Summary
The authors will describe in the following pages the reasons why the project of the Multi-functional
Sports Hall from Cluj Napoca is attractive. The main lines of the building are: a hall with a capacity
of 7000 seats, a structure dominated by precast concrete elements, a long span roof and an advanced
analyze of the connections, all well-kept into the limited funds. The roof solution consists in using
steel space trusses made out of square hollow sections (SHS). The truss has a clear span of 63.90m, a
total length of 76,10m, a maximum height of 4,00m that is reduced on the length of the structural
element, and a triangular cross section being 3,60m wide. Global stability checks and specific local
stability problems were performed and are exposed in the following paper. For the fabrication of the
space truss, welded joints between the SHS profiles were designed. As a result of the fact that for
characteristic failure checks of the welded TT and KK joints analytical methods are based only on a
semi-empirical formulae, developed for Φ=90 degrees (the angle between the diagonal planes), for
the design of joints finite element modelling was used. Good agreement between the results of the
developed finite element joint model and the analytical method for TT and KK joints has been
found, even though the semi-empirical formulae are applied for the analysed truss which had Φ=50
degrees.
Keywords: large span space trusses; precast concrete; joint analysis.
1. Introduction
In 2010 the local authorities of the city Cluj Napoca launched the selection process based on a
Feasibility Study for the new Multi-functional Sports Hall, located near the new city stadium.
Following the selection process which included a new structural solution proposal, a designer
association was selected including architects, structural engineers and electrical engineers. Based on
a new structural concept, Plan 31 Ro Ltd. was elected for designing the building structure.
The technical solution regarding force resisting structure was decided after taking in consideration a
couple of monolithically concrete frames and a roof made out of laminated wooden arches. The
monolithic concrete had the disadvantage of reduced time efficiency, and after the future owner
decided that it would be better to reduce the time with execution from 36 months to 12 months in
order to be able to organize a European Sport Competition, the design team had to find new
solutions. The building has 115m x 130m in plane dimensions, the work on site need it to start 2
months before winter time (often the air temperature is below -4 degrees Celsius) came with many
restrictions regarding pouring in situ concrete. The surface concrete slab of 15,000sqm have arisen
the cracking issue due to concrete shrinkage after its hardening, so the decision was a widespread
use of precast concrete elements. Where the design loads resulted in great reaction forces there were
used prestressed concrete beams with cast in situ concrete columns, while for the rest of the
elements were precasted and fixed with dry or wet connections.
The 64m span roof was first thought to be designed as several laminated wooden arches. Do to the
fact the entrepreneur have neither the possibility nor the technology to build these type of elements,
a new solution was brought and that was a space truss with SHS.
2. Building particularities
2.1 Architectural facts
The Multi-functional Sports Hall is organized on five levels: underground level, ground level and
three stories (Figures 1 and 2). Underground level is a parking with 447 car capacity. Ground level
together with first and second level includes public, officials, media, shopping and administration
areas. Ground level also includes the reserved area for sport players, while second level has a
conference centre. The third level is for media, special equipment and installations devices. In order
to offer multiple use of the playing area, the floor surface can be changed from 30x47m to 38x56m
by using extensible/retractable tribune structure on the ground level. In this manner handball, volley,
basketball, box and gymnastics championship are possible to take place in the Multi-functional
Sports Hall.
Fig. 1: Transverse section through the building
Fig. 2: Longitudinal section through the building
2.2 Design loads considered in calculus and structural analyses
In order to evaluate the structural response, in the design process were considered the following
loads (characteristic values), other than the self-weight of the elements:
- Roof loads EN1991-1-1: dead load + technological load qk = 1,0 kN/sqm;
- Concentrated technological loads (media box) applied in mid span, Pk= 60 kN;
- Temperature variation effects between erection phase (-15 to -20 degrees Celsius in winter)
and service phase (+15 to +20 degrees Celsius during lifetime);
- Snow loads on the roof according to EN1991-1-3, s0,k=1,5 kN/sqm;
- Wind loads on building envelope according to EN1991-1-4, qref=0,4 kN/sqm, vb0=27m/s;
- Live loads on slabs EN1991-1-1, qk = 10,0 kN/sqm – ground floor, qk = 5,0 kN/sqm – upper
floors;
- Technological loads qk = 2,5 kN/sqm – ground floor, qk = 3,5 kN/sqm – upper floors;
- Seismic action according to EN1998-1 [1], with peak ground acceleration ag=0,08g and
control period of seismic motion Tc=0,7 seconds;
- Load combination for ultimate limit state (ULS) and serviceability limit state (SLS)
according to EN 1990 [2].
2.3 Structural compliance of the concrete structure
Building`s substructure consists mainly in pad foundations, where it was necessary to balance the
pad foundations, moment resisting beams were added, due to the large bending moments appeared
at the base of the concrete columns supporting the roof; strip foundations were used for the walls
situated at the underground level, while for the training room a raft foundation was chosen being
also the support of the boarded floor. The foundation soil type is clay marl with a bearing capacity
of 750kPa.
The building is a concrete frame structure with a characteristic bay of 8,40x10,60m, for the arena
area. On sides the bays are smaller and with varying dimensions. The concrete frames consist in
precast concrete columns fixed in foundations using dry connections (Figure 3), except the columns
supporting the steel roof which are cast in situ. The last ones, having the cross section 60x120cm,
the transportation together with the control and site erecting it would have been difficult to perform.
Due to short execution terms, most of the columns were precasted and because of the cold weather
during execution time, there were used dry connections provided by PEIKKO.
Fig. 3: Precast concrete column base connection
All frame beams and stair beams are precasted, reinforced concrete or prestressed concrete. The
beam-column joints are moment-resisting (floor level ±0.00m) and pinned for the upper levels. For
the frames connected directly to the roof`s steel truss, rigid connections have been used for the
beams which are in the same plane with the space truss (Figure 4).
(before concreting the joint) (after concreting in the joint) Fig. 5: Topping reinforcing
Fig. 4: Beam-column connection
The slab consists in a precast part (hollow-core units with 200mm and 320mm height or preslabs of
80mm thick where the slab span is reduced) and a topping of 80mm thickness of C25/30 concrete,
and S500 reinforcing steel. In order to assure enough stiffness to the vertical loads (the problem of
floor vibrations was tested using PulseLabshop software from Bruel and Khaer for the in situ
experiments, as well as a commercial FEM software for the numerical simulation. While for the
horizontal loads, the cast in situ topping was design to transmit the reactions from the vertical
envelope and to the vertical force resisting elements (concrete columns), and also to assure a
horizontal rigid diaphragm effect. For a better connection between the partially precast slab and the
beams, hollow-core units were partially cut off at the edges and extra reinforced (Figures 5) with
triangular skeleton reinforcing; where preslabs were used, only the meshing wires in the topping
were enough thanks of the connectors left out of the preslabs surface.
3. Design of the roof`s steel structure
The roof structure consists in 7 trusses with a clear span of 63,90m, and total length of 76,10m,
supported by concrete frames and lateral interconnected with the rest of the structure through
horizontal and vertical steel bracings. The space steel trusses are mounted using a spacing of
10,50m (Figure 2). Choosing the most appropriate roof structure solution has been driven by a
number of factors including the span, roof geometry, load to be supported, economy and aesthetics.
The truss section is 3600 mm wide and approximately 4000 mm deep (variable along the span). The
steel trusses of this size are able to span such distances as simply supported elements, but large
vertical deformations and horizontal reactions were necessary to be managed. Several options were
investigated to keep the sizes to a minimum, including arch action (which would have required stiff
concrete structure) and cantilevered truss structure (which would have resulted in vertical tie
elements at both ends). The system that was decided combines both: the advantage of this system is
that the end cantilever with the vertical tying elements of the truss effectively reduces the vertical
deformations and axial forces in mid span, as well as allowing the continuity of the roof structure
over the lateral annexes. The principle was successfully used one of the authors in a similar project
[3]. Pinned supports were provided on the top of the concrete columns, with limited horizontal
displacement set up possibility for the erection phases. Longitudinal trusses were placed in mid
span, at the supports and near the supports, where the inner flange of the truss compression effort
change in tension.
The design of the steel structure was performed following the European standards. For strength,
stability and stiffness requirements of the structural elements the prescription of EN1993-1-1 [4],
EN1993-1-8 [5] and EN1998-1 [1] were used. For the design of the structural elements, linear
elastic structural analysis was performed. The design checks of the structural elements for ULS
include persistent or transient design situations (fundamental combinations), where snow loads in
combination with technological loads play the key role. For global stability checks Consteel
software was used, which calculation procedure is based on the general method of EN1993-1-1 [4].
For individual member checks, both methods A and B of EN1993-1-1 were performed. Good
agreement between the used methods was found. For the design of spatial truss joints the following
failure modes have been considered: local brace failure (yielding, local buckling), chord face
plastification, chord punching shear, chord side wall failure, chord shear failure [6]. Alternative
checks using finite element modeling was also used.
For SLS design checks of the structural elements, fundamental and exceptional load combinations
were used. The computed maximum vertical deflection of the space truss for SLS check under snow
and technological load is:
(1)
Fig. 6: The structural model of the transverse frame
mm
f
mm
f a 213
300
L
165 



3.1 Joints between the steel and concrete structure
Providing pinned supports for the roof trusses, positive effects in the internal effort distribution and
the highest horizontal reaction over the concrete structures, were obtained. The use of simply
supports for the roof trusses eliminates the horizontal reaction over the concrete structure, but has a
negative influence over the roof trusses in terms of vertical deflection and effort distribution. Final
solution for the connection (Figure 7) considered a combination of both effects: a limited sliding
possibility of the support, used only for the erection phase of the structure (mainly deformations
caused by the permanent actions are consumed), after that the support is transformed in a perfect
hinge. In this way a lower horizontal support reaction resulted, consuming around 30 mm horizontal
displacement by the sliding possibility of the support, from the total of 80 mm, calculated under
permanent, technological and snow loading.
Fig. 7: Sliding possibility of the support and a lateral view at support level
3.2 Global stability checks of the space steel truss
The global stability checks of the space truss were performed using Consteel software [7]. Buckling
analysis according to the general method of EN 1993-1-1, including only the 3D effects of the
structural members were performed (corrugated steel sheets were used as part of the envelope,
stressed skin beneficial action of the roof was neglected). To have an overview about the global
behaviour of the structure, the space trusses were calculated and checked using the full 3D model of
the structure, including also the concrete structure. According to the buckling analysis, a critical
load multiplication factor of αcr,op=3,63 was computed (Figure 8), corresponding to the stability loss
of first compressed diagonals. Improving the model, considering the effects of additional braces of
the compressed diagonals (Figure 9), the critical load multiplication factor increased at αcr,op=6,81.
Alternative design checks of the space truss were performed, using in a conservative way the
simply supported configuration of the roof structure (concrete structure was not considered in this
model), only the stabilizing effect of the longitudinal trusses placed over the support and in mid
span. A fair agreement between the 3D full model and simplified model was found. According to
the buckling analysis, a very similar buckling shape and the associated critical load multiplication
Fig. 8: Compressed diagonal buckling in the space truss (αcr,op=3,63)
factor of αcr,op=4,04 was computed. Improving the simplified model, considering the effects of
additional braces of the compressed diagonals, the critical load multiplication factor increased only
at αcr,op=5,05, due to the stability loss of upper compressed chord in mid span, which was not
present in 3D model, due to the moving possibility of the neglected concrete structure. The ratio of
utilization for the members, following the general method of EN 1993-1-1 resulted in less than 80%
his way, while considering the simply supported configuration of the roof truss structure the level of
100% is achieved.
Fig. 9: Improved space truss (αcr,op=6,81)
3.3 Joints checks using FEM of the space steel truss
The main concern after global stability analysis was to find out which is dominant: the global
stability loss of the chords or the local stability issues in the welded joints of the truss? Local brace
failure (yielding, local buckling), the chord face plastification, chord punching shear, chord side
wall failure, chord shear failure checks are necessary according to [6] for TT and KK joints. The
analytical methods given by [6] for TT and KK joints have limited range of validity, because the
semi empirical formulae are developed for Φ=90 degree (the angle between the diagonal planes).
To have a satisfactory response, finite element modelling of the heaviest loaded truss joint was used.
For an accurate analysis including geometrical and material nonlinearities of the selected joint
(Figure 10), a specific finite element model was developed (Figure 11). Nonlinear elastic-plastic
analysis considering geometric nonlinearities (GMNA and GMNIA) has been applied.
Fig. 10: Analyzed truss joint
The model was developed in ABAQUS [8] finite element program, using S4R-type elements (4-
node shell elements with reduced integration) with 6 degrees of freedom on each node (translation
and rotation with regard to the x, y and z-axis). All strengthening plates and SHS sections were
modelled in their mid-plane and the connections between chords and truss flanges were defined as a
surface-to-surface tie between SHS section end – strengthening plates (Figure 13). The model’s
materials were defined as elastic – linear plastic (E=210000 N/mm2
, υ = 0,3) with a yield strength
of fy = 275 N/mm2
for all the rectangular hollow sections. The loads from permanent, technological
and snow actions were introduced as point loads, relationship between the magnitudes was
considered according to the statical model. First buckling shape with the amplitude according to
EN1993-1-6 was used as initial imperfection in the nonlinear-elastic analysis (GMNIA). According
to the analysis results, the local stability loss of the compressed diagonal members connected in the
joint will define the joint capacity. This is associated with the brace failure (BF) in the analytical
method. The computed load multiplication factor according to the level of dominant load case
(permanent + technological + snow loads) resulted αcr,op=8,18, which is higher than those obtained
in the global stability analysis of the truss structure.
Fig. 11: FEM of the selected joint and material model
Fig. 12: First buckling mode of the joint Fig. 13: Analysis result without
(αcr,op=8,18) strengthening plate
4. Structure`s erection stages
The structure erection stages are:
- Phase I – cast in situ columns together with the precast elements (columns, beams, slabs) are
erected till the roof level, while the area beneath the playing field remains at the foundation
stage in order to be able to accomplish later the steel roof structure from inside and from
outside the building perimeter;
- Phase II – erecting work of the space steel trusses and mounting the bracings;
- Phase III – mounting the precast elements(several short columns, prestressed beams and
concrete hollow-core units) underneath the playing field as well as around the site, till
±0,00m level is reached;
- Phase IV – installation of the roof and façade envelope.
Fig. 14: Truss splicing for transport an erection on site
The transportation of any truss from the steel shop - where the assembly is produced – to the site to
be used, can be a very expensive process. The global dimension of one truss (76,10 m), imposed to
be cut in five pieces (Figure 11). Due to the expensive transportation of the first truss, for the next
six only the assembly parts were cut in the shop, the truss assembly welding was switched on site.
The erection process started when the first two trusses were ready. In the erection phase the end
parts was positioned first, followed by the intermediate three subassemblies positioning as a single
one (Figure 12). For all these intermediate phases, the stability of the parts has been checked.
Without any significant loads (only self-weight), the truss only with end lateral supports had a
comfortable computed critical load multiplication factor of αcr,op=9.58.
5. Conclusions
This paper describes the key aspects of matching a precast concrete structure with a large span
space truss and searching for the optimal solution in this issue, from the safety point of view but
also from the economical one too. Covering a large span area always arise problems even if we deal
with a building of a small height (like a greenhouse for instance). But when the roof, in this case a
space steel truss, is placed on top of a concrete structure several new issues need to be taken care off,
like: the compatibility of the two types of structures (steel and concrete) that need to work together
(displacements due to gravitational loads, horizontal loads, temperature differences), the
construction stages (starting with mounting the first parts of the truss, continuing with the final
assembling of the first truss and next the completion of the whole roof, and last but not least the
final touching – in this case turning the simple support into a perfect pinned hinge) and other
problems that may appear like the connection between SHS elements. Several local and global
stability design checks for a large free span roof truss structure were made. Using the finite element
method, complex welded joint configuration specifically used in space trusses made by SHS tubular
steel sections were analysed. Fair agreement between finite element method and analytical methods
according to [6] for TT and KK welded joints have been found, even semi-empirical formulae,
developed for trusses with Φ=90 degree where Φ is the angle between the diagonal planes, to give
satisfactory results also for the analysed joints of the particular truss which had Φ=50 degrees.
References
[1] EN 1998-1, “Design of structures for earthquake resistance” (2004)
[2] EN 1990-2005, “Design Code. Basis of design” (2004)
[3] NAGY Zs., CRISTUTIU I. M., Advanced nonlinear investigations of a 50 m span frame
case study: “The steel structure of the ice rink, city of Targu Mures, Romania”, Stability and
Ductility of Steel Structures, SDSS-2010, pp. 649-655 (2010)
[4] EN 1993-1-1, “Design of steel structures Part 1.1: General rules and rules for buildings”
(2006)
[5] EN1993-1-8, “Design of steel structures Part 1.8: Design of joints” (2006)
[6] WARDENIER J., PACKER J.A., ZHAO X.L., VAN DER VEGTE G.J., “Hollow Sections in
Structural Applications”, Comite International pour le developpement et l'Etude de la
Construction Tubulaire, ISBN 978-90-72830-86-9 (2010)
[7] CONSTEEL v.6.0 user manual (2011)
[8] ABAQUS, v.6.5.1, Dassault Systems/Simulia, Providence, RI, USA (2008)
[9] KISS Z., “Sala Multifunctionala de Sport din Cluj Napoca”, Revista AICPS nr.4/2012 (2012)
[10] NAGY Zs., “Local and Global Stability Analysis of a Large Free Span Steel Roof Structure”,
Proceedings of the Eleventh International Conference on Computational Structures
Technology (2012)

More Related Content

What's hot

study of usage factor in low cost construction
study of usage factor in low cost constructionstudy of usage factor in low cost construction
study of usage factor in low cost construction
Manisha Singh
 

What's hot (20)

Top down construction
Top down constructionTop down construction
Top down construction
 
Analysis of industrial shed
Analysis of industrial shedAnalysis of industrial shed
Analysis of industrial shed
 
Economic Concrete Frame Elements to Eurocode 2
Economic Concrete Frame Elements to Eurocode 2Economic Concrete Frame Elements to Eurocode 2
Economic Concrete Frame Elements to Eurocode 2
 
U boot beton technology
U boot beton technologyU boot beton technology
U boot beton technology
 
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
 
Tall buildings
Tall buildingsTall buildings
Tall buildings
 
Modular coordination
Modular coordinationModular coordination
Modular coordination
 
Analysis and design of building
Analysis and design of buildingAnalysis and design of building
Analysis and design of building
 
Innovative Basement Retentions System
Innovative Basement Retentions SystemInnovative Basement Retentions System
Innovative Basement Retentions System
 
Analysis and design of a multi storey reinforced concrete
Analysis and design of a multi storey reinforced concreteAnalysis and design of a multi storey reinforced concrete
Analysis and design of a multi storey reinforced concrete
 
study of usage factor in low cost construction
study of usage factor in low cost constructionstudy of usage factor in low cost construction
study of usage factor in low cost construction
 
Vertical cities presentation
Vertical cities presentationVertical cities presentation
Vertical cities presentation
 
Bconreport
BconreportBconreport
Bconreport
 
Ct3 steel space frame roof
Ct3 steel space frame roofCt3 steel space frame roof
Ct3 steel space frame roof
 
Detailed design of portal frames
Detailed design of portal framesDetailed design of portal frames
Detailed design of portal frames
 
Pre engineered building ppt rit
Pre engineered building ppt ritPre engineered building ppt rit
Pre engineered building ppt rit
 
Design of portal frame structures
Design of portal frame structuresDesign of portal frame structures
Design of portal frame structures
 
Residential Apartment Building
Residential Apartment BuildingResidential Apartment Building
Residential Apartment Building
 
Selecting one single type of building and covering
Selecting one single type of building and coveringSelecting one single type of building and covering
Selecting one single type of building and covering
 
IRJET- Comparative Study on the Seismic Behaviour of RCC and Steel-Concrete C...
IRJET- Comparative Study on the Seismic Behaviour of RCC and Steel-Concrete C...IRJET- Comparative Study on the Seismic Behaviour of RCC and Steel-Concrete C...
IRJET- Comparative Study on the Seismic Behaviour of RCC and Steel-Concrete C...
 

Similar to A long span structure in Romania Full paper balint karoly

B tech individual report
B tech individual reportB tech individual report
B tech individual report
ong93
 
CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written Report
Yap Xin
 
BTECHN PROJECT 2 Final report (GROUP)
BTECHN PROJECT 2 Final report (GROUP)BTECHN PROJECT 2 Final report (GROUP)
BTECHN PROJECT 2 Final report (GROUP)
ong93
 

Similar to A long span structure in Romania Full paper balint karoly (20)

Long span structures case study.pptx
Long span structures case study.pptxLong span structures case study.pptx
Long span structures case study.pptx
 
Ppt polyvalent hall romania(cluj napoca)
Ppt polyvalent hall  romania(cluj napoca)Ppt polyvalent hall  romania(cluj napoca)
Ppt polyvalent hall romania(cluj napoca)
 
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
 
B tech individual report
B tech individual reportB tech individual report
B tech individual report
 
Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...
 
CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written Report
 
IABSE 2002
IABSE 2002IABSE 2002
IABSE 2002
 
Building Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction SolutionsBuilding Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction Solutions
 
Cube tower mexico
Cube tower mexicoCube tower mexico
Cube tower mexico
 
Precast Concrete Structure: Architectural examples
Precast Concrete Structure: Architectural examplesPrecast Concrete Structure: Architectural examples
Precast Concrete Structure: Architectural examples
 
Building Construction 2 Project 2 Report
Building Construction 2 Project 2 ReportBuilding Construction 2 Project 2 Report
Building Construction 2 Project 2 Report
 
5th batch.pptx
5th batch.pptx5th batch.pptx
5th batch.pptx
 
Composite construction or Composite Structure/Frame
Composite construction or Composite Structure/FrameComposite construction or Composite Structure/Frame
Composite construction or Composite Structure/Frame
 
EC3 design
EC3 designEC3 design
EC3 design
 
IRJET- Study on Effect of Column Shape on Fire Resistance of CFST Column wi...
IRJET- 	 Study on Effect of Column Shape on Fire Resistance of CFST Column wi...IRJET- 	 Study on Effect of Column Shape on Fire Resistance of CFST Column wi...
IRJET- Study on Effect of Column Shape on Fire Resistance of CFST Column wi...
 
BTECHN PROJECT 2 Final report (GROUP)
BTECHN PROJECT 2 Final report (GROUP)BTECHN PROJECT 2 Final report (GROUP)
BTECHN PROJECT 2 Final report (GROUP)
 
file_34_ytvdlyd6
file_34_ytvdlyd6file_34_ytvdlyd6
file_34_ytvdlyd6
 
foundation and structural system of the shard building
foundation and structural system  of the shard buildingfoundation and structural system  of the shard building
foundation and structural system of the shard building
 
Beijing national stadium -The Bird's nest - Presentation group.pptx
Beijing national stadium -The Bird's nest - Presentation group.pptxBeijing national stadium -The Bird's nest - Presentation group.pptx
Beijing national stadium -The Bird's nest - Presentation group.pptx
 
G+3 APARTMENT BUILDING PROJECT REPORT
G+3 APARTMENT BUILDING  PROJECT  REPORTG+3 APARTMENT BUILDING  PROJECT  REPORT
G+3 APARTMENT BUILDING PROJECT REPORT
 

More from Anupama Krishnan

More from Anupama Krishnan (20)

CONTEMPORARY CARE: PATTERN TRANSLATIONS FOR AN INTERGENERATIONAL EXCHANGE Chr...
CONTEMPORARY CARE: PATTERN TRANSLATIONS FOR AN INTERGENERATIONAL EXCHANGE Chr...CONTEMPORARY CARE: PATTERN TRANSLATIONS FOR AN INTERGENERATIONAL EXCHANGE Chr...
CONTEMPORARY CARE: PATTERN TRANSLATIONS FOR AN INTERGENERATIONAL EXCHANGE Chr...
 
PP question bank
PP question bankPP question bank
PP question bank
 
ALLIED DESIGN QUESTION BANK
ALLIED DESIGN QUESTION BANKALLIED DESIGN QUESTION BANK
ALLIED DESIGN QUESTION BANK
 
Vinzol
VinzolVinzol
Vinzol
 
Professional practice vth year
Professional practice vth yearProfessional practice vth year
Professional practice vth year
 
Professional practise question bank
Professional practise question bankProfessional practise question bank
Professional practise question bank
 
Formation of cooperative society
Formation of cooperative societyFormation of cooperative society
Formation of cooperative society
 
India Easement Act
India Easement ActIndia Easement Act
India Easement Act
 
Depreciation and sinking fund
Depreciation and sinking fundDepreciation and sinking fund
Depreciation and sinking fund
 
Elements of valuation
Elements of valuationElements of valuation
Elements of valuation
 
Value and sinking fund
Value and sinking fundValue and sinking fund
Value and sinking fund
 
Dilapidation report
Dilapidation reportDilapidation report
Dilapidation report
 
FAIR MARKET VALUE
FAIR MARKET VALUEFAIR MARKET VALUE
FAIR MARKET VALUE
 
Allied design answer bank
Allied design answer bankAllied design answer bank
Allied design answer bank
 
Role as an architect in MHADA
Role as an architect in MHADARole as an architect in MHADA
Role as an architect in MHADA
 
TDR and fungible FSI
TDR and fungible FSITDR and fungible FSI
TDR and fungible FSI
 
Professional practise
Professional practiseProfessional practise
Professional practise
 
Explain the various factors that influence a structure?
Explain the various factors that influence a structure?Explain the various factors that influence a structure?
Explain the various factors that influence a structure?
 
LEGISLATIVE STRUCRURE OF MMR:
LEGISLATIVE STRUCRURE OF MMR:LEGISLATIVE STRUCRURE OF MMR:
LEGISLATIVE STRUCRURE OF MMR:
 
Building services optimization
Building services optimizationBuilding services optimization
Building services optimization
 

Recently uploaded

Probability Grade 10 Third Quarter Lessons
Probability Grade 10 Third Quarter LessonsProbability Grade 10 Third Quarter Lessons
Probability Grade 10 Third Quarter Lessons
JoseMangaJr1
 
Call Girls Jalahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Jalahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...Call Girls Jalahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Jalahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
amitlee9823
 
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al BarshaAl Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
AroojKhan71
 
Call Girls Begur Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Begur Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Begur Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Begur Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...
Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...
Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...
amitlee9823
 
Call Girls Indiranagar Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
Call Girls Indiranagar Just Call 👗 7737669865 👗 Top Class Call Girl Service B...Call Girls Indiranagar Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
Call Girls Indiranagar Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
amitlee9823
 
Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...
Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...
Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...
amitlee9823
 
Escorts Service Kumaraswamy Layout ☎ 7737669865☎ Book Your One night Stand (B...
Escorts Service Kumaraswamy Layout ☎ 7737669865☎ Book Your One night Stand (B...Escorts Service Kumaraswamy Layout ☎ 7737669865☎ Book Your One night Stand (B...
Escorts Service Kumaraswamy Layout ☎ 7737669865☎ Book Your One night Stand (B...
amitlee9823
 
FESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdfFESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdf
MarinCaroMartnezBerg
 
Abortion pills in Doha Qatar (+966572737505 ! Get Cytotec
Abortion pills in Doha Qatar (+966572737505 ! Get CytotecAbortion pills in Doha Qatar (+966572737505 ! Get Cytotec
Abortion pills in Doha Qatar (+966572737505 ! Get Cytotec
Abortion pills in Riyadh +966572737505 get cytotec
 

Recently uploaded (20)

Invezz.com - Grow your wealth with trading signals
Invezz.com - Grow your wealth with trading signalsInvezz.com - Grow your wealth with trading signals
Invezz.com - Grow your wealth with trading signals
 
Probability Grade 10 Third Quarter Lessons
Probability Grade 10 Third Quarter LessonsProbability Grade 10 Third Quarter Lessons
Probability Grade 10 Third Quarter Lessons
 
Call Girls Jalahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Jalahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...Call Girls Jalahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Jalahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
 
Week-01-2.ppt BBB human Computer interaction
Week-01-2.ppt BBB human Computer interactionWeek-01-2.ppt BBB human Computer interaction
Week-01-2.ppt BBB human Computer interaction
 
BDSM⚡Call Girls in Mandawali Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Mandawali Delhi >༒8448380779 Escort ServiceBDSM⚡Call Girls in Mandawali Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Mandawali Delhi >༒8448380779 Escort Service
 
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al BarshaAl Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
 
Call Girls Begur Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Begur Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Begur Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Begur Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...
Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...
Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...
 
Halmar dropshipping via API with DroFx
Halmar  dropshipping  via API with DroFxHalmar  dropshipping  via API with DroFx
Halmar dropshipping via API with DroFx
 
BabyOno dropshipping via API with DroFx.pptx
BabyOno dropshipping via API with DroFx.pptxBabyOno dropshipping via API with DroFx.pptx
BabyOno dropshipping via API with DroFx.pptx
 
Call Girls Indiranagar Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
Call Girls Indiranagar Just Call 👗 7737669865 👗 Top Class Call Girl Service B...Call Girls Indiranagar Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
Call Girls Indiranagar Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
 
Edukaciniai dropshipping via API with DroFx
Edukaciniai dropshipping via API with DroFxEdukaciniai dropshipping via API with DroFx
Edukaciniai dropshipping via API with DroFx
 
Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...
Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...
Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...
 
Sampling (random) method and Non random.ppt
Sampling (random) method and Non random.pptSampling (random) method and Non random.ppt
Sampling (random) method and Non random.ppt
 
Escorts Service Kumaraswamy Layout ☎ 7737669865☎ Book Your One night Stand (B...
Escorts Service Kumaraswamy Layout ☎ 7737669865☎ Book Your One night Stand (B...Escorts Service Kumaraswamy Layout ☎ 7737669865☎ Book Your One night Stand (B...
Escorts Service Kumaraswamy Layout ☎ 7737669865☎ Book Your One night Stand (B...
 
FESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdfFESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdf
 
VIP Model Call Girls Hinjewadi ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Hinjewadi ( Pune ) Call ON 8005736733 Starting From 5K t...VIP Model Call Girls Hinjewadi ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Hinjewadi ( Pune ) Call ON 8005736733 Starting From 5K t...
 
Midocean dropshipping via API with DroFx
Midocean dropshipping via API with DroFxMidocean dropshipping via API with DroFx
Midocean dropshipping via API with DroFx
 
Abortion pills in Doha Qatar (+966572737505 ! Get Cytotec
Abortion pills in Doha Qatar (+966572737505 ! Get CytotecAbortion pills in Doha Qatar (+966572737505 ! Get Cytotec
Abortion pills in Doha Qatar (+966572737505 ! Get Cytotec
 

A long span structure in Romania Full paper balint karoly

  • 1. A long span structure in Romania Zoltan KISS Professor Technical Univ. of Cj. N. Cluj Napoca, RO kiss.zoltan@plan31.ro Karoly BALINT Civil Engineer Plan31 Ro Cluj Napoca, RO balint.karoly@plan31.ro Nicu TOADER Civil Engineer Plan31 Ro Technical Univ. of Cj. N. toader.nicu@plan31.ro Zsolt NAGY Lecturer Technical Univ. of Cj. N. Cluj Napoca, RO zsolt.nagy@gordias.ro Summary The authors will describe in the following pages the reasons why the project of the Multi-functional Sports Hall from Cluj Napoca is attractive. The main lines of the building are: a hall with a capacity of 7000 seats, a structure dominated by precast concrete elements, a long span roof and an advanced analyze of the connections, all well-kept into the limited funds. The roof solution consists in using steel space trusses made out of square hollow sections (SHS). The truss has a clear span of 63.90m, a total length of 76,10m, a maximum height of 4,00m that is reduced on the length of the structural element, and a triangular cross section being 3,60m wide. Global stability checks and specific local stability problems were performed and are exposed in the following paper. For the fabrication of the space truss, welded joints between the SHS profiles were designed. As a result of the fact that for characteristic failure checks of the welded TT and KK joints analytical methods are based only on a semi-empirical formulae, developed for Φ=90 degrees (the angle between the diagonal planes), for the design of joints finite element modelling was used. Good agreement between the results of the developed finite element joint model and the analytical method for TT and KK joints has been found, even though the semi-empirical formulae are applied for the analysed truss which had Φ=50 degrees. Keywords: large span space trusses; precast concrete; joint analysis. 1. Introduction In 2010 the local authorities of the city Cluj Napoca launched the selection process based on a Feasibility Study for the new Multi-functional Sports Hall, located near the new city stadium. Following the selection process which included a new structural solution proposal, a designer association was selected including architects, structural engineers and electrical engineers. Based on a new structural concept, Plan 31 Ro Ltd. was elected for designing the building structure. The technical solution regarding force resisting structure was decided after taking in consideration a couple of monolithically concrete frames and a roof made out of laminated wooden arches. The monolithic concrete had the disadvantage of reduced time efficiency, and after the future owner decided that it would be better to reduce the time with execution from 36 months to 12 months in order to be able to organize a European Sport Competition, the design team had to find new solutions. The building has 115m x 130m in plane dimensions, the work on site need it to start 2 months before winter time (often the air temperature is below -4 degrees Celsius) came with many restrictions regarding pouring in situ concrete. The surface concrete slab of 15,000sqm have arisen the cracking issue due to concrete shrinkage after its hardening, so the decision was a widespread use of precast concrete elements. Where the design loads resulted in great reaction forces there were used prestressed concrete beams with cast in situ concrete columns, while for the rest of the elements were precasted and fixed with dry or wet connections. The 64m span roof was first thought to be designed as several laminated wooden arches. Do to the fact the entrepreneur have neither the possibility nor the technology to build these type of elements, a new solution was brought and that was a space truss with SHS.
  • 2. 2. Building particularities 2.1 Architectural facts The Multi-functional Sports Hall is organized on five levels: underground level, ground level and three stories (Figures 1 and 2). Underground level is a parking with 447 car capacity. Ground level together with first and second level includes public, officials, media, shopping and administration areas. Ground level also includes the reserved area for sport players, while second level has a conference centre. The third level is for media, special equipment and installations devices. In order to offer multiple use of the playing area, the floor surface can be changed from 30x47m to 38x56m by using extensible/retractable tribune structure on the ground level. In this manner handball, volley, basketball, box and gymnastics championship are possible to take place in the Multi-functional Sports Hall. Fig. 1: Transverse section through the building Fig. 2: Longitudinal section through the building 2.2 Design loads considered in calculus and structural analyses In order to evaluate the structural response, in the design process were considered the following loads (characteristic values), other than the self-weight of the elements: - Roof loads EN1991-1-1: dead load + technological load qk = 1,0 kN/sqm; - Concentrated technological loads (media box) applied in mid span, Pk= 60 kN; - Temperature variation effects between erection phase (-15 to -20 degrees Celsius in winter) and service phase (+15 to +20 degrees Celsius during lifetime); - Snow loads on the roof according to EN1991-1-3, s0,k=1,5 kN/sqm; - Wind loads on building envelope according to EN1991-1-4, qref=0,4 kN/sqm, vb0=27m/s; - Live loads on slabs EN1991-1-1, qk = 10,0 kN/sqm – ground floor, qk = 5,0 kN/sqm – upper floors; - Technological loads qk = 2,5 kN/sqm – ground floor, qk = 3,5 kN/sqm – upper floors; - Seismic action according to EN1998-1 [1], with peak ground acceleration ag=0,08g and control period of seismic motion Tc=0,7 seconds;
  • 3. - Load combination for ultimate limit state (ULS) and serviceability limit state (SLS) according to EN 1990 [2]. 2.3 Structural compliance of the concrete structure Building`s substructure consists mainly in pad foundations, where it was necessary to balance the pad foundations, moment resisting beams were added, due to the large bending moments appeared at the base of the concrete columns supporting the roof; strip foundations were used for the walls situated at the underground level, while for the training room a raft foundation was chosen being also the support of the boarded floor. The foundation soil type is clay marl with a bearing capacity of 750kPa. The building is a concrete frame structure with a characteristic bay of 8,40x10,60m, for the arena area. On sides the bays are smaller and with varying dimensions. The concrete frames consist in precast concrete columns fixed in foundations using dry connections (Figure 3), except the columns supporting the steel roof which are cast in situ. The last ones, having the cross section 60x120cm, the transportation together with the control and site erecting it would have been difficult to perform. Due to short execution terms, most of the columns were precasted and because of the cold weather during execution time, there were used dry connections provided by PEIKKO. Fig. 3: Precast concrete column base connection All frame beams and stair beams are precasted, reinforced concrete or prestressed concrete. The beam-column joints are moment-resisting (floor level ±0.00m) and pinned for the upper levels. For the frames connected directly to the roof`s steel truss, rigid connections have been used for the beams which are in the same plane with the space truss (Figure 4). (before concreting the joint) (after concreting in the joint) Fig. 5: Topping reinforcing Fig. 4: Beam-column connection The slab consists in a precast part (hollow-core units with 200mm and 320mm height or preslabs of 80mm thick where the slab span is reduced) and a topping of 80mm thickness of C25/30 concrete, and S500 reinforcing steel. In order to assure enough stiffness to the vertical loads (the problem of floor vibrations was tested using PulseLabshop software from Bruel and Khaer for the in situ experiments, as well as a commercial FEM software for the numerical simulation. While for the horizontal loads, the cast in situ topping was design to transmit the reactions from the vertical envelope and to the vertical force resisting elements (concrete columns), and also to assure a horizontal rigid diaphragm effect. For a better connection between the partially precast slab and the beams, hollow-core units were partially cut off at the edges and extra reinforced (Figures 5) with
  • 4. triangular skeleton reinforcing; where preslabs were used, only the meshing wires in the topping were enough thanks of the connectors left out of the preslabs surface. 3. Design of the roof`s steel structure The roof structure consists in 7 trusses with a clear span of 63,90m, and total length of 76,10m, supported by concrete frames and lateral interconnected with the rest of the structure through horizontal and vertical steel bracings. The space steel trusses are mounted using a spacing of 10,50m (Figure 2). Choosing the most appropriate roof structure solution has been driven by a number of factors including the span, roof geometry, load to be supported, economy and aesthetics. The truss section is 3600 mm wide and approximately 4000 mm deep (variable along the span). The steel trusses of this size are able to span such distances as simply supported elements, but large vertical deformations and horizontal reactions were necessary to be managed. Several options were investigated to keep the sizes to a minimum, including arch action (which would have required stiff concrete structure) and cantilevered truss structure (which would have resulted in vertical tie elements at both ends). The system that was decided combines both: the advantage of this system is that the end cantilever with the vertical tying elements of the truss effectively reduces the vertical deformations and axial forces in mid span, as well as allowing the continuity of the roof structure over the lateral annexes. The principle was successfully used one of the authors in a similar project [3]. Pinned supports were provided on the top of the concrete columns, with limited horizontal displacement set up possibility for the erection phases. Longitudinal trusses were placed in mid span, at the supports and near the supports, where the inner flange of the truss compression effort change in tension. The design of the steel structure was performed following the European standards. For strength, stability and stiffness requirements of the structural elements the prescription of EN1993-1-1 [4], EN1993-1-8 [5] and EN1998-1 [1] were used. For the design of the structural elements, linear elastic structural analysis was performed. The design checks of the structural elements for ULS include persistent or transient design situations (fundamental combinations), where snow loads in combination with technological loads play the key role. For global stability checks Consteel software was used, which calculation procedure is based on the general method of EN1993-1-1 [4]. For individual member checks, both methods A and B of EN1993-1-1 were performed. Good agreement between the used methods was found. For the design of spatial truss joints the following failure modes have been considered: local brace failure (yielding, local buckling), chord face plastification, chord punching shear, chord side wall failure, chord shear failure [6]. Alternative checks using finite element modeling was also used. For SLS design checks of the structural elements, fundamental and exceptional load combinations were used. The computed maximum vertical deflection of the space truss for SLS check under snow and technological load is: (1) Fig. 6: The structural model of the transverse frame mm f mm f a 213 300 L 165    
  • 5. 3.1 Joints between the steel and concrete structure Providing pinned supports for the roof trusses, positive effects in the internal effort distribution and the highest horizontal reaction over the concrete structures, were obtained. The use of simply supports for the roof trusses eliminates the horizontal reaction over the concrete structure, but has a negative influence over the roof trusses in terms of vertical deflection and effort distribution. Final solution for the connection (Figure 7) considered a combination of both effects: a limited sliding possibility of the support, used only for the erection phase of the structure (mainly deformations caused by the permanent actions are consumed), after that the support is transformed in a perfect hinge. In this way a lower horizontal support reaction resulted, consuming around 30 mm horizontal displacement by the sliding possibility of the support, from the total of 80 mm, calculated under permanent, technological and snow loading. Fig. 7: Sliding possibility of the support and a lateral view at support level 3.2 Global stability checks of the space steel truss The global stability checks of the space truss were performed using Consteel software [7]. Buckling analysis according to the general method of EN 1993-1-1, including only the 3D effects of the structural members were performed (corrugated steel sheets were used as part of the envelope, stressed skin beneficial action of the roof was neglected). To have an overview about the global behaviour of the structure, the space trusses were calculated and checked using the full 3D model of the structure, including also the concrete structure. According to the buckling analysis, a critical load multiplication factor of αcr,op=3,63 was computed (Figure 8), corresponding to the stability loss of first compressed diagonals. Improving the model, considering the effects of additional braces of the compressed diagonals (Figure 9), the critical load multiplication factor increased at αcr,op=6,81. Alternative design checks of the space truss were performed, using in a conservative way the simply supported configuration of the roof structure (concrete structure was not considered in this model), only the stabilizing effect of the longitudinal trusses placed over the support and in mid span. A fair agreement between the 3D full model and simplified model was found. According to the buckling analysis, a very similar buckling shape and the associated critical load multiplication Fig. 8: Compressed diagonal buckling in the space truss (αcr,op=3,63)
  • 6. factor of αcr,op=4,04 was computed. Improving the simplified model, considering the effects of additional braces of the compressed diagonals, the critical load multiplication factor increased only at αcr,op=5,05, due to the stability loss of upper compressed chord in mid span, which was not present in 3D model, due to the moving possibility of the neglected concrete structure. The ratio of utilization for the members, following the general method of EN 1993-1-1 resulted in less than 80% his way, while considering the simply supported configuration of the roof truss structure the level of 100% is achieved. Fig. 9: Improved space truss (αcr,op=6,81) 3.3 Joints checks using FEM of the space steel truss The main concern after global stability analysis was to find out which is dominant: the global stability loss of the chords or the local stability issues in the welded joints of the truss? Local brace failure (yielding, local buckling), the chord face plastification, chord punching shear, chord side wall failure, chord shear failure checks are necessary according to [6] for TT and KK joints. The analytical methods given by [6] for TT and KK joints have limited range of validity, because the semi empirical formulae are developed for Φ=90 degree (the angle between the diagonal planes). To have a satisfactory response, finite element modelling of the heaviest loaded truss joint was used. For an accurate analysis including geometrical and material nonlinearities of the selected joint (Figure 10), a specific finite element model was developed (Figure 11). Nonlinear elastic-plastic analysis considering geometric nonlinearities (GMNA and GMNIA) has been applied. Fig. 10: Analyzed truss joint The model was developed in ABAQUS [8] finite element program, using S4R-type elements (4- node shell elements with reduced integration) with 6 degrees of freedom on each node (translation and rotation with regard to the x, y and z-axis). All strengthening plates and SHS sections were modelled in their mid-plane and the connections between chords and truss flanges were defined as a surface-to-surface tie between SHS section end – strengthening plates (Figure 13). The model’s materials were defined as elastic – linear plastic (E=210000 N/mm2 , υ = 0,3) with a yield strength of fy = 275 N/mm2 for all the rectangular hollow sections. The loads from permanent, technological and snow actions were introduced as point loads, relationship between the magnitudes was considered according to the statical model. First buckling shape with the amplitude according to EN1993-1-6 was used as initial imperfection in the nonlinear-elastic analysis (GMNIA). According to the analysis results, the local stability loss of the compressed diagonal members connected in the joint will define the joint capacity. This is associated with the brace failure (BF) in the analytical method. The computed load multiplication factor according to the level of dominant load case (permanent + technological + snow loads) resulted αcr,op=8,18, which is higher than those obtained in the global stability analysis of the truss structure.
  • 7. Fig. 11: FEM of the selected joint and material model Fig. 12: First buckling mode of the joint Fig. 13: Analysis result without (αcr,op=8,18) strengthening plate 4. Structure`s erection stages The structure erection stages are: - Phase I – cast in situ columns together with the precast elements (columns, beams, slabs) are erected till the roof level, while the area beneath the playing field remains at the foundation stage in order to be able to accomplish later the steel roof structure from inside and from outside the building perimeter; - Phase II – erecting work of the space steel trusses and mounting the bracings; - Phase III – mounting the precast elements(several short columns, prestressed beams and concrete hollow-core units) underneath the playing field as well as around the site, till ±0,00m level is reached; - Phase IV – installation of the roof and façade envelope. Fig. 14: Truss splicing for transport an erection on site The transportation of any truss from the steel shop - where the assembly is produced – to the site to be used, can be a very expensive process. The global dimension of one truss (76,10 m), imposed to
  • 8. be cut in five pieces (Figure 11). Due to the expensive transportation of the first truss, for the next six only the assembly parts were cut in the shop, the truss assembly welding was switched on site. The erection process started when the first two trusses were ready. In the erection phase the end parts was positioned first, followed by the intermediate three subassemblies positioning as a single one (Figure 12). For all these intermediate phases, the stability of the parts has been checked. Without any significant loads (only self-weight), the truss only with end lateral supports had a comfortable computed critical load multiplication factor of αcr,op=9.58. 5. Conclusions This paper describes the key aspects of matching a precast concrete structure with a large span space truss and searching for the optimal solution in this issue, from the safety point of view but also from the economical one too. Covering a large span area always arise problems even if we deal with a building of a small height (like a greenhouse for instance). But when the roof, in this case a space steel truss, is placed on top of a concrete structure several new issues need to be taken care off, like: the compatibility of the two types of structures (steel and concrete) that need to work together (displacements due to gravitational loads, horizontal loads, temperature differences), the construction stages (starting with mounting the first parts of the truss, continuing with the final assembling of the first truss and next the completion of the whole roof, and last but not least the final touching – in this case turning the simple support into a perfect pinned hinge) and other problems that may appear like the connection between SHS elements. Several local and global stability design checks for a large free span roof truss structure were made. Using the finite element method, complex welded joint configuration specifically used in space trusses made by SHS tubular steel sections were analysed. Fair agreement between finite element method and analytical methods according to [6] for TT and KK welded joints have been found, even semi-empirical formulae, developed for trusses with Φ=90 degree where Φ is the angle between the diagonal planes, to give satisfactory results also for the analysed joints of the particular truss which had Φ=50 degrees. References [1] EN 1998-1, “Design of structures for earthquake resistance” (2004) [2] EN 1990-2005, “Design Code. Basis of design” (2004) [3] NAGY Zs., CRISTUTIU I. M., Advanced nonlinear investigations of a 50 m span frame case study: “The steel structure of the ice rink, city of Targu Mures, Romania”, Stability and Ductility of Steel Structures, SDSS-2010, pp. 649-655 (2010) [4] EN 1993-1-1, “Design of steel structures Part 1.1: General rules and rules for buildings” (2006) [5] EN1993-1-8, “Design of steel structures Part 1.8: Design of joints” (2006) [6] WARDENIER J., PACKER J.A., ZHAO X.L., VAN DER VEGTE G.J., “Hollow Sections in Structural Applications”, Comite International pour le developpement et l'Etude de la Construction Tubulaire, ISBN 978-90-72830-86-9 (2010) [7] CONSTEEL v.6.0 user manual (2011) [8] ABAQUS, v.6.5.1, Dassault Systems/Simulia, Providence, RI, USA (2008) [9] KISS Z., “Sala Multifunctionala de Sport din Cluj Napoca”, Revista AICPS nr.4/2012 (2012) [10] NAGY Zs., “Local and Global Stability Analysis of a Large Free Span Steel Roof Structure”, Proceedings of the Eleventh International Conference on Computational Structures Technology (2012)