Project Phases:
■ The Batumi Project is divided into four phases, each of which is implemented by the Municipality of Batumi:
 Phase I consisted of rehabilitation measures for the water and sewer supply facilities in parts of the old
town of Batumi. Phase I had an investment cost of 18.5 million EUR and was implemented from 2007
until 2012.
 Phase II extends the rehabilitation measures of phase I to more parts of the city and also to nearby
coastal villages south of Batumi. This phase also builds a new waste water treatment plant for Batumi.
At a cost of 47 million EUR, phase II has been implemented between 2009 and 2013.
 .
 Phase IV concerns the rehabilitation and extension of the water supply network and the rehabilitation of
the sewer system in Batumi (new city boundaries). The Project covers the continuation of Project
Phases I-III that aim at a continuous and demand-oriented supply of the population with hygienically
sound water as well as an ecological and hygienically sound disposal and treatment of the wastewater
of Batumi. The estimated total investment cost of the Project Phase IV amount to approximately EUR
30 m.
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 2
Phase III of the Batumi municipal water project focuses on rehabilitating the rest of Batumi’s
water and sewer facilities. It continues to expand into surrounding rural coastal areas. At a
projected cost of 43.5 million EUR, phase III began in 2012 and expected to be finished in 2018.
Project Background & Scope
■ Project background - previous sewage disposal principle
comprised of individual & high rise residential buildings
being discharged to existing rainwater channels taking the
sewage directly into the Sea.
■ Project scope – environmental protection, prevention of
further Black Sea coast pollution, separation of sewage from
storm water collectors, abortion and prevention of further
sewage influx into Black Sea, improvement of quality of
coastal, bathing waters through rehabilitation and
construction of new sewerage systems within dense city
areas as well as surrounding coastal villages.
■ Lot 4-1 / Wastewater component:
 In total ~41km of sewerage pipelines, 690nr inspection
manholes, 2,190nr of house connection manholes.
 Gravity collectors L=32,8km (PP SN10, DN200-400mm, GRP
PN10 DN500, 800, 1000mm), with 661nr manholes, 2,184nr
house connection manholes.
 5.4km of pressure main (Steel PE/cem.mortar, DN1000mm)
with associated valves & washouts, combined type air valves
 One WW Shaft Pumping Station “Back Pull-Out” type (Q3=
2x57.3l/s @ 6,4m).
Section Collector
House
Connections
Manholes
(m) (pcs) (pcs)
Waste Water
Gravity Sewerage Networks
Remaining System A(RSA)
Steel (PE/cem.mort), DN250 187.00
PP SN10 (DN250-400) 12,842.00
GRP PN10, SN10,000 (DN500, 800) 482.00
Sub-total: 13,511.00 842.00 258.00
Swamp & South Swamp Area (SSA)
PP SN10 (DN200-400) 17,861.00 1,342.00 356.00
Sub-total: 17,861.00 1,342.00 356.00
Trunk Main Collectors
Collector "B"
GRP PN10, SN10 DN800-1000 2,557.00 47.00
In-lining DN1000, 1200 1,128.00
Sub-total: 3,685.00 47.00
Total - gravity sewers 35,057.00 2,184.00 661.00
Pressure Mains
Pumping Main "B"
Steel (PE/cem.mortar), DN1000 5,184.00 21.00
Total - pressure mains: 5,184.00 21.00
Total sewerage: 40,241.00 2,184.00 682.00
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 3
Objectives & Benefits
■ ObjectivesThe Batumi MunicipalWater Project aims to:
 Ensure a continuous supply of safe drinking water for the population of Batumi
 Reduce water losses and ensure efficient use of resources
 Guarantee a controlled and improved wastewater collection treatment system
 Provide regular testing and analysis of public drinking water so it is up to EU standards
 Cover operation and maintenance costs for BatumiTskali Utility by service fees
 Protect the water ecosystems of the Black Sea and Chakvi RiverWatershed
 Benefits:
 Prevents costly and pointless water loss
 Constructs a new low energyWWTP that has a solar drying system
 Achieves EU water quality standards
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 4
Lot 4-1
 Remaining System A (RSA) – dense city area
sewerage system remaining for construction
from Phase II of the Project;
 Swamp & South Swamp Area Sewage
Network (SSA) – located at the South-East
part of the city center with a high population
density, sewage previously discharged to
existing rainwater channels taking the
sewage directly into the Sea;
 Sewage Pumping Main B connecting main
WW PS B with WWTP Adlia; max. pressure 1,7
– 2,3bars.
 Collector B as trunk main is the most
important component of System B & System
C and hence its backbone as it conveys
collecting major lateral collectors and will
carry all the sewage from these areas to the
existing PS B and from there – to the WWTP
Adlia.
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 5
Remaining
SystemA (RSA)
 Covering dense city area sewerage system
remaining for construction from Phase II of
the Project:
 13,185m of sewerage city collectors (Steel
DN250mm, PP DN250-400mm, GRP
DN500-1200mm),
 258nr inspection manholes,
 842nr house connections.
 Sewage pumping station - “Back Pull-Out”
pump 2 x 57.3 l/s, H=6,4m; with double
HDPE wall housing (ID = 2,000 mm, SN4),
buoyancy preventive concrete casing.
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi - Phase III /
Lot 4-1
6
RSA - Prefabricated concrete manholes:
Located at all changes of the vertical or horizontal alignment and at intervals not
exceeding 50m’ for primary & secondary sewer lines
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 7
RSA - HORIZONTAL
DRILLING:
CROSSING BELLOWTHE RAILWAY,
EXISTING STORM-WATER
CHANNELSWITH STEELCONDUIT
PIPEWITH CONCRETE SEALING
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in
Batumi - Phase III / Lot 4-1 8
RSA – Prefabricated concrete inspection manholes
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 9
RSA - Sewage
shaft PS A-1
“Back Pull-Out” pump:
 2 x 57.3 l/s, H=6,4m;
 Double HDPE wall housing;
 ID = 2,200 mm,
 OD = 2,433mm
 H=6,700mm,
 SN4,
 Buoyancy preventive concrete casing
class C25.
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi - Phase III /
Lot 4-1
10
RSA - Construction phases - sewage shaft PS A-1 –
sheet piled excavation, concrete buoyancy preventive casing
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 11
RSA - Construction phases - sewage shaft PS A-1
installation of PS’ HDPE housing downstream from screen chamber with sluice gate valve
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 12
RSA - Construction phases - sewage shaft PS A-1
buoyancy preventive concrete casing surrounding HDPE PS
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 13
RSA - Construction phases - sewage PS A-1
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 14
RSA - sewage PS A-1
pumps (2 x 57.3 l/s, H=6,4m)
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 15
RSA - sewage PS A-1
operation in 1+1 work regime of pumps (2 x 57.3 l/s, H=6,4m)
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 16
RSA - sewage PS A-1
pumps (2 x 57.3 l/s, H=6,4m)
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 17
Swamp & South
SwampArea Sewage
Network (SSA)
Located at the South-East part of the city center with a
high population density, sewage previously discharged to
existing rainwater channels taking the sewage directly
into the Sea: 17,664m of sewerage city collectors (PP
DN200-400mm), 1,424nr house connections;
New sewage network in the Swamp & South SwampArea
includes the following:
 14,223m of primary and secondary gravity sewer
collectors with diameters ranging PP DN250 –
DN400mm, with depths up to 5,0m;
 3,638m of tertiary lines (PP DN200mm);
 356nr manholes with depths up to 5,0m;
 889nr PP & 453 concrete HC manholes
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi - Phase III /
Lot 4-1
18
SSA -Works
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 19
SSA –Works
Prefabricated Concrete Inspection manholes
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 20
SSA –Works
Prefabricated Concrete Inspection manholes
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 21
SSA –Works
House Connection PP-Manhole with 1 inlet / 1 outlet
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 22
SSA –Works
House Connection PP-Manhole with 3 inlets / 1 outlet
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 23
Sewage Pumping
Main B (PMB)
 Connecting main WW PS B with WWTP
Adlia;
 Steel pressure pipeline DN1000mm
(1,016X10/8.8mm), L=5,184m;
 PE coated / sulfate resistant cement
mortar lined;
 Max. pressure rating btw. pressure 1,7 –
2,3bars.
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi - Phase III /
Lot 4-1
24
Sewage Pumping Main B (PMB)
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 25
Sewage Pumping Main B (PMB)
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 26
Sewage Pumping Main B (PMB)
Valve &Washout Manholes
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 27
Sewage Pumping Main B (PMB)
Concrete thrust blocks on DN1000mm pressure pipeline
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 28
Sewage Pumping Main B (PMB)/
Combined Air ReleaseValves
 Located on high-points of pumping mains,
designed to operate with sewage DN150,
PN10.
 Combined air valve discharges gases during the
filling or charging of the system, admits air to
the system while it is being emptied of liquid
and discharges accumulated gases from the
system while it is under pressure and
operating, combining air & vacuum.
 Additional isolating valve to permit inspection
and maintenance of the valve
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 29
Sewage Pumping Main B (PMB) – Crossing over the Mejinitskali River
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 30
SewageCollector B
Collector B (GRP DN800 - 1000mm,
L=2,557m) as trunk main is considered as
the most important component of System
B & System C and hence its backbone as it
conveys collecting major lateral collectors
and will carry all the sewage from these
areas to the existing WW PS B and from
there – over new Pumping Main B to the
WWTP Adlia.
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi - Phase III /
Lot 4-1
31
Collector B
Comprises the following general issues:
Replacement of existing collector:
 Construction of 2,6 km of GRP DN800 &
DN1000mm sewer trunk main with invert
levels from 1,8m to 4,5m;
 Construction of 47 concrete manholes
with depths between 1,8 – 4,5m;
In-lining of existing collector:
 Rehabilitation of ~1,1km of existing
DN1000, 1200mm sewer trunk main by
trenchless technology with depths
varying between 4,0 & 8,0m
 Construction of 20nr manholes with
depths btw.4,0 & 8,0m
 Due to deteriorated status of existing
collector, in-lining was abandoned, new
DN1200 collector to be installed under
future project!
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 32
Sewage Collector B
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 33
Sewage Collector B
Multiple crossings with existing
installations
Collector route parallel to existing SW
channel
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 34
Collector B
Tertiary collectors – collection of HC above the trunk-collector
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 35
Sewage Collector B
Soil investigation – due to swamp area, replacement of subgrade material required below
pipe-invert level (H= 0.5 / 1,0m)
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 36
Manholes
Manholes: prefabricated concrete manholes
located at all changes of the vertical or
horizontal alignment and at intervals not
exceeding 50m’ for primary & secondary
sewer lines.
In-situ concrete manholes are considered at all
changes of the vertical or horizontal
alignment and at intervals not exceeding
70m’ in straight line for theTrunk Main
Collector B.
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi - Phase III /
Lot 4-1
37
Quality Control
 Trench subgrade soil analysis;
 Pipeline alignment, invert elevations;
 Pipe trench bedding & backfilling compaction
level;
 Ultrasonic testing on welded joints;
 Tightness testing of WW system (collector,
manhole, house connections);
 CCTV inspection of collectors;
 Standard concrete testing (Slump,
Compressive strength,…);
 Material inspections on delivery and
installation
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi - Phase III /
Lot 4-1
38
QC / Prefabricated concrete curing pools, compressive strength
testing
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 39
QC / material inspections on delivery
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 40
QC /Tightness testing of gravity sewers
as per EN1610
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 41
QC / CCTV Inspection
(closed circuit television) as per ATV M 14, part 2
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 42
Health & Safety
Regular Safety Patrols preventing potential accidents
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 43
Materials:
prefabricated concrete manholes / curing pools
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 44
Materials:
prefabricated concrete manholes (for collectors DN200-400)
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 45
Materials:
prefabricated concrete manholes for large pipe diameters (DN500 – 1200)
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 46
Materials:
prefabricated concrete manholes for connections / crossing with large pipe diameters (DN500 –
1200)
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 47
Materials:
Manhole covers, dirt (sand) traps - B125, LW800-D400 (Meier Guss, Germany)
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 48
Materials:
GRP Pipe material – SN10000, DN500-1200 (Superlit,Turkey);
Rehabilitation of MunicipalWater Supply &Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 49
Materials:
PP Pipe material – KG2000, SN10, DN150-400 (Wavin,Germany)
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 50
Materials:
Steel pipes, Epoxy coated / sulfate resistant cement lined, (NOKSEL,Turkey)
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 51
Material:
Steel pipes, Epoxy coated / sulfate resistant cement lined, (HATBORU,Turkey)
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 52
Materials:
House connection manholes (Wavin, Germany)
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 53
Materials:
Valves, fittings (VAG, Germany)
Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 54

More Related Content

What's hot

What's hot (20)

Ch02intro
Ch02introCh02intro
Ch02intro
 
Is 1343 2012
Is 1343 2012Is 1343 2012
Is 1343 2012
 
Hydraulics of water Distribution System
 Hydraulics of water Distribution System Hydraulics of water Distribution System
Hydraulics of water Distribution System
 
Unit 4-canal
Unit 4-canalUnit 4-canal
Unit 4-canal
 
Sewer Design
Sewer Design Sewer Design
Sewer Design
 
Teesta Barrage Project
Teesta Barrage ProjectTeesta Barrage Project
Teesta Barrage Project
 
Storage and distribution reservoirs
Storage and distribution reservoirsStorage and distribution reservoirs
Storage and distribution reservoirs
 
Mahan 03 oct 2013
Mahan 03 oct 2013Mahan 03 oct 2013
Mahan 03 oct 2013
 
River training works lecture
River training works lectureRiver training works lecture
River training works lecture
 
Reservoir capacity
Reservoir capacityReservoir capacity
Reservoir capacity
 
L 5and l-6 sewer design
L 5and l-6 sewer designL 5and l-6 sewer design
L 5and l-6 sewer design
 
Sewage Treatment Plant Design Project
Sewage  Treatment  Plant  Design  ProjectSewage  Treatment  Plant  Design  Project
Sewage Treatment Plant Design Project
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavement
 
Small bore system: Wastewater Engineering
Small bore system: Wastewater EngineeringSmall bore system: Wastewater Engineering
Small bore system: Wastewater Engineering
 
Plain sedimentation tanks sewage
Plain sedimentation tanks  sewagePlain sedimentation tanks  sewage
Plain sedimentation tanks sewage
 
Intake structures in wwwe
Intake structures in wwweIntake structures in wwwe
Intake structures in wwwe
 
performance evaluation of desilting devices
performance evaluation of desilting devicesperformance evaluation of desilting devices
performance evaluation of desilting devices
 
Design of pipe network
Design of pipe networkDesign of pipe network
Design of pipe network
 
Various types of pressure pipes
Various types of pressure pipes Various types of pressure pipes
Various types of pressure pipes
 
Water Resources Engineering - Question Bank (Subjective)
Water Resources Engineering - Question Bank (Subjective)Water Resources Engineering - Question Bank (Subjective)
Water Resources Engineering - Question Bank (Subjective)
 

Similar to Rehabilitation of Municipal Water Supply and Wastewater Infrastructure in Batumi - Phase III, Lot 4-1

DesignCriteriaManual DesignCriteriaManual JICA.pdf
DesignCriteriaManual DesignCriteriaManual JICA.pdfDesignCriteriaManual DesignCriteriaManual JICA.pdf
DesignCriteriaManual DesignCriteriaManual JICA.pdfkahlaoui1
 
Kakanj City Waste Water Project
Kakanj City Waste Water ProjectKakanj City Waste Water Project
Kakanj City Waste Water ProjectVladimir Popovic
 
Flatlick Sewer Rehabilitation Project Phase 1 and 2
Flatlick Sewer Rehabilitation Project Phase 1 and 2Flatlick Sewer Rehabilitation Project Phase 1 and 2
Flatlick Sewer Rehabilitation Project Phase 1 and 2Fairfax County
 
IRJET- Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...
IRJET-  	  Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...IRJET-  	  Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...
IRJET- Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...IRJET Journal
 
Intro infrastructure project 2015.02.26
Intro infrastructure project 2015.02.26Intro infrastructure project 2015.02.26
Intro infrastructure project 2015.02.26Uyanga Nyamkhuu
 
Seismic concrete Bore Piles at Makhinjauri water supply reservoir
Seismic concrete Bore Piles at Makhinjauri water supply reservoirSeismic concrete Bore Piles at Makhinjauri water supply reservoir
Seismic concrete Bore Piles at Makhinjauri water supply reservoirVladimir Popovic
 
Waste water project derventa, bosnia
Waste water project derventa, bosniaWaste water project derventa, bosnia
Waste water project derventa, bosniaVladimir Popovic
 
Chimoio_Water_Supply_Project_FinalDesign(1).pdf
Chimoio_Water_Supply_Project_FinalDesign(1).pdfChimoio_Water_Supply_Project_FinalDesign(1).pdf
Chimoio_Water_Supply_Project_FinalDesign(1).pdfAmmar475682
 
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptxLectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptxAsnelTiffa
 
Bangalore's Water Supply situation - BWSSB
Bangalore's Water Supply situation - BWSSBBangalore's Water Supply situation - BWSSB
Bangalore's Water Supply situation - BWSSBSangeeta (San) Banerjee
 
IRJET- Water Supply through Underground Tunnel from Thane to Bhandup using TBM
IRJET- Water Supply through Underground Tunnel from Thane to Bhandup using TBMIRJET- Water Supply through Underground Tunnel from Thane to Bhandup using TBM
IRJET- Water Supply through Underground Tunnel from Thane to Bhandup using TBMIRJET Journal
 

Similar to Rehabilitation of Municipal Water Supply and Wastewater Infrastructure in Batumi - Phase III, Lot 4-1 (20)

DesignCriteriaManual DesignCriteriaManual JICA.pdf
DesignCriteriaManual DesignCriteriaManual JICA.pdfDesignCriteriaManual DesignCriteriaManual JICA.pdf
DesignCriteriaManual DesignCriteriaManual JICA.pdf
 
Kakanj wastewater project
Kakanj wastewater projectKakanj wastewater project
Kakanj wastewater project
 
Kakanj City Waste Water Project
Kakanj City Waste Water ProjectKakanj City Waste Water Project
Kakanj City Waste Water Project
 
Trenchless Rehabilitation of Sewer & Water Networks
Trenchless Rehabilitation of Sewer & Water NetworksTrenchless Rehabilitation of Sewer & Water Networks
Trenchless Rehabilitation of Sewer & Water Networks
 
Derventa City WW Project
Derventa City WW ProjectDerventa City WW Project
Derventa City WW Project
 
Barker.R.CV.
Barker.R.CV.Barker.R.CV.
Barker.R.CV.
 
Flatlick Sewer Rehabilitation Project Phase 1 and 2
Flatlick Sewer Rehabilitation Project Phase 1 and 2Flatlick Sewer Rehabilitation Project Phase 1 and 2
Flatlick Sewer Rehabilitation Project Phase 1 and 2
 
IRJET- Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...
IRJET-  	  Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...IRJET-  	  Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...
IRJET- Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...
 
Intro infrastructure project 2015.02.26
Intro infrastructure project 2015.02.26Intro infrastructure project 2015.02.26
Intro infrastructure project 2015.02.26
 
Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15
 
Seismic concrete Bore Piles at Makhinjauri water supply reservoir
Seismic concrete Bore Piles at Makhinjauri water supply reservoirSeismic concrete Bore Piles at Makhinjauri water supply reservoir
Seismic concrete Bore Piles at Makhinjauri water supply reservoir
 
Waste water project derventa, bosnia
Waste water project derventa, bosniaWaste water project derventa, bosnia
Waste water project derventa, bosnia
 
Mumbai sewage
Mumbai sewageMumbai sewage
Mumbai sewage
 
Ded butets english
Ded butets englishDed butets english
Ded butets english
 
Sanipor
SaniporSanipor
Sanipor
 
Chimoio_Water_Supply_Project_FinalDesign(1).pdf
Chimoio_Water_Supply_Project_FinalDesign(1).pdfChimoio_Water_Supply_Project_FinalDesign(1).pdf
Chimoio_Water_Supply_Project_FinalDesign(1).pdf
 
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptxLectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
 
Bangalore's Water Supply situation - BWSSB
Bangalore's Water Supply situation - BWSSBBangalore's Water Supply situation - BWSSB
Bangalore's Water Supply situation - BWSSB
 
IRJET- Water Supply through Underground Tunnel from Thane to Bhandup using TBM
IRJET- Water Supply through Underground Tunnel from Thane to Bhandup using TBMIRJET- Water Supply through Underground Tunnel from Thane to Bhandup using TBM
IRJET- Water Supply through Underground Tunnel from Thane to Bhandup using TBM
 
CV William 2016
CV William 2016CV William 2016
CV William 2016
 

More from Vladimir Popovic

Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805Vladimir Popovic
 
Tightness testing of gravity pipelines
Tightness testing of gravity pipelinesTightness testing of gravity pipelines
Tightness testing of gravity pipelinesVladimir Popovic
 
3-Days Construction Schedule
3-Days Construction Schedule3-Days Construction Schedule
3-Days Construction ScheduleVladimir Popovic
 
Water Supply Pipelines Channel Crossing Examples
Water Supply Pipelines Channel Crossing ExamplesWater Supply Pipelines Channel Crossing Examples
Water Supply Pipelines Channel Crossing ExamplesVladimir Popovic
 
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing ConditionsVladimir Popovic
 
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing ConditionsVladimir Popovic
 
Sealing of Wall Shutter Tie-Rod Holes
Sealing of Wall Shutter Tie-Rod HolesSealing of Wall Shutter Tie-Rod Holes
Sealing of Wall Shutter Tie-Rod HolesVladimir Popovic
 
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURESAPPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURESVladimir Popovic
 
Construction Joints Sealing - Dual Seal Swellable Water-Stop
Construction Joints Sealing - Dual Seal Swellable Water-StopConstruction Joints Sealing - Dual Seal Swellable Water-Stop
Construction Joints Sealing - Dual Seal Swellable Water-StopVladimir Popovic
 
Man Made River Project IV Phase - Ghadames Project - AJRT Regulating Tank 70....
Man Made River Project IV Phase - Ghadames Project - AJRT Regulating Tank 70....Man Made River Project IV Phase - Ghadames Project - AJRT Regulating Tank 70....
Man Made River Project IV Phase - Ghadames Project - AJRT Regulating Tank 70....Vladimir Popovic
 
Man Made River Project – Libya - Gharyan Tank 300.000m3 Construction
Man Made River Project – Libya - Gharyan Tank 300.000m3 ConstructionMan Made River Project – Libya - Gharyan Tank 300.000m3 Construction
Man Made River Project – Libya - Gharyan Tank 300.000m3 ConstructionVladimir Popovic
 
Standard Waste Water Manholes of precast concrete elements
Standard Waste Water Manholes of precast concrete elementsStandard Waste Water Manholes of precast concrete elements
Standard Waste Water Manholes of precast concrete elementsVladimir Popovic
 
Ozurgeti City / Water Supply Project
Ozurgeti City / Water Supply ProjectOzurgeti City / Water Supply Project
Ozurgeti City / Water Supply ProjectVladimir Popovic
 
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)Vladimir Popovic
 
Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)Vladimir Popovic
 
Man Made River Project IV Phase / Ghadames Project - Minor Structures
Man Made River Project IV Phase / Ghadames Project - Minor StructuresMan Made River Project IV Phase / Ghadames Project - Minor Structures
Man Made River Project IV Phase / Ghadames Project - Minor StructuresVladimir Popovic
 
Man Made River Project - IV Phase / Ghadames Project - Pipelaying
Man Made River Project - IV Phase / Ghadames Project - PipelayingMan Made River Project - IV Phase / Ghadames Project - Pipelaying
Man Made River Project - IV Phase / Ghadames Project - PipelayingVladimir Popovic
 
Kostajnica City - WS/WW Project
Kostajnica City - WS/WW ProjectKostajnica City - WS/WW Project
Kostajnica City - WS/WW ProjectVladimir Popovic
 
Derventa City Water Supply Project
Derventa City Water Supply ProjectDerventa City Water Supply Project
Derventa City Water Supply ProjectVladimir Popovic
 
Lanchkhuti WS Project Overview
Lanchkhuti WS Project OverviewLanchkhuti WS Project Overview
Lanchkhuti WS Project OverviewVladimir Popovic
 

More from Vladimir Popovic (20)

Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
 
Tightness testing of gravity pipelines
Tightness testing of gravity pipelinesTightness testing of gravity pipelines
Tightness testing of gravity pipelines
 
3-Days Construction Schedule
3-Days Construction Schedule3-Days Construction Schedule
3-Days Construction Schedule
 
Water Supply Pipelines Channel Crossing Examples
Water Supply Pipelines Channel Crossing ExamplesWater Supply Pipelines Channel Crossing Examples
Water Supply Pipelines Channel Crossing Examples
 
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
 
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
 
Sealing of Wall Shutter Tie-Rod Holes
Sealing of Wall Shutter Tie-Rod HolesSealing of Wall Shutter Tie-Rod Holes
Sealing of Wall Shutter Tie-Rod Holes
 
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURESAPPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
 
Construction Joints Sealing - Dual Seal Swellable Water-Stop
Construction Joints Sealing - Dual Seal Swellable Water-StopConstruction Joints Sealing - Dual Seal Swellable Water-Stop
Construction Joints Sealing - Dual Seal Swellable Water-Stop
 
Man Made River Project IV Phase - Ghadames Project - AJRT Regulating Tank 70....
Man Made River Project IV Phase - Ghadames Project - AJRT Regulating Tank 70....Man Made River Project IV Phase - Ghadames Project - AJRT Regulating Tank 70....
Man Made River Project IV Phase - Ghadames Project - AJRT Regulating Tank 70....
 
Man Made River Project – Libya - Gharyan Tank 300.000m3 Construction
Man Made River Project – Libya - Gharyan Tank 300.000m3 ConstructionMan Made River Project – Libya - Gharyan Tank 300.000m3 Construction
Man Made River Project – Libya - Gharyan Tank 300.000m3 Construction
 
Standard Waste Water Manholes of precast concrete elements
Standard Waste Water Manholes of precast concrete elementsStandard Waste Water Manholes of precast concrete elements
Standard Waste Water Manholes of precast concrete elements
 
Ozurgeti City / Water Supply Project
Ozurgeti City / Water Supply ProjectOzurgeti City / Water Supply Project
Ozurgeti City / Water Supply Project
 
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
 
Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)
 
Man Made River Project IV Phase / Ghadames Project - Minor Structures
Man Made River Project IV Phase / Ghadames Project - Minor StructuresMan Made River Project IV Phase / Ghadames Project - Minor Structures
Man Made River Project IV Phase / Ghadames Project - Minor Structures
 
Man Made River Project - IV Phase / Ghadames Project - Pipelaying
Man Made River Project - IV Phase / Ghadames Project - PipelayingMan Made River Project - IV Phase / Ghadames Project - Pipelaying
Man Made River Project - IV Phase / Ghadames Project - Pipelaying
 
Kostajnica City - WS/WW Project
Kostajnica City - WS/WW ProjectKostajnica City - WS/WW Project
Kostajnica City - WS/WW Project
 
Derventa City Water Supply Project
Derventa City Water Supply ProjectDerventa City Water Supply Project
Derventa City Water Supply Project
 
Lanchkhuti WS Project Overview
Lanchkhuti WS Project OverviewLanchkhuti WS Project Overview
Lanchkhuti WS Project Overview
 

Recently uploaded

Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfsumitt6_25730773
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...vershagrag
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...ppkakm
 
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...gragchanchal546
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxpritamlangde
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...jabtakhaidam7
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesRashidFaridChishti
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 

Recently uploaded (20)

Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...
 
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 

Rehabilitation of Municipal Water Supply and Wastewater Infrastructure in Batumi - Phase III, Lot 4-1

  • 1. Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi - Phase III Lot 4-1 Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 1
  • 2. Project Phases: ■ The Batumi Project is divided into four phases, each of which is implemented by the Municipality of Batumi:  Phase I consisted of rehabilitation measures for the water and sewer supply facilities in parts of the old town of Batumi. Phase I had an investment cost of 18.5 million EUR and was implemented from 2007 until 2012.  Phase II extends the rehabilitation measures of phase I to more parts of the city and also to nearby coastal villages south of Batumi. This phase also builds a new waste water treatment plant for Batumi. At a cost of 47 million EUR, phase II has been implemented between 2009 and 2013.  .  Phase IV concerns the rehabilitation and extension of the water supply network and the rehabilitation of the sewer system in Batumi (new city boundaries). The Project covers the continuation of Project Phases I-III that aim at a continuous and demand-oriented supply of the population with hygienically sound water as well as an ecological and hygienically sound disposal and treatment of the wastewater of Batumi. The estimated total investment cost of the Project Phase IV amount to approximately EUR 30 m. Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 2 Phase III of the Batumi municipal water project focuses on rehabilitating the rest of Batumi’s water and sewer facilities. It continues to expand into surrounding rural coastal areas. At a projected cost of 43.5 million EUR, phase III began in 2012 and expected to be finished in 2018.
  • 3. Project Background & Scope ■ Project background - previous sewage disposal principle comprised of individual & high rise residential buildings being discharged to existing rainwater channels taking the sewage directly into the Sea. ■ Project scope – environmental protection, prevention of further Black Sea coast pollution, separation of sewage from storm water collectors, abortion and prevention of further sewage influx into Black Sea, improvement of quality of coastal, bathing waters through rehabilitation and construction of new sewerage systems within dense city areas as well as surrounding coastal villages. ■ Lot 4-1 / Wastewater component:  In total ~41km of sewerage pipelines, 690nr inspection manholes, 2,190nr of house connection manholes.  Gravity collectors L=32,8km (PP SN10, DN200-400mm, GRP PN10 DN500, 800, 1000mm), with 661nr manholes, 2,184nr house connection manholes.  5.4km of pressure main (Steel PE/cem.mortar, DN1000mm) with associated valves & washouts, combined type air valves  One WW Shaft Pumping Station “Back Pull-Out” type (Q3= 2x57.3l/s @ 6,4m). Section Collector House Connections Manholes (m) (pcs) (pcs) Waste Water Gravity Sewerage Networks Remaining System A(RSA) Steel (PE/cem.mort), DN250 187.00 PP SN10 (DN250-400) 12,842.00 GRP PN10, SN10,000 (DN500, 800) 482.00 Sub-total: 13,511.00 842.00 258.00 Swamp & South Swamp Area (SSA) PP SN10 (DN200-400) 17,861.00 1,342.00 356.00 Sub-total: 17,861.00 1,342.00 356.00 Trunk Main Collectors Collector "B" GRP PN10, SN10 DN800-1000 2,557.00 47.00 In-lining DN1000, 1200 1,128.00 Sub-total: 3,685.00 47.00 Total - gravity sewers 35,057.00 2,184.00 661.00 Pressure Mains Pumping Main "B" Steel (PE/cem.mortar), DN1000 5,184.00 21.00 Total - pressure mains: 5,184.00 21.00 Total sewerage: 40,241.00 2,184.00 682.00 Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 3
  • 4. Objectives & Benefits ■ ObjectivesThe Batumi MunicipalWater Project aims to:  Ensure a continuous supply of safe drinking water for the population of Batumi  Reduce water losses and ensure efficient use of resources  Guarantee a controlled and improved wastewater collection treatment system  Provide regular testing and analysis of public drinking water so it is up to EU standards  Cover operation and maintenance costs for BatumiTskali Utility by service fees  Protect the water ecosystems of the Black Sea and Chakvi RiverWatershed  Benefits:  Prevents costly and pointless water loss  Constructs a new low energyWWTP that has a solar drying system  Achieves EU water quality standards Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 4
  • 5. Lot 4-1  Remaining System A (RSA) – dense city area sewerage system remaining for construction from Phase II of the Project;  Swamp & South Swamp Area Sewage Network (SSA) – located at the South-East part of the city center with a high population density, sewage previously discharged to existing rainwater channels taking the sewage directly into the Sea;  Sewage Pumping Main B connecting main WW PS B with WWTP Adlia; max. pressure 1,7 – 2,3bars.  Collector B as trunk main is the most important component of System B & System C and hence its backbone as it conveys collecting major lateral collectors and will carry all the sewage from these areas to the existing PS B and from there – to the WWTP Adlia. Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 5
  • 6. Remaining SystemA (RSA)  Covering dense city area sewerage system remaining for construction from Phase II of the Project:  13,185m of sewerage city collectors (Steel DN250mm, PP DN250-400mm, GRP DN500-1200mm),  258nr inspection manholes,  842nr house connections.  Sewage pumping station - “Back Pull-Out” pump 2 x 57.3 l/s, H=6,4m; with double HDPE wall housing (ID = 2,000 mm, SN4), buoyancy preventive concrete casing. Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 6
  • 7. RSA - Prefabricated concrete manholes: Located at all changes of the vertical or horizontal alignment and at intervals not exceeding 50m’ for primary & secondary sewer lines Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 7
  • 8. RSA - HORIZONTAL DRILLING: CROSSING BELLOWTHE RAILWAY, EXISTING STORM-WATER CHANNELSWITH STEELCONDUIT PIPEWITH CONCRETE SEALING Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 8
  • 9. RSA – Prefabricated concrete inspection manholes Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 9
  • 10. RSA - Sewage shaft PS A-1 “Back Pull-Out” pump:  2 x 57.3 l/s, H=6,4m;  Double HDPE wall housing;  ID = 2,200 mm,  OD = 2,433mm  H=6,700mm,  SN4,  Buoyancy preventive concrete casing class C25. Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 10
  • 11. RSA - Construction phases - sewage shaft PS A-1 – sheet piled excavation, concrete buoyancy preventive casing Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 11
  • 12. RSA - Construction phases - sewage shaft PS A-1 installation of PS’ HDPE housing downstream from screen chamber with sluice gate valve Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 12
  • 13. RSA - Construction phases - sewage shaft PS A-1 buoyancy preventive concrete casing surrounding HDPE PS Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 13
  • 14. RSA - Construction phases - sewage PS A-1 Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 14
  • 15. RSA - sewage PS A-1 pumps (2 x 57.3 l/s, H=6,4m) Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 15
  • 16. RSA - sewage PS A-1 operation in 1+1 work regime of pumps (2 x 57.3 l/s, H=6,4m) Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 16
  • 17. RSA - sewage PS A-1 pumps (2 x 57.3 l/s, H=6,4m) Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 17
  • 18. Swamp & South SwampArea Sewage Network (SSA) Located at the South-East part of the city center with a high population density, sewage previously discharged to existing rainwater channels taking the sewage directly into the Sea: 17,664m of sewerage city collectors (PP DN200-400mm), 1,424nr house connections; New sewage network in the Swamp & South SwampArea includes the following:  14,223m of primary and secondary gravity sewer collectors with diameters ranging PP DN250 – DN400mm, with depths up to 5,0m;  3,638m of tertiary lines (PP DN200mm);  356nr manholes with depths up to 5,0m;  889nr PP & 453 concrete HC manholes Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 18
  • 19. SSA -Works Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 19
  • 20. SSA –Works Prefabricated Concrete Inspection manholes Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 20
  • 21. SSA –Works Prefabricated Concrete Inspection manholes Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 21
  • 22. SSA –Works House Connection PP-Manhole with 1 inlet / 1 outlet Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 22
  • 23. SSA –Works House Connection PP-Manhole with 3 inlets / 1 outlet Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 23
  • 24. Sewage Pumping Main B (PMB)  Connecting main WW PS B with WWTP Adlia;  Steel pressure pipeline DN1000mm (1,016X10/8.8mm), L=5,184m;  PE coated / sulfate resistant cement mortar lined;  Max. pressure rating btw. pressure 1,7 – 2,3bars. Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 24
  • 25. Sewage Pumping Main B (PMB) Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 25
  • 26. Sewage Pumping Main B (PMB) Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 26
  • 27. Sewage Pumping Main B (PMB) Valve &Washout Manholes Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 27
  • 28. Sewage Pumping Main B (PMB) Concrete thrust blocks on DN1000mm pressure pipeline Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 28
  • 29. Sewage Pumping Main B (PMB)/ Combined Air ReleaseValves  Located on high-points of pumping mains, designed to operate with sewage DN150, PN10.  Combined air valve discharges gases during the filling or charging of the system, admits air to the system while it is being emptied of liquid and discharges accumulated gases from the system while it is under pressure and operating, combining air & vacuum.  Additional isolating valve to permit inspection and maintenance of the valve Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 29
  • 30. Sewage Pumping Main B (PMB) – Crossing over the Mejinitskali River Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 30
  • 31. SewageCollector B Collector B (GRP DN800 - 1000mm, L=2,557m) as trunk main is considered as the most important component of System B & System C and hence its backbone as it conveys collecting major lateral collectors and will carry all the sewage from these areas to the existing WW PS B and from there – over new Pumping Main B to the WWTP Adlia. Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 31
  • 32. Collector B Comprises the following general issues: Replacement of existing collector:  Construction of 2,6 km of GRP DN800 & DN1000mm sewer trunk main with invert levels from 1,8m to 4,5m;  Construction of 47 concrete manholes with depths between 1,8 – 4,5m; In-lining of existing collector:  Rehabilitation of ~1,1km of existing DN1000, 1200mm sewer trunk main by trenchless technology with depths varying between 4,0 & 8,0m  Construction of 20nr manholes with depths btw.4,0 & 8,0m  Due to deteriorated status of existing collector, in-lining was abandoned, new DN1200 collector to be installed under future project! Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 32
  • 33. Sewage Collector B Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 33
  • 34. Sewage Collector B Multiple crossings with existing installations Collector route parallel to existing SW channel Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 34
  • 35. Collector B Tertiary collectors – collection of HC above the trunk-collector Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 35
  • 36. Sewage Collector B Soil investigation – due to swamp area, replacement of subgrade material required below pipe-invert level (H= 0.5 / 1,0m) Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 36
  • 37. Manholes Manholes: prefabricated concrete manholes located at all changes of the vertical or horizontal alignment and at intervals not exceeding 50m’ for primary & secondary sewer lines. In-situ concrete manholes are considered at all changes of the vertical or horizontal alignment and at intervals not exceeding 70m’ in straight line for theTrunk Main Collector B. Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 37
  • 38. Quality Control  Trench subgrade soil analysis;  Pipeline alignment, invert elevations;  Pipe trench bedding & backfilling compaction level;  Ultrasonic testing on welded joints;  Tightness testing of WW system (collector, manhole, house connections);  CCTV inspection of collectors;  Standard concrete testing (Slump, Compressive strength,…);  Material inspections on delivery and installation Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 38
  • 39. QC / Prefabricated concrete curing pools, compressive strength testing Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 39
  • 40. QC / material inspections on delivery Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 40
  • 41. QC /Tightness testing of gravity sewers as per EN1610 Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 41
  • 42. QC / CCTV Inspection (closed circuit television) as per ATV M 14, part 2 Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 42
  • 43. Health & Safety Regular Safety Patrols preventing potential accidents Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 43
  • 44. Materials: prefabricated concrete manholes / curing pools Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 44
  • 45. Materials: prefabricated concrete manholes (for collectors DN200-400) Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 45
  • 46. Materials: prefabricated concrete manholes for large pipe diameters (DN500 – 1200) Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 46
  • 47. Materials: prefabricated concrete manholes for connections / crossing with large pipe diameters (DN500 – 1200) Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 47
  • 48. Materials: Manhole covers, dirt (sand) traps - B125, LW800-D400 (Meier Guss, Germany) Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 48
  • 49. Materials: GRP Pipe material – SN10000, DN500-1200 (Superlit,Turkey); Rehabilitation of MunicipalWater Supply &Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 49
  • 50. Materials: PP Pipe material – KG2000, SN10, DN150-400 (Wavin,Germany) Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 50
  • 51. Materials: Steel pipes, Epoxy coated / sulfate resistant cement lined, (NOKSEL,Turkey) Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 51
  • 52. Material: Steel pipes, Epoxy coated / sulfate resistant cement lined, (HATBORU,Turkey) Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 52
  • 53. Materials: House connection manholes (Wavin, Germany) Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 53
  • 54. Materials: Valves, fittings (VAG, Germany) Rehabilitation of MunicipalWater Supply & Wastewater Infrastructure in Batumi - Phase III / Lot 4-1 54