Southern Engineering
Consulting Services
“SECS”
Plan for Project Management Services
About SECS and Project Services
SECS LLC, is the leading independent provider of comprehensive services,
infrastructure upgrades, project management solutions, energy efficiency, and
renewable energy solutions for facilities throughout North America and internationally.
“SECS” begins every engagement with an initial “Kickoff Meeting” to establish a working
relationship with the client, discuss and agree on the scope of the engagement including
project control processes and requirements (status reporting, issues management, etc.),
and address project logistics and communication issues.
In addition to the kickoff meeting, program reviews are scheduled on a regular
basis. These point meetings are designed to ensure client satisfaction of overall
engagement quality. They allow us the opportunity to provide our clients with a status
on accomplishments during the previous period, planned activities, budget and spend
rate, issues, recommendations, advice, and insight.
Our consultants are skilled at rapidly analyzing your situation, determining the right mix
of high-value, high-impact solutions, and quickly executing the best solutions to deliver
measurable and sustainable results.
As a professional project management firm, “SECS” is committed to quality. Our
offerings are continually being refined and improved as a result of our experience on all
of our client engagements.
We leverage our research to consistently integrate industry best practice quality
standards and trends. Our consultants come equipped with the knowledge, experience,
vertical industry depth, and tools associated with the specific offering being delivered.
“SECS” has completed projects from simple process equipment installations to
complete facility builds.
A lot of our work has been based off of EEP services and audits. However, we are fully
capable of process equipment installations and building improvements. We believe any
good CAPEX project should be based off of good data and an ROI (return on
investment) projection. With that simple philosophy we have successfully completed
several compressed air system upgrades, Boiler system upgrades and process
improvements, lighting based strictly on data and validating that data.
We are also firm believers in the 5 PMI Steps:
 Project Initiation
 Project Planning
 Project Execution
 Project Monitoring and Controls
 Project Closure and Lessons Learned
A few “SECS” Project Completions to date include:
 Bimbo Bakeries (George Weston Foods)- new Thomas’s English Muffin Facility 1
million square feet
 SPF- Diana 2 new warehouses and research facility, boiler house
 SPF Diana- new plant Guyman, Oklahoma with process equipment
 Schwan Foods- multiple plants new air compressor rooms, energy alignments,
boiler rooms, plant surveys for process improvements
 Schwan Foods- product spiral and freezer rebuilds and evaluations
 Schwan Foods – complete packaging lines
 Northeast Foods- Spiral rebuilding management
 Industrial Thermal Infrared Analysis
 Vibration Analysis
 Demand Management Analysis
 Oven profiles and evaluations, installations
 Silo installations, liquid and dry ingredient
 Ingredient transfer systems
 Lighting upgrades with Capex and rebates
 Refrigeration control systems with full automation services via wonderware
overlays
 Numerous process equipment installations from mixers to cooling conveyors and
packaging equipment
 Site Contract Administration
 Project Development Management
 Solar Support Capabilities
 Plant Construction and Buildings with Designs
 Process and ancillary equipment installations and audits
 Maintenance and downtime improvements CMMS systems
 Process and production improvements (CAPEX Support)
 Real Time Monitoring of Critical Assets
 Executive to Turnkey Project Management
Project examples completed over past several years:
Manufacturing Plants and Industrial Building Projects:
 SPF North America- 50,000 sq. ft. Pet Food facility and process equipment,
Guyman, Oklahoma 5.8 million dollars
 SPF North America- 10,000 sq. ft. warehouse and equipment Hodges, Sc.
 SPF North America- 2,000 sq. ft. storage warehouse and equipment Hodges, Sc.
 SPF North America- 800 sq. ft. Cattery Building and equipment Hodges, Sc., 1.4
million
 SPF North America- 2 – 200’ liquid silo’s installation
 George Weston Bakeries- 10,000 production facility addition Orlando, Fla.,
addition and equipment
 George Weston Bakeries- 600,00 Sq. Ft. Thomas’s English muffin plant Elkhart,
Indiana-67million dollar project, plant and equipment purchased purveyed and
installed
 George Weston Bakeries- 8 bread and roll cooler installations
 George Weston Bakeries- 6 bread and roll oven rebuilds
 George Weston Bakeries- 2- muffin oven rebuilds
 20 plus years of Building and equipment installations through career
Energy Savings Projects:
 SPF North America – Lighting upgrades through entire warehouse 40,000 Sq. ft.
storage facility- mercury vapor lighting technology switched and replaced with
T5HO lighting upgrades. Cost $57,000.00 payback was figured for 3 yrs.
 SPF North America- Office area lighting upgrades T-12 standards to T8
replacements
 SPF North America- Installed two York Shipley boilers with software that
regulates the boilers to run at 75% capacity and alternate every three days from
master to slave
 SPF North America- Dedert evaporator equipment installation- decreased drying
time and shortened gas dryer run time. $1,800,000.00 purchase price with
ancillary equipment payback was figured for 5 yrs.
 SPF North America- switched plant over to time of use Duke Power rate to save
power costs. 7/24 operation with savings of $23,000.00 in first year
 George Weston Bakeries- Hydraulic fluid driven conveyors and spiral bread and
roll coolers converted to VFD driven. Immediate payback in energy and
dependability.
 George Weston Bakeries- VFD conversions on all motors in entire Easton, pa.
facility
 George Weston Bakeries- cooling towers converted to VFD drives
 George Weston Bakeries – sub metering installed to track energy usage and
curve high demand
 George Weston Bakeries- infrared and vibration analysis throughout facility,
electrical panels and equipment
 Holsum ButterKrust- HVAC upgrades mandated by CFR’s R-12 to 417a entire
facility and leaks repaired
 Schwan Foods- Lighting upgrades
 Compressed air sequencing and optimization
 Flour and ingredient systems installations
"SECS" Approach to Predictive Maintenance
 We now offer full service Industrial Thermal Infrared Analysis to our customers for
electrical and HVAC inspections. Get those 480 Volt panels inspected regularly
and reduce your reactive maintenance downtime. Thermal imaging is the next
wave of new technology that we can offer our customer base.
 Vibration analysis is another full service offering to our customers. Reactive
maintenance to proactive maintenance lower that downtime. Appointments are
being scheduled now!
“SECS” Approach To PMO
The design and implementation services consist of three distinct tasks, including:
Engineering & Design:
SECS’ design team will take the accepted project selected by your company for
implementation and create a final design. This will include design sketches as may
be required to convey the scope of the project, equipment selections, and scopes of
work sufficient to provide investment-grade cost estimates. All design documents will
be submitted to your company for review and approval prior to ordering of equipment
and beginning construction.
Construction Management & On-site Supervision:
Following the results created through the design and engineering effort, SECS will
competitively price all equipment; competitively solicit and hire local, qualified
subcontractors; and construct and commission the project. A minimum of three bids
for equipment and installation will be solicited where possible. SECS will assure
successful project implementation by maintaining an open and regular line of
communications with the plant, providing careful coordination, and through on-site
construction supervision. An SECS project manager will be assigned to each
individual project and be the prime point of contact with your company for all local
construction activities. The site-specific project manager’s role is to coordinate and
communicate all implementation efforts from design, through procurement and
construction, to commissioning and final turnover to your company at a project level,
while the program manager will have overall responsibility for delivering a timely and
uniform product to your company across all plants and communicating and reporting
to your company on a corporate or programmatic level on a regular basis.
Commissioning/M&V/Training/Closeout:
To assure that the installed measures meet the intent of the customer and design
documents, all installed equipment and or buildings will be fully commissioned by
SECS’ engineers, with support as necessary by the installing subcontractors and
equipment vendors. Depending on the measures, this might also entail pre- and
post- retrofit measurement of performance parameters (e.g. motor wattage, boiler
efficiency) above and beyond the validation services provided by data collection
services to confirm any projected energy savings. SECS will also train local facility
operations staff as necessary in the proper use and maintenance of the installed
equipment to assure a seamless turnover to your company and project closeout.
The cost for the design and installation services will be structured on an hourly or
package cost-plus basis, and shall include all project direct costs, namely, materials,
subcontracted labor, and bonding, if required; SECS’ professional services, including,
but not limited to, engineering, project management, commissioning, measurement and
verification, energy management and training, priced at the labor rates negotiated, plus
travel expenses, per diem and other reimbursable expenses. The labor rates negotiated
are straight rates and we can provide services on a per project basis as needed. Travel
expenses are billed outside labor rates Net 30 days where as possible and or agreed.
Project reimbursable expenses will be charged only as agreed by your company.
“SECS” Approach To Energy
SECS integrated products and services are delivered using an innovative process that
maximizes energy and carbon reductions through financially compelling solutions.
Whether SECS is designing a refrigeration controls system for a dairy processing
facility, constructing a solar system thru its partnerships for a medical products
manufacturer, or implementing an enterprise-wide industrial energy management
program for a Fortune 500 company, SECS delivers the right information – at the right
time – to enable decisions that improve energy efficiency, reduce cost, and achieve
sustainability goals.
Contact Information
Roger Rearick
Owner
Email address: rrearick@southernengineeringconsulting.net
Phone Number(s):
Cell: 1-570-898-5615
Office:1-864-229-2956
Jessica Rearick
VP ProjectDevelopmentand Sales
Email address: jrearick@southernengineeringconsulting.net
Phone Number(s):
Cell: 1-570-259-4556
Office:864-229-2956

More Related Content

What's hot

John Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Snyder
 
Latest_resume_10.9.14
Latest_resume_10.9.14Latest_resume_10.9.14
Latest_resume_10.9.14dnag12
 
Engineering & Project Management
Engineering & Project ManagementEngineering & Project Management
Engineering & Project ManagementJames Gilmore
 
Greg Stephenson Resume 12-2015
Greg Stephenson Resume 12-2015Greg Stephenson Resume 12-2015
Greg Stephenson Resume 12-2015Greg Stephenson
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume Arun Das
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq Ahmad
 
Carmel Process Solutions Presentation
Carmel Process Solutions PresentationCarmel Process Solutions Presentation
Carmel Process Solutions PresentationDonaldAudia
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume Arun Das
 
MDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMohammed Kaleemuddin
 
Steves Resume Upgrade 2
Steves Resume Upgrade 2Steves Resume Upgrade 2
Steves Resume Upgrade 2Steve McMillan
 

What's hot (19)

Geoffrey Rowling CV
Geoffrey Rowling CVGeoffrey Rowling CV
Geoffrey Rowling CV
 
John Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resume
 
Latest_resume_10.9.14
Latest_resume_10.9.14Latest_resume_10.9.14
Latest_resume_10.9.14
 
Engineering & Project Management
Engineering & Project ManagementEngineering & Project Management
Engineering & Project Management
 
vijins new-11-2016
vijins new-11-2016vijins new-11-2016
vijins new-11-2016
 
Greg Stephenson Resume 12-2015
Greg Stephenson Resume 12-2015Greg Stephenson Resume 12-2015
Greg Stephenson Resume 12-2015
 
cv 2016
cv 2016cv 2016
cv 2016
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume
 
Marshall Steve (pm)
Marshall Steve (pm)Marshall Steve (pm)
Marshall Steve (pm)
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)
 
Leacock steven resume
Leacock steven   resumeLeacock steven   resume
Leacock steven resume
 
Carmel Process Solutions Presentation
Carmel Process Solutions PresentationCarmel Process Solutions Presentation
Carmel Process Solutions Presentation
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume
 
MDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year Experience
 
Steve Wonnacott Resume
Steve Wonnacott ResumeSteve Wonnacott Resume
Steve Wonnacott Resume
 
Giridhar
GiridharGiridhar
Giridhar
 
Sunderland Resume
Sunderland ResumeSunderland Resume
Sunderland Resume
 
David Lawrence11
David Lawrence11David Lawrence11
David Lawrence11
 
Steves Resume Upgrade 2
Steves Resume Upgrade 2Steves Resume Upgrade 2
Steves Resume Upgrade 2
 

Viewers also liked

Resume_Prakash_Experienced_2yrs_Testing
Resume_Prakash_Experienced_2yrs_TestingResume_Prakash_Experienced_2yrs_Testing
Resume_Prakash_Experienced_2yrs_TestingPRAKASH N
 
Ingeniería egipcia rafael yepez
Ingeniería egipcia rafael yepezIngeniería egipcia rafael yepez
Ingeniería egipcia rafael yepezrafael yepez
 
089 CC2011 Crete (2011) Rail Straightness Control in Service
089 CC2011 Crete (2011) Rail Straightness Control in Service089 CC2011 Crete (2011) Rail Straightness Control in Service
089 CC2011 Crete (2011) Rail Straightness Control in ServiceAndrea Bracciali
 
Assignment 26 – individual pitch
Assignment 26 – individual pitchAssignment 26 – individual pitch
Assignment 26 – individual pitch013862
 
Exquisite Academy presentation
Exquisite Academy presentationExquisite Academy presentation
Exquisite Academy presentationMihaela Roșcov
 
презентация семинар доу
презентация семинар доупрезентация семинар доу
презентация семинар доуLary Maty
 
Natasha Jansen Certificates
Natasha Jansen CertificatesNatasha Jansen Certificates
Natasha Jansen CertificatesNatasha Jansen
 

Viewers also liked (13)

Resume_Prakash_Experienced_2yrs_Testing
Resume_Prakash_Experienced_2yrs_TestingResume_Prakash_Experienced_2yrs_Testing
Resume_Prakash_Experienced_2yrs_Testing
 
Ingeniería egipcia rafael yepez
Ingeniería egipcia rafael yepezIngeniería egipcia rafael yepez
Ingeniería egipcia rafael yepez
 
089 CC2011 Crete (2011) Rail Straightness Control in Service
089 CC2011 Crete (2011) Rail Straightness Control in Service089 CC2011 Crete (2011) Rail Straightness Control in Service
089 CC2011 Crete (2011) Rail Straightness Control in Service
 
Assignment 26 – individual pitch
Assignment 26 – individual pitchAssignment 26 – individual pitch
Assignment 26 – individual pitch
 
Exquisite Academy presentation
Exquisite Academy presentationExquisite Academy presentation
Exquisite Academy presentation
 
Ola-Gad
Ola-GadOla-Gad
Ola-Gad
 
презентация семинар доу
презентация семинар доупрезентация семинар доу
презентация семинар доу
 
Barriers of listening
Barriers of listeningBarriers of listening
Barriers of listening
 
Book review
Book reviewBook review
Book review
 
Demonetization
DemonetizationDemonetization
Demonetization
 
Moderadores por ponencias CVME 2013
Moderadores por ponencias CVME 2013Moderadores por ponencias CVME 2013
Moderadores por ponencias CVME 2013
 
Natasha Jansen Certificates
Natasha Jansen CertificatesNatasha Jansen Certificates
Natasha Jansen Certificates
 
Current microbiology
Current microbiologyCurrent microbiology
Current microbiology
 

Similar to SECS White Paper For Folders

Energy Innovators Powerpoint Tmays
Energy Innovators Powerpoint TmaysEnergy Innovators Powerpoint Tmays
Energy Innovators Powerpoint Tmaysguest9c9565
 
John P Chan II
John P Chan IIJohn P Chan II
John P Chan IIjohn chan
 
James a.hinkle resume quality manufacturing 1976 - 2016
James a.hinkle resume quality   manufacturing 1976 - 2016James a.hinkle resume quality   manufacturing 1976 - 2016
James a.hinkle resume quality manufacturing 1976 - 2016James Hinkle
 
Resume - Steve Poulter (Document Control)
Resume - Steve Poulter (Document Control)Resume - Steve Poulter (Document Control)
Resume - Steve Poulter (Document Control)Steven Poulter
 
Energy Innovators Powerpoint Tmays
Energy Innovators Powerpoint TmaysEnergy Innovators Powerpoint Tmays
Energy Innovators Powerpoint TmaysTmays
 
Resume John I Coffman AL 8-29-16
Resume John I Coffman AL 8-29-16Resume John I Coffman AL 8-29-16
Resume John I Coffman AL 8-29-16John Coffman PMP
 
Interiors & Special Projects – Interior Renovations, Infrastructure Repairs, ...
Interiors & Special Projects – Interior Renovations, Infrastructure Repairs, ...Interiors & Special Projects – Interior Renovations, Infrastructure Repairs, ...
Interiors & Special Projects – Interior Renovations, Infrastructure Repairs, ...McKenney's Inc
 
w-o summary 10-27-15
w-o summary 10-27-15w-o summary 10-27-15
w-o summary 10-27-15Bill Moran
 
Current Capabilities Presentation 050416
Current Capabilities Presentation 050416Current Capabilities Presentation 050416
Current Capabilities Presentation 050416Roger Boyette
 
Nilesh More_Project Manager
Nilesh More_Project ManagerNilesh More_Project Manager
Nilesh More_Project ManagerNilesh More
 
Andrew taylor cv march 2016.doc
Andrew taylor cv march 2016.docAndrew taylor cv march 2016.doc
Andrew taylor cv march 2016.docAndy Taylor
 
CV_Alana Miles-2015-
CV_Alana Miles-2015-CV_Alana Miles-2015-
CV_Alana Miles-2015-Alana Miles
 
McKenney’s, Inc. Interiors & Special Projects - Solving Renovation Needs Quic...
McKenney’s, Inc. Interiors & Special Projects - Solving Renovation Needs Quic...McKenney’s, Inc. Interiors & Special Projects - Solving Renovation Needs Quic...
McKenney’s, Inc. Interiors & Special Projects - Solving Renovation Needs Quic...McKenney's Inc
 

Similar to SECS White Paper For Folders (20)

CORPBROCHURE FINAL
CORPBROCHURE FINALCORPBROCHURE FINAL
CORPBROCHURE FINAL
 
Maverick consulting
Maverick consulting Maverick consulting
Maverick consulting
 
SPEC Process Engineering&Construction
SPEC Process Engineering&ConstructionSPEC Process Engineering&Construction
SPEC Process Engineering&Construction
 
JMK Resume 2
JMK Resume 2JMK Resume 2
JMK Resume 2
 
CV
CVCV
CV
 
Energy Innovators Powerpoint Tmays
Energy Innovators Powerpoint TmaysEnergy Innovators Powerpoint Tmays
Energy Innovators Powerpoint Tmays
 
John P Chan II
John P Chan IIJohn P Chan II
John P Chan II
 
James a.hinkle resume quality manufacturing 1976 - 2016
James a.hinkle resume quality   manufacturing 1976 - 2016James a.hinkle resume quality   manufacturing 1976 - 2016
James a.hinkle resume quality manufacturing 1976 - 2016
 
Resume - Steve Poulter (Document Control)
Resume - Steve Poulter (Document Control)Resume - Steve Poulter (Document Control)
Resume - Steve Poulter (Document Control)
 
Energy Innovators Powerpoint Tmays
Energy Innovators Powerpoint TmaysEnergy Innovators Powerpoint Tmays
Energy Innovators Powerpoint Tmays
 
Resume John I Coffman AL 8-29-16
Resume John I Coffman AL 8-29-16Resume John I Coffman AL 8-29-16
Resume John I Coffman AL 8-29-16
 
Centerre Brochure
Centerre BrochureCenterre Brochure
Centerre Brochure
 
Interiors & Special Projects – Interior Renovations, Infrastructure Repairs, ...
Interiors & Special Projects – Interior Renovations, Infrastructure Repairs, ...Interiors & Special Projects – Interior Renovations, Infrastructure Repairs, ...
Interiors & Special Projects – Interior Renovations, Infrastructure Repairs, ...
 
The Projects
The ProjectsThe Projects
The Projects
 
w-o summary 10-27-15
w-o summary 10-27-15w-o summary 10-27-15
w-o summary 10-27-15
 
Current Capabilities Presentation 050416
Current Capabilities Presentation 050416Current Capabilities Presentation 050416
Current Capabilities Presentation 050416
 
Nilesh More_Project Manager
Nilesh More_Project ManagerNilesh More_Project Manager
Nilesh More_Project Manager
 
Andrew taylor cv march 2016.doc
Andrew taylor cv march 2016.docAndrew taylor cv march 2016.doc
Andrew taylor cv march 2016.doc
 
CV_Alana Miles-2015-
CV_Alana Miles-2015-CV_Alana Miles-2015-
CV_Alana Miles-2015-
 
McKenney’s, Inc. Interiors & Special Projects - Solving Renovation Needs Quic...
McKenney’s, Inc. Interiors & Special Projects - Solving Renovation Needs Quic...McKenney’s, Inc. Interiors & Special Projects - Solving Renovation Needs Quic...
McKenney’s, Inc. Interiors & Special Projects - Solving Renovation Needs Quic...
 

SECS White Paper For Folders

  • 2. About SECS and Project Services SECS LLC, is the leading independent provider of comprehensive services, infrastructure upgrades, project management solutions, energy efficiency, and renewable energy solutions for facilities throughout North America and internationally. “SECS” begins every engagement with an initial “Kickoff Meeting” to establish a working relationship with the client, discuss and agree on the scope of the engagement including project control processes and requirements (status reporting, issues management, etc.), and address project logistics and communication issues. In addition to the kickoff meeting, program reviews are scheduled on a regular basis. These point meetings are designed to ensure client satisfaction of overall engagement quality. They allow us the opportunity to provide our clients with a status on accomplishments during the previous period, planned activities, budget and spend rate, issues, recommendations, advice, and insight. Our consultants are skilled at rapidly analyzing your situation, determining the right mix of high-value, high-impact solutions, and quickly executing the best solutions to deliver measurable and sustainable results. As a professional project management firm, “SECS” is committed to quality. Our offerings are continually being refined and improved as a result of our experience on all of our client engagements. We leverage our research to consistently integrate industry best practice quality standards and trends. Our consultants come equipped with the knowledge, experience, vertical industry depth, and tools associated with the specific offering being delivered. “SECS” has completed projects from simple process equipment installations to complete facility builds. A lot of our work has been based off of EEP services and audits. However, we are fully capable of process equipment installations and building improvements. We believe any good CAPEX project should be based off of good data and an ROI (return on investment) projection. With that simple philosophy we have successfully completed several compressed air system upgrades, Boiler system upgrades and process improvements, lighting based strictly on data and validating that data. We are also firm believers in the 5 PMI Steps:  Project Initiation  Project Planning  Project Execution  Project Monitoring and Controls  Project Closure and Lessons Learned
  • 3. A few “SECS” Project Completions to date include:  Bimbo Bakeries (George Weston Foods)- new Thomas’s English Muffin Facility 1 million square feet  SPF- Diana 2 new warehouses and research facility, boiler house  SPF Diana- new plant Guyman, Oklahoma with process equipment  Schwan Foods- multiple plants new air compressor rooms, energy alignments, boiler rooms, plant surveys for process improvements  Schwan Foods- product spiral and freezer rebuilds and evaluations  Schwan Foods – complete packaging lines  Northeast Foods- Spiral rebuilding management  Industrial Thermal Infrared Analysis  Vibration Analysis  Demand Management Analysis  Oven profiles and evaluations, installations  Silo installations, liquid and dry ingredient  Ingredient transfer systems  Lighting upgrades with Capex and rebates  Refrigeration control systems with full automation services via wonderware overlays  Numerous process equipment installations from mixers to cooling conveyors and packaging equipment  Site Contract Administration  Project Development Management  Solar Support Capabilities  Plant Construction and Buildings with Designs  Process and ancillary equipment installations and audits  Maintenance and downtime improvements CMMS systems  Process and production improvements (CAPEX Support)  Real Time Monitoring of Critical Assets  Executive to Turnkey Project Management
  • 4. Project examples completed over past several years: Manufacturing Plants and Industrial Building Projects:  SPF North America- 50,000 sq. ft. Pet Food facility and process equipment, Guyman, Oklahoma 5.8 million dollars  SPF North America- 10,000 sq. ft. warehouse and equipment Hodges, Sc.  SPF North America- 2,000 sq. ft. storage warehouse and equipment Hodges, Sc.  SPF North America- 800 sq. ft. Cattery Building and equipment Hodges, Sc., 1.4 million  SPF North America- 2 – 200’ liquid silo’s installation  George Weston Bakeries- 10,000 production facility addition Orlando, Fla., addition and equipment  George Weston Bakeries- 600,00 Sq. Ft. Thomas’s English muffin plant Elkhart, Indiana-67million dollar project, plant and equipment purchased purveyed and installed  George Weston Bakeries- 8 bread and roll cooler installations  George Weston Bakeries- 6 bread and roll oven rebuilds  George Weston Bakeries- 2- muffin oven rebuilds  20 plus years of Building and equipment installations through career Energy Savings Projects:  SPF North America – Lighting upgrades through entire warehouse 40,000 Sq. ft. storage facility- mercury vapor lighting technology switched and replaced with T5HO lighting upgrades. Cost $57,000.00 payback was figured for 3 yrs.  SPF North America- Office area lighting upgrades T-12 standards to T8 replacements  SPF North America- Installed two York Shipley boilers with software that regulates the boilers to run at 75% capacity and alternate every three days from master to slave
  • 5.  SPF North America- Dedert evaporator equipment installation- decreased drying time and shortened gas dryer run time. $1,800,000.00 purchase price with ancillary equipment payback was figured for 5 yrs.  SPF North America- switched plant over to time of use Duke Power rate to save power costs. 7/24 operation with savings of $23,000.00 in first year  George Weston Bakeries- Hydraulic fluid driven conveyors and spiral bread and roll coolers converted to VFD driven. Immediate payback in energy and dependability.  George Weston Bakeries- VFD conversions on all motors in entire Easton, pa. facility  George Weston Bakeries- cooling towers converted to VFD drives  George Weston Bakeries – sub metering installed to track energy usage and curve high demand  George Weston Bakeries- infrared and vibration analysis throughout facility, electrical panels and equipment  Holsum ButterKrust- HVAC upgrades mandated by CFR’s R-12 to 417a entire facility and leaks repaired  Schwan Foods- Lighting upgrades  Compressed air sequencing and optimization  Flour and ingredient systems installations "SECS" Approach to Predictive Maintenance  We now offer full service Industrial Thermal Infrared Analysis to our customers for electrical and HVAC inspections. Get those 480 Volt panels inspected regularly and reduce your reactive maintenance downtime. Thermal imaging is the next wave of new technology that we can offer our customer base.  Vibration analysis is another full service offering to our customers. Reactive maintenance to proactive maintenance lower that downtime. Appointments are being scheduled now!
  • 6. “SECS” Approach To PMO The design and implementation services consist of three distinct tasks, including: Engineering & Design: SECS’ design team will take the accepted project selected by your company for implementation and create a final design. This will include design sketches as may be required to convey the scope of the project, equipment selections, and scopes of work sufficient to provide investment-grade cost estimates. All design documents will be submitted to your company for review and approval prior to ordering of equipment and beginning construction. Construction Management & On-site Supervision: Following the results created through the design and engineering effort, SECS will competitively price all equipment; competitively solicit and hire local, qualified subcontractors; and construct and commission the project. A minimum of three bids for equipment and installation will be solicited where possible. SECS will assure successful project implementation by maintaining an open and regular line of communications with the plant, providing careful coordination, and through on-site construction supervision. An SECS project manager will be assigned to each individual project and be the prime point of contact with your company for all local construction activities. The site-specific project manager’s role is to coordinate and communicate all implementation efforts from design, through procurement and construction, to commissioning and final turnover to your company at a project level, while the program manager will have overall responsibility for delivering a timely and uniform product to your company across all plants and communicating and reporting to your company on a corporate or programmatic level on a regular basis. Commissioning/M&V/Training/Closeout: To assure that the installed measures meet the intent of the customer and design documents, all installed equipment and or buildings will be fully commissioned by SECS’ engineers, with support as necessary by the installing subcontractors and equipment vendors. Depending on the measures, this might also entail pre- and post- retrofit measurement of performance parameters (e.g. motor wattage, boiler efficiency) above and beyond the validation services provided by data collection services to confirm any projected energy savings. SECS will also train local facility operations staff as necessary in the proper use and maintenance of the installed equipment to assure a seamless turnover to your company and project closeout.
  • 7. The cost for the design and installation services will be structured on an hourly or package cost-plus basis, and shall include all project direct costs, namely, materials, subcontracted labor, and bonding, if required; SECS’ professional services, including, but not limited to, engineering, project management, commissioning, measurement and verification, energy management and training, priced at the labor rates negotiated, plus travel expenses, per diem and other reimbursable expenses. The labor rates negotiated are straight rates and we can provide services on a per project basis as needed. Travel expenses are billed outside labor rates Net 30 days where as possible and or agreed. Project reimbursable expenses will be charged only as agreed by your company. “SECS” Approach To Energy SECS integrated products and services are delivered using an innovative process that maximizes energy and carbon reductions through financially compelling solutions. Whether SECS is designing a refrigeration controls system for a dairy processing facility, constructing a solar system thru its partnerships for a medical products manufacturer, or implementing an enterprise-wide industrial energy management program for a Fortune 500 company, SECS delivers the right information – at the right time – to enable decisions that improve energy efficiency, reduce cost, and achieve sustainability goals.
  • 8. Contact Information Roger Rearick Owner Email address: rrearick@southernengineeringconsulting.net Phone Number(s): Cell: 1-570-898-5615 Office:1-864-229-2956 Jessica Rearick VP ProjectDevelopmentand Sales Email address: jrearick@southernengineeringconsulting.net Phone Number(s): Cell: 1-570-259-4556 Office:864-229-2956