SlideShare a Scribd company logo
1 of 7
Download to read offline
1
CURRICULUM VITAE
NAME: MANUEL RAMOS DE CAMPOS ABREU BARTILOTTI
ADDRESS: Rua S. Miguel Nascente 6, 2ºC 2805-024 Pragal – Almada PORTUGAL
TELEPHONES: MOBILE. (+351 96 383 46 71) HOME. (+351 21 295 74 39)
E –MAIL: mbartilotti3@gmail.com
SKYPE: manybarti11
NATIONALITY: Portuguese. CIVIL STAUS: Divorced.
DATE OF BIRTH: 13/09/1952
LANGUAGES: Portuguese (Mother Tong), English & French (Spoken & Written), Spanish (Spoken)
Italien. (Spoken).
 ACADEMIC BACKGROUND: Technical high industrial school, with two years of the Preparatory Sections
for engineer institutes.
 PROFESSIONAL TRAINING: -
 Technical Drawing Course.
 Rigger Course. Piping and Equipment Lifting – By Mammoet – Holland
 SPECIAL FLANGES ERECTION COURSE (Male anda Female, Tong and Groove, Ring Joint) –
HOLLAND
 SAFETY CERTIFICATE: VCA – I –Safety Course For Workers in Refineries, Petrochemical’s, etc…
EXECUTIVE SUMARY:
I have more than 34 years experience in the field of piping and steel structures in the following areas for
Construction of the: Petrochemical’s, Refineries, Gas Plants, Water Treatment Centers, Incinerator’s, Cellulose
factories, Chemicals plants, Crackers Factories and Mill factories.
After serving my time as a pipe fitter I subsequently moved into piping and steel structures Foreman and
Supervisor alternating as Construction Superintendent, QC Supervisor and Piping Field Engineer. Computer
literate such as: Windows and Office – (EXCEL and WORD).
I have gained a widened knowledge of production assemblies of piping and structure, maintenance of machines,
work preparation, materials, welding sequence and systems such as: (SMAW, GTAW, SAW, and Plasma.) and
co-ordination of workforce.
I consider my main attributes to be a self-motivated team player who works well under pressure to meet project
requirements and time schedules.
PROFESSIONAL EXPERIÊNCE:
04/ 2012 till 12/ 2013: SITUBEL
POSITION: PIPING SUPERVISOR
RESPONSIBILITIES: Activities as a Piping Supervisor such as.
 Sporadic Supervisory works in prefabrication and assembly of pipes in small businesses Companies who
SITUBEL rent manpower in PORTUGAL.
2
04/2010 till 31/12/2011: THYSSENKRUPP
POSITION: PIPING SUPERVISOR
RESPONSIBILITIES: Activities as a piping supervisor such as.
 Responsible for Supervision and Inspection the Subcontractor Company in Prefabrication and assembly of the
 entire piping on "FGD_Bateria-A ', B and C. Who is the {Flue Gas Desulfurization System of the Coking Plant}.
 Modify and rerouting on site, the majority of the pipe work spools, and supports.
 Coordinating the daily report and weekly progress. Member of the pre-commissioning Team on “FGD_Battery-
A”, “FGD_Battery-B” and “FGD_Battery-C”.
PROJECT: THYSSENKRUPP / CSA, New Steel Industry of Atlântic - “BRAZIL”
06/2008 till 09/2009: THYSSENKRUPP
POSITION: CONSTRUCTION SUPERVISOR
RESPONSIBILITIES: Activities as piping and structural construction Supervisor Such as.
 Supervising and Inspection of Subcontractors Companies in the work of assembling the Steel Structures and
The Ducts belonging to Dedusting System of the Blast Furnaces inside and outside the Stock House and Cast
House.
 Resolve the Subcontractors problems in Assembly and erection of steel structures and the ducts according to the
norms on Site.
 Coordination of the weekly progress. Cooperation and help the logistic Department.
 Supervision and Inspection in the assembly of the Pressure Equalizing System of the Blast Furnace 01.
 Responsible for the daily inspection of a Brazilian Company named "EBSE", situated about at 25 km from the
Permises of the Steel Plant, which was hired by ThyssenKrupp for make the Pre-fabrication of a large part of the
Piping Spools for Erection of the two Blast Furnaces.
 Supervising and Inspection the Erection of piping utilities on Stock house and Cast House.
PROJECT: THYSSENKRUPP/CSA, New Steel Industry of Atlântic - “BRAZIL”
30/05/2008 till 01/06/2008: FDO-ABB ENGINEERING, Ltd.
POSITION: PIPING SUPERVISOR
RESPONSIBILITIES: Activities as a piping supervisor such as.
 When I started my work in Algeria, I was placed in the Piping Superintendent office next to Camp where we all
live it was also the place where was situated the workshop prefabrication of piping for various units of Natural
Gas who were to be Remodeled.
 After a few days, I was requested by the Site Manager to work together studying what types of welding
procedures that we had on our hands to weld the tie-ins at several refineries Renewal of Natural Gas that could
not stop the refining the Natural Gas.
 During the time I was working in conjunction with the Site Manager, he asked me to perform all the calculations
necessary to make Water hydraulic testing for a Refinery Gas Renewal that was within the board of Hassi R’mel.
The volume of Water Calculated by me, would be transported to the refinery by a Sisterna Truck.
 Supervise several workers and instruct them the method for opening the flanges of gas pipelines that were already
empty and no traces of gas to be able to take with proper security the Scratched Ring Joint, and then they could
insert the new Ring Joint without any problem in one of the areas of the refinery that was already stopped and
prepared to conduct this kind of work, knowing that the refinery has always been in continuous process of
Refining the Natural Gas.
PROJECT: BOOSTING Ph2 Hassi R’mel on Several Natural Gas Refineries – ALGERIA.
3
09/2007 till 30/04/2008: TECHNIP ITALY
POSITION: PIPING FIELD ENGINEER
RESPONSIBILITIES: Activities of Piping Field Engineer such as.
 Preparation of isometrics and piping layouts, for emission to the field for pre-fabrication and erection.
 Troubleshooting with the pipe through the existing Technical Queries on Work Site.
 Small bore Piping Special Supports Designer.
 Preparation of Test Folders, and Punch Lists of erected piping.
 I was one of the Team Members for Verification and Approval well as the signature of the
Signing of Documents Required for delivery to the Client the Reinstallation of piping after the execution of the
tests.
PROJECT: Canadian Natural Resources Oil Sands (C.N.R.L.) HORIZON PLANT - CANADA.
01/2007 till 08/2007: Consolidated Contractors International Company (S.A.L.)
POSITION: SITE SUPERINTENDENT - PIPING
RESPONSIBILITIES: Activities as a Site Superintendent – Piping such as.
 Coordination of the Piping Survey on Pipe Racks, supervise and plan the erection sequence.
 Coordination of the Piping Flushing works.
 Assistance to the Engineering Department, control and verification that the individual isometrics each reel, were
in agreement with the original isometric in measurements, rotations, Angles and so on.
 Coordination of the progress of sub-contractor’s works and weekly planning.
 Resolve of projects deviations.
PROJECT: Expansion of Gas Plant in the department of Quality Control Section whose acronym is (Q.C.S.) in
Ras Laffan Industrial City – QATAR.
06/2006 till 12/2006: ALLSEAS – ENGINEERING BV
POSITION: PIPING SUPERVISOR
RESPONSIBILITIES: Piping Supervisor works such as.
 Supervision of pre-fabrication works in the workshop.
 Supervision and plan the erection of piping spools on board the ship was converted from cargo ship to lay
pipeline on sea ship.
 Planning of the erection work sequence and necessary resources allocation.
 Co-ordination and supervision of both labour and materials.
 Resolve of project deviations by means of Site Technical Queries.
 The Conversion of the Cargo Ship to Ship for laying pipelines on the bottom of the sea belonging to Allseas was
completed in the shipyards of Keppel Verolme in the NETHERLANDS.
PROJECT: ALLSEAS / KEPPEL VEROLME – THE NETHERLANDS

08/2004 till 03/2006: FABRICOM – GTI – SUEZ
POSITION: PIPING FOREMAN
RESPONSIBILITIES: Activities of Piping Foreman such as.
 Coordination of prefabrication of spools in carbon steel and stainless steel with different schedules of piping.
 Responsible for daily progress of piping spools already tacked weld.
 Planning the prefabricated piping spools for be welded on the workshop welding area.
 Assistance to hand-over.
 Co-ordination the Prefabrication of spools of piping for be installed in the modules in the area where they were
being manufactured and assembled modules that after being with all pipe
spools mounted properly, and be accepted by the Quality Control these same modules were
loaded on ships able to transport the modules to build a new refinery in NORWAY.
PROJECT: WORKSHOP OF FABRICOM-GTI-SUEZ IN HOBOKEN – BÉLGIUM
4
07/2002 till 07/2004; ABB LUMMUS GLOBAL
POSITION: PIPING and STRUCTURES SUPERVISOR
RESPONSIBILITIES: Responsible for the erection of the pipe and structure works, including.
 Co-ordination and supervision of both labour and materials.
 Resolve of project deviations by means of Technical Queries.
 Planning of the erection work sequence and necessary resources allocation.
PROJECT: PO11 Project – Lyondell, Maasvlakte – NETHERLANDS
02/2002 till 06/2002: GENIUS VOS
POSITION: PIPING FOREMAN
RESPONSIBILITIES: Activities as a Piping Foreman such as.
 Receipt of the Isometric by the Workshop Supervisor who were sent from various Petroleum Prospecting
platforms around the North Sea to the workshop facilities of Genius Vos, for the manufacture of new pipe spools
in Carbon Steel, Stainless Steel, Duplex and Superduplex, to replace the spool pipes that were already in the
process of corrosion and wear of the various platforms, which the Genius Vos provided consumables for the
maintenance of anchored Platforms on the Sea, as well as a Technical Support.
 Planning the implementation of piping spools of small and large bore in Carbon Steel, Stainless Steel, Duplex
and Super Duplex.
 Planning the execution of the tests required of new pipe spools in Carbon Steel, Stainless Steel, Duplex and
Super Duplex.
 Repairs onshore of small Petroleum Prospecting platforms that were transported from the North Sea to a land
adjacent to the Genius Vos Workshop.
PROJECT: Piping Fabrication in Carbon Steel, Stainless Steel, Duplex and Super Duplex - GENIUS VOS
WORKSHOP in IJMUDEN - NETHERLANDS.
08/2001 till 01/2002: STORK INDUSTRY SERVICES BV
POSITION: PIPING FOREMAN
RESPONSIBILITIES: Responsibilities of Piping Foreman were.
 Planning the execution of piping spool’s (small bore and large bore).
 Planning the execution of piping spools and implementation of the necessary tests.
 Planning the execution of construction the piping supports.
 Planning the Erection of Piping Spools.
 Supervising the Erection of Piping Spools.
 Coordination the Fabrication the Spools of Piping..
PROJECT: SHELL PERNIS OIL REFINERY IN ROTTERDAM – NETHERLANDS
01/2001 till 31/12/2001: OELE-HIDRAUVIANENSE Lda,
POSITION: CONSTRUCTION SUPERVISOR / ENGINEER
RESPONSIBILITES: Responsible for the construction of the piping and structural works including.
 Planning the erection work sequence and necessary resources allocation for Installation the New HVAC
Machines, and new Heaters, who will be installed on the same Foundations of the Hold HVAC Machines and the
Heaters was installed.
 Supervising the Installation of new Chillers, and all Piping connections to the Chillers.
 Co-ordination and supervision of both labour and materials.
 In this project, I was the one who drew all new piping isometrics that was prefabricated and assembled in
brackets also designed by me that were installed next to the existing piping.
PROJECT: Installation of new HVAC equipment in one of the networks operators of National Mobil
Phones named TMN in Main Headquarters in LISBON – PORTUGAL
5
06/1999 till 09/2000: PONTICELLI Frères.
POSITION: WORK PREPARATOR
RESPONSIBILITIES: Activities of technical office related with Work Preparation
and Construction Engineering, such as.
 Preparation the isometrics and piping layouts, for emission to the field, for pre-fabrication and erection.
 Preparation and release Piping Supports construction work-packages. Resolve of piping Technical Queries.
 Monitoring of Pipe Assemblies and monitoring of pipe materials, as well as giving technical support in the field
of Construction.
 Preparation the “As Builts”, Test Packs and Punch List’s.
PROJECT: SOLVAY PETROCHEMICAL in MARTOREL – SPAIN.
1998 till 1999: SICOM BV
POSITION: PIPING SUPERVISOR
RESPONSIBILITIES: Main technical activities were as follows.
 Supervision of Spool’s Fabrication and Erection.
 Resolution of Project Modifications through Technical Consultations to the Engineering Department.
 Planning of the erection work sequence and necessary resources allocation.
PROJECT: CONSTRUCTION OF A NEW PHASE IN SHELL PERNIS REFINERY – HOLLAND
1997 till 1998: DUMEZ COPISA
POSITION: QUALITY CONTROL SUPERVISOR
RESPONSIBILITIES: Activities of Quality Control Supervisor such as.
 Daily inspection of joints to be welded in Carbon Steel and Stainless Steel pipes such as 304L, 316L and Duplex.
 Daily inspection of the welders portable stoves in order to confirm that I those same stoves were connected to the
electrical current in order to maintain a temperature between 80°C and 150°C, and if not contained Carbon Steel
Electrodes mixed with Stainless Steel Electrodes.
 Visual inspection of welds on Carbon steel pipes, stainless steel pipes and Duplex.
 Verification of welding procedures, and providing the documentation necessary for different types of welding in
the work, such as welding in Carbon Steel Pipes, Stainless Steel Pipes 304L, 316L and Duplex.
 Preparation the Documentation and monitoring the release of thePpiping Spools for Abrasive Sand Blasting and
Painting of the respective Piping Spools.
 Pipe circuits checking and punch lists.
PROJECT: PETROCHEMICAL INDUSTRY (IN CARTAGENA) – SPAIN
1996 till 1997: SICOM BV
POSITION: PIPING SUPERVISOR
RESPONSIBILITIES: Main technical activities were.
 Supervising the manufacturing of piping spools.
 Resolution of the changes made in isometrics through technical consultations to the Engineering Workshop.
 Planning of prefabrication of the sequence of piping spools and forward these same piping spools to the
Department of Welding Workshop of SICOM BV in Vlissingen.
PROJECT: Prefabrication for the construction of a new phase in the Shell Refinery in Moerdjike -
NETHERLANDS.
6
1994 till 1996: EUROTUNNELS
POSITION: PIPING FOREMAN
RESPONSIBILITIES: These activities are.
 Coordination the Erection of the Equipments and piping spoos.
 Resolve the project modifications on field.
 Planning the Erection work sequence and the necessary resources for piping allocation.
 Assistance to hand-over
PROJECT: MEDICAL FACTORY in FRIBOURG - SWITZERLAND
1990 till 1994: AALBORG CISERVE Lda,
POSITION: FOREMAN COORDINATOR
RESPONSIBILITIES: Main technical activities were.
 Coordination of the all piping jobs, between the vessel & the piping Department including,distribution the
manpower and man-hours.
 Planning and analise all documents presented by the owners of the Ships for do the piping jobs on different
vessels like VLCCs, Tankers, LPGs, Gas Carriers, Rigs and etc…
PROJECTS: Repair & Maintenance of Boilers on Board the Ships and in Shipyards in PORTUGAL and
AROUND THE WORLD.
1987 till 1989: BABCOK – AFRICA
POSITION: PIPING SUPERVISOR
RESPONSIBILITIES: Main technical activities were.
 Supervision of Spool’s Fabrication and Erection.
 Resolve of project modifications by means of Site Technical Queries.
 Planning the Elevation sequence and the resources required for the allocation of Piping Spools and Equipments.
PROJECT: J.C.I.- (Saref Project-Platinum Refinery in RUSTEMBURG – SOUTH AFRICA
1985 till 1987: N-REN ITERNATIONAL
POSITION: PIPE FITTER
RESPONSIBILITIES: Main technical activities were.
 Execution of pre-fabrication and erection of piping spools in Carbon Steel and Stainless Steel.
 Execution of piping supports.
 Execution the steam tracing with ½” stainless steel pipe in one of the areas of the Complex, were almost the
piping was stainless steel.
PROJECT: CHEMICAL FERTILIZER COMPLEX at TAMATAVE – MADAGASCAR
1981 till 1984: BABCOCK – AFRICA
POSITION: PIPE FITTER & BOILERMAKER
RESPOSIBILITIES: Main technical activities were.
 Execution of pre-fabrication and erection of piping spools in Carbon Steel and Stainless Steel.
 Execution of piping support’s.
 Execution the fabrication and erection of Steel Structures.
 Most of the work I did there, was in stops of several Power Stations in South Africa.
PROJECTS: SHUT DOWNS IN SEVERAL POWER STATIONS – REPUBLIC OF SOUTH AFRICA
7
1979 till 1981: A. SOUSA & SOUSA. Lda,
POSITION: PIPE FITTER
RESPONSIBILITIES: Main technical activities were.
 Prefabrication and assembly the jacketed pipes in a new National factory for manufacturing the salt and water
crackers and Waffles.
 Prefabrication and assembly of supports, where they would be installed the jacketed pipes.
PROJECT: NEW NATIONAL FACTORY OF SALT and WATER CRACKERS & WAFFLES IN MEM-
MARTINS – PORTUGAL.
01/05/1977 till 31/12/1977: MOMPOR / METALTORRE. Lda,
POSITON: PIPE FITTER
RESPONSIBILITIES: Main technical activities were.
 I started my career as a Pipefitter in Hydro Tests of a large part of the Crude Pipelines in Petrogal refinery in
Sines.
 I was hired by Metaltorre it was one of the companies who hired hand labor to MOMPOR that was one
of several companies that also rented their work to Mompor, for EX :. The Portuguese Nervion,
Gremetal, and many more companies. All these companies were hired by Technip France, to carry out
the construction and completion of the new refinery belonging to the Consortium of Petrogal, which
was the Sines Refinery.
PROJECT: COMPLETE THE CONSTRUCTION OF THE PETROGAL REFINERY in SINES –
PORTUGAL.

More Related Content

What's hot (20)

Resume Thad Gilbert
Resume Thad GilbertResume Thad Gilbert
Resume Thad Gilbert
 
navjay
navjaynavjay
navjay
 
RajeevCV2016
RajeevCV2016RajeevCV2016
RajeevCV2016
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal Engineer
 
Waseem CV
Waseem CVWaseem CV
Waseem CV
 
CV Than Van Linh
CV Than Van LinhCV Than Van Linh
CV Than Van Linh
 
Nguyen Huu Hanh 's CV Jan 2016
Nguyen Huu Hanh 's CV Jan 2016Nguyen Huu Hanh 's CV Jan 2016
Nguyen Huu Hanh 's CV Jan 2016
 
BKP Resume
BKP  ResumeBKP  Resume
BKP Resume
 
sharndencv
sharndencvsharndencv
sharndencv
 
Main PPS operation experience - English
Main PPS operation experience - EnglishMain PPS operation experience - English
Main PPS operation experience - English
 
ElanCVdocx
ElanCVdocxElanCVdocx
ElanCVdocx
 
M.Udayakumar CV (1)
M.Udayakumar CV (1)M.Udayakumar CV (1)
M.Udayakumar CV (1)
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gas
 
Cv english
Cv englishCv english
Cv english
 
CV E. Viner Updated
CV E. Viner UpdatedCV E. Viner Updated
CV E. Viner Updated
 
GEC presentation
GEC  presentationGEC  presentation
GEC presentation
 
Mechanical Engineer-Syed Zain Ali
Mechanical Engineer-Syed Zain AliMechanical Engineer-Syed Zain Ali
Mechanical Engineer-Syed Zain Ali
 
wsa
wsawsa
wsa
 
wsa
wsawsa
wsa
 

Similar to CV-English_Bartilotti-16-12-2014

cv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachmentcv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachment
Eugene van Brakel
 
Curriculum Vitae-Sverre W. Viland
Curriculum Vitae-Sverre W. VilandCurriculum Vitae-Sverre W. Viland
Curriculum Vitae-Sverre W. Viland
Sverre Viland
 
Mark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CVMark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CV
Mark Crame
 
CV John Raugstad Woodgroup
CV John Raugstad WoodgroupCV John Raugstad Woodgroup
CV John Raugstad Woodgroup
John Raugstad
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
Ahmed Youssef
 
Stewart Kane CV 2015
Stewart Kane CV 2015Stewart Kane CV 2015
Stewart Kane CV 2015
Stewart Kane
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016
Stewart Kane
 
peter.fitzpatrick.cv.2016-2017
peter.fitzpatrick.cv.2016-2017peter.fitzpatrick.cv.2016-2017
peter.fitzpatrick.cv.2016-2017
Peter Fitzpatrick
 
Hai_Vuong Huy_CV_ins
Hai_Vuong Huy_CV_insHai_Vuong Huy_CV_ins
Hai_Vuong Huy_CV_ins
Vuong Huy Hai
 
Benoit Giroux - CV2015 English Linkedin no page 6
Benoit Giroux - CV2015 English Linkedin no page 6Benoit Giroux - CV2015 English Linkedin no page 6
Benoit Giroux - CV2015 English Linkedin no page 6
Benoit Giroux
 
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume -   Sr.QC Inspector-Mech.welding-painting-piping-pipelineResume -   Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
UDAYAKUMAR P C PANICKER
 

Similar to CV-English_Bartilotti-16-12-2014 (20)

cv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachmentcv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachment
 
Bill ure cv 31 08-16
Bill ure cv 31 08-16Bill ure cv 31 08-16
Bill ure cv 31 08-16
 
Curriculum Vitae-Sverre W. Viland
Curriculum Vitae-Sverre W. VilandCurriculum Vitae-Sverre W. Viland
Curriculum Vitae-Sverre W. Viland
 
GMcnicol CV
GMcnicol CVGMcnicol CV
GMcnicol CV
 
Stephen Brooks CV
Stephen Brooks CVStephen Brooks CV
Stephen Brooks CV
 
Jeff Cartwright CV May 2016
Jeff Cartwright CV May 2016Jeff Cartwright CV May 2016
Jeff Cartwright CV May 2016
 
Mark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CVMark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CV
 
CV of Re Bello - (BWE Denmark)
CV of Re Bello - (BWE Denmark)CV of Re Bello - (BWE Denmark)
CV of Re Bello - (BWE Denmark)
 
CV John Raugstad Woodgroup
CV John Raugstad WoodgroupCV John Raugstad Woodgroup
CV John Raugstad Woodgroup
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
DVCV060715
DVCV060715DVCV060715
DVCV060715
 
Stewart Kane CV 2015
Stewart Kane CV 2015Stewart Kane CV 2015
Stewart Kane CV 2015
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016
 
peter.fitzpatrick.cv.2016-2017
peter.fitzpatrick.cv.2016-2017peter.fitzpatrick.cv.2016-2017
peter.fitzpatrick.cv.2016-2017
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Jonathan Hemming CV
Jonathan Hemming CVJonathan Hemming CV
Jonathan Hemming CV
 
Hai_Vuong Huy_CV_ins
Hai_Vuong Huy_CV_insHai_Vuong Huy_CV_ins
Hai_Vuong Huy_CV_ins
 
Benoit Giroux - CV2015 English Linkedin no page 6
Benoit Giroux - CV2015 English Linkedin no page 6Benoit Giroux - CV2015 English Linkedin no page 6
Benoit Giroux - CV2015 English Linkedin no page 6
 
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume -   Sr.QC Inspector-Mech.welding-painting-piping-pipelineResume -   Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
 

More from Manuel Bartilotti

My Certificate of Assembler Special Flanges.
My Certificate of Assembler Special Flanges.My Certificate of Assembler Special Flanges.
My Certificate of Assembler Special Flanges.
Manuel Bartilotti
 
OSSA Regional Orientation Program
OSSA Regional Orientation ProgramOSSA Regional Orientation Program
OSSA Regional Orientation Program
Manuel Bartilotti
 
Construction Safety Training Sistem at Technip Italy S.p.A.
Construction Safety Training Sistem at Technip Italy S.p.A.Construction Safety Training Sistem at Technip Italy S.p.A.
Construction Safety Training Sistem at Technip Italy S.p.A.
Manuel Bartilotti
 
Safety for Operational Supervisors SCC (2)
Safety for Operational Supervisors SCC (2)Safety for Operational Supervisors SCC (2)
Safety for Operational Supervisors SCC (2)
Manuel Bartilotti
 
Copy of PIPING PROGRESS SHEET OF FGD - BATERY-B-WEEK-08 of 2011
Copy of PIPING PROGRESS SHEET OF FGD - BATERY-B-WEEK-08 of 2011Copy of PIPING PROGRESS SHEET OF FGD - BATERY-B-WEEK-08 of 2011
Copy of PIPING PROGRESS SHEET OF FGD - BATERY-B-WEEK-08 of 2011
Manuel Bartilotti
 
PROGRESS SHEET OF PRESSURE EQUALIZING SYSTEM-BF1_ 2009 (WEEK 26)
PROGRESS SHEET OF PRESSURE EQUALIZING SYSTEM-BF1_ 2009 (WEEK 26)PROGRESS SHEET OF PRESSURE EQUALIZING SYSTEM-BF1_ 2009 (WEEK 26)
PROGRESS SHEET OF PRESSURE EQUALIZING SYSTEM-BF1_ 2009 (WEEK 26)
Manuel Bartilotti
 
OSSA Regional Orientation Program
OSSA Regional Orientation ProgramOSSA Regional Orientation Program
OSSA Regional Orientation Program
Manuel Bartilotti
 
Construction Safety Trayning System at Technip Italy S.p.A.
Construction Safety Trayning System at Technip Italy S.p.A.Construction Safety Trayning System at Technip Italy S.p.A.
Construction Safety Trayning System at Technip Italy S.p.A.
Manuel Bartilotti
 
RECOMMENDATION LETTER FROM SICON BV
RECOMMENDATION LETTER FROM SICON BVRECOMMENDATION LETTER FROM SICON BV
RECOMMENDATION LETTER FROM SICON BV
Manuel Bartilotti
 
Recommendation Letter from METALTORRE.Lda
Recommendation Letter from METALTORRE.LdaRecommendation Letter from METALTORRE.Lda
Recommendation Letter from METALTORRE.Lda
Manuel Bartilotti
 
Recommendation Letter from A. SOUSA & SOUSA, Lda.
Recommendation Letter from A. SOUSA & SOUSA, Lda.Recommendation Letter from A. SOUSA & SOUSA, Lda.
Recommendation Letter from A. SOUSA & SOUSA, Lda.
Manuel Bartilotti
 
Recommendation Letter from BABCOCK ENGINEERING CONTRACTORS
Recommendation Letter from BABCOCK ENGINEERING CONTRACTORSRecommendation Letter from BABCOCK ENGINEERING CONTRACTORS
Recommendation Letter from BABCOCK ENGINEERING CONTRACTORS
Manuel Bartilotti
 
WELDER QUALIFICATION TEST CERTIFICATE
WELDER QUALIFICATION TEST CERTIFICATEWELDER QUALIFICATION TEST CERTIFICATE
WELDER QUALIFICATION TEST CERTIFICATE
Manuel Bartilotti
 
Recommendation Letter from N-Ren Madagascar
Recommendation Letter from N-Ren MadagascarRecommendation Letter from N-Ren Madagascar
Recommendation Letter from N-Ren Madagascar
Manuel Bartilotti
 
ABB Lummus PO 11 Project H.S.E. Department.
ABB Lummus PO 11 Project H.S.E. Department.ABB Lummus PO 11 Project H.S.E. Department.
ABB Lummus PO 11 Project H.S.E. Department.
Manuel Bartilotti
 
RECOMMENDATION LETTER FROM TECHNIP ITALY
RECOMMENDATION LETTER FROM TECHNIP ITALYRECOMMENDATION LETTER FROM TECHNIP ITALY
RECOMMENDATION LETTER FROM TECHNIP ITALY
Manuel Bartilotti
 

More from Manuel Bartilotti (20)

My Personal Safety Logbook.
My Personal Safety Logbook.My Personal Safety Logbook.
My Personal Safety Logbook.
 
My Certificate of Assembler Special Flanges.
My Certificate of Assembler Special Flanges.My Certificate of Assembler Special Flanges.
My Certificate of Assembler Special Flanges.
 
OSSA Regional Orientation Program
OSSA Regional Orientation ProgramOSSA Regional Orientation Program
OSSA Regional Orientation Program
 
Construction Safety Training Sistem at Technip Italy S.p.A.
Construction Safety Training Sistem at Technip Italy S.p.A.Construction Safety Training Sistem at Technip Italy S.p.A.
Construction Safety Training Sistem at Technip Italy S.p.A.
 
ABCS Alberta BC Safety
ABCS Alberta BC SafetyABCS Alberta BC Safety
ABCS Alberta BC Safety
 
Safety for Operational Supervisors SCC (2)
Safety for Operational Supervisors SCC (2)Safety for Operational Supervisors SCC (2)
Safety for Operational Supervisors SCC (2)
 
Copy of PIPING PROGRESS SHEET OF FGD - BATERY-B-WEEK-08 of 2011
Copy of PIPING PROGRESS SHEET OF FGD - BATERY-B-WEEK-08 of 2011Copy of PIPING PROGRESS SHEET OF FGD - BATERY-B-WEEK-08 of 2011
Copy of PIPING PROGRESS SHEET OF FGD - BATERY-B-WEEK-08 of 2011
 
MY VCA-1
MY VCA-1MY VCA-1
MY VCA-1
 
PROGRESS SHEET OF PRESSURE EQUALIZING SYSTEM-BF1_ 2009 (WEEK 26)
PROGRESS SHEET OF PRESSURE EQUALIZING SYSTEM-BF1_ 2009 (WEEK 26)PROGRESS SHEET OF PRESSURE EQUALIZING SYSTEM-BF1_ 2009 (WEEK 26)
PROGRESS SHEET OF PRESSURE EQUALIZING SYSTEM-BF1_ 2009 (WEEK 26)
 
RBCS Alberta BC Safety
RBCS Alberta BC SafetyRBCS Alberta BC Safety
RBCS Alberta BC Safety
 
OSSA Regional Orientation Program
OSSA Regional Orientation ProgramOSSA Regional Orientation Program
OSSA Regional Orientation Program
 
Construction Safety Trayning System at Technip Italy S.p.A.
Construction Safety Trayning System at Technip Italy S.p.A.Construction Safety Trayning System at Technip Italy S.p.A.
Construction Safety Trayning System at Technip Italy S.p.A.
 
RECOMMENDATION LETTER FROM SICON BV
RECOMMENDATION LETTER FROM SICON BVRECOMMENDATION LETTER FROM SICON BV
RECOMMENDATION LETTER FROM SICON BV
 
Recommendation Letter from METALTORRE.Lda
Recommendation Letter from METALTORRE.LdaRecommendation Letter from METALTORRE.Lda
Recommendation Letter from METALTORRE.Lda
 
Recommendation Letter from A. SOUSA & SOUSA, Lda.
Recommendation Letter from A. SOUSA & SOUSA, Lda.Recommendation Letter from A. SOUSA & SOUSA, Lda.
Recommendation Letter from A. SOUSA & SOUSA, Lda.
 
Recommendation Letter from BABCOCK ENGINEERING CONTRACTORS
Recommendation Letter from BABCOCK ENGINEERING CONTRACTORSRecommendation Letter from BABCOCK ENGINEERING CONTRACTORS
Recommendation Letter from BABCOCK ENGINEERING CONTRACTORS
 
WELDER QUALIFICATION TEST CERTIFICATE
WELDER QUALIFICATION TEST CERTIFICATEWELDER QUALIFICATION TEST CERTIFICATE
WELDER QUALIFICATION TEST CERTIFICATE
 
Recommendation Letter from N-Ren Madagascar
Recommendation Letter from N-Ren MadagascarRecommendation Letter from N-Ren Madagascar
Recommendation Letter from N-Ren Madagascar
 
ABB Lummus PO 11 Project H.S.E. Department.
ABB Lummus PO 11 Project H.S.E. Department.ABB Lummus PO 11 Project H.S.E. Department.
ABB Lummus PO 11 Project H.S.E. Department.
 
RECOMMENDATION LETTER FROM TECHNIP ITALY
RECOMMENDATION LETTER FROM TECHNIP ITALYRECOMMENDATION LETTER FROM TECHNIP ITALY
RECOMMENDATION LETTER FROM TECHNIP ITALY
 

CV-English_Bartilotti-16-12-2014

  • 1. 1 CURRICULUM VITAE NAME: MANUEL RAMOS DE CAMPOS ABREU BARTILOTTI ADDRESS: Rua S. Miguel Nascente 6, 2ºC 2805-024 Pragal – Almada PORTUGAL TELEPHONES: MOBILE. (+351 96 383 46 71) HOME. (+351 21 295 74 39) E –MAIL: mbartilotti3@gmail.com SKYPE: manybarti11 NATIONALITY: Portuguese. CIVIL STAUS: Divorced. DATE OF BIRTH: 13/09/1952 LANGUAGES: Portuguese (Mother Tong), English & French (Spoken & Written), Spanish (Spoken) Italien. (Spoken).  ACADEMIC BACKGROUND: Technical high industrial school, with two years of the Preparatory Sections for engineer institutes.  PROFESSIONAL TRAINING: -  Technical Drawing Course.  Rigger Course. Piping and Equipment Lifting – By Mammoet – Holland  SPECIAL FLANGES ERECTION COURSE (Male anda Female, Tong and Groove, Ring Joint) – HOLLAND  SAFETY CERTIFICATE: VCA – I –Safety Course For Workers in Refineries, Petrochemical’s, etc… EXECUTIVE SUMARY: I have more than 34 years experience in the field of piping and steel structures in the following areas for Construction of the: Petrochemical’s, Refineries, Gas Plants, Water Treatment Centers, Incinerator’s, Cellulose factories, Chemicals plants, Crackers Factories and Mill factories. After serving my time as a pipe fitter I subsequently moved into piping and steel structures Foreman and Supervisor alternating as Construction Superintendent, QC Supervisor and Piping Field Engineer. Computer literate such as: Windows and Office – (EXCEL and WORD). I have gained a widened knowledge of production assemblies of piping and structure, maintenance of machines, work preparation, materials, welding sequence and systems such as: (SMAW, GTAW, SAW, and Plasma.) and co-ordination of workforce. I consider my main attributes to be a self-motivated team player who works well under pressure to meet project requirements and time schedules. PROFESSIONAL EXPERIÊNCE: 04/ 2012 till 12/ 2013: SITUBEL POSITION: PIPING SUPERVISOR RESPONSIBILITIES: Activities as a Piping Supervisor such as.  Sporadic Supervisory works in prefabrication and assembly of pipes in small businesses Companies who SITUBEL rent manpower in PORTUGAL.
  • 2. 2 04/2010 till 31/12/2011: THYSSENKRUPP POSITION: PIPING SUPERVISOR RESPONSIBILITIES: Activities as a piping supervisor such as.  Responsible for Supervision and Inspection the Subcontractor Company in Prefabrication and assembly of the  entire piping on "FGD_Bateria-A ', B and C. Who is the {Flue Gas Desulfurization System of the Coking Plant}.  Modify and rerouting on site, the majority of the pipe work spools, and supports.  Coordinating the daily report and weekly progress. Member of the pre-commissioning Team on “FGD_Battery- A”, “FGD_Battery-B” and “FGD_Battery-C”. PROJECT: THYSSENKRUPP / CSA, New Steel Industry of Atlântic - “BRAZIL” 06/2008 till 09/2009: THYSSENKRUPP POSITION: CONSTRUCTION SUPERVISOR RESPONSIBILITIES: Activities as piping and structural construction Supervisor Such as.  Supervising and Inspection of Subcontractors Companies in the work of assembling the Steel Structures and The Ducts belonging to Dedusting System of the Blast Furnaces inside and outside the Stock House and Cast House.  Resolve the Subcontractors problems in Assembly and erection of steel structures and the ducts according to the norms on Site.  Coordination of the weekly progress. Cooperation and help the logistic Department.  Supervision and Inspection in the assembly of the Pressure Equalizing System of the Blast Furnace 01.  Responsible for the daily inspection of a Brazilian Company named "EBSE", situated about at 25 km from the Permises of the Steel Plant, which was hired by ThyssenKrupp for make the Pre-fabrication of a large part of the Piping Spools for Erection of the two Blast Furnaces.  Supervising and Inspection the Erection of piping utilities on Stock house and Cast House. PROJECT: THYSSENKRUPP/CSA, New Steel Industry of Atlântic - “BRAZIL” 30/05/2008 till 01/06/2008: FDO-ABB ENGINEERING, Ltd. POSITION: PIPING SUPERVISOR RESPONSIBILITIES: Activities as a piping supervisor such as.  When I started my work in Algeria, I was placed in the Piping Superintendent office next to Camp where we all live it was also the place where was situated the workshop prefabrication of piping for various units of Natural Gas who were to be Remodeled.  After a few days, I was requested by the Site Manager to work together studying what types of welding procedures that we had on our hands to weld the tie-ins at several refineries Renewal of Natural Gas that could not stop the refining the Natural Gas.  During the time I was working in conjunction with the Site Manager, he asked me to perform all the calculations necessary to make Water hydraulic testing for a Refinery Gas Renewal that was within the board of Hassi R’mel. The volume of Water Calculated by me, would be transported to the refinery by a Sisterna Truck.  Supervise several workers and instruct them the method for opening the flanges of gas pipelines that were already empty and no traces of gas to be able to take with proper security the Scratched Ring Joint, and then they could insert the new Ring Joint without any problem in one of the areas of the refinery that was already stopped and prepared to conduct this kind of work, knowing that the refinery has always been in continuous process of Refining the Natural Gas. PROJECT: BOOSTING Ph2 Hassi R’mel on Several Natural Gas Refineries – ALGERIA.
  • 3. 3 09/2007 till 30/04/2008: TECHNIP ITALY POSITION: PIPING FIELD ENGINEER RESPONSIBILITIES: Activities of Piping Field Engineer such as.  Preparation of isometrics and piping layouts, for emission to the field for pre-fabrication and erection.  Troubleshooting with the pipe through the existing Technical Queries on Work Site.  Small bore Piping Special Supports Designer.  Preparation of Test Folders, and Punch Lists of erected piping.  I was one of the Team Members for Verification and Approval well as the signature of the Signing of Documents Required for delivery to the Client the Reinstallation of piping after the execution of the tests. PROJECT: Canadian Natural Resources Oil Sands (C.N.R.L.) HORIZON PLANT - CANADA. 01/2007 till 08/2007: Consolidated Contractors International Company (S.A.L.) POSITION: SITE SUPERINTENDENT - PIPING RESPONSIBILITIES: Activities as a Site Superintendent – Piping such as.  Coordination of the Piping Survey on Pipe Racks, supervise and plan the erection sequence.  Coordination of the Piping Flushing works.  Assistance to the Engineering Department, control and verification that the individual isometrics each reel, were in agreement with the original isometric in measurements, rotations, Angles and so on.  Coordination of the progress of sub-contractor’s works and weekly planning.  Resolve of projects deviations. PROJECT: Expansion of Gas Plant in the department of Quality Control Section whose acronym is (Q.C.S.) in Ras Laffan Industrial City – QATAR. 06/2006 till 12/2006: ALLSEAS – ENGINEERING BV POSITION: PIPING SUPERVISOR RESPONSIBILITIES: Piping Supervisor works such as.  Supervision of pre-fabrication works in the workshop.  Supervision and plan the erection of piping spools on board the ship was converted from cargo ship to lay pipeline on sea ship.  Planning of the erection work sequence and necessary resources allocation.  Co-ordination and supervision of both labour and materials.  Resolve of project deviations by means of Site Technical Queries.  The Conversion of the Cargo Ship to Ship for laying pipelines on the bottom of the sea belonging to Allseas was completed in the shipyards of Keppel Verolme in the NETHERLANDS. PROJECT: ALLSEAS / KEPPEL VEROLME – THE NETHERLANDS  08/2004 till 03/2006: FABRICOM – GTI – SUEZ POSITION: PIPING FOREMAN RESPONSIBILITIES: Activities of Piping Foreman such as.  Coordination of prefabrication of spools in carbon steel and stainless steel with different schedules of piping.  Responsible for daily progress of piping spools already tacked weld.  Planning the prefabricated piping spools for be welded on the workshop welding area.  Assistance to hand-over.  Co-ordination the Prefabrication of spools of piping for be installed in the modules in the area where they were being manufactured and assembled modules that after being with all pipe spools mounted properly, and be accepted by the Quality Control these same modules were loaded on ships able to transport the modules to build a new refinery in NORWAY. PROJECT: WORKSHOP OF FABRICOM-GTI-SUEZ IN HOBOKEN – BÉLGIUM
  • 4. 4 07/2002 till 07/2004; ABB LUMMUS GLOBAL POSITION: PIPING and STRUCTURES SUPERVISOR RESPONSIBILITIES: Responsible for the erection of the pipe and structure works, including.  Co-ordination and supervision of both labour and materials.  Resolve of project deviations by means of Technical Queries.  Planning of the erection work sequence and necessary resources allocation. PROJECT: PO11 Project – Lyondell, Maasvlakte – NETHERLANDS 02/2002 till 06/2002: GENIUS VOS POSITION: PIPING FOREMAN RESPONSIBILITIES: Activities as a Piping Foreman such as.  Receipt of the Isometric by the Workshop Supervisor who were sent from various Petroleum Prospecting platforms around the North Sea to the workshop facilities of Genius Vos, for the manufacture of new pipe spools in Carbon Steel, Stainless Steel, Duplex and Superduplex, to replace the spool pipes that were already in the process of corrosion and wear of the various platforms, which the Genius Vos provided consumables for the maintenance of anchored Platforms on the Sea, as well as a Technical Support.  Planning the implementation of piping spools of small and large bore in Carbon Steel, Stainless Steel, Duplex and Super Duplex.  Planning the execution of the tests required of new pipe spools in Carbon Steel, Stainless Steel, Duplex and Super Duplex.  Repairs onshore of small Petroleum Prospecting platforms that were transported from the North Sea to a land adjacent to the Genius Vos Workshop. PROJECT: Piping Fabrication in Carbon Steel, Stainless Steel, Duplex and Super Duplex - GENIUS VOS WORKSHOP in IJMUDEN - NETHERLANDS. 08/2001 till 01/2002: STORK INDUSTRY SERVICES BV POSITION: PIPING FOREMAN RESPONSIBILITIES: Responsibilities of Piping Foreman were.  Planning the execution of piping spool’s (small bore and large bore).  Planning the execution of piping spools and implementation of the necessary tests.  Planning the execution of construction the piping supports.  Planning the Erection of Piping Spools.  Supervising the Erection of Piping Spools.  Coordination the Fabrication the Spools of Piping.. PROJECT: SHELL PERNIS OIL REFINERY IN ROTTERDAM – NETHERLANDS 01/2001 till 31/12/2001: OELE-HIDRAUVIANENSE Lda, POSITION: CONSTRUCTION SUPERVISOR / ENGINEER RESPONSIBILITES: Responsible for the construction of the piping and structural works including.  Planning the erection work sequence and necessary resources allocation for Installation the New HVAC Machines, and new Heaters, who will be installed on the same Foundations of the Hold HVAC Machines and the Heaters was installed.  Supervising the Installation of new Chillers, and all Piping connections to the Chillers.  Co-ordination and supervision of both labour and materials.  In this project, I was the one who drew all new piping isometrics that was prefabricated and assembled in brackets also designed by me that were installed next to the existing piping. PROJECT: Installation of new HVAC equipment in one of the networks operators of National Mobil Phones named TMN in Main Headquarters in LISBON – PORTUGAL
  • 5. 5 06/1999 till 09/2000: PONTICELLI Frères. POSITION: WORK PREPARATOR RESPONSIBILITIES: Activities of technical office related with Work Preparation and Construction Engineering, such as.  Preparation the isometrics and piping layouts, for emission to the field, for pre-fabrication and erection.  Preparation and release Piping Supports construction work-packages. Resolve of piping Technical Queries.  Monitoring of Pipe Assemblies and monitoring of pipe materials, as well as giving technical support in the field of Construction.  Preparation the “As Builts”, Test Packs and Punch List’s. PROJECT: SOLVAY PETROCHEMICAL in MARTOREL – SPAIN. 1998 till 1999: SICOM BV POSITION: PIPING SUPERVISOR RESPONSIBILITIES: Main technical activities were as follows.  Supervision of Spool’s Fabrication and Erection.  Resolution of Project Modifications through Technical Consultations to the Engineering Department.  Planning of the erection work sequence and necessary resources allocation. PROJECT: CONSTRUCTION OF A NEW PHASE IN SHELL PERNIS REFINERY – HOLLAND 1997 till 1998: DUMEZ COPISA POSITION: QUALITY CONTROL SUPERVISOR RESPONSIBILITIES: Activities of Quality Control Supervisor such as.  Daily inspection of joints to be welded in Carbon Steel and Stainless Steel pipes such as 304L, 316L and Duplex.  Daily inspection of the welders portable stoves in order to confirm that I those same stoves were connected to the electrical current in order to maintain a temperature between 80°C and 150°C, and if not contained Carbon Steel Electrodes mixed with Stainless Steel Electrodes.  Visual inspection of welds on Carbon steel pipes, stainless steel pipes and Duplex.  Verification of welding procedures, and providing the documentation necessary for different types of welding in the work, such as welding in Carbon Steel Pipes, Stainless Steel Pipes 304L, 316L and Duplex.  Preparation the Documentation and monitoring the release of thePpiping Spools for Abrasive Sand Blasting and Painting of the respective Piping Spools.  Pipe circuits checking and punch lists. PROJECT: PETROCHEMICAL INDUSTRY (IN CARTAGENA) – SPAIN 1996 till 1997: SICOM BV POSITION: PIPING SUPERVISOR RESPONSIBILITIES: Main technical activities were.  Supervising the manufacturing of piping spools.  Resolution of the changes made in isometrics through technical consultations to the Engineering Workshop.  Planning of prefabrication of the sequence of piping spools and forward these same piping spools to the Department of Welding Workshop of SICOM BV in Vlissingen. PROJECT: Prefabrication for the construction of a new phase in the Shell Refinery in Moerdjike - NETHERLANDS.
  • 6. 6 1994 till 1996: EUROTUNNELS POSITION: PIPING FOREMAN RESPONSIBILITIES: These activities are.  Coordination the Erection of the Equipments and piping spoos.  Resolve the project modifications on field.  Planning the Erection work sequence and the necessary resources for piping allocation.  Assistance to hand-over PROJECT: MEDICAL FACTORY in FRIBOURG - SWITZERLAND 1990 till 1994: AALBORG CISERVE Lda, POSITION: FOREMAN COORDINATOR RESPONSIBILITIES: Main technical activities were.  Coordination of the all piping jobs, between the vessel & the piping Department including,distribution the manpower and man-hours.  Planning and analise all documents presented by the owners of the Ships for do the piping jobs on different vessels like VLCCs, Tankers, LPGs, Gas Carriers, Rigs and etc… PROJECTS: Repair & Maintenance of Boilers on Board the Ships and in Shipyards in PORTUGAL and AROUND THE WORLD. 1987 till 1989: BABCOK – AFRICA POSITION: PIPING SUPERVISOR RESPONSIBILITIES: Main technical activities were.  Supervision of Spool’s Fabrication and Erection.  Resolve of project modifications by means of Site Technical Queries.  Planning the Elevation sequence and the resources required for the allocation of Piping Spools and Equipments. PROJECT: J.C.I.- (Saref Project-Platinum Refinery in RUSTEMBURG – SOUTH AFRICA 1985 till 1987: N-REN ITERNATIONAL POSITION: PIPE FITTER RESPONSIBILITIES: Main technical activities were.  Execution of pre-fabrication and erection of piping spools in Carbon Steel and Stainless Steel.  Execution of piping supports.  Execution the steam tracing with ½” stainless steel pipe in one of the areas of the Complex, were almost the piping was stainless steel. PROJECT: CHEMICAL FERTILIZER COMPLEX at TAMATAVE – MADAGASCAR 1981 till 1984: BABCOCK – AFRICA POSITION: PIPE FITTER & BOILERMAKER RESPOSIBILITIES: Main technical activities were.  Execution of pre-fabrication and erection of piping spools in Carbon Steel and Stainless Steel.  Execution of piping support’s.  Execution the fabrication and erection of Steel Structures.  Most of the work I did there, was in stops of several Power Stations in South Africa. PROJECTS: SHUT DOWNS IN SEVERAL POWER STATIONS – REPUBLIC OF SOUTH AFRICA
  • 7. 7 1979 till 1981: A. SOUSA & SOUSA. Lda, POSITION: PIPE FITTER RESPONSIBILITIES: Main technical activities were.  Prefabrication and assembly the jacketed pipes in a new National factory for manufacturing the salt and water crackers and Waffles.  Prefabrication and assembly of supports, where they would be installed the jacketed pipes. PROJECT: NEW NATIONAL FACTORY OF SALT and WATER CRACKERS & WAFFLES IN MEM- MARTINS – PORTUGAL. 01/05/1977 till 31/12/1977: MOMPOR / METALTORRE. Lda, POSITON: PIPE FITTER RESPONSIBILITIES: Main technical activities were.  I started my career as a Pipefitter in Hydro Tests of a large part of the Crude Pipelines in Petrogal refinery in Sines.  I was hired by Metaltorre it was one of the companies who hired hand labor to MOMPOR that was one of several companies that also rented their work to Mompor, for EX :. The Portuguese Nervion, Gremetal, and many more companies. All these companies were hired by Technip France, to carry out the construction and completion of the new refinery belonging to the Consortium of Petrogal, which was the Sines Refinery. PROJECT: COMPLETE THE CONSTRUCTION OF THE PETROGAL REFINERY in SINES – PORTUGAL.