SlideShare a Scribd company logo
1 of 23
INTRODUCTION OF
INFRASTRUCTURE PROJECT
2014.05.20-23
THE PROJECT OF INFRASTRUCTURE
“ The infrastructure project” of the Ministry of Construction Urban
development was established the frame work of implementing policy by the
resolution 118 of 2013 the Mongolian Government housing policies and home
district's policy is to limit the amount of this policy.
Infrastructure projects are to construct to supply
consumption, infrastructure engineering lines & network,
and construction of facilities in the newly proposed
districts with 42,000 apartments to be built in
Ulaanbaatar, to serve 26700 seats school children, 7100
seats kindergarten, to serve 4350 residents per a day
hospitals, 2,000 job vacancies public services centers,
shopping centers, hotels, sports, swimming pool,
cultural centers and office.
PURPOSE OF PROJECT
Implementing project
the general planning of districts
“Yarmag ” residential district
“Bayan gol am” residential district
residential district “VII-р sub district ”
“Buyant-Ukhaa”residential district
Around “Public broadcasting center ”
“Ireedui complex ”
district
Center of Ulaanbaatar
“Solongo” district
- Completed jobs - 6
- Ongoing work - 8
- Implementation of the new jobs - 12
26 construction works are ongoing the frame of "Infrastructure "
project on the 7 districts of Ulaanbaatar.
Attributable to:
IMPLEMENTING JOBS
“BUYANT UKHAA ”RESIDENTIAL DISTRICT
This residential district is located near the Chingiss -Khaan
international airport or 12km from the center of capital city Ulaanbaatar
where has been planned to construct around 15,000 residential houses,
apartment buildings , schools , kindergartens, hospitals , and sports
complex with a modern architectural solution “Buyant- Ukhaa”
residential area which is planned to be established . The complex
system engineering infrastructure is to build the frame work of
infrastructure project “Buyant- Ukhaa” residential area.
1 . The construction work of Buyant-Ukhaa residential areas where have been
doing the drinking water sources , 20 pieces wells , V = 2800kh2 m3 of 2 pcs
reservoir and pump station , construction of power supply.
"BUYANT -UKHAA" DISTRICT ENGINEER INFRASTRUCTURE
2 . f400 mm 2863 m double line is continued from fresh water resource,
from the pump station to the ring line is continued 546m and a totally
3884 pipes , 120 m access channel construction work on the Buyant-
Ukhaa residential area.
3 . F 315 mm 10031, 2 m, F 110 mm diameter of fresh water 70 m ring line, and
80 m channel access of the construction work of Byant-Ukhaa residential area.
4 . F 200 mm 2242 m double line with waste water pressure , f 200 mm 2820
lines , f160 mm 1042 m line , 2 pieces stations and 40 m access channel
construction on the Buyant- Ukhaa residential area.
5 . From Shine Yarmag sub-station 10 kV 2 complex structures is to delivering
dispense facilities are 9.89 km , architecting and designing the 9.9 MW power
cable work and construction on the Buyant-Ukhaa residential area.
6. 2 complex division of 10 kVis distribution network of approximately 9.9
MW capacity to meet demand for the power supply, 2 * 400 Kwa capacity TP
25 kits , 33.0 km long 10 kV cable lines achecture has designed and
construction on the Buyant-Ukhaa residential area
6 . 10 pieces archectures design of heating & water delivering center,
construction on the 10th parts of Buyant- Ukhaa residential district
7 . The design and archectures of the 13v magistrali 400 double line of
heating and 100 m line 7th pump station is to pair to extend into f400 mm and
to become the corridor system construction on the Buyant- Ukhaa residential
district
8 . Design and 20,000 m3 of wastewater treatment plant construction Buyant- Ukhaa
residential area.
Water, hearing 10 pieces center
Delivering station 25 pieces
20 pecies deep well
9 600 м wast woter line
10 031 м fresh water line
2х2800 м3 volume water pool
ENGINEERING INFRASTRUCTURE OF “BUYANT
UKHAA” RESIDENTIAL DISTRICT
GENERAL PLANNING OF THE BUYANT-UKHAA
RESIDENTS DISTRICT
PLANNING PROJECTS OF IMPLEMENTING IN
THE FUTURE
Д/д Project in action , construction , capacity , location
Standard price of construction
/billion tugrig г/
VII, XIV, residential districts engineering lines
1 6 pieces of water and heat transferring center’s design and construction12 Part of 7th District 1.558
2 6 pieces of Archecture and design of near the Public broadcasting district 1.558
Engineering lines of Berlin Eco Residential district
3 Berlin eco Town , outside heat , clean water f32 3000 - 300 -mm m main line drawings and construction 2.767
4 Berlin –eco town , 2 pieces , water , heat transferring center design and construction 0.52
5 Berlin 2000 , in addition to eco - town sewer m main line drawings and construction 0.399
" Rainbow " residential area of engineering line works
6 " Rainbow " area outside water pipes expand and sewage main line drawings and construction 0.529
Yarmag housing areas of engineering networks
7 Yarmag apartments 15.0 km of water main line design and construction 4.831
8 Yarmag apartments 14.5 km sewage main line drawings and construction 2.711
9
Yarmag districts electrical supply for the 10 kV distribution network, estimated to provide 14.3 MW of capacity
utilization close to 10 kV with AE - 3 complex , 2 * 400kVA mighty TP 36 kits , 37.6 km long 10 kV cable picture
project and construction
8.807
10
near Yarmag bridge district substation 10 kV 1 NT 12 km into the complex 15 MW power cable for use by the
design and construction
1.035
“Ireedui” complex areas of engineering networks
11 Future complex area’s water f150 - 350 11 - mm main line 4377 m , swimming pool design and construction 2.333
Totally 27.048
PROJECT RESULTS
Currently, " Infrastructure " project has been fulfilled successfully 95.6
billion worth, total 5 distribution facilities of the electricity supplies, 59
closed buildings substation with a capacity of 250 - 630kV with equipment,
112.2 km long cable line construction, 20 heat transferring centeral
buildings , 20 wells of clean water supplyment , 2 water tank pools with a
capacity of 2,800 m3 , 18.2 km long line pipe F110 - 315 -mm diameter are
constructed , and 2 waste water pump station , 14.1 km long pipeline F150 -
600 -mm diameter assembled were successfully completed in Ulaanbaatar.
ACHIEVEMENTS OF PROJECT
1. Nowadays there are some solve problems have been appeared which
are depended on the lines and equipment of plants very fewer. So using
the importing the most equipment is from the Republic of China and
Russia to construction works of infrastructure. Beside them, to waste
the time, lost money for importing very much that is appeared the
negative results for the country’s economics. In order to decide those
solve problems to involve the foreign investment and to establish lines
and equipment’s plants such as engineering infrastructure lines and
equipment etc. which are most important role to execute the
infrastructure.
PROPOSAL OF INVESTMENT
2. In recently, there has been using the solar energy power intensively,
especially geotherma, sun, wind, water solar power energy which are
using on the worldwide renewable energy . In order to decide the
infrastructure issues which are most virtual need to requirement in
Mongolia increasingly. In this regard, we are ready to joint work with the
business activities of foreign investors in this field to express their
willingness to cooperate with you.
We have confidence with you to cooperate the filed of infrastructure
which is to implement the policy of Mongolian government that is
increase housing supply, to support the manufacturing of construction
materials, based on the development of modern technology.
Thank you very much
for attention

More Related Content

Similar to Ded butets english

Copy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOMCopy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOMB SARKAR
 
Tuul-Songino Project Overview 22.05.2015
Tuul-Songino Project Overview  22.05.2015Tuul-Songino Project Overview  22.05.2015
Tuul-Songino Project Overview 22.05.2015Ivaylo Velikov
 
Construction and Architecture Magazine 13 sept oct 2011
Construction and Architecture Magazine 13 sept oct 2011Construction and Architecture Magazine 13 sept oct 2011
Construction and Architecture Magazine 13 sept oct 2011Remona Divekar
 
Kakanj City Waste Water Project
Kakanj City Waste Water ProjectKakanj City Waste Water Project
Kakanj City Waste Water ProjectVladimir Popovic
 
Esia of 220 k v ug transmission line from lalazar to mauripur g.s & 132 ...
Esia of 220 k v ug transmission line from lalazar to  mauripur g.s & 132 ...Esia of 220 k v ug transmission line from lalazar to  mauripur g.s & 132 ...
Esia of 220 k v ug transmission line from lalazar to mauripur g.s & 132 ...zubeditufail
 
Final eia of 500 kv t l lakhra pp
Final eia of 500 kv t l lakhra ppFinal eia of 500 kv t l lakhra pp
Final eia of 500 kv t l lakhra ppzubeditufail
 
Presentation ENG от 28 декабря 2010 года
Presentation ENG от 28 декабря 2010 годаPresentation ENG от 28 декабря 2010 года
Presentation ENG от 28 декабря 2010 годаRivets
 
Report on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectReport on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectRubnawaz Bhatti
 
Yogesh 8th sem project report
Yogesh 8th sem project reportYogesh 8th sem project report
Yogesh 8th sem project reportYogesh Thakur
 
Rehabilitation of Municipal Water Supply and Wastewater Infrastructure in Bat...
Rehabilitation of Municipal Water Supply and Wastewater Infrastructure in Bat...Rehabilitation of Municipal Water Supply and Wastewater Infrastructure in Bat...
Rehabilitation of Municipal Water Supply and Wastewater Infrastructure in Bat...Vladimir Popovic
 
Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...
Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...
Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...zubeditufail
 

Similar to Ded butets english (20)

CV William 2016
CV William 2016CV William 2016
CV William 2016
 
Powerful parbati
Powerful parbatiPowerful parbati
Powerful parbati
 
Copy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOMCopy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOM
 
Tuul-Songino Project Overview 22.05.2015
Tuul-Songino Project Overview  22.05.2015Tuul-Songino Project Overview  22.05.2015
Tuul-Songino Project Overview 22.05.2015
 
Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15
 
Construction and Architecture Magazine 13 sept oct 2011
Construction and Architecture Magazine 13 sept oct 2011Construction and Architecture Magazine 13 sept oct 2011
Construction and Architecture Magazine 13 sept oct 2011
 
Kakanj wastewater project
Kakanj wastewater projectKakanj wastewater project
Kakanj wastewater project
 
Kakanj City Waste Water Project
Kakanj City Waste Water ProjectKakanj City Waste Water Project
Kakanj City Waste Water Project
 
OmanPower&Water2017_Brochure-2
OmanPower&Water2017_Brochure-2OmanPower&Water2017_Brochure-2
OmanPower&Water2017_Brochure-2
 
Esia of 220 k v ug transmission line from lalazar to mauripur g.s & 132 ...
Esia of 220 k v ug transmission line from lalazar to  mauripur g.s & 132 ...Esia of 220 k v ug transmission line from lalazar to  mauripur g.s & 132 ...
Esia of 220 k v ug transmission line from lalazar to mauripur g.s & 132 ...
 
muok cv
muok cvmuok cv
muok cv
 
Final eia of 500 kv t l lakhra pp
Final eia of 500 kv t l lakhra ppFinal eia of 500 kv t l lakhra pp
Final eia of 500 kv t l lakhra pp
 
AMIT 17357.pptx
AMIT 17357.pptxAMIT 17357.pptx
AMIT 17357.pptx
 
Presentation ENG от 28 декабря 2010 года
Presentation ENG от 28 декабря 2010 годаPresentation ENG от 28 декабря 2010 года
Presentation ENG от 28 декабря 2010 года
 
Report on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectReport on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic project
 
Yogesh 8th sem project report
Yogesh 8th sem project reportYogesh 8th sem project report
Yogesh 8th sem project report
 
Project Outline
Project OutlineProject Outline
Project Outline
 
Rehabilitation of Municipal Water Supply and Wastewater Infrastructure in Bat...
Rehabilitation of Municipal Water Supply and Wastewater Infrastructure in Bat...Rehabilitation of Municipal Water Supply and Wastewater Infrastructure in Bat...
Rehabilitation of Municipal Water Supply and Wastewater Infrastructure in Bat...
 
Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...
Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...
Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...
 
CV RESAT YASAR
CV RESAT YASARCV RESAT YASAR
CV RESAT YASAR
 

Recently uploaded

(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 

Recently uploaded (20)

(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 

Ded butets english

  • 2. THE PROJECT OF INFRASTRUCTURE “ The infrastructure project” of the Ministry of Construction Urban development was established the frame work of implementing policy by the resolution 118 of 2013 the Mongolian Government housing policies and home district's policy is to limit the amount of this policy.
  • 3. Infrastructure projects are to construct to supply consumption, infrastructure engineering lines & network, and construction of facilities in the newly proposed districts with 42,000 apartments to be built in Ulaanbaatar, to serve 26700 seats school children, 7100 seats kindergarten, to serve 4350 residents per a day hospitals, 2,000 job vacancies public services centers, shopping centers, hotels, sports, swimming pool, cultural centers and office. PURPOSE OF PROJECT
  • 4. Implementing project the general planning of districts “Yarmag ” residential district “Bayan gol am” residential district residential district “VII-р sub district ” “Buyant-Ukhaa”residential district Around “Public broadcasting center ” “Ireedui complex ” district Center of Ulaanbaatar “Solongo” district
  • 5. - Completed jobs - 6 - Ongoing work - 8 - Implementation of the new jobs - 12 26 construction works are ongoing the frame of "Infrastructure " project on the 7 districts of Ulaanbaatar. Attributable to: IMPLEMENTING JOBS
  • 6. “BUYANT UKHAA ”RESIDENTIAL DISTRICT This residential district is located near the Chingiss -Khaan international airport or 12km from the center of capital city Ulaanbaatar where has been planned to construct around 15,000 residential houses, apartment buildings , schools , kindergartens, hospitals , and sports complex with a modern architectural solution “Buyant- Ukhaa” residential area which is planned to be established . The complex system engineering infrastructure is to build the frame work of infrastructure project “Buyant- Ukhaa” residential area.
  • 7. 1 . The construction work of Buyant-Ukhaa residential areas where have been doing the drinking water sources , 20 pieces wells , V = 2800kh2 m3 of 2 pcs reservoir and pump station , construction of power supply. "BUYANT -UKHAA" DISTRICT ENGINEER INFRASTRUCTURE
  • 8. 2 . f400 mm 2863 m double line is continued from fresh water resource, from the pump station to the ring line is continued 546m and a totally 3884 pipes , 120 m access channel construction work on the Buyant- Ukhaa residential area.
  • 9. 3 . F 315 mm 10031, 2 m, F 110 mm diameter of fresh water 70 m ring line, and 80 m channel access of the construction work of Byant-Ukhaa residential area.
  • 10. 4 . F 200 mm 2242 m double line with waste water pressure , f 200 mm 2820 lines , f160 mm 1042 m line , 2 pieces stations and 40 m access channel construction on the Buyant- Ukhaa residential area.
  • 11. 5 . From Shine Yarmag sub-station 10 kV 2 complex structures is to delivering dispense facilities are 9.89 km , architecting and designing the 9.9 MW power cable work and construction on the Buyant-Ukhaa residential area.
  • 12. 6. 2 complex division of 10 kVis distribution network of approximately 9.9 MW capacity to meet demand for the power supply, 2 * 400 Kwa capacity TP 25 kits , 33.0 km long 10 kV cable lines achecture has designed and construction on the Buyant-Ukhaa residential area
  • 13. 6 . 10 pieces archectures design of heating & water delivering center, construction on the 10th parts of Buyant- Ukhaa residential district
  • 14. 7 . The design and archectures of the 13v magistrali 400 double line of heating and 100 m line 7th pump station is to pair to extend into f400 mm and to become the corridor system construction on the Buyant- Ukhaa residential district
  • 15. 8 . Design and 20,000 m3 of wastewater treatment plant construction Buyant- Ukhaa residential area.
  • 16. Water, hearing 10 pieces center Delivering station 25 pieces 20 pecies deep well 9 600 м wast woter line 10 031 м fresh water line 2х2800 м3 volume water pool ENGINEERING INFRASTRUCTURE OF “BUYANT UKHAA” RESIDENTIAL DISTRICT
  • 17. GENERAL PLANNING OF THE BUYANT-UKHAA RESIDENTS DISTRICT
  • 18. PLANNING PROJECTS OF IMPLEMENTING IN THE FUTURE Д/д Project in action , construction , capacity , location Standard price of construction /billion tugrig г/ VII, XIV, residential districts engineering lines 1 6 pieces of water and heat transferring center’s design and construction12 Part of 7th District 1.558 2 6 pieces of Archecture and design of near the Public broadcasting district 1.558 Engineering lines of Berlin Eco Residential district 3 Berlin eco Town , outside heat , clean water f32 3000 - 300 -mm m main line drawings and construction 2.767 4 Berlin –eco town , 2 pieces , water , heat transferring center design and construction 0.52 5 Berlin 2000 , in addition to eco - town sewer m main line drawings and construction 0.399 " Rainbow " residential area of engineering line works 6 " Rainbow " area outside water pipes expand and sewage main line drawings and construction 0.529 Yarmag housing areas of engineering networks 7 Yarmag apartments 15.0 km of water main line design and construction 4.831 8 Yarmag apartments 14.5 km sewage main line drawings and construction 2.711 9 Yarmag districts electrical supply for the 10 kV distribution network, estimated to provide 14.3 MW of capacity utilization close to 10 kV with AE - 3 complex , 2 * 400kVA mighty TP 36 kits , 37.6 km long 10 kV cable picture project and construction 8.807 10 near Yarmag bridge district substation 10 kV 1 NT 12 km into the complex 15 MW power cable for use by the design and construction 1.035 “Ireedui” complex areas of engineering networks 11 Future complex area’s water f150 - 350 11 - mm main line 4377 m , swimming pool design and construction 2.333 Totally 27.048
  • 19. PROJECT RESULTS Currently, " Infrastructure " project has been fulfilled successfully 95.6 billion worth, total 5 distribution facilities of the electricity supplies, 59 closed buildings substation with a capacity of 250 - 630kV with equipment, 112.2 km long cable line construction, 20 heat transferring centeral buildings , 20 wells of clean water supplyment , 2 water tank pools with a capacity of 2,800 m3 , 18.2 km long line pipe F110 - 315 -mm diameter are constructed , and 2 waste water pump station , 14.1 km long pipeline F150 - 600 -mm diameter assembled were successfully completed in Ulaanbaatar. ACHIEVEMENTS OF PROJECT
  • 20. 1. Nowadays there are some solve problems have been appeared which are depended on the lines and equipment of plants very fewer. So using the importing the most equipment is from the Republic of China and Russia to construction works of infrastructure. Beside them, to waste the time, lost money for importing very much that is appeared the negative results for the country’s economics. In order to decide those solve problems to involve the foreign investment and to establish lines and equipment’s plants such as engineering infrastructure lines and equipment etc. which are most important role to execute the infrastructure. PROPOSAL OF INVESTMENT
  • 21. 2. In recently, there has been using the solar energy power intensively, especially geotherma, sun, wind, water solar power energy which are using on the worldwide renewable energy . In order to decide the infrastructure issues which are most virtual need to requirement in Mongolia increasingly. In this regard, we are ready to joint work with the business activities of foreign investors in this field to express their willingness to cooperate with you.
  • 22. We have confidence with you to cooperate the filed of infrastructure which is to implement the policy of Mongolian government that is increase housing supply, to support the manufacturing of construction materials, based on the development of modern technology.
  • 23. Thank you very much for attention