Bcon 2 proj 2
 
ITD FINAL PROJECT BRIEF
ITD FINAL PROJECT BRIEFITD FINAL PROJECT BRIEF
ITD FINAL PROJECT BRIEF
 
Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015
 
Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015
 
Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015
 
Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015
 
ITD Drawing final project studio unit living_march 2015
ITD Drawing final project studio unit living_march 2015ITD Drawing final project studio unit living_march 2015
ITD Drawing final project studio unit living_march 2015
 
Drawing studio unit living
Drawing studio unit livingDrawing studio unit living
Drawing studio unit living
 
Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015
 
Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015
 
Itd drawing final project studio unit living_march 2015
Itd drawing final project studio unit living_march 2015Itd drawing final project studio unit living_march 2015
Itd drawing final project studio unit living_march 2015
 
Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015
 
ITD FINAL PROJECT BRIEF
ITD FINAL PROJECT BRIEFITD FINAL PROJECT BRIEF
ITD FINAL PROJECT BRIEF
 
Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015
 

More from Darshiini Vig

SEM 6 : PROJECT MANAGEMENT PROJECT 2 BRIEF
SEM 6 : PROJECT MANAGEMENT  PROJECT 2 BRIEFSEM 6 : PROJECT MANAGEMENT  PROJECT 2 BRIEF
SEM 6 : PROJECT MANAGEMENT PROJECT 2 BRIEFDarshiini Vig
 
SEM 6 : PROJECT MANAGEMENT PROJECT 1 BRIEF
SEM 6 : PROJECT MANAGEMENT  PROJECT 1 BRIEFSEM 6 : PROJECT MANAGEMENT  PROJECT 1 BRIEF
SEM 6 : PROJECT MANAGEMENT PROJECT 1 BRIEFDarshiini Vig
 
SEM 6 : PROJECT MANAGEMENT MODULE OUTLINE
SEM 6 : PROJECT MANAGEMENT MODULE OUTLINESEM 6 : PROJECT MANAGEMENT MODULE OUTLINE
SEM 6 : PROJECT MANAGEMENT MODULE OUTLINEDarshiini Vig
 
SEM 6 : PORTFOLIO PROJECT BRIEF
SEM 6 : PORTFOLIO PROJECT BRIEF SEM 6 : PORTFOLIO PROJECT BRIEF
SEM 6 : PORTFOLIO PROJECT BRIEF Darshiini Vig
 
SEM 6 : PORTFOLIO MODULE OUTLINE
SEM 6 : PORTFOLIO MODULE OUTLINESEM 6 : PORTFOLIO MODULE OUTLINE
SEM 6 : PORTFOLIO MODULE OUTLINEDarshiini Vig
 
SEM 6 : STUDIO MODULE OUTLINE
SEM 6 : STUDIO MODULE OUTLINESEM 6 : STUDIO MODULE OUTLINE
SEM 6 : STUDIO MODULE OUTLINEDarshiini Vig
 
SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2Darshiini Vig
 
SEM 6 : BTECH 2 MODULE OUTLINE
SEM 6 : BTECH 2 MODULE OUTLINESEM 6 : BTECH 2 MODULE OUTLINE
SEM 6 : BTECH 2 MODULE OUTLINEDarshiini Vig
 
SEM 6 : BTECH 2 PROJECT 1
SEM 6 : BTECH 2 PROJECT 1SEM 6 : BTECH 2 PROJECT 1
SEM 6 : BTECH 2 PROJECT 1Darshiini Vig
 
SEM 6 : STUDIO PROJECT 1B
SEM 6 : STUDIO PROJECT 1BSEM 6 : STUDIO PROJECT 1B
SEM 6 : STUDIO PROJECT 1BDarshiini Vig
 
SEM 6 : STUDIO PROJECT 1C
SEM 6 : STUDIO PROJECT 1CSEM 6 : STUDIO PROJECT 1C
SEM 6 : STUDIO PROJECT 1CDarshiini Vig
 
SEM 6 : STUDIO PROJECT 1A
SEM 6 : STUDIO PROJECT 1ASEM 6 : STUDIO PROJECT 1A
SEM 6 : STUDIO PROJECT 1ADarshiini Vig
 
BSCIENCE PROJECT 2 FINAL REPORT
BSCIENCE PROJECT 2 FINAL REPORTBSCIENCE PROJECT 2 FINAL REPORT
BSCIENCE PROJECT 2 FINAL REPORTDarshiini Vig
 
BTECH 1 PROJECT 2 FINAL REPORT
BTECH 1 PROJECT 2 FINAL REPORT BTECH 1 PROJECT 2 FINAL REPORT
BTECH 1 PROJECT 2 FINAL REPORT Darshiini Vig
 
SEM 5 : PROJECT 2 BTECH 1
SEM 5 : PROJECT 2 BTECH 1 SEM 5 : PROJECT 2 BTECH 1
SEM 5 : PROJECT 2 BTECH 1 Darshiini Vig
 
CSI E-JOURNAL INDIVIDUAL COMPONENT
CSI E-JOURNAL INDIVIDUAL COMPONENTCSI E-JOURNAL INDIVIDUAL COMPONENT
CSI E-JOURNAL INDIVIDUAL COMPONENTDarshiini Vig
 
CSI WOODEN PALLETS BOARD
CSI WOODEN PALLETS BOARD CSI WOODEN PALLETS BOARD
CSI WOODEN PALLETS BOARD Darshiini Vig
 
CSI INITIAL PROPOSAL DOCUMENT
CSI INITIAL PROPOSAL DOCUMENT CSI INITIAL PROPOSAL DOCUMENT
CSI INITIAL PROPOSAL DOCUMENT Darshiini Vig
 
CSI INITIAL PROPOSAL SLIDES
CSI INITIAL PROPOSAL SLIDES CSI INITIAL PROPOSAL SLIDES
CSI INITIAL PROPOSAL SLIDES Darshiini Vig
 
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2Darshiini Vig
 

More from Darshiini Vig (20)

SEM 6 : PROJECT MANAGEMENT PROJECT 2 BRIEF
SEM 6 : PROJECT MANAGEMENT  PROJECT 2 BRIEFSEM 6 : PROJECT MANAGEMENT  PROJECT 2 BRIEF
SEM 6 : PROJECT MANAGEMENT PROJECT 2 BRIEF
 
SEM 6 : PROJECT MANAGEMENT PROJECT 1 BRIEF
SEM 6 : PROJECT MANAGEMENT  PROJECT 1 BRIEFSEM 6 : PROJECT MANAGEMENT  PROJECT 1 BRIEF
SEM 6 : PROJECT MANAGEMENT PROJECT 1 BRIEF
 
SEM 6 : PROJECT MANAGEMENT MODULE OUTLINE
SEM 6 : PROJECT MANAGEMENT MODULE OUTLINESEM 6 : PROJECT MANAGEMENT MODULE OUTLINE
SEM 6 : PROJECT MANAGEMENT MODULE OUTLINE
 
SEM 6 : PORTFOLIO PROJECT BRIEF
SEM 6 : PORTFOLIO PROJECT BRIEF SEM 6 : PORTFOLIO PROJECT BRIEF
SEM 6 : PORTFOLIO PROJECT BRIEF
 
SEM 6 : PORTFOLIO MODULE OUTLINE
SEM 6 : PORTFOLIO MODULE OUTLINESEM 6 : PORTFOLIO MODULE OUTLINE
SEM 6 : PORTFOLIO MODULE OUTLINE
 
SEM 6 : STUDIO MODULE OUTLINE
SEM 6 : STUDIO MODULE OUTLINESEM 6 : STUDIO MODULE OUTLINE
SEM 6 : STUDIO MODULE OUTLINE
 
SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2
 
SEM 6 : BTECH 2 MODULE OUTLINE
SEM 6 : BTECH 2 MODULE OUTLINESEM 6 : BTECH 2 MODULE OUTLINE
SEM 6 : BTECH 2 MODULE OUTLINE
 
SEM 6 : BTECH 2 PROJECT 1
SEM 6 : BTECH 2 PROJECT 1SEM 6 : BTECH 2 PROJECT 1
SEM 6 : BTECH 2 PROJECT 1
 
SEM 6 : STUDIO PROJECT 1B
SEM 6 : STUDIO PROJECT 1BSEM 6 : STUDIO PROJECT 1B
SEM 6 : STUDIO PROJECT 1B
 
SEM 6 : STUDIO PROJECT 1C
SEM 6 : STUDIO PROJECT 1CSEM 6 : STUDIO PROJECT 1C
SEM 6 : STUDIO PROJECT 1C
 
SEM 6 : STUDIO PROJECT 1A
SEM 6 : STUDIO PROJECT 1ASEM 6 : STUDIO PROJECT 1A
SEM 6 : STUDIO PROJECT 1A
 
BSCIENCE PROJECT 2 FINAL REPORT
BSCIENCE PROJECT 2 FINAL REPORTBSCIENCE PROJECT 2 FINAL REPORT
BSCIENCE PROJECT 2 FINAL REPORT
 
BTECH 1 PROJECT 2 FINAL REPORT
BTECH 1 PROJECT 2 FINAL REPORT BTECH 1 PROJECT 2 FINAL REPORT
BTECH 1 PROJECT 2 FINAL REPORT
 
SEM 5 : PROJECT 2 BTECH 1
SEM 5 : PROJECT 2 BTECH 1 SEM 5 : PROJECT 2 BTECH 1
SEM 5 : PROJECT 2 BTECH 1
 
CSI E-JOURNAL INDIVIDUAL COMPONENT
CSI E-JOURNAL INDIVIDUAL COMPONENTCSI E-JOURNAL INDIVIDUAL COMPONENT
CSI E-JOURNAL INDIVIDUAL COMPONENT
 
CSI WOODEN PALLETS BOARD
CSI WOODEN PALLETS BOARD CSI WOODEN PALLETS BOARD
CSI WOODEN PALLETS BOARD
 
CSI INITIAL PROPOSAL DOCUMENT
CSI INITIAL PROPOSAL DOCUMENT CSI INITIAL PROPOSAL DOCUMENT
CSI INITIAL PROPOSAL DOCUMENT
 
CSI INITIAL PROPOSAL SLIDES
CSI INITIAL PROPOSAL SLIDES CSI INITIAL PROPOSAL SLIDES
CSI INITIAL PROPOSAL SLIDES
 
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
 

Recently uploaded

ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxChelloAnnAsuncion2
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxCarlos105
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxMaryGraceBautista27
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptx
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 

SEMESTER 2.5 : PROJECT 3 BRIEF

  • 1. Methods of Documentation and Measured Drawings (ARC60305/ARC2323/ARC1215): January 2016 1 SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Centre for Modern Architecture Studies in Southeast Asia (MASSA) _________________________________________________________________________________________ Bachelor of Science (Honours) in Architecture / (Architecture) Module: METHODS OF DOCUMENTATION AND MEASURED DRAWINGS (ARC60305/ARC2323/ARC1215) Instructor: Dr. Nor Hayati Hussain (603-56295754; norhayati.hussain@taylors.edu.my) Project 3: Measured Drawings & Model (Group work with 15% individual components) Due Date: 7 March 2016 Introduction The project will be carried out throughout the semester where students will be assigned to measure and document a historical / architecturally significant or heritage building and translate all the data into a set of drawings. Each group will have to only measure one particular building assigned by the course coordinator. Apart from doing the measuring exercise on site, students will also need to do additional research in order to piece together all the important data about the building. The model will provide additional physical information of the building. Objectives of Project This project aims to produce a set of measure drawings of a historical and/or architecturally significant building or structure in a specific location. A report containing important and historical information of the building will complement the drawings. It is an on-site exercise where students are required to execute fieldwork and hands-on measuring exercise. Learning Outcomes of this Project  Recommend the appropriate method or architectural historic documentation  Recognize and recall techniques of measured drawing and documentation  Explain the as-built building constructions, architectural details and elements  Interpret historic architectural element, structure and building  Execute fieldwork and hands-on measurement exercise  Translate measure data into scaled drawings  Produce a report on the building highlighting its importance and historical significance Tasks In groups of assigned number of members, depending on the size and complexity of the building to be measured, students are to do a measuring exercise on the particular building, taking all physical information of the building, from its location to its spatial layout as well as details. Each group will be given laser measuring devices and a 30 meter measuring tape. Students may bring along additional tools such as papers, pencils, clay and camera that may be useful in getting and recording all the data obtained. It is COMPULSORY for all students to attend this field work as it is the most important part of this module.
  • 2. Methods of Documentation and Measured Drawings (ARC60305/ARC2323/ARC1215): January 2016 2 Submission Requirements 2 set of A1 sized drawings (one with dimensions and one without dimensions) and 2 sets of A3 sized drawings (both without dimensions) comprising the following;  Key plan  Location plan  Site plan incorporating the roof plan  Floor plans  Elevations  Sections  Site sections  Exploded isometric / axonometric  A physical model to show the construction / structure of the buildings using ONLY balsa wood OR white model boards as either one section OR an open-able full model  Details – construction, architectural, decorative elements / ornaments (minimum one each) All annotations should be made in bilingual for traditional terminologies such as ‘tebar layar’, ‘dou-gong’ or ‘sikhara’. Assessment Criteria The assessment for this assignment will be based on  Methods, accuracy and efficiency of collecting information during fieldwork  Completeness of the drawings submitted  Application of drawing convention, line thickness, symbols, abbreviation, layout , scale, labelling, annotation etc  Progress – constant and / or increased development in the production of drawings and model  Accuracy – ability to translate physical data into drawings and model  Clarity – readable and comprehensive drawings and model  Efficiency and consistency of the group performance  Individual contribution on the drawings and models Marking Criteria Marks shall be distributed as follows: Progress marks (20%)  On site performance – individual (10 marks) - Methods, accuracy and efficiency of collecting information during fieldwork  Interim submission (drawings & model) (10 marks) - Application of drawing convention, line thickness, symbols, abbreviation, layout, scale, labelling, annotation etc. (5%) - Accuracy and clarity – ability to translate physical data into drawings (5%) Final submission (30%)  Completeness, Drawing Application, Accuracy and Clarity of drawings (15 marks) - Completeness of the drawings submitted & Application of drawing convention, line thickness, symbols, abbreviation, layout, scale, labelling, annotation etc. (10%) - Accuracy & clarity – ability to translate physical data into drawings (5%)  Model (10 marks)
  • 3. Methods of Documentation and Measured Drawings (ARC60305/ARC2323/ARC1215): January 2016 3 - Accuracy – ability to translate physical data into model (5%) - Clarity – readable and well-crafted model (5%)  Individual performance and contribution (peer assessment) (5 marks) - Individual contribution on the drawings and models Reference 1. Biefeld, Bert. 2007. Basic Technical Drawing. Germany. Birkhauser 2. John, Burn ed. 2004. Recording Historic Structure. New Jersey. John Wiley & Sons 3. KALAM-UTM, Risalah Panduan (Program Kajian Lukisan Terukur). UTM 4. Arnold, Dana. 2002. Reading Architectural History. London. Routledge 5. Hanafi, Zulkifli. 1999. Lukisan Terukur Rumah Tradisional Melayu Pulau Pinang. Kedah. Amber-Solara Publication 6. Hanafi, Zulkifli. 2004. Lukisan Terukur Rumah Tradisional Melayu Melayu Perak. Kedah. Amber-Solara Publication