SlideShare a Scribd company logo
1 of 4
Download to read offline
 
1 | P a g e  
 
Todd M. Pullman
9026 13th
Avenue NW
Seattle, WA 98117
206-949-4513
toddpullman@hotmail.com
 
A highly talented and accomplished Construction Project and Site Management professional seeks to
capitalize on current skills & experience, and move forward into an environment that will offer
growth & opportunity.
 
Summary of Qualifications
17 + years of Project and Team Management Experience in Construction Industry.
Competent in All Forms of Project Scheduling and Construction.
Experienced with Cost Monitoring and Budget Management.
Highly Adept at Directing Multiple Construction and Site Development Projects.
Works Extremely Well with Clients to Resolve Issues, Perform Planning, and Ensure Satisfaction.
Knowledgeable in Working with, and Managing Teams and Subcontractors.
Excellent Communication and Motivation Skills.
Strong Management and Interpersonal Skills.
 
ProfessionalExperience
Project Manager – Johnson Controls, Inc. (Major Projects Division & Solutions Division)
Bothell, WA – 5/09 to Present – DDC Controls Contractor
Limited Area Production and Storage Complex (LAPSC) – Bangor Naval Base - $8M
100,000 Sq. Ft. of Office & Storage Facility.
High End DDC Low Voltage Controls Package.
Installation of Blast, Poppet, and Contamination Isolation Valves.
Installation of DDC Controls to Integrate w/ Mechanical & Electrical Equipment.
Port of Seattle - $1.5M
Installation of new Credentialing System Software, including Fingerprinting
and Background Check System.
Installation of new Credentialing Hardware including Badge Printers,
Fingerprint Readers, Cameras, Biometric Capture Units, Signature Pads, and Test Readers.
Provide Software and Implementation Services that included
Installation, Configuration, Legacy Data Migration, Interface Development, Reporting, and
Training.
King County WPTP Dewatering Replacement - $12.5M
25,000 Sq. Ft. of Sewage Facility.
Installation of new Centrifuge Dewatering Equipment and associated Controls,
Control Cabinets, and VFD’s.
Installation of new Dewatering Conveyors.
High End Mechanical & Electrical Package.
Installation of new Structural Steel & Structural Platform including Stairs,
Handrails, and Guardrails.
Explosives Handling Wharf #2 - $1.5M
350,000 Sq. Ft. of Office & Storage Facility.
High End DDC Low Voltage Controls Package.
Installation of new DDC control cabinets, VFD’s, and Poppet Valves.
Installation of DDC Controls to Integrate w/ Mechanical & Electrical Equipment.
Solely responsible on the above projects for the following:
Developing Project Schedules for Bidding and Budgeting Purposes.
Negotiation of Contracts with Suppliers, Vendors, and Subcontractors.
Generating Scopes of Work for Subcontractors.
Developing Construction Schedules for Subcontractors and Suppliers.
 
2 | P a g e  
 
Material Planning and Procurement.
Risk& Quality Management.
Reviewed and Coordinated Submittal Packages.
Supervised and Ran Subcontractors & Owners Progress Meetings.
Generated, Tracked, and Negotiated all PCO’s.
Assembled Monthly Requisitions to Owners.
Compiled Financial Information for In-House Upper Management Meetings.
Generated, Tracked, and Coordinated RFI’s.
DrawingDistribution/Organization.
Generating Meeting Minutes for Owner’s, Subcontractor, and MEP Meetings.
Project Manager – Lease Crutcher Lewis (SPD Division)
Seattle, WA – 2/06 to 4/09 – General Contractor
Joshua Green Building - $15.3M
Preconstruction Services for Renovation of Historical Office Building 101,100 Sq.
Ft. of Office & Retail Space.
High End Mechanical & Electrical Package Structural.
Steel & Seismic Upgrade.
Installation of PGRG Cornice.
Refurbish of Historical Windows & Stairwell.
Swedish Medical Center Neurosurgery O.R. - $5.5M
19,000 sq. ft. of High End Clean Room Medical Space.
High End Mechanical & Electrical Package.
Structural Steel & Interstitial Space Installation.
High End Millwork & Flooring Finishes.
Coordination of Owner’s Medical Equipment Installation including Pole Star.
Swedish Medical Center MRI - $2.0M
4,500 sq. ft. of High End Clean Room Medical Space.
High End Mechanical & Electrical Package.
High End Millwork & Flooring Finishes.
Coordination of Owner’s Medical Equipment Installation including MRI.
Swedish Medical Center CIS - $1.6M
25,000 sq. ft. Occupied Office Space.
Demolition of existing Laboratory Space & Equipment.
Typical Finishes.
Swedish Medical Center Neuroscience Subspecialties - $1.5M
11,100 sq. ft. of High End Medical Clinic Space.
High End Millwork & Flooring Finishes.
Typical Office Space.
Coordination of Owner’s Medical Equipment Installation.
Group Health Cooperative MRI - $1.4M
3,750 sq. ft. of High End Clean Room Medical Space.
High End Mechanical & Electrical Package.
High End Millwork & Flooring Finishes.
Coordination of Owner’s Medical Equipment Installation including MRI.
Group Health Cooperative MOB Space - $1.3M
21,000 sq. ft. Typical Office Space.
Typical Finishes.
Swedish Medical Center IS Relocation - $750K
29,000 sq. ft. Typical Office Space.
Typical Finishes.
Swedish Medical Center Learning Center - $350K
5,200 sq. ft. Teaching/Learning Facilities.
Typical Finishes.
Swedish Medical Center Cardiovascular Center - $350K
 
3 | P a g e  
 
3,400 sq. ft. Typical Office Space.
Typical Finishes.
Louis Vuitton - $650K
3,300 sq. ft. High End Retail Store Space High End Millwork Package.
High End FinishesandElectrical/Lighting/Security Package.
Solely responsible on the above projects for the following:
Developing Project Schedules for Bidding and Budgeting Purposes.
Negotiation of Contracts with Suppliers, Vendors, and Subcontractors.
Generating Scopes of Work for Subcontractors.
Developing Construction Schedules for Subcontractors and Suppliers.
Material Planning and Procurement.
Risk& Quality Management.
Reviewed and Coordinated Submittal Packages.
Supervised and Ran Subcontractors & Owners Progress Meetings.
Generated, Tracked, and Negotiated all PCO’s.
Assembled Monthly Requisitions to Owners.
Compiled Financial Information for In-House Upper Management Meetings.
Generated, Tracked, and Coordinated RFI’s.
DrawingDistribution/Organization.
Generating Meeting Minutes for Owner’s, Subcontractor, and MEP Meetings.
 
Project Manager – HITT Contracting, Inc. (Interior Construction Division)
Fairfax, VA – 10/01 to 1/06 – General Contractor
Morgan, Lewis & Bockius - $21M
330,000 sq. ft. of High End Office Space.
Installation of World’s Longest Solar-Powered Light Pipe (120 feet).
15,000 sq. ft. Employee Fitness Center.
45,000 sq. ft. Employee Cafeteria.
Arnold & Porter - $12.8M
115,000 sq. ft. High End Occupied Office Space.
High End Millwork Package.
High End Paint & Venetian Plaster Finishes.
High End Stone/Granite Finishes.
Sprint - $5.4M
89,000 sq. ft. Typical Office Space.
4,500 sq. ft. SCIF Security Space.
High End Electrical/Lighting Package.
High Mechanical Package.
Ivins, Phillips & Barker - $3.5M
21,000 sq. ft. High End Occupied Office Space.
Typical Finishes.
High End Millwork Package.
Georgetown University Law Center - $1.8M
11,000 sq. ft. of Cafeteria & Dining Space.
High End Amtico Flooring and Millwork Package.
High End Electrical/Lighting Package.
Lenkersdorfer Jewelry Store - $850K
5,500 sq. ft. High End Jewelry Store Space.
High End Millwork Package & Custom Finishes.
High End Electrical/Lighting/Security Package.
High End Marble Storefront/Flooring Package.
Solely responsible on the above projects for the following:
Developing Project Schedules for Bidding and Budgeting Purposes.
Negotiation of Contracts with Suppliers, Vendors, and Subcontractors.
Generating Scopes of Work for Subcontractors.
 
4 | P a g e  
 
Developing Construction Schedules for Subcontractors and Suppliers.
Material Planning and Procurement.
Risk& Quality Management.
Reviewed and Coordinated Submittal Packages.
Supervised and Ran Subcontractors & Owners Progress Meetings.
Generated, Tracked, and Negotiated all PCO’s.
Assembled Monthly Requisitions to Owners.
Compiled Financial Information for In-House Upper Management Meetings.
Generated, Tracked, and Coordinated RFI’s.
DrawingDistribution/Organization.
Generating Meeting Minutes for Owner’s, Subcontractor, and MEP Meetings.
 
Assistant Project Manager – HITT Contracting, Inc.
Fairfax, VA – 9/98 to 10/01 – General Contractor
Raytheon Reflections Building - $3.5M
125,000 sq. ft. New Office Construction.
High End Finishes.
Complete Mechanical & Electrical Package.
Seabury & Smith, Inc. - $2.1M
30,000 sq. ft. Interior Renovation Typical Office Finishes.
ESPN Zone - $8.5M
45,000 sq. ft. Interior Build-Out High End Finishes.
Coordination of Owners Subcontractors & Equipment.
Assisted Project Executive/Project Managers with all stages of construction.
Honors, Activities and Skills
Project Management Professional, PMP Certified.
OSHA 30 & CPR Certified.
Member of Association of General Contractors.
ABC Washington DC “Excellence in Construction” Award Winner for Interiors $35-$50/Sq. Ft.
ABC Washington DC “Excellence in Construction” Award Winner for Interiors $50-$75/Sq. Ft.
WBC Washington DC “Excellence in Craftsmanship” Award Winner for Interiors $50-$75/Sq. Ft.
AGC Washington DC “Washington Contractor Award.”
Washington, DC AIA Chapter Awards Program “Awards Of Excellence in Interior Architecture.”
Proficient with Prolog, Windows, Word, Excel, Access, Project, Timberline Estimating, Forefront,
Primavera Scheduling Products including P6, and Sure Trak.
Education
Pennsylvania State University, University Park, PA -- 8/93 to 5/98.
Bachelor of Science in Real Estate and International Business with a minor in Business Law.
 
References
Available Upon Request.

More Related Content

What's hot (19)

Resume 4-14-2015
Resume 4-14-2015Resume 4-14-2015
Resume 4-14-2015
 
Ariel Awayan CV updated
Ariel Awayan CV updatedAriel Awayan CV updated
Ariel Awayan CV updated
 
Dale Crowe Resume 2016
Dale Crowe Resume 2016Dale Crowe Resume 2016
Dale Crowe Resume 2016
 
Charles Riha
Charles RihaCharles Riha
Charles Riha
 
GOEFF STEBBINS RESUME
GOEFF STEBBINS RESUMEGOEFF STEBBINS RESUME
GOEFF STEBBINS RESUME
 
Ahart resume
Ahart resumeAhart resume
Ahart resume
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume
 
ahart resume
ahart resumeahart resume
ahart resume
 
Jack Oldrin RS2
Jack Oldrin RS2Jack Oldrin RS2
Jack Oldrin RS2
 
Eric Zagata 10-10-2015 Resume_
Eric Zagata 10-10-2015 Resume_Eric Zagata 10-10-2015 Resume_
Eric Zagata 10-10-2015 Resume_
 
C V
C VC V
C V
 
Revised Tom Nuc. Res. #1
Revised Tom Nuc. Res. #1Revised Tom Nuc. Res. #1
Revised Tom Nuc. Res. #1
 
Steve Clark CV 2015
Steve Clark CV 2015Steve Clark CV 2015
Steve Clark CV 2015
 
JWBRESUME
JWBRESUMEJWBRESUME
JWBRESUME
 
Dereque D.w-ref
Dereque D.w-refDereque D.w-ref
Dereque D.w-ref
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume
 
CV john Halpin 6.4latest 30-01-17
CV john Halpin 6.4latest 30-01-17CV john Halpin 6.4latest 30-01-17
CV john Halpin 6.4latest 30-01-17
 
stu's resume
stu's resumestu's resume
stu's resume
 
Dennis L Crews
Dennis L CrewsDennis L Crews
Dennis L Crews
 

Similar to Todd M. Pullman Resume

Mike Haller - Professional Resume
Mike Haller - Professional ResumeMike Haller - Professional Resume
Mike Haller - Professional Resume
Michael Haller
 
Phil Staib's Resume 2016
Phil Staib's Resume 2016Phil Staib's Resume 2016
Phil Staib's Resume 2016
Phil Staib
 
Resume of S Burch 11-2015
Resume of S Burch 11-2015Resume of S Burch 11-2015
Resume of S Burch 11-2015
Steve Burch MRC
 
SECS White Paper For Folders
SECS White Paper For FoldersSECS White Paper For Folders
SECS White Paper For Folders
Jessica Rearick
 
Resume John I Coffman AL 8-29-16
Resume John I Coffman AL 8-29-16Resume John I Coffman AL 8-29-16
Resume John I Coffman AL 8-29-16
John Coffman PMP
 
Rusty McEacern Project Manager
Rusty McEacern Project ManagerRusty McEacern Project Manager
Rusty McEacern Project Manager
Malcolm McEachern
 
Linkedin Summary
Linkedin SummaryLinkedin Summary
Linkedin Summary
Ilyas Ahsan
 
Callahan_Allen_Resume
Callahan_Allen_ResumeCallahan_Allen_Resume
Callahan_Allen_Resume
Al Callahan
 
1. Usman Ali CV Project Engineer Electrical.pdf
1. Usman Ali CV Project Engineer Electrical.pdf1. Usman Ali CV Project Engineer Electrical.pdf
1. Usman Ali CV Project Engineer Electrical.pdf
EmmanuelMatutu
 

Similar to Todd M. Pullman Resume (20)

Martin L Reetz Resume 092215
Martin L Reetz Resume 092215Martin L Reetz Resume 092215
Martin L Reetz Resume 092215
 
Mike Haller - Professional Resume
Mike Haller - Professional ResumeMike Haller - Professional Resume
Mike Haller - Professional Resume
 
Phil Staib's Resume 2016
Phil Staib's Resume 2016Phil Staib's Resume 2016
Phil Staib's Resume 2016
 
Kris anderson 2016 resume docx
Kris anderson 2016 resume docxKris anderson 2016 resume docx
Kris anderson 2016 resume docx
 
Resume Bob 6
Resume Bob 6Resume Bob 6
Resume Bob 6
 
Resume of S Burch 11-2015
Resume of S Burch 11-2015Resume of S Burch 11-2015
Resume of S Burch 11-2015
 
SECS White Paper For Folders
SECS White Paper For FoldersSECS White Paper For Folders
SECS White Paper For Folders
 
Resume John I Coffman AL 8-29-16
Resume John I Coffman AL 8-29-16Resume John I Coffman AL 8-29-16
Resume John I Coffman AL 8-29-16
 
Rusty McEacern Project Manager
Rusty McEacern Project ManagerRusty McEacern Project Manager
Rusty McEacern Project Manager
 
Linkedin Summary
Linkedin SummaryLinkedin Summary
Linkedin Summary
 
Res414
Res414Res414
Res414
 
KBE Laboratories 2011
KBE Laboratories 2011 KBE Laboratories 2011
KBE Laboratories 2011
 
Don Mac Donald CV
Don Mac Donald CVDon Mac Donald CV
Don Mac Donald CV
 
D Ford Resume 3 14 10
D Ford Resume 3 14 10D Ford Resume 3 14 10
D Ford Resume 3 14 10
 
Project Vietnam
Project VietnamProject Vietnam
Project Vietnam
 
2010 uci douglas hospital team platinum award by bdc
2010 uci douglas hospital team platinum award by bdc2010 uci douglas hospital team platinum award by bdc
2010 uci douglas hospital team platinum award by bdc
 
Centerre Brochure
Centerre BrochureCenterre Brochure
Centerre Brochure
 
Callahan_Allen_Resume
Callahan_Allen_ResumeCallahan_Allen_Resume
Callahan_Allen_Resume
 
Resume
ResumeResume
Resume
 
1. Usman Ali CV Project Engineer Electrical.pdf
1. Usman Ali CV Project Engineer Electrical.pdf1. Usman Ali CV Project Engineer Electrical.pdf
1. Usman Ali CV Project Engineer Electrical.pdf
 

Todd M. Pullman Resume

  • 1.   1 | P a g e     Todd M. Pullman 9026 13th Avenue NW Seattle, WA 98117 206-949-4513 toddpullman@hotmail.com   A highly talented and accomplished Construction Project and Site Management professional seeks to capitalize on current skills & experience, and move forward into an environment that will offer growth & opportunity.   Summary of Qualifications 17 + years of Project and Team Management Experience in Construction Industry. Competent in All Forms of Project Scheduling and Construction. Experienced with Cost Monitoring and Budget Management. Highly Adept at Directing Multiple Construction and Site Development Projects. Works Extremely Well with Clients to Resolve Issues, Perform Planning, and Ensure Satisfaction. Knowledgeable in Working with, and Managing Teams and Subcontractors. Excellent Communication and Motivation Skills. Strong Management and Interpersonal Skills.   ProfessionalExperience Project Manager – Johnson Controls, Inc. (Major Projects Division & Solutions Division) Bothell, WA – 5/09 to Present – DDC Controls Contractor Limited Area Production and Storage Complex (LAPSC) – Bangor Naval Base - $8M 100,000 Sq. Ft. of Office & Storage Facility. High End DDC Low Voltage Controls Package. Installation of Blast, Poppet, and Contamination Isolation Valves. Installation of DDC Controls to Integrate w/ Mechanical & Electrical Equipment. Port of Seattle - $1.5M Installation of new Credentialing System Software, including Fingerprinting and Background Check System. Installation of new Credentialing Hardware including Badge Printers, Fingerprint Readers, Cameras, Biometric Capture Units, Signature Pads, and Test Readers. Provide Software and Implementation Services that included Installation, Configuration, Legacy Data Migration, Interface Development, Reporting, and Training. King County WPTP Dewatering Replacement - $12.5M 25,000 Sq. Ft. of Sewage Facility. Installation of new Centrifuge Dewatering Equipment and associated Controls, Control Cabinets, and VFD’s. Installation of new Dewatering Conveyors. High End Mechanical & Electrical Package. Installation of new Structural Steel & Structural Platform including Stairs, Handrails, and Guardrails. Explosives Handling Wharf #2 - $1.5M 350,000 Sq. Ft. of Office & Storage Facility. High End DDC Low Voltage Controls Package. Installation of new DDC control cabinets, VFD’s, and Poppet Valves. Installation of DDC Controls to Integrate w/ Mechanical & Electrical Equipment. Solely responsible on the above projects for the following: Developing Project Schedules for Bidding and Budgeting Purposes. Negotiation of Contracts with Suppliers, Vendors, and Subcontractors. Generating Scopes of Work for Subcontractors. Developing Construction Schedules for Subcontractors and Suppliers.
  • 2.   2 | P a g e     Material Planning and Procurement. Risk& Quality Management. Reviewed and Coordinated Submittal Packages. Supervised and Ran Subcontractors & Owners Progress Meetings. Generated, Tracked, and Negotiated all PCO’s. Assembled Monthly Requisitions to Owners. Compiled Financial Information for In-House Upper Management Meetings. Generated, Tracked, and Coordinated RFI’s. DrawingDistribution/Organization. Generating Meeting Minutes for Owner’s, Subcontractor, and MEP Meetings. Project Manager – Lease Crutcher Lewis (SPD Division) Seattle, WA – 2/06 to 4/09 – General Contractor Joshua Green Building - $15.3M Preconstruction Services for Renovation of Historical Office Building 101,100 Sq. Ft. of Office & Retail Space. High End Mechanical & Electrical Package Structural. Steel & Seismic Upgrade. Installation of PGRG Cornice. Refurbish of Historical Windows & Stairwell. Swedish Medical Center Neurosurgery O.R. - $5.5M 19,000 sq. ft. of High End Clean Room Medical Space. High End Mechanical & Electrical Package. Structural Steel & Interstitial Space Installation. High End Millwork & Flooring Finishes. Coordination of Owner’s Medical Equipment Installation including Pole Star. Swedish Medical Center MRI - $2.0M 4,500 sq. ft. of High End Clean Room Medical Space. High End Mechanical & Electrical Package. High End Millwork & Flooring Finishes. Coordination of Owner’s Medical Equipment Installation including MRI. Swedish Medical Center CIS - $1.6M 25,000 sq. ft. Occupied Office Space. Demolition of existing Laboratory Space & Equipment. Typical Finishes. Swedish Medical Center Neuroscience Subspecialties - $1.5M 11,100 sq. ft. of High End Medical Clinic Space. High End Millwork & Flooring Finishes. Typical Office Space. Coordination of Owner’s Medical Equipment Installation. Group Health Cooperative MRI - $1.4M 3,750 sq. ft. of High End Clean Room Medical Space. High End Mechanical & Electrical Package. High End Millwork & Flooring Finishes. Coordination of Owner’s Medical Equipment Installation including MRI. Group Health Cooperative MOB Space - $1.3M 21,000 sq. ft. Typical Office Space. Typical Finishes. Swedish Medical Center IS Relocation - $750K 29,000 sq. ft. Typical Office Space. Typical Finishes. Swedish Medical Center Learning Center - $350K 5,200 sq. ft. Teaching/Learning Facilities. Typical Finishes. Swedish Medical Center Cardiovascular Center - $350K
  • 3.   3 | P a g e     3,400 sq. ft. Typical Office Space. Typical Finishes. Louis Vuitton - $650K 3,300 sq. ft. High End Retail Store Space High End Millwork Package. High End FinishesandElectrical/Lighting/Security Package. Solely responsible on the above projects for the following: Developing Project Schedules for Bidding and Budgeting Purposes. Negotiation of Contracts with Suppliers, Vendors, and Subcontractors. Generating Scopes of Work for Subcontractors. Developing Construction Schedules for Subcontractors and Suppliers. Material Planning and Procurement. Risk& Quality Management. Reviewed and Coordinated Submittal Packages. Supervised and Ran Subcontractors & Owners Progress Meetings. Generated, Tracked, and Negotiated all PCO’s. Assembled Monthly Requisitions to Owners. Compiled Financial Information for In-House Upper Management Meetings. Generated, Tracked, and Coordinated RFI’s. DrawingDistribution/Organization. Generating Meeting Minutes for Owner’s, Subcontractor, and MEP Meetings.   Project Manager – HITT Contracting, Inc. (Interior Construction Division) Fairfax, VA – 10/01 to 1/06 – General Contractor Morgan, Lewis & Bockius - $21M 330,000 sq. ft. of High End Office Space. Installation of World’s Longest Solar-Powered Light Pipe (120 feet). 15,000 sq. ft. Employee Fitness Center. 45,000 sq. ft. Employee Cafeteria. Arnold & Porter - $12.8M 115,000 sq. ft. High End Occupied Office Space. High End Millwork Package. High End Paint & Venetian Plaster Finishes. High End Stone/Granite Finishes. Sprint - $5.4M 89,000 sq. ft. Typical Office Space. 4,500 sq. ft. SCIF Security Space. High End Electrical/Lighting Package. High Mechanical Package. Ivins, Phillips & Barker - $3.5M 21,000 sq. ft. High End Occupied Office Space. Typical Finishes. High End Millwork Package. Georgetown University Law Center - $1.8M 11,000 sq. ft. of Cafeteria & Dining Space. High End Amtico Flooring and Millwork Package. High End Electrical/Lighting Package. Lenkersdorfer Jewelry Store - $850K 5,500 sq. ft. High End Jewelry Store Space. High End Millwork Package & Custom Finishes. High End Electrical/Lighting/Security Package. High End Marble Storefront/Flooring Package. Solely responsible on the above projects for the following: Developing Project Schedules for Bidding and Budgeting Purposes. Negotiation of Contracts with Suppliers, Vendors, and Subcontractors. Generating Scopes of Work for Subcontractors.
  • 4.   4 | P a g e     Developing Construction Schedules for Subcontractors and Suppliers. Material Planning and Procurement. Risk& Quality Management. Reviewed and Coordinated Submittal Packages. Supervised and Ran Subcontractors & Owners Progress Meetings. Generated, Tracked, and Negotiated all PCO’s. Assembled Monthly Requisitions to Owners. Compiled Financial Information for In-House Upper Management Meetings. Generated, Tracked, and Coordinated RFI’s. DrawingDistribution/Organization. Generating Meeting Minutes for Owner’s, Subcontractor, and MEP Meetings.   Assistant Project Manager – HITT Contracting, Inc. Fairfax, VA – 9/98 to 10/01 – General Contractor Raytheon Reflections Building - $3.5M 125,000 sq. ft. New Office Construction. High End Finishes. Complete Mechanical & Electrical Package. Seabury & Smith, Inc. - $2.1M 30,000 sq. ft. Interior Renovation Typical Office Finishes. ESPN Zone - $8.5M 45,000 sq. ft. Interior Build-Out High End Finishes. Coordination of Owners Subcontractors & Equipment. Assisted Project Executive/Project Managers with all stages of construction. Honors, Activities and Skills Project Management Professional, PMP Certified. OSHA 30 & CPR Certified. Member of Association of General Contractors. ABC Washington DC “Excellence in Construction” Award Winner for Interiors $35-$50/Sq. Ft. ABC Washington DC “Excellence in Construction” Award Winner for Interiors $50-$75/Sq. Ft. WBC Washington DC “Excellence in Craftsmanship” Award Winner for Interiors $50-$75/Sq. Ft. AGC Washington DC “Washington Contractor Award.” Washington, DC AIA Chapter Awards Program “Awards Of Excellence in Interior Architecture.” Proficient with Prolog, Windows, Word, Excel, Access, Project, Timberline Estimating, Forefront, Primavera Scheduling Products including P6, and Sure Trak. Education Pennsylvania State University, University Park, PA -- 8/93 to 5/98. Bachelor of Science in Real Estate and International Business with a minor in Business Law.   References Available Upon Request.