SlideShare a Scribd company logo
1 of 3
Download to read offline
1 of 3
Mohammad. A. Abdullatif
SUMMERY:
12 Years of progressive experience in Electrical Engineering; Participated in Variety of MEP
construction Projects including Housing building, high-rise buildings, commercial buildings &special
projects (Airbase, Hotels …). Assignments varied from design, site supervision, follow up and
coordination of technical and commercial issues at various stages.
EXPERINCE:
APR 2012 up to Date: MEP-Project Manager, JV (SACC-Thermo L.L.C)
Five Star Hotel (Anjum), Abdullatif Jameel Real Estate Inv Co –Makkah, Saudi Arabia
Manage All Remaining MEP Installations at the Building including of the followings:
• Installation of All HVAC systems including , Chilled water pumps 16 Nos., Chilled water
piping systems and Ducting works, AHU’s , FCU’s , Fan’s
• Installation of Fire Fighting systems including sprinklers , CO2 and FM200 systems
• Installation of Plumbing systems include the Drainage and water supply pipes , water Tanks,
submersible pumps , gray water systems , boilers system .
• Installation of Electrical works including the lighting and Power, LC, Fire Alarm, UPS systems,
and Main Electrical rooms, LV and MV cables.
• Resolve problems as they are anticipated or as they arise at own level, guide direct reports
to resolve problems proactively and/or promptly to ensure adherence to project plan and
avoid increase in costs.
• Oversee documentation and progress monitoring data and drawings required for required
reporting.
• Liaise and attend regular site meetings with the client and the project Management /consultant
to maintain a healthy relationship throughout the contract’s lifetime
• Supervise and coordinate the activities of all Project Engineers in order to avoid rework,
conflicts, delays or undue costs.
• Manage all aspects of labor requirements for the project including the initial labor forecast as
well as weekly labor reports.
• Authorize delivery notes, material requisitions through Engineers and following material
requisition forms with client in order to ensure that the project’s material requirements are
delivered on time.
• Coordinate and oversee technical testing and inspection and ensure these are witnessed by
consultant and formal approval is obtained, after each stage of implementation /or according to
project schedule during the duration of the project.
2 of 3
Jul 2010-Mar 2012 : MEP-Project Manager , JV (ESEC –Thermo L.L.C)
King Fahd Air Base (Al Taif), Saudi Arabia.
Main Responsibilities includes the Following:
• Establishing Standard Operating Procedures for MEP project.
• Reviewed preliminary project concepts and schematics (drawings, specifications, calculations).
• Monitored and evaluated the quality of planning, design, and construction activities
accomplished by PMC, vendors, designers, and contractors.
• Provided direction and leadership to assigned resources for effective and timely execution of
the project.
• Guided and supervised MEP staff and following up with logistic team.
• Liaise and attend regular site meetings with the client and the project Management /consultant
for solving of various issues during project period.
• Monitored construction/implementation for conformity with approved design, including detailed
scheduling and coordination.
• Ensured QHSE requirements are performed in job-related activities.
• Maintain a diary of all activities occurring on the project site in order to facilitate any claims or
extensions should they be required.
• Escalate major issues e.g. those impacting completion, delays, budget, quality or safety which
is anticipated or which arises, to Senior Management promptly and with full information,
preferably with detailed recommendations of the solutions.
• Participated in QHSE audits and workplace inspections.
• Ensure that project to be satisfactory handed over to Consultant /Client and Close-out project
with final account.
Dec 2007 – Jun 2010, MEP Project Manager, Thermo L.L.C (UAE)
Projects Involved in:
1. Twin tower for H.H Sheikh Khalifa Bin Zayed Al Nhyan - AD.
2. Labor camps at (Musaffah , Al Faya , Al Mafraq ) .
Main responsibilities Includes :
• Work with management to assign, perform, oversee and schedule work tasks and meet cost
objectives.
• Follow up of the project executes installation, testing, commissioning and closeout.
• Coordinate the progress of work with the main contractors.
• Responsible for overall plan, design/engineering/coordination and implementation/execution of
respective services including control and monitoring of progress.
• Leading construction & coordination team.
• Controlling cost, budget & preparing feasibility and preparing progress report.
• Develops projects plans specifying goals, strategy, and staffing, scheduling, identification of
risks contingency plans and allocation of available resources.
• Provides technical leadership to personnel supporting the assigned project.
• Provide technical approvals for the project’s material submittals, base design, schematic
design, shop drawings, technical data sheets….. etc.
• Ensure optimized engineering solution to meet clients and end user requirements.
3 of 3
• Produce sufficient data for variation orders and timely communicate to client in coordination
with general manager / contract / estimation section.
• Supervising daily log of construction and inspection activates and compares progress reports.
• Ensuring QS/HSE Company polices.
• Develops quality assurance test plans and direct quality and assurance testing.
• Handing over all systems to government authority such as (ADDC, ADSSC, Civil Defense,
Etisalat …etc.).
Sep 2004 – Nov 2007, Electrical Engineer , Badi T&C Company – Doha, Qatar
Involved in all company projects such as (Private villas, Mosques & general buildings) and have the
following responsibilities:
• Evaluated and resolved all project technical problems.
• Ensured project completion within budget and on schedule.
• Testing of all products for correct installation and operation.
• Maintained good professional relationships with Clients, consultants, subcontractors
• Handing over all achieved buildings to government authorities such as (kahramaa,Qtel,
Municipality).
Professional Qualifications:
• 2003, Bachelor Degree in Electrical Engineering, Damascus, Syria
• 2007, Certificate in Auto CAD Skills Al Khwarizmi University (Alain-UAE)
Skills:
Personal Information:
Contact: Email: mhdabdullatif@gmail.com, Mobile: +966550198800,+966541341892
Address: Makkah –Saudi Arabia
Date of Birth: DOB 7th
• IT Skills
Jun 1977
Marital Status: Married.
Nationality: Syrian.
.
: Microsoft Office (Word, Excel…).
• Language : English, Arabic Native.

More Related Content

What's hot

KennethWilliams Professional Resume
KennethWilliams Professional ResumeKennethWilliams Professional Resume
KennethWilliams Professional ResumeKen Williams
 
EPC_EPCM Business process modelling rendition
EPC_EPCM Business process modelling renditionEPC_EPCM Business process modelling rendition
EPC_EPCM Business process modelling renditionJaswin Sood
 
Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016Mohamed Elsahen
 
Anthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_ResumeAnthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_ResumeAnthony Vitola
 
Hamza El Gabour cv MEP CORDINATOR
Hamza El Gabour cv MEP CORDINATORHamza El Gabour cv MEP CORDINATOR
Hamza El Gabour cv MEP CORDINATORHamza Aljabour
 
Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016Ayman Issa
 
Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement ignitetribes
 
Haytham zidan, civil engineer, 2008
Haytham zidan, civil engineer, 2008Haytham zidan, civil engineer, 2008
Haytham zidan, civil engineer, 2008HaythamZidan1
 
Epc issues and recommendations
Epc issues and recommendationsEpc issues and recommendations
Epc issues and recommendationsubk1411
 
Zahir - Technical Safety - 2017
Zahir - Technical Safety - 2017Zahir - Technical Safety - 2017
Zahir - Technical Safety - 2017Zahir Patel
 
anthony-j.-martini-resume 20161021
anthony-j.-martini-resume 20161021anthony-j.-martini-resume 20161021
anthony-j.-martini-resume 20161021Anthony Martini
 
Project management plan
Project management planProject management plan
Project management planDonny Olson
 
CV-Gabriel Koncal-LinkedIn
CV-Gabriel Koncal-LinkedInCV-Gabriel Koncal-LinkedIn
CV-Gabriel Koncal-LinkedInGabriel Koncal
 

What's hot (20)

Bill resume
Bill resumeBill resume
Bill resume
 
Hussein Ahmad Salem-CV
Hussein Ahmad Salem-CVHussein Ahmad Salem-CV
Hussein Ahmad Salem-CV
 
KennethWilliams Professional Resume
KennethWilliams Professional ResumeKennethWilliams Professional Resume
KennethWilliams Professional Resume
 
EPC_EPCM Business process modelling rendition
EPC_EPCM Business process modelling renditionEPC_EPCM Business process modelling rendition
EPC_EPCM Business process modelling rendition
 
Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016
 
Anthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_ResumeAnthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_Resume
 
Hamza El Gabour cv MEP CORDINATOR
Hamza El Gabour cv MEP CORDINATORHamza El Gabour cv MEP CORDINATOR
Hamza El Gabour cv MEP CORDINATOR
 
API 510 RESUME
API 510 RESUMEAPI 510 RESUME
API 510 RESUME
 
Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016
 
Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement
 
Epc presentation robert foxpresentation
Epc presentation robert foxpresentationEpc presentation robert foxpresentation
Epc presentation robert foxpresentation
 
Why EPC
Why EPCWhy EPC
Why EPC
 
Haytham zidan, civil engineer, 2008
Haytham zidan, civil engineer, 2008Haytham zidan, civil engineer, 2008
Haytham zidan, civil engineer, 2008
 
Epc issues and recommendations
Epc issues and recommendationsEpc issues and recommendations
Epc issues and recommendations
 
CV of Dinesh
CV of DineshCV of Dinesh
CV of Dinesh
 
Zahir - Technical Safety - 2017
Zahir - Technical Safety - 2017Zahir - Technical Safety - 2017
Zahir - Technical Safety - 2017
 
2014-2015
2014-20152014-2015
2014-2015
 
anthony-j.-martini-resume 20161021
anthony-j.-martini-resume 20161021anthony-j.-martini-resume 20161021
anthony-j.-martini-resume 20161021
 
Project management plan
Project management planProject management plan
Project management plan
 
CV-Gabriel Koncal-LinkedIn
CV-Gabriel Koncal-LinkedInCV-Gabriel Koncal-LinkedIn
CV-Gabriel Koncal-LinkedIn
 

Viewers also liked

El crit
El critEl crit
El critaran43
 
P borrellas palau de la música
P borrellas palau de la músicaP borrellas palau de la música
P borrellas palau de la músicaaran43
 
Ancient egypt students activities
Ancient egypt students activitiesAncient egypt students activities
Ancient egypt students activitiesaran43
 
Tembang macapat lengkap
Tembang macapat lengkapTembang macapat lengkap
Tembang macapat lengkapFelix net
 
English assignment
English assignmentEnglish assignment
English assignmentFelix net
 
Tugas teks Kelas 9
Tugas teks Kelas 9Tugas teks Kelas 9
Tugas teks Kelas 9Felix net
 
Human evolution
Human evolutionHuman evolution
Human evolutionaran43
 
Parafrasa puisi
Parafrasa puisiParafrasa puisi
Parafrasa puisiFelix net
 
Presiden dan wakilnya dari yang 1 sampai jokowi
Presiden dan wakilnya dari yang 1 sampai jokowiPresiden dan wakilnya dari yang 1 sampai jokowi
Presiden dan wakilnya dari yang 1 sampai jokowiFelix net
 
Factory profile associated garments ltd
Factory profile associated garments ltdFactory profile associated garments ltd
Factory profile associated garments ltdddriay
 

Viewers also liked (16)

El crit
El critEl crit
El crit
 
P borrellas palau de la música
P borrellas palau de la músicaP borrellas palau de la música
P borrellas palau de la música
 
Indonesiaa
IndonesiaaIndonesiaa
Indonesiaa
 
Vatecan plaza
Vatecan plazaVatecan plaza
Vatecan plaza
 
Tempuyung
TempuyungTempuyung
Tempuyung
 
SURENDRA
SURENDRASURENDRA
SURENDRA
 
Ancient egypt students activities
Ancient egypt students activitiesAncient egypt students activities
Ancient egypt students activities
 
Tembang macapat lengkap
Tembang macapat lengkapTembang macapat lengkap
Tembang macapat lengkap
 
Tapak Dara
Tapak DaraTapak Dara
Tapak Dara
 
English assignment
English assignmentEnglish assignment
English assignment
 
Tugas teks Kelas 9
Tugas teks Kelas 9Tugas teks Kelas 9
Tugas teks Kelas 9
 
Vatecan plaza
Vatecan plazaVatecan plaza
Vatecan plaza
 
Human evolution
Human evolutionHuman evolution
Human evolution
 
Parafrasa puisi
Parafrasa puisiParafrasa puisi
Parafrasa puisi
 
Presiden dan wakilnya dari yang 1 sampai jokowi
Presiden dan wakilnya dari yang 1 sampai jokowiPresiden dan wakilnya dari yang 1 sampai jokowi
Presiden dan wakilnya dari yang 1 sampai jokowi
 
Factory profile associated garments ltd
Factory profile associated garments ltdFactory profile associated garments ltd
Factory profile associated garments ltd
 

Similar to C V

Derek swift cv_2016
Derek swift cv_2016Derek swift cv_2016
Derek swift cv_2016Derek Swift
 
Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CVvimal nc
 
YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG yogesh kumar
 
Resume - Khalid Hussain Project
Resume - Khalid Hussain ProjectResume - Khalid Hussain Project
Resume - Khalid Hussain ProjectKhalid Hussain
 
Wael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp LettersWael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp LettersWaell Azmy
 
TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015Teddy Fernando
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Amir Mohammed
 
Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan
 
Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain
 

Similar to C V (20)

Mohamed khairy CV
Mohamed khairy CVMohamed khairy CV
Mohamed khairy CV
 
Derek swift cv_2016
Derek swift cv_2016Derek swift cv_2016
Derek swift cv_2016
 
CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05
 
Engr ilyas cv new
Engr ilyas cv newEngr ilyas cv new
Engr ilyas cv new
 
Final_Resume Abdul Jameel
Final_Resume Abdul JameelFinal_Resume Abdul Jameel
Final_Resume Abdul Jameel
 
Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CV
 
CV@JOMY NEW
CV@JOMY NEWCV@JOMY NEW
CV@JOMY NEW
 
Mohaideen CV
Mohaideen CVMohaideen CV
Mohaideen CV
 
satheesh Resume
satheesh Resumesatheesh Resume
satheesh Resume
 
Ayman curriculum vitae2
Ayman curriculum vitae2Ayman curriculum vitae2
Ayman curriculum vitae2
 
Ayman curriculum vitae
Ayman curriculum vitaeAyman curriculum vitae
Ayman curriculum vitae
 
Ayman curriculum vitae
Ayman curriculum vitaeAyman curriculum vitae
Ayman curriculum vitae
 
YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG
 
Resume - Khalid Hussain Project
Resume - Khalid Hussain ProjectResume - Khalid Hussain Project
Resume - Khalid Hussain Project
 
Wael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp LettersWael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp Letters
 
TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
 
Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan cv 30816
Mohamed Hassan cv 30816
 
Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan cv 30816
Mohamed Hassan cv 30816
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 

C V

  • 1. 1 of 3 Mohammad. A. Abdullatif SUMMERY: 12 Years of progressive experience in Electrical Engineering; Participated in Variety of MEP construction Projects including Housing building, high-rise buildings, commercial buildings &special projects (Airbase, Hotels …). Assignments varied from design, site supervision, follow up and coordination of technical and commercial issues at various stages. EXPERINCE: APR 2012 up to Date: MEP-Project Manager, JV (SACC-Thermo L.L.C) Five Star Hotel (Anjum), Abdullatif Jameel Real Estate Inv Co –Makkah, Saudi Arabia Manage All Remaining MEP Installations at the Building including of the followings: • Installation of All HVAC systems including , Chilled water pumps 16 Nos., Chilled water piping systems and Ducting works, AHU’s , FCU’s , Fan’s • Installation of Fire Fighting systems including sprinklers , CO2 and FM200 systems • Installation of Plumbing systems include the Drainage and water supply pipes , water Tanks, submersible pumps , gray water systems , boilers system . • Installation of Electrical works including the lighting and Power, LC, Fire Alarm, UPS systems, and Main Electrical rooms, LV and MV cables. • Resolve problems as they are anticipated or as they arise at own level, guide direct reports to resolve problems proactively and/or promptly to ensure adherence to project plan and avoid increase in costs. • Oversee documentation and progress monitoring data and drawings required for required reporting. • Liaise and attend regular site meetings with the client and the project Management /consultant to maintain a healthy relationship throughout the contract’s lifetime • Supervise and coordinate the activities of all Project Engineers in order to avoid rework, conflicts, delays or undue costs. • Manage all aspects of labor requirements for the project including the initial labor forecast as well as weekly labor reports. • Authorize delivery notes, material requisitions through Engineers and following material requisition forms with client in order to ensure that the project’s material requirements are delivered on time. • Coordinate and oversee technical testing and inspection and ensure these are witnessed by consultant and formal approval is obtained, after each stage of implementation /or according to project schedule during the duration of the project.
  • 2. 2 of 3 Jul 2010-Mar 2012 : MEP-Project Manager , JV (ESEC –Thermo L.L.C) King Fahd Air Base (Al Taif), Saudi Arabia. Main Responsibilities includes the Following: • Establishing Standard Operating Procedures for MEP project. • Reviewed preliminary project concepts and schematics (drawings, specifications, calculations). • Monitored and evaluated the quality of planning, design, and construction activities accomplished by PMC, vendors, designers, and contractors. • Provided direction and leadership to assigned resources for effective and timely execution of the project. • Guided and supervised MEP staff and following up with logistic team. • Liaise and attend regular site meetings with the client and the project Management /consultant for solving of various issues during project period. • Monitored construction/implementation for conformity with approved design, including detailed scheduling and coordination. • Ensured QHSE requirements are performed in job-related activities. • Maintain a diary of all activities occurring on the project site in order to facilitate any claims or extensions should they be required. • Escalate major issues e.g. those impacting completion, delays, budget, quality or safety which is anticipated or which arises, to Senior Management promptly and with full information, preferably with detailed recommendations of the solutions. • Participated in QHSE audits and workplace inspections. • Ensure that project to be satisfactory handed over to Consultant /Client and Close-out project with final account. Dec 2007 – Jun 2010, MEP Project Manager, Thermo L.L.C (UAE) Projects Involved in: 1. Twin tower for H.H Sheikh Khalifa Bin Zayed Al Nhyan - AD. 2. Labor camps at (Musaffah , Al Faya , Al Mafraq ) . Main responsibilities Includes : • Work with management to assign, perform, oversee and schedule work tasks and meet cost objectives. • Follow up of the project executes installation, testing, commissioning and closeout. • Coordinate the progress of work with the main contractors. • Responsible for overall plan, design/engineering/coordination and implementation/execution of respective services including control and monitoring of progress. • Leading construction & coordination team. • Controlling cost, budget & preparing feasibility and preparing progress report. • Develops projects plans specifying goals, strategy, and staffing, scheduling, identification of risks contingency plans and allocation of available resources. • Provides technical leadership to personnel supporting the assigned project. • Provide technical approvals for the project’s material submittals, base design, schematic design, shop drawings, technical data sheets….. etc. • Ensure optimized engineering solution to meet clients and end user requirements.
  • 3. 3 of 3 • Produce sufficient data for variation orders and timely communicate to client in coordination with general manager / contract / estimation section. • Supervising daily log of construction and inspection activates and compares progress reports. • Ensuring QS/HSE Company polices. • Develops quality assurance test plans and direct quality and assurance testing. • Handing over all systems to government authority such as (ADDC, ADSSC, Civil Defense, Etisalat …etc.). Sep 2004 – Nov 2007, Electrical Engineer , Badi T&C Company – Doha, Qatar Involved in all company projects such as (Private villas, Mosques & general buildings) and have the following responsibilities: • Evaluated and resolved all project technical problems. • Ensured project completion within budget and on schedule. • Testing of all products for correct installation and operation. • Maintained good professional relationships with Clients, consultants, subcontractors • Handing over all achieved buildings to government authorities such as (kahramaa,Qtel, Municipality). Professional Qualifications: • 2003, Bachelor Degree in Electrical Engineering, Damascus, Syria • 2007, Certificate in Auto CAD Skills Al Khwarizmi University (Alain-UAE) Skills: Personal Information: Contact: Email: mhdabdullatif@gmail.com, Mobile: +966550198800,+966541341892 Address: Makkah –Saudi Arabia Date of Birth: DOB 7th • IT Skills Jun 1977 Marital Status: Married. Nationality: Syrian. . : Microsoft Office (Word, Excel…). • Language : English, Arabic Native.