SCHOOL OF ARCHITECTURE, BUILDING & DESIGN
Modern Architecture Studies in Southeast Asia Research Unit (MASSA)
Bachelor of Science (Honours) (Architecture)
METHODS OF DOCUMENTATION AND MEASURED DRAWINGS [ARC 1215]
__________________________________________________________________________________
Project: 2
Measured Drawing
50% of final marks (Group work with 15% individual components)
Submission date: 2 March 2015
Introduction
This project will be carried out throughout the semester where students will be assigned to measure and
document a historical / heritage building and translate all the data into a set of drawings and a model. Each
group will have to only measure one particular building assigned by the lecturer. Apart from doing the
measuring exercise on site, students will also need to do additional research in order to piece together all
the important data about the building.
Objectives of Project
This project aims to produce a set of measured drawings of historical buildings or structures in a specific
location. A report containing important and historical information of the buildings will complement the
drawings. It is an on-site exercise where students are required to execute fieldwork and hands-on
measurement exercise
Learning Outcomes of this Project
Upon successful completion of the subject, students will be able to:
 Recommend the appropriate method of architectural historic documentation
 Recognize and recall techniques of measured drawing and documentation
 Explain the as-built building constructions, architectural details and elements
2
 Interpret historic architectural element, structure and building
 Execute fieldwork and hands-on measurement exercise
 Translate measured data into scaled drawings
 Produce a report on the buildings highlighting its importance and historical significance
Tasks
In groups of certain number of students, depending on the size and complexity of the building to be
measured, students are to do a measuring exercise on the particular building, taking all physical information
of the building, from its location to its spatial layout as well as details. Each group will be given laser
measuring devices and a 30 meter measuring tape. Students may bring along additional tools such as
papers, pencils, clay and camera that may be useful in getting and recording all the data obtained.
It is COMPULSORY for all students to attend this field work as it is the most important part of this module.
Submission Requirement
2 set of A1 sized drawings (one with dimensions and one without dimensions) and 2
sets of A3 sized drawings (both without dimensions) comprising the following;
 Key plan
 Location plan
 Site plan incorporating the roof plan
 Floor plans
 Elevations
 Sections
 Site sections
 Exploded isometric / axonometric
 A physical model to show the construction / structure of the buildings using ONLY balsa wood OR
white model boards as either one section OR an open-able full model
 Details – construction, architectural, decorative elements / ornaments (minimum one each)
All annotations should be made in bilingual terms highlighting traditional terminologies such as ‘tebar layar’,
‘dou-gong’ or ‘sikhara’.
Assessment criteria
The assessment for this assignment will be based on
 Methods, accuracy and efficiency of collecting information during fieldwork
 Completeness of the drawings submitted
 Application of drawing convention, line thickness, symbols, abbreviation, layout , scale, labelling,
annotation etc
 Progress – constant and / or increased development in the production of drawings and model
 Accuracy – ability to translate physical data into drawings and model
 Clarity – readable and comprehensive drawings and model
 Efficiency and consistency of the group performance
 Individual contribution on the drawings and models
3
Marking criteria
Marks shall be distributed as follows:
Progress marks (20%)
 On site performance – individual 10 marks
- Methods, accuracy and efficiency of collecting information during fieldwork
-
 Interim submission (drawings & model) 10 marks
- Application of drawing convention, line thickness, symbols, abbreviation, layout, scale,
labelling, annotation etc (5%)
- Accuracy and clarity – ability to translate physical data into drawings (5%)
Final submission (30%)
 Completeness, Drawing Application, Accuracy and Clarity of drawings 15
- Completeness of the drawings submitted & Application of drawing convention, line thickness,
symbols, abbreviation, layout, scale, labelling, annotation etc (10%)
- Accuracy & clarity – ability to translate physical data into drawings (5%)
 Model 10
- Accuracy – ability to translate physical data into model (5%)
- Clarity – readable and well-crafted model (5%)
 Individual performance and contribution (peer assessment) 5
- Individual contribution on the drawings and models
Suggested References
1. Biefeld, Bert. 2007. Basic Technical Drawing. Germany. Birkhauser
2. John, Burn ed. 2004. Recording Historic Structure. New Jersey. John Wiley & Sons
3. KALAM-UTM, Risalah Panduan (Program Kajian Lukisan Terukur). UTM
4. Arnold, Dana. 2002. Reading Architectural History. London. Routledge
5. Hanafi, Zulkifli. 1999. Lukisan Terukur Rumah Tradisional Melayu Pulau Pinang. Kedah. Amber-
Solara Publication
6. Hanafi, Zulkifli. 2004. Lukisan Terukur Rumah Tradisional Melayu Melayu Perak. Kedah. Amber-
Solara Publication

More Related Content

What's hot

Asu history and theory lecture 5-design development 18-11-2017
Asu history and theory lecture 5-design development 18-11-2017Asu history and theory lecture 5-design development 18-11-2017
Asu history and theory lecture 5-design development 18-11-2017Galala University
 
Project 1 brief precedent studies
Project 1 brief precedent studiesProject 1 brief precedent studies
Project 1 brief precedent studiesAnthony Chew
 
Outline ckar 300
Outline ckar 300Outline ckar 300
Outline ckar 300jwaldick
 
Arc1126 project 2b retreat house (aug 2015)
Arc1126 project 2b retreat house (aug 2015)Arc1126 project 2b retreat house (aug 2015)
Arc1126 project 2b retreat house (aug 2015)Jia Jun Chok
 
architecture studio 2 arc 1126 outline
  architecture studio 2 arc 1126 outline   architecture studio 2 arc 1126 outline
architecture studio 2 arc 1126 outline Darshiini Vig
 
Arc1126 project 2a brief observation deck @ cape rachado
Arc1126 project 2a brief observation deck @ cape rachadoArc1126 project 2a brief observation deck @ cape rachado
Arc1126 project 2a brief observation deck @ cape rachadoDarshiini Vig
 
Individual assignment brief ct3-2015
Individual assignment brief ct3-2015Individual assignment brief ct3-2015
Individual assignment brief ct3-2015Felix Vong
 
Dv final project pc
Dv final project pcDv final project pc
Dv final project pcAnthony Chew
 
Asu history and theory lecture 3b-based design method 21-10-2017
Asu history and theory lecture 3b-based design method 21-10-2017Asu history and theory lecture 3b-based design method 21-10-2017
Asu history and theory lecture 3b-based design method 21-10-2017Galala University
 
Arc1126 project 1 famous people, familiar faces
Arc1126 project 1 famous people, familiar faces Arc1126 project 1 famous people, familiar faces
Arc1126 project 1 famous people, familiar faces Darshiini Vig
 
Culture and History I Project Brief
Culture and History I Project BriefCulture and History I Project Brief
Culture and History I Project BriefBolin Loong
 

What's hot (12)

Asu history and theory lecture 5-design development 18-11-2017
Asu history and theory lecture 5-design development 18-11-2017Asu history and theory lecture 5-design development 18-11-2017
Asu history and theory lecture 5-design development 18-11-2017
 
Project 1 brief precedent studies
Project 1 brief precedent studiesProject 1 brief precedent studies
Project 1 brief precedent studies
 
Outline ckar 300
Outline ckar 300Outline ckar 300
Outline ckar 300
 
Arc1126 project 2b retreat house (aug 2015)
Arc1126 project 2b retreat house (aug 2015)Arc1126 project 2b retreat house (aug 2015)
Arc1126 project 2b retreat house (aug 2015)
 
architecture studio 2 arc 1126 outline
  architecture studio 2 arc 1126 outline   architecture studio 2 arc 1126 outline
architecture studio 2 arc 1126 outline
 
Arc1126 project 2a brief observation deck @ cape rachado
Arc1126 project 2a brief observation deck @ cape rachadoArc1126 project 2a brief observation deck @ cape rachado
Arc1126 project 2a brief observation deck @ cape rachado
 
Individual assignment brief ct3-2015
Individual assignment brief ct3-2015Individual assignment brief ct3-2015
Individual assignment brief ct3-2015
 
Dv final project pc
Dv final project pcDv final project pc
Dv final project pc
 
2110013
21100132110013
2110013
 
Asu history and theory lecture 3b-based design method 21-10-2017
Asu history and theory lecture 3b-based design method 21-10-2017Asu history and theory lecture 3b-based design method 21-10-2017
Asu history and theory lecture 3b-based design method 21-10-2017
 
Arc1126 project 1 famous people, familiar faces
Arc1126 project 1 famous people, familiar faces Arc1126 project 1 famous people, familiar faces
Arc1126 project 1 famous people, familiar faces
 
Culture and History I Project Brief
Culture and History I Project BriefCulture and History I Project Brief
Culture and History I Project Brief
 

Similar to Project 2 measured drawing jan2015 rev

Arc 60305 project 3 measured drawings
Arc 60305 project 3 measured drawingsArc 60305 project 3 measured drawings
Arc 60305 project 3 measured drawingsChow Hong Da
 
Arc 60305 project 3 measured drawings
Arc 60305 project 3 measured drawingsArc 60305 project 3 measured drawings
Arc 60305 project 3 measured drawingsArvindhan Balasingam
 
Itdproject3brief 150625045740-lva1-app6892
Itdproject3brief 150625045740-lva1-app6892Itdproject3brief 150625045740-lva1-app6892
Itdproject3brief 150625045740-lva1-app6892Darryl Harvey
 
ITD Drawing final project studio unit living_january 2015
ITD Drawing final project studio unit living_january 2015ITD Drawing final project studio unit living_january 2015
ITD Drawing final project studio unit living_january 2015Madeline Liew
 
ITD Drawing final project studio unit living
ITD Drawing final project studio unit livingITD Drawing final project studio unit living
ITD Drawing final project studio unit livingashleyyeap
 
Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015Leon Lim
 
ITD Finale Brief
ITD Finale BriefITD Finale Brief
ITD Finale BriefTamZhaoWei
 
ITD Final Project - Drawing Basic Space
ITD Final Project - Drawing Basic SpaceITD Final Project - Drawing Basic Space
ITD Final Project - Drawing Basic SpaceNatalie Yunxian
 
Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015stactixzz97
 
Drawing final project studio unit living_january 2015 (1)
Drawing final project studio unit living_january 2015 (1)Drawing final project studio unit living_january 2015 (1)
Drawing final project studio unit living_january 2015 (1)Zheng Chee Cham
 
Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015Lin Hui
 
Itd project 3 brief
Itd project 3 briefItd project 3 brief
Itd project 3 briefSongKit96
 
Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015SolomonTangerine
 
Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015JJeanius
 
Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015Lee Fong Yen
 
Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015ChelleChelleeeee
 
Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015Jian Leo
 
Drawing final project studio unit living_january 2015 (1)
Drawing final project studio unit living_january 2015 (1)Drawing final project studio unit living_january 2015 (1)
Drawing final project studio unit living_january 2015 (1)chuenmin
 
Drawing final project studio unit living_january 2015(1)
Drawing final project studio unit living_january 2015(1)Drawing final project studio unit living_january 2015(1)
Drawing final project studio unit living_january 2015(1)Louise Foong
 

Similar to Project 2 measured drawing jan2015 rev (20)

Arc 60305 project 3 measured drawings
Arc 60305 project 3 measured drawingsArc 60305 project 3 measured drawings
Arc 60305 project 3 measured drawings
 
Arc 60305 project 3 measured drawings
Arc 60305 project 3 measured drawingsArc 60305 project 3 measured drawings
Arc 60305 project 3 measured drawings
 
Itdproject3brief 150625045740-lva1-app6892
Itdproject3brief 150625045740-lva1-app6892Itdproject3brief 150625045740-lva1-app6892
Itdproject3brief 150625045740-lva1-app6892
 
ITD Drawing final project studio unit living_january 2015
ITD Drawing final project studio unit living_january 2015ITD Drawing final project studio unit living_january 2015
ITD Drawing final project studio unit living_january 2015
 
ITD Drawing final project studio unit living
ITD Drawing final project studio unit livingITD Drawing final project studio unit living
ITD Drawing final project studio unit living
 
Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015
 
ITD Finale Brief
ITD Finale BriefITD Finale Brief
ITD Finale Brief
 
ITD Final Project - Drawing Basic Space
ITD Final Project - Drawing Basic SpaceITD Final Project - Drawing Basic Space
ITD Final Project - Drawing Basic Space
 
Itd project 3 brief
Itd project 3 briefItd project 3 brief
Itd project 3 brief
 
Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015
 
Drawing final project studio unit living_january 2015 (1)
Drawing final project studio unit living_january 2015 (1)Drawing final project studio unit living_january 2015 (1)
Drawing final project studio unit living_january 2015 (1)
 
Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015
 
Itd project 3 brief
Itd project 3 briefItd project 3 brief
Itd project 3 brief
 
Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015
 
Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015
 
Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015
 
Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015
 
Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015
 
Drawing final project studio unit living_january 2015 (1)
Drawing final project studio unit living_january 2015 (1)Drawing final project studio unit living_january 2015 (1)
Drawing final project studio unit living_january 2015 (1)
 
Drawing final project studio unit living_january 2015(1)
Drawing final project studio unit living_january 2015(1)Drawing final project studio unit living_january 2015(1)
Drawing final project studio unit living_january 2015(1)
 

More from Preston Liew

Architectural design project project 1b brief august 2016
Architectural design project project 1b brief august 2016Architectural design project project 1b brief august 2016
Architectural design project project 1b brief august 2016Preston Liew
 
Architectural design project project 1a brief august 2016
Architectural design project project 1a brief august 2016Architectural design project project 1a brief august 2016
Architectural design project project 1a brief august 2016Preston Liew
 
Architectural design project module outline august 2016
Architectural design project module outline august 2016Architectural design project module outline august 2016
Architectural design project module outline august 2016Preston Liew
 
PUTRAJAYA SITE ANALSYS - TEAM CY
PUTRAJAYA SITE ANALSYS - TEAM CYPUTRAJAYA SITE ANALSYS - TEAM CY
PUTRAJAYA SITE ANALSYS - TEAM CYPreston Liew
 
Site analysis JALAN IPOH TEAM NANI
Site analysis JALAN IPOH TEAM NANISite analysis JALAN IPOH TEAM NANI
Site analysis JALAN IPOH TEAM NANIPreston Liew
 
Project brief 2 architecture studio 5 march 2016 v3
Project brief 2 architecture studio 5 march 2016  v3Project brief 2 architecture studio 5 march 2016  v3
Project brief 2 architecture studio 5 march 2016 v3Preston Liew
 
Studio module outline
Studio module outline Studio module outline
Studio module outline Preston Liew
 
B tech report proj 2 PRESTON
B tech report proj 2 PRESTONB tech report proj 2 PRESTON
B tech report proj 2 PRESTONPreston Liew
 
Project brief 2 btech1 march 2016
Project brief 2 btech1 march 2016Project brief 2 btech1 march 2016
Project brief 2 btech1 march 2016Preston Liew
 
Btech module outline
Btech module outlineBtech module outline
Btech module outlinePreston Liew
 
Btech brief assignment 1
Btech brief assignment 1Btech brief assignment 1
Btech brief assignment 1Preston Liew
 
Preston bsci proj 2
Preston bsci proj 2Preston bsci proj 2
Preston bsci proj 2Preston Liew
 
Light report compiled
Light report compiledLight report compiled
Light report compiledPreston Liew
 
Project 2 integration
Project 2  integrationProject 2  integration
Project 2 integrationPreston Liew
 
Project 1 performance evaluation
Project 1 performance evaluationProject 1 performance evaluation
Project 1 performance evaluationPreston Liew
 
Research questions preston liew
Research questions   preston liewResearch questions   preston liew
Research questions preston liewPreston Liew
 
Spirituality & sense of place
Spirituality & sense of placeSpirituality & sense of place
Spirituality & sense of placePreston Liew
 
Islamic architecture arc 2342 project 1 brief august 2015
Islamic architecture arc 2342 project 1 brief august 2015Islamic architecture arc 2342 project 1 brief august 2015
Islamic architecture arc 2342 project 1 brief august 2015Preston Liew
 

More from Preston Liew (20)

Architectural design project project 1b brief august 2016
Architectural design project project 1b brief august 2016Architectural design project project 1b brief august 2016
Architectural design project project 1b brief august 2016
 
Architectural design project project 1a brief august 2016
Architectural design project project 1a brief august 2016Architectural design project project 1a brief august 2016
Architectural design project project 1a brief august 2016
 
Architectural design project module outline august 2016
Architectural design project module outline august 2016Architectural design project module outline august 2016
Architectural design project module outline august 2016
 
PUTRAJAYA SITE ANALSYS - TEAM CY
PUTRAJAYA SITE ANALSYS - TEAM CYPUTRAJAYA SITE ANALSYS - TEAM CY
PUTRAJAYA SITE ANALSYS - TEAM CY
 
Site analysis JALAN IPOH TEAM NANI
Site analysis JALAN IPOH TEAM NANISite analysis JALAN IPOH TEAM NANI
Site analysis JALAN IPOH TEAM NANI
 
Project brief 2 architecture studio 5 march 2016 v3
Project brief 2 architecture studio 5 march 2016  v3Project brief 2 architecture studio 5 march 2016  v3
Project brief 2 architecture studio 5 march 2016 v3
 
Studio brief
Studio briefStudio brief
Studio brief
 
Studio module outline
Studio module outline Studio module outline
Studio module outline
 
B tech report proj 2 PRESTON
B tech report proj 2 PRESTONB tech report proj 2 PRESTON
B tech report proj 2 PRESTON
 
Project brief 2 btech1 march 2016
Project brief 2 btech1 march 2016Project brief 2 btech1 march 2016
Project brief 2 btech1 march 2016
 
Btech module outline
Btech module outlineBtech module outline
Btech module outline
 
Btech brief assignment 1
Btech brief assignment 1Btech brief assignment 1
Btech brief assignment 1
 
Preston bsci proj 2
Preston bsci proj 2Preston bsci proj 2
Preston bsci proj 2
 
Light report compiled
Light report compiledLight report compiled
Light report compiled
 
Sound final
Sound finalSound final
Sound final
 
Project 2 integration
Project 2  integrationProject 2  integration
Project 2 integration
 
Project 1 performance evaluation
Project 1 performance evaluationProject 1 performance evaluation
Project 1 performance evaluation
 
Research questions preston liew
Research questions   preston liewResearch questions   preston liew
Research questions preston liew
 
Spirituality & sense of place
Spirituality & sense of placeSpirituality & sense of place
Spirituality & sense of place
 
Islamic architecture arc 2342 project 1 brief august 2015
Islamic architecture arc 2342 project 1 brief august 2015Islamic architecture arc 2342 project 1 brief august 2015
Islamic architecture arc 2342 project 1 brief august 2015
 

Project 2 measured drawing jan2015 rev

  • 1. 1 SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Modern Architecture Studies in Southeast Asia Research Unit (MASSA) Bachelor of Science (Honours) (Architecture) METHODS OF DOCUMENTATION AND MEASURED DRAWINGS [ARC 1215] __________________________________________________________________________________ Project: 2 Measured Drawing 50% of final marks (Group work with 15% individual components) Submission date: 2 March 2015 Introduction This project will be carried out throughout the semester where students will be assigned to measure and document a historical / heritage building and translate all the data into a set of drawings and a model. Each group will have to only measure one particular building assigned by the lecturer. Apart from doing the measuring exercise on site, students will also need to do additional research in order to piece together all the important data about the building. Objectives of Project This project aims to produce a set of measured drawings of historical buildings or structures in a specific location. A report containing important and historical information of the buildings will complement the drawings. It is an on-site exercise where students are required to execute fieldwork and hands-on measurement exercise Learning Outcomes of this Project Upon successful completion of the subject, students will be able to:  Recommend the appropriate method of architectural historic documentation  Recognize and recall techniques of measured drawing and documentation  Explain the as-built building constructions, architectural details and elements
  • 2. 2  Interpret historic architectural element, structure and building  Execute fieldwork and hands-on measurement exercise  Translate measured data into scaled drawings  Produce a report on the buildings highlighting its importance and historical significance Tasks In groups of certain number of students, depending on the size and complexity of the building to be measured, students are to do a measuring exercise on the particular building, taking all physical information of the building, from its location to its spatial layout as well as details. Each group will be given laser measuring devices and a 30 meter measuring tape. Students may bring along additional tools such as papers, pencils, clay and camera that may be useful in getting and recording all the data obtained. It is COMPULSORY for all students to attend this field work as it is the most important part of this module. Submission Requirement 2 set of A1 sized drawings (one with dimensions and one without dimensions) and 2 sets of A3 sized drawings (both without dimensions) comprising the following;  Key plan  Location plan  Site plan incorporating the roof plan  Floor plans  Elevations  Sections  Site sections  Exploded isometric / axonometric  A physical model to show the construction / structure of the buildings using ONLY balsa wood OR white model boards as either one section OR an open-able full model  Details – construction, architectural, decorative elements / ornaments (minimum one each) All annotations should be made in bilingual terms highlighting traditional terminologies such as ‘tebar layar’, ‘dou-gong’ or ‘sikhara’. Assessment criteria The assessment for this assignment will be based on  Methods, accuracy and efficiency of collecting information during fieldwork  Completeness of the drawings submitted  Application of drawing convention, line thickness, symbols, abbreviation, layout , scale, labelling, annotation etc  Progress – constant and / or increased development in the production of drawings and model  Accuracy – ability to translate physical data into drawings and model  Clarity – readable and comprehensive drawings and model  Efficiency and consistency of the group performance  Individual contribution on the drawings and models
  • 3. 3 Marking criteria Marks shall be distributed as follows: Progress marks (20%)  On site performance – individual 10 marks - Methods, accuracy and efficiency of collecting information during fieldwork -  Interim submission (drawings & model) 10 marks - Application of drawing convention, line thickness, symbols, abbreviation, layout, scale, labelling, annotation etc (5%) - Accuracy and clarity – ability to translate physical data into drawings (5%) Final submission (30%)  Completeness, Drawing Application, Accuracy and Clarity of drawings 15 - Completeness of the drawings submitted & Application of drawing convention, line thickness, symbols, abbreviation, layout, scale, labelling, annotation etc (10%) - Accuracy & clarity – ability to translate physical data into drawings (5%)  Model 10 - Accuracy – ability to translate physical data into model (5%) - Clarity – readable and well-crafted model (5%)  Individual performance and contribution (peer assessment) 5 - Individual contribution on the drawings and models Suggested References 1. Biefeld, Bert. 2007. Basic Technical Drawing. Germany. Birkhauser 2. John, Burn ed. 2004. Recording Historic Structure. New Jersey. John Wiley & Sons 3. KALAM-UTM, Risalah Panduan (Program Kajian Lukisan Terukur). UTM 4. Arnold, Dana. 2002. Reading Architectural History. London. Routledge 5. Hanafi, Zulkifli. 1999. Lukisan Terukur Rumah Tradisional Melayu Pulau Pinang. Kedah. Amber- Solara Publication 6. Hanafi, Zulkifli. 2004. Lukisan Terukur Rumah Tradisional Melayu Melayu Perak. Kedah. Amber- Solara Publication