1. Private & Confidential
3
Executed Project
D
e
-
No Project Name Status
1. De-oiling, Gauging. Auxiliary Pumping to Assist Intelligent Pigging &
Dewatering/Commissioning:
SBOPL282: 10” x 4.6KM Crude Line From SUJT-C to SUPG-B
(Sumandak)
Completed
2. De-oiling, Gauging. Auxiliary Pumping to Assist Intelligent Pigging &
Dewatering/Commissioning:
SBOPL281: 16” x 7.1KM Crude Line From SUDP-A to SUPG-B
SBOPL280: 16” x 7.1KM Crude Line From SUDP-A to SMP-B
(Reverse Flow)
Completed
3. Supply of Manpower, Material & Equipment for Erection &
Dismantle of Scaffolding to Assist IP:
SBOPL144A: 20” x 47.71KM Crude Line from SMR-A to LCOT
Completed
4. De-oiling, Cleaning/Gauging, Auxiliary Pumping to Assist IP, Bulk
Dewatering, Final Dewatering & Nitrogen/N2 Preservation:
SBOPL123: 8” x 0.7KM Crude Line From SMJT-G to SMJT-E
SBOPL126: 6” x 0.64KM Crude Line From SMJT-G to SMJT-E
SBOPL127: 6” x 0.64KM Crude Line From SMJT-G to SMJT-E
SBOPL128: 6” x 0.64KM Gas Line From SMJT-G to SMJT-E (Reverse
Flow)
Completed
5. Vacuum Inspection & Monitoring Sabah Sarawak Gas
Pipeline(SSGP) 36” x 400KM From SOGT to MNLG Bintulu
Completed
6. Supply of Manpower, Material & Equipment for Erection &
Dismantle of Scaffolding To Assist Defect Verification At SUPG-B &
SUJT-C.
Completed
7. Samarang Turn Around Shutdown(TASD) 2016:
Scope 1:
De-oiling, Cleaning/Flushing, Dewatering to Assist IP:
SBOPL125A: 8” x 0.7KM Crude Line From SMP-C to SMJT-F
SBOPL143: 12” x 3.0KM Crude Line From SMP-C to SMR-A (Reverse
Flow)
Scope 2:
Sectional Replacement For Defected Riser Spool/Hot Work:
SBOPL125A: One(1) Length 3.0m Pipe Riser API 5L X52
SBOPL143: One(1) Length 2.0m Pipe Riser API 5L X42
Successful