Private & Confidential
3
Executed Project
D
e
-
No Project Name Status
1. De-oiling, Gauging. Auxiliary Pumping to Assist Intelligent Pigging &
Dewatering/Commissioning:
SBOPL282: 10” x 4.6KM Crude Line From SUJT-C to SUPG-B
(Sumandak)
Completed
2. De-oiling, Gauging. Auxiliary Pumping to Assist Intelligent Pigging &
Dewatering/Commissioning:
SBOPL281: 16” x 7.1KM Crude Line From SUDP-A to SUPG-B
SBOPL280: 16” x 7.1KM Crude Line From SUDP-A to SMP-B
(Reverse Flow)
Completed
3. Supply of Manpower, Material & Equipment for Erection &
Dismantle of Scaffolding to Assist IP:
SBOPL144A: 20” x 47.71KM Crude Line from SMR-A to LCOT
Completed
4. De-oiling, Cleaning/Gauging, Auxiliary Pumping to Assist IP, Bulk
Dewatering, Final Dewatering & Nitrogen/N2 Preservation:
SBOPL123: 8” x 0.7KM Crude Line From SMJT-G to SMJT-E
SBOPL126: 6” x 0.64KM Crude Line From SMJT-G to SMJT-E
SBOPL127: 6” x 0.64KM Crude Line From SMJT-G to SMJT-E
SBOPL128: 6” x 0.64KM Gas Line From SMJT-G to SMJT-E (Reverse
Flow)
Completed
5. Vacuum Inspection & Monitoring Sabah Sarawak Gas
Pipeline(SSGP) 36” x 400KM From SOGT to MNLG Bintulu
Completed
6. Supply of Manpower, Material & Equipment for Erection &
Dismantle of Scaffolding To Assist Defect Verification At SUPG-B &
SUJT-C.
Completed
7. Samarang Turn Around Shutdown(TASD) 2016:
Scope 1:
De-oiling, Cleaning/Flushing, Dewatering to Assist IP:
SBOPL125A: 8” x 0.7KM Crude Line From SMP-C to SMJT-F
SBOPL143: 12” x 3.0KM Crude Line From SMP-C to SMR-A (Reverse
Flow)
Scope 2:
Sectional Replacement For Defected Riser Spool/Hot Work:
SBOPL125A: One(1) Length 3.0m Pipe Riser API 5L X52
SBOPL143: One(1) Length 2.0m Pipe Riser API 5L X42
Successful

More Related Content

Similar to EXECUTED PROJECT LIST

CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000daniel cobar
 
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2syed abdul wahab
 
LTG_Job Status_25May10.ppt
LTG_Job Status_25May10.pptLTG_Job Status_25May10.ppt
LTG_Job Status_25May10.pptEhtishamAndrAbi1
 
IPTC 16192 Manuscript
IPTC 16192 ManuscriptIPTC 16192 Manuscript
IPTC 16192 ManuscriptNghi Nguyen
 
"Deepwater Managed Pressure Drilling and Well Drillability, Efficiency and Pr...
"Deepwater Managed Pressure Drilling and Well Drillability, Efficiency and Pr..."Deepwater Managed Pressure Drilling and Well Drillability, Efficiency and Pr...
"Deepwater Managed Pressure Drilling and Well Drillability, Efficiency and Pr...Society of Petroleum Engineers
 
Trican Well Service - Unconventional Resources Presentation
Trican Well Service - Unconventional Resources PresentationTrican Well Service - Unconventional Resources Presentation
Trican Well Service - Unconventional Resources PresentationSistema FIEB
 
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012ggurudev
 
Jupa_SolidCitric_products
Jupa_SolidCitric_productsJupa_SolidCitric_products
Jupa_SolidCitric_productsEndre Birkeland
 
NETVIEL-2015.pptx
NETVIEL-2015.pptxNETVIEL-2015.pptx
NETVIEL-2015.pptxsunnysoe1
 
Presenting AUGIER Energy
Presenting AUGIER EnergyPresenting AUGIER Energy
Presenting AUGIER EnergyRashmi Jeswani
 
curiculum vitae azlan (latest)
curiculum vitae azlan (latest)curiculum vitae azlan (latest)
curiculum vitae azlan (latest)Azlan Shah
 
8.CV ARIF NIZAR
8.CV ARIF NIZAR8.CV ARIF NIZAR
8.CV ARIF NIZARArif Nizar
 
File thuyet trinh - Kiem tra an mon duong ong PM3
File thuyet trinh - Kiem tra an mon duong ong PM3File thuyet trinh - Kiem tra an mon duong ong PM3
File thuyet trinh - Kiem tra an mon duong ong PM3Tuan Nguyen
 
05. PPT for EAC (BPCL).ppt
05. PPT for EAC (BPCL).ppt05. PPT for EAC (BPCL).ppt
05. PPT for EAC (BPCL).pptNMnam
 
ATIs-B12-2-Wire-Gas-Transmitter-Support-Drawings.pdf
ATIs-B12-2-Wire-Gas-Transmitter-Support-Drawings.pdfATIs-B12-2-Wire-Gas-Transmitter-Support-Drawings.pdf
ATIs-B12-2-Wire-Gas-Transmitter-Support-Drawings.pdfENVIMART
 

Similar to EXECUTED PROJECT LIST (20)

SynergieCAD-V93K-CTH-Configuration_MAR16
SynergieCAD-V93K-CTH-Configuration_MAR16SynergieCAD-V93K-CTH-Configuration_MAR16
SynergieCAD-V93K-CTH-Configuration_MAR16
 
CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000
 
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
 
LTG_Job Status_25May10.ppt
LTG_Job Status_25May10.pptLTG_Job Status_25May10.ppt
LTG_Job Status_25May10.ppt
 
IPTC 16192 Manuscript
IPTC 16192 ManuscriptIPTC 16192 Manuscript
IPTC 16192 Manuscript
 
Mg innovation flng cn 2010
Mg innovation flng cn 2010Mg innovation flng cn 2010
Mg innovation flng cn 2010
 
"Deepwater Managed Pressure Drilling and Well Drillability, Efficiency and Pr...
"Deepwater Managed Pressure Drilling and Well Drillability, Efficiency and Pr..."Deepwater Managed Pressure Drilling and Well Drillability, Efficiency and Pr...
"Deepwater Managed Pressure Drilling and Well Drillability, Efficiency and Pr...
 
PLS 2017: Erskine Bridge Electrical and Lighting Refurbishment
PLS 2017: Erskine Bridge Electrical and Lighting RefurbishmentPLS 2017: Erskine Bridge Electrical and Lighting Refurbishment
PLS 2017: Erskine Bridge Electrical and Lighting Refurbishment
 
Trican Well Service - Unconventional Resources Presentation
Trican Well Service - Unconventional Resources PresentationTrican Well Service - Unconventional Resources Presentation
Trican Well Service - Unconventional Resources Presentation
 
ProcContSite
ProcContSiteProcContSite
ProcContSite
 
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
 
Jupa_SolidCitric_products
Jupa_SolidCitric_productsJupa_SolidCitric_products
Jupa_SolidCitric_products
 
NETVIEL-2015.pptx
NETVIEL-2015.pptxNETVIEL-2015.pptx
NETVIEL-2015.pptx
 
Presenting AUGIER Energy
Presenting AUGIER EnergyPresenting AUGIER Energy
Presenting AUGIER Energy
 
curiculum vitae azlan (latest)
curiculum vitae azlan (latest)curiculum vitae azlan (latest)
curiculum vitae azlan (latest)
 
8.CV ARIF NIZAR
8.CV ARIF NIZAR8.CV ARIF NIZAR
8.CV ARIF NIZAR
 
File thuyet trinh - Kiem tra an mon duong ong PM3
File thuyet trinh - Kiem tra an mon duong ong PM3File thuyet trinh - Kiem tra an mon duong ong PM3
File thuyet trinh - Kiem tra an mon duong ong PM3
 
05. PPT for EAC (BPCL).ppt
05. PPT for EAC (BPCL).ppt05. PPT for EAC (BPCL).ppt
05. PPT for EAC (BPCL).ppt
 
ATIs-B12-2-Wire-Gas-Transmitter-Support-Drawings.pdf
ATIs-B12-2-Wire-Gas-Transmitter-Support-Drawings.pdfATIs-B12-2-Wire-Gas-Transmitter-Support-Drawings.pdf
ATIs-B12-2-Wire-Gas-Transmitter-Support-Drawings.pdf
 
My FS2 DEE
My FS2 DEEMy FS2 DEE
My FS2 DEE
 

EXECUTED PROJECT LIST

  • 1. Private & Confidential 3 Executed Project D e - No Project Name Status 1. De-oiling, Gauging. Auxiliary Pumping to Assist Intelligent Pigging & Dewatering/Commissioning: SBOPL282: 10” x 4.6KM Crude Line From SUJT-C to SUPG-B (Sumandak) Completed 2. De-oiling, Gauging. Auxiliary Pumping to Assist Intelligent Pigging & Dewatering/Commissioning: SBOPL281: 16” x 7.1KM Crude Line From SUDP-A to SUPG-B SBOPL280: 16” x 7.1KM Crude Line From SUDP-A to SMP-B (Reverse Flow) Completed 3. Supply of Manpower, Material & Equipment for Erection & Dismantle of Scaffolding to Assist IP: SBOPL144A: 20” x 47.71KM Crude Line from SMR-A to LCOT Completed 4. De-oiling, Cleaning/Gauging, Auxiliary Pumping to Assist IP, Bulk Dewatering, Final Dewatering & Nitrogen/N2 Preservation: SBOPL123: 8” x 0.7KM Crude Line From SMJT-G to SMJT-E SBOPL126: 6” x 0.64KM Crude Line From SMJT-G to SMJT-E SBOPL127: 6” x 0.64KM Crude Line From SMJT-G to SMJT-E SBOPL128: 6” x 0.64KM Gas Line From SMJT-G to SMJT-E (Reverse Flow) Completed 5. Vacuum Inspection & Monitoring Sabah Sarawak Gas Pipeline(SSGP) 36” x 400KM From SOGT to MNLG Bintulu Completed 6. Supply of Manpower, Material & Equipment for Erection & Dismantle of Scaffolding To Assist Defect Verification At SUPG-B & SUJT-C. Completed 7. Samarang Turn Around Shutdown(TASD) 2016: Scope 1: De-oiling, Cleaning/Flushing, Dewatering to Assist IP: SBOPL125A: 8” x 0.7KM Crude Line From SMP-C to SMJT-F SBOPL143: 12” x 3.0KM Crude Line From SMP-C to SMR-A (Reverse Flow) Scope 2: Sectional Replacement For Defected Riser Spool/Hot Work: SBOPL125A: One(1) Length 3.0m Pipe Riser API 5L X52 SBOPL143: One(1) Length 2.0m Pipe Riser API 5L X42 Successful