SlideShare a Scribd company logo
1 of 4
Download to read offline
__________________________

                   Estimated Costs of
                 Maintenance, Repair and
                       Remodeling
                   for the Wisconsin Barn Preservation Initiative*
While no information can replace an on-site inspection and detailed cost estimate, this document provides a
starting point for owners concerned with the maintenance, repair and remodeling of their barns. These
“rough estimates” were developed through telephone interviews with several of the buildings contractors
noted in the associated “Short List of Contractors and Consultants.” Any additional feedback would be
appreciated.

As the revision date below indicates, this information is periodically updated. To receive the most current
materials please contact the author or access the information at the following Internet address:
http://www.uwex.edu/lgc/barns/barns.htm


Compiled By:

Charles S. Law, Ph.D.
Community Planning and Design Specialist
Local Government Center
229 Lowell Hall, 610 Langdon Street
Madison, WI 53703
(608) 265-2501
E-mail: cslaw@facstaff.wisc.edu


* The Wisconsin Barn Preservation Initiative is an ongoing effort aimed at helping preserve many of the historic agricultural
buildings in Wisconsin. Advising this initiative are the University of Wisconsin-Extension, the State Historical Society of
Wisconsin, and the Wisconsin Trust for Historic Preservation. For more information please contact the author.
________________________________________________________________________________________________________
Revised 12/98

Do your homework, then consult a professional: Barns often have "hidden" problems and it is impossible to
develop an accurate estimate of work needed without studying the building. There is no substitute to having a
qualified consultant or contractor make a site visit. Barn owners should refer to the associated short list of contractors
that has been developed. Before meeting with a contractor, it is important to familiarize yourself with the type of
work and costs that may be involved. Be a knowledgeable consumer, and make sure consultants and contractors are
qualified. A qualified home contractor may not be equally qualified to work on a barn. For more detailed information
on the work listed below, please see the list of supportive resources and literature.

Be aware of the rates for craftspeople: Many cost estimates will be based on "time and materials" so it is helpful to
have estimates for the hourly rates of craftspeople. Expect "historically accurate" restoration to cost more due to the
added expense of finding and matching original materials as well as the specialized skills required of the contractor.
                                                                                Estimate                  Unit
  general carpenter                                                             $17.50                    hr.
  general carpenter's assistant                                                 $12.00                    hr.
  restoration / specialized carpenter                                           $30.00-45.00              hr.
  stone restoration:            masons                                          $35.00                    hr.
                                labor                                           $25.00                    hr.
  general:                      masons                                          $16.00                    hr.
                                painters                                        $16.00                    hr.
                                roofers                                         $16.00                    hr.
  general contractor                                                            5-10% project cost
  “as is” blueprints & detailed restoration~conversion recommendations          $500                      job
  working blueprints for conversion to home                                     $1500                     job
  general consulting - scoping out work for contractors to bid                  $250 to several thousand

Don't forget about doing your own preventative maintenance: A small investment in regular maintenance can
save a lot of money in the long run. The type of work involved in maintenance is well suited to the "do it yourself"
barn owner. Most damage to buildings is caused by water, including frost heave. Working gutters and down spouts
with correct grading and landscaping can extend the life of foundations. Roof maintenance and painting of wood
surfaces is equally important. Even when barns are vacant, the building still needs to be maintained and insulated
against cold and other elements.

Consider the need for professional maintenance and repair: The following estimates are based on the assumption
that there are no hidden or additional problems. By evaluating all aspects of the barn from foundation to framing to
roof to exterior walls to the interior (often in that order), the barn owner should be able to reduce uncertainty.

1. FOUNDATION                                                                    Estimate                 Unit
       stone restoration (soft mortar is key)
           tuck pointing only *                                                  $10.00 - 15.00           sq. ft.
           stone demolition and relay *                                          $20.00 - 30.00           sq. ft.
                * price depends on size of stone, condition of wall, etc.
       may be more cost effective to replace rather than repair
           - 10" poured concrete                                                 $209                     lin. ft.
           (replacement will involve jacking up wall & mow floor)
       jacking up barn
           - jacking up only: 60' barn                                           $1,800                   ea.
           - even ceiling                                                        $2.50                    sq. ft.
           - or "depends on size and condition of barn"                          $200 - 20,000            ea.
2. FRAMING: posts, beams, sills, rafters, and joists                    Estimate           Unit
* may involve removing weight (jacking) & replacing members
          straightening end wall                                        $800.00            ea.
          pulling together joints (ex. mortise & tennon)                $300 -700          ea.
          replacement of support beams / posts                          $200 - 500         ea.
          * concrete pier may be needed
               or                                                       $20.00             ft.
          replacement of sill / beam for 60' side                       $2,500             ea.
          * includes: 8" x 8" oak beam, jacking up (5 posts)

3. ROOF
          new painted metal roof, steel (ex. 29 gauge) & 2" x 4"        $1.00 - 2.00       sq. ft.
               or                                                       $10,000 - 12,000   barn
          * should also add roof ventilation (50% of roof line)
               - 10' ventilation regulator                              $200.00            ea.
          new layer of organic asphalt shingle (< 3 layers on roof)      $1.00             sq. ft.
          strip old shingles & add layer of plywood deck                 $1.10             sq. ft.

4. EXTERIOR WALLS
        new exterior siding: wood (reverse baton, shiplap, carsiding)   $1.75 - 3.00       sq. ft.
            rough sawn                                                  $1.75              sq. ft.
            board & baton                                               $2.25              sq. ft.
        painting barn exterior (wall surface)                           $.40 - .60         sq. ft.
            or 5000 sq. ft. barn (wall surface)                         $2,000 - 3,000     barn
            - same barn with chemical strip estimated at                 $10,000           barn
            or 40' x 100' barn                                          $1800              barn
        * includes: removal of loose paint, painting of standard trim
            - possible extras: renailing loose boards                   $400 - 600         barn
                                 replacing boards
                                 painting window trim                   $2.00               "light"
        new exterior siding: metal - painted                            $1.00 - 4.00       sq. ft.
            or a 36' x 87' x (16'-20') barn including all trim          $18,000            barn
            or 5-6 times what it would cost to just paint

5. INTERIOR
        cleaning barn interior: pressure washing                        __________         sq. ft.
        whitewashing barn interior                                      __________         sq. ft.
        removal of old interior concrete floor / stanchions             $1.00 - 3.00       sq. ft.
            - remove old floor / stanchions & repour (50 cow barn)       $4,000 - 6,000    ea.
        new interior concrete floor                                     $2.00 - 2.50       sq. ft.
        interior finishing and insulation of walls                      $2.50 - 4.95       sq. ft.
        new floor boards                                                $1.50 - 3.00       sq. ft.
        windows (4' x 2' Aluminum slider with screen)                   $186.00            ea.
        doors (service 3' x 6'-8")                                      $296.00            ea.
            (big door with steel frame)                                 $500.00            ea.
Sometimes remodeling is desired: There is overlap between remodeling and maintenance and repair, but the
following would not be typical work and may be more relevant to remodeling or adaptive reuse.

                                                                         Estimate               Unit
          addition of interior non-load bearing walls                    $3.50                  sq. ft.
          repositioning of support columns                               $80.00                 ea.
          new stairs leading to loft / second story                      $400.00                ea.
          new furnace / heating system (inc. duct work & furnace)        $5,000 - 7,000         ea.
              - addition of Air conditioning                             $1,450                 ea.
          plumbing                                                       $5,500 - 6,000         ea.
          addition of bath: 1/2 bath (powder bath / stool)               $1,000                 ea.
          addition of bath: full bath                                    $5,000                 ea.
          septic system (average)                                        $5,500                 ea.
              - conventional                                             $2,500                 ea.
              - mound                                                    $8,000 - 9,000         ea.

moving smaller ag buildings (barns too big, floor unconnected)           $5,000 - 8,000         ea.
         * influenced by how big, how built, how far

Conversion to a home: The example provided is for a two and a half story barn, 30'x40'. This barn would have a
footage print of 1200 square feet and a second floor of about 800 square feet.

          2000 sq. ft. living area = $150,000                            $75.00                 sq. ft.
          200 sq. ft. upper loft = $9,000                                $45.00                 sq. ft.
          1200 sq. ft. full basement = $12,000 (unfinished)              $10.00                 sq. ft.

More Related Content

What's hot

Bricks
BricksBricks
Bricks
hlksd
 
Presentation on Brick Masonry, Paint and Plastering
Presentation on Brick Masonry, Paint and PlasteringPresentation on Brick Masonry, Paint and Plastering
Presentation on Brick Masonry, Paint and Plastering
Abontee
 
Strength of Natural Soil Bricks
Strength of Natural Soil BricksStrength of Natural Soil Bricks
Strength of Natural Soil Bricks
japes101
 

What's hot (20)

Ppt by maruthish on floors
Ppt by maruthish on floorsPpt by maruthish on floors
Ppt by maruthish on floors
 
BRICK MASONRY PPT BY SUBHENDU SAMUI
BRICK MASONRY PPT BY SUBHENDU SAMUIBRICK MASONRY PPT BY SUBHENDU SAMUI
BRICK MASONRY PPT BY SUBHENDU SAMUI
 
BRICK FLOORING
BRICK FLOORINGBRICK FLOORING
BRICK FLOORING
 
BRICK MASONRY
BRICK MASONRYBRICK MASONRY
BRICK MASONRY
 
Grit finish
Grit finish Grit finish
Grit finish
 
Report on concrete
Report on concreteReport on concrete
Report on concrete
 
Bricks
BricksBricks
Bricks
 
Brick Masonry Fall 09
Brick Masonry Fall 09Brick Masonry Fall 09
Brick Masonry Fall 09
 
Stone masonry
Stone masonryStone masonry
Stone masonry
 
Bmc flooring
Bmc flooring   Bmc flooring
Bmc flooring
 
Masonry construction (Building Construction)
Masonry construction (Building Construction)Masonry construction (Building Construction)
Masonry construction (Building Construction)
 
Flooring
FlooringFlooring
Flooring
 
Bricks
BricksBricks
Bricks
 
Building construction materials - brick
Building construction materials  - brick Building construction materials  - brick
Building construction materials - brick
 
Types of Flooring
Types of Flooring Types of Flooring
Types of Flooring
 
Presentation on Brick Masonry, Paint and Plastering
Presentation on Brick Masonry, Paint and PlasteringPresentation on Brick Masonry, Paint and Plastering
Presentation on Brick Masonry, Paint and Plastering
 
MARBLE
MARBLEMARBLE
MARBLE
 
Mudarchitecture,
Mudarchitecture,Mudarchitecture,
Mudarchitecture,
 
Floors
FloorsFloors
Floors
 
Strength of Natural Soil Bricks
Strength of Natural Soil BricksStrength of Natural Soil Bricks
Strength of Natural Soil Bricks
 

Similar to Costs

Project Administration
Project AdministrationProject Administration
Project Administration
tpresley
 

Similar to Costs (9)

Project Administration
Project AdministrationProject Administration
Project Administration
 
Bill Of Quantities
Bill Of QuantitiesBill Of Quantities
Bill Of Quantities
 
Gh high tunnels_2008-01pr
Gh high tunnels_2008-01prGh high tunnels_2008-01pr
Gh high tunnels_2008-01pr
 
Gh high tunnels_2008-01pr
Gh high tunnels_2008-01prGh high tunnels_2008-01pr
Gh high tunnels_2008-01pr
 
Part 3 Exterior Painting and Restoration
Part 3  Exterior Painting and RestorationPart 3  Exterior Painting and Restoration
Part 3 Exterior Painting and Restoration
 
Workilo is the best home improvent service provider in Brooklyn
Workilo is the best home improvent service provider in BrooklynWorkilo is the best home improvent service provider in Brooklyn
Workilo is the best home improvent service provider in Brooklyn
 
PARADISE ESTIMATING
PARADISE ESTIMATINGPARADISE ESTIMATING
PARADISE ESTIMATING
 
Home Owner's Guide To Contractor Pricing
Home Owner's Guide To Contractor PricingHome Owner's Guide To Contractor Pricing
Home Owner's Guide To Contractor Pricing
 
Get in the flippin game flipping homes presentation - joleen halloran kelle...
Get in the flippin game   flipping homes presentation - joleen halloran kelle...Get in the flippin game   flipping homes presentation - joleen halloran kelle...
Get in the flippin game flipping homes presentation - joleen halloran kelle...
 

Recently uploaded

ppt your views.ppt your views of your college in your eyes
ppt your views.ppt your views of your college in your eyesppt your views.ppt your views of your college in your eyes
ppt your views.ppt your views of your college in your eyes
ashishpaul799
 
IATP How-to Foreign Travel May 2024.pdff
IATP How-to Foreign Travel May 2024.pdffIATP How-to Foreign Travel May 2024.pdff
IATP How-to Foreign Travel May 2024.pdff
17thcssbs2
 
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
中 央社
 

Recently uploaded (20)

Post Exam Fun(da) Intra UEM General Quiz 2024 - Prelims q&a.pdf
Post Exam Fun(da) Intra UEM General Quiz 2024 - Prelims q&a.pdfPost Exam Fun(da) Intra UEM General Quiz 2024 - Prelims q&a.pdf
Post Exam Fun(da) Intra UEM General Quiz 2024 - Prelims q&a.pdf
 
Envelope of Discrepancy in Orthodontics: Enhancing Precision in Treatment
 Envelope of Discrepancy in Orthodontics: Enhancing Precision in Treatment Envelope of Discrepancy in Orthodontics: Enhancing Precision in Treatment
Envelope of Discrepancy in Orthodontics: Enhancing Precision in Treatment
 
Pragya Champions Chalice 2024 Prelims & Finals Q/A set, General Quiz
Pragya Champions Chalice 2024 Prelims & Finals Q/A set, General QuizPragya Champions Chalice 2024 Prelims & Finals Q/A set, General Quiz
Pragya Champions Chalice 2024 Prelims & Finals Q/A set, General Quiz
 
Open Educational Resources Primer PowerPoint
Open Educational Resources Primer PowerPointOpen Educational Resources Primer PowerPoint
Open Educational Resources Primer PowerPoint
 
An overview of the various scriptures in Hinduism
An overview of the various scriptures in HinduismAn overview of the various scriptures in Hinduism
An overview of the various scriptures in Hinduism
 
How to the fix Attribute Error in odoo 17
How to the fix Attribute Error in odoo 17How to the fix Attribute Error in odoo 17
How to the fix Attribute Error in odoo 17
 
Operations Management - Book1.p - Dr. Abdulfatah A. Salem
Operations Management - Book1.p  - Dr. Abdulfatah A. SalemOperations Management - Book1.p  - Dr. Abdulfatah A. Salem
Operations Management - Book1.p - Dr. Abdulfatah A. Salem
 
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjjStl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
 
ppt your views.ppt your views of your college in your eyes
ppt your views.ppt your views of your college in your eyesppt your views.ppt your views of your college in your eyes
ppt your views.ppt your views of your college in your eyes
 
IATP How-to Foreign Travel May 2024.pdff
IATP How-to Foreign Travel May 2024.pdffIATP How-to Foreign Travel May 2024.pdff
IATP How-to Foreign Travel May 2024.pdff
 
The Ball Poem- John Berryman_20240518_001617_0000.pptx
The Ball Poem- John Berryman_20240518_001617_0000.pptxThe Ball Poem- John Berryman_20240518_001617_0000.pptx
The Ball Poem- John Berryman_20240518_001617_0000.pptx
 
Application of Matrices in real life. Presentation on application of matrices
Application of Matrices in real life. Presentation on application of matricesApplication of Matrices in real life. Presentation on application of matrices
Application of Matrices in real life. Presentation on application of matrices
 
Behavioral-sciences-dr-mowadat rana (1).pdf
Behavioral-sciences-dr-mowadat rana (1).pdfBehavioral-sciences-dr-mowadat rana (1).pdf
Behavioral-sciences-dr-mowadat rana (1).pdf
 
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
 
Features of Video Calls in the Discuss Module in Odoo 17
Features of Video Calls in the Discuss Module in Odoo 17Features of Video Calls in the Discuss Module in Odoo 17
Features of Video Calls in the Discuss Module in Odoo 17
 
Navigating the Misinformation Minefield: The Role of Higher Education in the ...
Navigating the Misinformation Minefield: The Role of Higher Education in the ...Navigating the Misinformation Minefield: The Role of Higher Education in the ...
Navigating the Misinformation Minefield: The Role of Higher Education in the ...
 
How to Manage Closest Location in Odoo 17 Inventory
How to Manage Closest Location in Odoo 17 InventoryHow to Manage Closest Location in Odoo 17 Inventory
How to Manage Closest Location in Odoo 17 Inventory
 
Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17
Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17
Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17
 
2024_Student Session 2_ Set Plan Preparation.pptx
2024_Student Session 2_ Set Plan Preparation.pptx2024_Student Session 2_ Set Plan Preparation.pptx
2024_Student Session 2_ Set Plan Preparation.pptx
 
BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...
BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...
BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...
 

Costs

  • 1. __________________________ Estimated Costs of Maintenance, Repair and Remodeling for the Wisconsin Barn Preservation Initiative* While no information can replace an on-site inspection and detailed cost estimate, this document provides a starting point for owners concerned with the maintenance, repair and remodeling of their barns. These “rough estimates” were developed through telephone interviews with several of the buildings contractors noted in the associated “Short List of Contractors and Consultants.” Any additional feedback would be appreciated. As the revision date below indicates, this information is periodically updated. To receive the most current materials please contact the author or access the information at the following Internet address: http://www.uwex.edu/lgc/barns/barns.htm Compiled By: Charles S. Law, Ph.D. Community Planning and Design Specialist Local Government Center 229 Lowell Hall, 610 Langdon Street Madison, WI 53703 (608) 265-2501 E-mail: cslaw@facstaff.wisc.edu * The Wisconsin Barn Preservation Initiative is an ongoing effort aimed at helping preserve many of the historic agricultural buildings in Wisconsin. Advising this initiative are the University of Wisconsin-Extension, the State Historical Society of Wisconsin, and the Wisconsin Trust for Historic Preservation. For more information please contact the author.
  • 2. ________________________________________________________________________________________________________ Revised 12/98 Do your homework, then consult a professional: Barns often have "hidden" problems and it is impossible to develop an accurate estimate of work needed without studying the building. There is no substitute to having a qualified consultant or contractor make a site visit. Barn owners should refer to the associated short list of contractors that has been developed. Before meeting with a contractor, it is important to familiarize yourself with the type of work and costs that may be involved. Be a knowledgeable consumer, and make sure consultants and contractors are qualified. A qualified home contractor may not be equally qualified to work on a barn. For more detailed information on the work listed below, please see the list of supportive resources and literature. Be aware of the rates for craftspeople: Many cost estimates will be based on "time and materials" so it is helpful to have estimates for the hourly rates of craftspeople. Expect "historically accurate" restoration to cost more due to the added expense of finding and matching original materials as well as the specialized skills required of the contractor. Estimate Unit general carpenter $17.50 hr. general carpenter's assistant $12.00 hr. restoration / specialized carpenter $30.00-45.00 hr. stone restoration: masons $35.00 hr. labor $25.00 hr. general: masons $16.00 hr. painters $16.00 hr. roofers $16.00 hr. general contractor 5-10% project cost “as is” blueprints & detailed restoration~conversion recommendations $500 job working blueprints for conversion to home $1500 job general consulting - scoping out work for contractors to bid $250 to several thousand Don't forget about doing your own preventative maintenance: A small investment in regular maintenance can save a lot of money in the long run. The type of work involved in maintenance is well suited to the "do it yourself" barn owner. Most damage to buildings is caused by water, including frost heave. Working gutters and down spouts with correct grading and landscaping can extend the life of foundations. Roof maintenance and painting of wood surfaces is equally important. Even when barns are vacant, the building still needs to be maintained and insulated against cold and other elements. Consider the need for professional maintenance and repair: The following estimates are based on the assumption that there are no hidden or additional problems. By evaluating all aspects of the barn from foundation to framing to roof to exterior walls to the interior (often in that order), the barn owner should be able to reduce uncertainty. 1. FOUNDATION Estimate Unit stone restoration (soft mortar is key) tuck pointing only * $10.00 - 15.00 sq. ft. stone demolition and relay * $20.00 - 30.00 sq. ft. * price depends on size of stone, condition of wall, etc. may be more cost effective to replace rather than repair - 10" poured concrete $209 lin. ft. (replacement will involve jacking up wall & mow floor) jacking up barn - jacking up only: 60' barn $1,800 ea. - even ceiling $2.50 sq. ft. - or "depends on size and condition of barn" $200 - 20,000 ea.
  • 3. 2. FRAMING: posts, beams, sills, rafters, and joists Estimate Unit * may involve removing weight (jacking) & replacing members straightening end wall $800.00 ea. pulling together joints (ex. mortise & tennon) $300 -700 ea. replacement of support beams / posts $200 - 500 ea. * concrete pier may be needed or $20.00 ft. replacement of sill / beam for 60' side $2,500 ea. * includes: 8" x 8" oak beam, jacking up (5 posts) 3. ROOF new painted metal roof, steel (ex. 29 gauge) & 2" x 4" $1.00 - 2.00 sq. ft. or $10,000 - 12,000 barn * should also add roof ventilation (50% of roof line) - 10' ventilation regulator $200.00 ea. new layer of organic asphalt shingle (< 3 layers on roof) $1.00 sq. ft. strip old shingles & add layer of plywood deck $1.10 sq. ft. 4. EXTERIOR WALLS new exterior siding: wood (reverse baton, shiplap, carsiding) $1.75 - 3.00 sq. ft. rough sawn $1.75 sq. ft. board & baton $2.25 sq. ft. painting barn exterior (wall surface) $.40 - .60 sq. ft. or 5000 sq. ft. barn (wall surface) $2,000 - 3,000 barn - same barn with chemical strip estimated at $10,000 barn or 40' x 100' barn $1800 barn * includes: removal of loose paint, painting of standard trim - possible extras: renailing loose boards $400 - 600 barn replacing boards painting window trim $2.00 "light" new exterior siding: metal - painted $1.00 - 4.00 sq. ft. or a 36' x 87' x (16'-20') barn including all trim $18,000 barn or 5-6 times what it would cost to just paint 5. INTERIOR cleaning barn interior: pressure washing __________ sq. ft. whitewashing barn interior __________ sq. ft. removal of old interior concrete floor / stanchions $1.00 - 3.00 sq. ft. - remove old floor / stanchions & repour (50 cow barn) $4,000 - 6,000 ea. new interior concrete floor $2.00 - 2.50 sq. ft. interior finishing and insulation of walls $2.50 - 4.95 sq. ft. new floor boards $1.50 - 3.00 sq. ft. windows (4' x 2' Aluminum slider with screen) $186.00 ea. doors (service 3' x 6'-8") $296.00 ea. (big door with steel frame) $500.00 ea.
  • 4. Sometimes remodeling is desired: There is overlap between remodeling and maintenance and repair, but the following would not be typical work and may be more relevant to remodeling or adaptive reuse. Estimate Unit addition of interior non-load bearing walls $3.50 sq. ft. repositioning of support columns $80.00 ea. new stairs leading to loft / second story $400.00 ea. new furnace / heating system (inc. duct work & furnace) $5,000 - 7,000 ea. - addition of Air conditioning $1,450 ea. plumbing $5,500 - 6,000 ea. addition of bath: 1/2 bath (powder bath / stool) $1,000 ea. addition of bath: full bath $5,000 ea. septic system (average) $5,500 ea. - conventional $2,500 ea. - mound $8,000 - 9,000 ea. moving smaller ag buildings (barns too big, floor unconnected) $5,000 - 8,000 ea. * influenced by how big, how built, how far Conversion to a home: The example provided is for a two and a half story barn, 30'x40'. This barn would have a footage print of 1200 square feet and a second floor of about 800 square feet. 2000 sq. ft. living area = $150,000 $75.00 sq. ft. 200 sq. ft. upper loft = $9,000 $45.00 sq. ft. 1200 sq. ft. full basement = $12,000 (unfinished) $10.00 sq. ft.