Project Management (MGT60403 / ARC3614): Project 2, August 2017
Semester 6 1 | P a g e
SCHOOL OF ARCHITECTURE, BUILDING & DESIGN
Centre for Modern Architecture Studies in Southeast Asia (MASSA)
Bachelor of Science (Honours) (Architecture)
PROJECT MANAGEMENT (MGT60403 / ARC3614)
Project 2: DOCUMENTATION OF A MEDIUM-SIZED PROJECT
Total assessment: 30%
Prerequisite: None
Submission date: Week 13 (6 December 2017)
Introduction
This involves the documentation of your Studio 6 Architectural Design Project, to apply the principles learned in Project
1 to your final project. Students from Design Studio 4 or 5 will use their design in Studio 4 or 5 for the study.
Objectives of Project
Theobjectivesofthisprojectareasfollows:
 To understand the application of management techniques in the control and direction of project resources
 To evaluate the dynamic changes which occur during a project’s life cycle and the nature of a project’s success.
 To understand the means of evaluating and managing risks that can lead to success and failure in a project’s
performance.
Learning Outcomes of this Project
By the end of this project, students are expected to understand thefollowing:
 Define project characteristics, objectives, organizations and success
 ApplyProjectManagementtools andtechniquestocontrol andcommunicatetoachieveacommon goal
 Summarize strategies for the execution of the development process in response to the client's objectives.
Tasks-Methodology
Your task is to document your own Design Studio Project from the point of view of a Project Manager.
Document (Written report, annotated visual images) will be in 5 main Components in total:
1. Introduction of Project (Identifying clients, stakeholders, objectives and goals).
2. Design Analysis, picking up issues of Design Suitability and Project Viability and specifically related to your
design. (Note: This is to be in essay format, schematic diagrams, sketches and drawing where necessary).
3. Project Procurement and Resource Planning (to identify the most suitable contract procurement for the
project and planning of resources, organization structures to achieve project deliverables)
4. Risk Analysis, and Maintenance Strategy (to achieve the identified success criteria and project
deliverables). This must be in a table format.
5. Success Criteria, WBS, Gantt chart (showing the measurable success criteria for the overall implementation
strategy, analysis of critical paths, floats plotted against time). This chart will highlight Project Deliverables.
6. Students are required to perform their own research and study on the mentioned components.
Project Management (MGT60403 / ARC3614): Project 2, August 2017
Semester 6 2 | P a g e
Submission Requirement
- A bound A4 report (LANDSCAPE orientation) including drawings, charts, diagrams, photos documenting your
project. The project management report should be approximately 1,000 words long and not more than 20 pages.
Drawings and other documentation in A3 MUST to be folded into A4, bound into A4 report. LOOSE documentation will NOT be
accepted.
- e-portfoliotobesubmittedtoasharedlinktobeinformedlater.
Assessment criteria
The assessment will be based on your:
 Demonstrated ability to perform an accurate project analysis for yourproject from the point of view of a project
manager (Site analysis, SWOT, PESTEL, project viability)
 Understanding of the basic contractual requirement and resources required.
 Understanding of the issues involved in Risk Management and their application to your project.
 Measurable Success Criteria (time, cost, scope/quality).
 Ability to construct a viable and realistic WBS and Gantt chart for yourproject.
 Quality and legibility of your presentation document and the smart use of Tools/Techniques in your
presentation.
Marking Criterias
No. Criteria Breakdown of Marks
1. Content of report – 5 main components (Task-Methodology) 20%
2. Format and clarity of report 10%
TOTAL 30%
* Note: Students are required to read and understand he project brief properly. This exercise does not require a
complete scheme of the design studio project.
Prepared by: Checked by: Approved by:
……………………………. ……………………………. …………………………….
(Ar. Hjh. Sateerah Hj. Hassan) (Ar. Zahari Zubir) (Mohd. Adib Ramli)
Module Coordinator Stream Coordinator Programme Director
DL: 035625352 Professional Studies B. Sc. Architecture (Hons)
Office: Academic Suite C9
Date: Date: Date:
Remarks:
1. The Project Brief is to be distributed to the students in the first week of the semester.
2. Any changes to the Project Brief shall be communicated (in writing) to the Programme Director and the approved
revised version must be communicated to the students.

More Related Content

Similar to SEM 6 : PROJECT MANAGEMENT PROJECT 2 BRIEF

Architectural design project project 1b brief august 2016
Architectural design project project 1b brief august 2016Architectural design project project 1b brief august 2016
Architectural design project project 1b brief august 2016Preston Liew
 
Project Management - principles, practice and process
Project Management - principles, practice and process Project Management - principles, practice and process
Project Management - principles, practice and process Charles Cotter, PhD
 
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docxBSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docxAASTHA76
 
EU Horizon2020 proposal development by Anastasia Walter
EU Horizon2020 proposal development by Anastasia Walter EU Horizon2020 proposal development by Anastasia Walter
EU Horizon2020 proposal development by Anastasia Walter Anastasia Walter
 
SEM 6 : STUDIO PROJECT 1B
SEM 6 : STUDIO PROJECT 1BSEM 6 : STUDIO PROJECT 1B
SEM 6 : STUDIO PROJECT 1BDarshiini Vig
 
ADP - PROJ 1B BRIEF
ADP - PROJ 1B BRIEFADP - PROJ 1B BRIEF
ADP - PROJ 1B BRIEFYen Min Khor
 
Project Planning and Scheduling
Project Planning and SchedulingProject Planning and Scheduling
Project Planning and Schedulingijtsrd
 
Project planning
Project planningProject planning
Project planningShaikh Zain
 
Project management
Project managementProject management
Project managementArnab Ghosh
 
Grade CommentscloseNo IP submitted as of 08232018.Hello Cece.docx
Grade CommentscloseNo IP submitted as of 08232018.Hello Cece.docxGrade CommentscloseNo IP submitted as of 08232018.Hello Cece.docx
Grade CommentscloseNo IP submitted as of 08232018.Hello Cece.docxwhittemorelucilla
 
Mmi entrepreneurship 6
Mmi entrepreneurship 6Mmi entrepreneurship 6
Mmi entrepreneurship 6gatecomro
 
AssignmentsAssignment 1Example for the charts and or graphs.pp.docx
AssignmentsAssignment 1Example for the charts and or graphs.pp.docxAssignmentsAssignment 1Example for the charts and or graphs.pp.docx
AssignmentsAssignment 1Example for the charts and or graphs.pp.docxssuser562afc1
 
Lecture 2 30-01-2020.pdf
Lecture 2 30-01-2020.pdfLecture 2 30-01-2020.pdf
Lecture 2 30-01-2020.pdfTanzeelShahid5
 
Project Management Principles and Process
Project Management Principles and ProcessProject Management Principles and Process
Project Management Principles and ProcessCharles Cotter, PhD
 
Mb0049 (2) May 2012 Master of Business Administration - MBA Semester 2 MB0049...
Mb0049 (2) May 2012 Master of Business Administration - MBA Semester 2 MB0049...Mb0049 (2) May 2012 Master of Business Administration - MBA Semester 2 MB0049...
Mb0049 (2) May 2012 Master of Business Administration - MBA Semester 2 MB0049...Devendra Kachhi
 
Pm0011 project planning and scheduling
Pm0011   project planning and schedulingPm0011   project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Project management for Instructional Designers
Project management for Instructional DesignersProject management for Instructional Designers
Project management for Instructional DesignersKimberly Kaye
 

Similar to SEM 6 : PROJECT MANAGEMENT PROJECT 2 BRIEF (20)

Architectural design project project 1b brief august 2016
Architectural design project project 1b brief august 2016Architectural design project project 1b brief august 2016
Architectural design project project 1b brief august 2016
 
Project Management - principles, practice and process
Project Management - principles, practice and process Project Management - principles, practice and process
Project Management - principles, practice and process
 
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docxBSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
 
EU Horizon2020 proposal development by Anastasia Walter
EU Horizon2020 proposal development by Anastasia Walter EU Horizon2020 proposal development by Anastasia Walter
EU Horizon2020 proposal development by Anastasia Walter
 
SEM 6 : STUDIO PROJECT 1B
SEM 6 : STUDIO PROJECT 1BSEM 6 : STUDIO PROJECT 1B
SEM 6 : STUDIO PROJECT 1B
 
ADP - PROJ 1B BRIEF
ADP - PROJ 1B BRIEFADP - PROJ 1B BRIEF
ADP - PROJ 1B BRIEF
 
Project Planning and Scheduling
Project Planning and SchedulingProject Planning and Scheduling
Project Planning and Scheduling
 
Project planning
Project planningProject planning
Project planning
 
Project Management : Project Planning by iFour Technolab Pvt. Ltd.
Project Management : Project Planning by iFour Technolab Pvt. Ltd.Project Management : Project Planning by iFour Technolab Pvt. Ltd.
Project Management : Project Planning by iFour Technolab Pvt. Ltd.
 
pmppgoav14.ppt
pmppgoav14.pptpmppgoav14.ppt
pmppgoav14.ppt
 
Project management
Project managementProject management
Project management
 
Grade CommentscloseNo IP submitted as of 08232018.Hello Cece.docx
Grade CommentscloseNo IP submitted as of 08232018.Hello Cece.docxGrade CommentscloseNo IP submitted as of 08232018.Hello Cece.docx
Grade CommentscloseNo IP submitted as of 08232018.Hello Cece.docx
 
Mmi entrepreneurship 6
Mmi entrepreneurship 6Mmi entrepreneurship 6
Mmi entrepreneurship 6
 
AssignmentsAssignment 1Example for the charts and or graphs.pp.docx
AssignmentsAssignment 1Example for the charts and or graphs.pp.docxAssignmentsAssignment 1Example for the charts and or graphs.pp.docx
AssignmentsAssignment 1Example for the charts and or graphs.pp.docx
 
Lecture 2 30-01-2020.pdf
Lecture 2 30-01-2020.pdfLecture 2 30-01-2020.pdf
Lecture 2 30-01-2020.pdf
 
Project Management Principles and Process
Project Management Principles and ProcessProject Management Principles and Process
Project Management Principles and Process
 
Mb0049 (2) May 2012 Master of Business Administration - MBA Semester 2 MB0049...
Mb0049 (2) May 2012 Master of Business Administration - MBA Semester 2 MB0049...Mb0049 (2) May 2012 Master of Business Administration - MBA Semester 2 MB0049...
Mb0049 (2) May 2012 Master of Business Administration - MBA Semester 2 MB0049...
 
Pm0011 project planning and scheduling
Pm0011   project planning and schedulingPm0011   project planning and scheduling
Pm0011 project planning and scheduling
 
Project management for Instructional Designers
Project management for Instructional DesignersProject management for Instructional Designers
Project management for Instructional Designers
 
assignment on project planning
assignment on project planningassignment on project planning
assignment on project planning
 

More from Darshiini Vig

SEM 6 : STUDIO MODULE OUTLINE
SEM 6 : STUDIO MODULE OUTLINESEM 6 : STUDIO MODULE OUTLINE
SEM 6 : STUDIO MODULE OUTLINEDarshiini Vig
 
SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2Darshiini Vig
 
SEM 6 : BTECH 2 MODULE OUTLINE
SEM 6 : BTECH 2 MODULE OUTLINESEM 6 : BTECH 2 MODULE OUTLINE
SEM 6 : BTECH 2 MODULE OUTLINEDarshiini Vig
 
SEM 6 : BTECH 2 PROJECT 1
SEM 6 : BTECH 2 PROJECT 1SEM 6 : BTECH 2 PROJECT 1
SEM 6 : BTECH 2 PROJECT 1Darshiini Vig
 
SEM 6 : STUDIO PROJECT 1C
SEM 6 : STUDIO PROJECT 1CSEM 6 : STUDIO PROJECT 1C
SEM 6 : STUDIO PROJECT 1CDarshiini Vig
 
SEM 6 : STUDIO PROJECT 1A
SEM 6 : STUDIO PROJECT 1ASEM 6 : STUDIO PROJECT 1A
SEM 6 : STUDIO PROJECT 1ADarshiini Vig
 
BSCIENCE PROJECT 2 FINAL REPORT
BSCIENCE PROJECT 2 FINAL REPORTBSCIENCE PROJECT 2 FINAL REPORT
BSCIENCE PROJECT 2 FINAL REPORTDarshiini Vig
 
BTECH 1 PROJECT 2 FINAL REPORT
BTECH 1 PROJECT 2 FINAL REPORT BTECH 1 PROJECT 2 FINAL REPORT
BTECH 1 PROJECT 2 FINAL REPORT Darshiini Vig
 
SEM 5 : PROJECT 2 BTECH 1
SEM 5 : PROJECT 2 BTECH 1 SEM 5 : PROJECT 2 BTECH 1
SEM 5 : PROJECT 2 BTECH 1 Darshiini Vig
 
CSI E-JOURNAL INDIVIDUAL COMPONENT
CSI E-JOURNAL INDIVIDUAL COMPONENTCSI E-JOURNAL INDIVIDUAL COMPONENT
CSI E-JOURNAL INDIVIDUAL COMPONENTDarshiini Vig
 
CSI WOODEN PALLETS BOARD
CSI WOODEN PALLETS BOARD CSI WOODEN PALLETS BOARD
CSI WOODEN PALLETS BOARD Darshiini Vig
 
CSI INITIAL PROPOSAL DOCUMENT
CSI INITIAL PROPOSAL DOCUMENT CSI INITIAL PROPOSAL DOCUMENT
CSI INITIAL PROPOSAL DOCUMENT Darshiini Vig
 
CSI INITIAL PROPOSAL SLIDES
CSI INITIAL PROPOSAL SLIDES CSI INITIAL PROPOSAL SLIDES
CSI INITIAL PROPOSAL SLIDES Darshiini Vig
 
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2Darshiini Vig
 
SEM 5 : PROJECT 2 BSCIENCE 2
SEM 5 : PROJECT 2 BSCIENCE 2SEM 5 : PROJECT 2 BSCIENCE 2
SEM 5 : PROJECT 2 BSCIENCE 2Darshiini Vig
 
SEM 5 : PROJECT 2 THEORIES URBAN
SEM 5 : PROJECT 2 THEORIES URBAN SEM 5 : PROJECT 2 THEORIES URBAN
SEM 5 : PROJECT 2 THEORIES URBAN Darshiini Vig
 
SEM 5 : PROJECT 1 THEORIES URBAN
SEM 5 : PROJECT 1 THEORIES URBAN SEM 5 : PROJECT 1 THEORIES URBAN
SEM 5 : PROJECT 1 THEORIES URBAN Darshiini Vig
 
SEM 5 : THEORIES URBAN MODULE OUTLINE
SEM 5 : THEORIES URBAN MODULE OUTLINE SEM 5 : THEORIES URBAN MODULE OUTLINE
SEM 5 : THEORIES URBAN MODULE OUTLINE Darshiini Vig
 
SEM 5 : PROJECT 2 STUDIO
SEM 5 : PROJECT 2 STUDIOSEM 5 : PROJECT 2 STUDIO
SEM 5 : PROJECT 2 STUDIODarshiini Vig
 
SEM 5 : PROJECT 1 STUDIO
SEM 5 : PROJECT 1 STUDIO SEM 5 : PROJECT 1 STUDIO
SEM 5 : PROJECT 1 STUDIO Darshiini Vig
 

More from Darshiini Vig (20)

SEM 6 : STUDIO MODULE OUTLINE
SEM 6 : STUDIO MODULE OUTLINESEM 6 : STUDIO MODULE OUTLINE
SEM 6 : STUDIO MODULE OUTLINE
 
SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2
 
SEM 6 : BTECH 2 MODULE OUTLINE
SEM 6 : BTECH 2 MODULE OUTLINESEM 6 : BTECH 2 MODULE OUTLINE
SEM 6 : BTECH 2 MODULE OUTLINE
 
SEM 6 : BTECH 2 PROJECT 1
SEM 6 : BTECH 2 PROJECT 1SEM 6 : BTECH 2 PROJECT 1
SEM 6 : BTECH 2 PROJECT 1
 
SEM 6 : STUDIO PROJECT 1C
SEM 6 : STUDIO PROJECT 1CSEM 6 : STUDIO PROJECT 1C
SEM 6 : STUDIO PROJECT 1C
 
SEM 6 : STUDIO PROJECT 1A
SEM 6 : STUDIO PROJECT 1ASEM 6 : STUDIO PROJECT 1A
SEM 6 : STUDIO PROJECT 1A
 
BSCIENCE PROJECT 2 FINAL REPORT
BSCIENCE PROJECT 2 FINAL REPORTBSCIENCE PROJECT 2 FINAL REPORT
BSCIENCE PROJECT 2 FINAL REPORT
 
BTECH 1 PROJECT 2 FINAL REPORT
BTECH 1 PROJECT 2 FINAL REPORT BTECH 1 PROJECT 2 FINAL REPORT
BTECH 1 PROJECT 2 FINAL REPORT
 
SEM 5 : PROJECT 2 BTECH 1
SEM 5 : PROJECT 2 BTECH 1 SEM 5 : PROJECT 2 BTECH 1
SEM 5 : PROJECT 2 BTECH 1
 
CSI E-JOURNAL INDIVIDUAL COMPONENT
CSI E-JOURNAL INDIVIDUAL COMPONENTCSI E-JOURNAL INDIVIDUAL COMPONENT
CSI E-JOURNAL INDIVIDUAL COMPONENT
 
CSI WOODEN PALLETS BOARD
CSI WOODEN PALLETS BOARD CSI WOODEN PALLETS BOARD
CSI WOODEN PALLETS BOARD
 
CSI INITIAL PROPOSAL DOCUMENT
CSI INITIAL PROPOSAL DOCUMENT CSI INITIAL PROPOSAL DOCUMENT
CSI INITIAL PROPOSAL DOCUMENT
 
CSI INITIAL PROPOSAL SLIDES
CSI INITIAL PROPOSAL SLIDES CSI INITIAL PROPOSAL SLIDES
CSI INITIAL PROPOSAL SLIDES
 
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
 
SEM 5 : PROJECT 2 BSCIENCE 2
SEM 5 : PROJECT 2 BSCIENCE 2SEM 5 : PROJECT 2 BSCIENCE 2
SEM 5 : PROJECT 2 BSCIENCE 2
 
SEM 5 : PROJECT 2 THEORIES URBAN
SEM 5 : PROJECT 2 THEORIES URBAN SEM 5 : PROJECT 2 THEORIES URBAN
SEM 5 : PROJECT 2 THEORIES URBAN
 
SEM 5 : PROJECT 1 THEORIES URBAN
SEM 5 : PROJECT 1 THEORIES URBAN SEM 5 : PROJECT 1 THEORIES URBAN
SEM 5 : PROJECT 1 THEORIES URBAN
 
SEM 5 : THEORIES URBAN MODULE OUTLINE
SEM 5 : THEORIES URBAN MODULE OUTLINE SEM 5 : THEORIES URBAN MODULE OUTLINE
SEM 5 : THEORIES URBAN MODULE OUTLINE
 
SEM 5 : PROJECT 2 STUDIO
SEM 5 : PROJECT 2 STUDIOSEM 5 : PROJECT 2 STUDIO
SEM 5 : PROJECT 2 STUDIO
 
SEM 5 : PROJECT 1 STUDIO
SEM 5 : PROJECT 1 STUDIO SEM 5 : PROJECT 1 STUDIO
SEM 5 : PROJECT 1 STUDIO
 

Recently uploaded

ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxMaryGraceBautista27
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
Q4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxQ4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxnelietumpap1
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 

Recently uploaded (20)

ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptx
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
Q4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxQ4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptx
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 

SEM 6 : PROJECT MANAGEMENT PROJECT 2 BRIEF

  • 1. Project Management (MGT60403 / ARC3614): Project 2, August 2017 Semester 6 1 | P a g e SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Centre for Modern Architecture Studies in Southeast Asia (MASSA) Bachelor of Science (Honours) (Architecture) PROJECT MANAGEMENT (MGT60403 / ARC3614) Project 2: DOCUMENTATION OF A MEDIUM-SIZED PROJECT Total assessment: 30% Prerequisite: None Submission date: Week 13 (6 December 2017) Introduction This involves the documentation of your Studio 6 Architectural Design Project, to apply the principles learned in Project 1 to your final project. Students from Design Studio 4 or 5 will use their design in Studio 4 or 5 for the study. Objectives of Project Theobjectivesofthisprojectareasfollows:  To understand the application of management techniques in the control and direction of project resources  To evaluate the dynamic changes which occur during a project’s life cycle and the nature of a project’s success.  To understand the means of evaluating and managing risks that can lead to success and failure in a project’s performance. Learning Outcomes of this Project By the end of this project, students are expected to understand thefollowing:  Define project characteristics, objectives, organizations and success  ApplyProjectManagementtools andtechniquestocontrol andcommunicatetoachieveacommon goal  Summarize strategies for the execution of the development process in response to the client's objectives. Tasks-Methodology Your task is to document your own Design Studio Project from the point of view of a Project Manager. Document (Written report, annotated visual images) will be in 5 main Components in total: 1. Introduction of Project (Identifying clients, stakeholders, objectives and goals). 2. Design Analysis, picking up issues of Design Suitability and Project Viability and specifically related to your design. (Note: This is to be in essay format, schematic diagrams, sketches and drawing where necessary). 3. Project Procurement and Resource Planning (to identify the most suitable contract procurement for the project and planning of resources, organization structures to achieve project deliverables) 4. Risk Analysis, and Maintenance Strategy (to achieve the identified success criteria and project deliverables). This must be in a table format. 5. Success Criteria, WBS, Gantt chart (showing the measurable success criteria for the overall implementation strategy, analysis of critical paths, floats plotted against time). This chart will highlight Project Deliverables. 6. Students are required to perform their own research and study on the mentioned components.
  • 2. Project Management (MGT60403 / ARC3614): Project 2, August 2017 Semester 6 2 | P a g e Submission Requirement - A bound A4 report (LANDSCAPE orientation) including drawings, charts, diagrams, photos documenting your project. The project management report should be approximately 1,000 words long and not more than 20 pages. Drawings and other documentation in A3 MUST to be folded into A4, bound into A4 report. LOOSE documentation will NOT be accepted. - e-portfoliotobesubmittedtoasharedlinktobeinformedlater. Assessment criteria The assessment will be based on your:  Demonstrated ability to perform an accurate project analysis for yourproject from the point of view of a project manager (Site analysis, SWOT, PESTEL, project viability)  Understanding of the basic contractual requirement and resources required.  Understanding of the issues involved in Risk Management and their application to your project.  Measurable Success Criteria (time, cost, scope/quality).  Ability to construct a viable and realistic WBS and Gantt chart for yourproject.  Quality and legibility of your presentation document and the smart use of Tools/Techniques in your presentation. Marking Criterias No. Criteria Breakdown of Marks 1. Content of report – 5 main components (Task-Methodology) 20% 2. Format and clarity of report 10% TOTAL 30% * Note: Students are required to read and understand he project brief properly. This exercise does not require a complete scheme of the design studio project. Prepared by: Checked by: Approved by: ……………………………. ……………………………. ……………………………. (Ar. Hjh. Sateerah Hj. Hassan) (Ar. Zahari Zubir) (Mohd. Adib Ramli) Module Coordinator Stream Coordinator Programme Director DL: 035625352 Professional Studies B. Sc. Architecture (Hons) Office: Academic Suite C9 Date: Date: Date: Remarks: 1. The Project Brief is to be distributed to the students in the first week of the semester. 2. Any changes to the Project Brief shall be communicated (in writing) to the Programme Director and the approved revised version must be communicated to the students.