1. 1
CURRICULUM VITAE
NAME: MANUEL RAMOS DE CAMPOS ABREU BARTILOTTI
ADDRESS: Rua S. Miguel Nascente 6, 2ºC 2805-024 Pragal – Almada PORTUGAL
TELEPHONES: MOBILE. (+351 96 383 46 71) HOME. (+351 21 295 74 39)
E –MAIL: mbartilotti3@gmail.com
SKYPE: manybarti11
NATIONALITY: Portuguese. CIVIL STAUS: Divorced.
DATE OF BIRTH: 13/09/1952
LANGUAGES: Portuguese (Mother Tong), English & French (Spoken & Written), Spanish (Spoken)
Italien. (Spoken).
ACADEMIC BACKGROUND: Technical high industrial school, with two years of the Preparatory Sections
for engineer institutes.
PROFESSIONAL TRAINING: -
Technical Drawing Course.
Rigger Course. Piping and Equipment Lifting – By Mammoet – Holland
SPECIAL FLANGES ERECTION COURSE (Male anda Female, Tong and Groove, Ring Joint) –
HOLLAND
SAFETY CERTIFICATE: VCA – I –Safety Course For Workers in Refineries, Petrochemical’s, etc…
EXECUTIVE SUMARY:
I have more than 34 years experience in the field of piping and steel structures in the following areas for
Construction of the: Petrochemical’s, Refineries, Gas Plants, Water Treatment Centers, Incinerator’s, Cellulose
factories, Chemicals plants, Crackers Factories and Mill factories.
After serving my time as a pipe fitter I subsequently moved into piping and steel structures Foreman and
Supervisor alternating as Construction Superintendent, QC Supervisor and Piping Field Engineer. Computer
literate such as: Windows and Office – (EXCEL and WORD).
I have gained a widened knowledge of production assemblies of piping and structure, maintenance of machines,
work preparation, materials, welding sequence and systems such as: (SMAW, GTAW, SAW, and Plasma.) and
co-ordination of workforce.
I consider my main attributes to be a self-motivated team player who works well under pressure to meet project
requirements and time schedules.
PROFESSIONAL EXPERIÊNCE:
04/ 2012 till 12/ 2013: SITUBEL
POSITION: PIPING SUPERVISOR
RESPONSIBILITIES: Activities as a Piping Supervisor such as.
Sporadic Supervisory works in prefabrication and assembly of pipes in small businesses Companies who
SITUBEL rent manpower in PORTUGAL.
2. 2
04/2010 till 31/12/2011: THYSSENKRUPP
POSITION: PIPING SUPERVISOR
RESPONSIBILITIES: Activities as a piping supervisor such as.
Responsible for Supervision and Inspection the Subcontractor Company in Prefabrication and assembly of the
entire piping on "FGD_Bateria-A ', B and C. Who is the {Flue Gas Desulfurization System of the Coking Plant}.
Modify and rerouting on site, the majority of the pipe work spools, and supports.
Coordinating the daily report and weekly progress. Member of the pre-commissioning Team on “FGD_Battery-
A”, “FGD_Battery-B” and “FGD_Battery-C”.
PROJECT: THYSSENKRUPP / CSA, New Steel Industry of Atlântic - “BRAZIL”
06/2008 till 09/2009: THYSSENKRUPP
POSITION: CONSTRUCTION SUPERVISOR
RESPONSIBILITIES: Activities as piping and structural construction Supervisor Such as.
Supervising and Inspection of Subcontractors Companies in the work of assembling the Steel Structures and
The Ducts belonging to Dedusting System of the Blast Furnaces inside and outside the Stock House and Cast
House.
Resolve the Subcontractors problems in Assembly and erection of steel structures and the ducts according to the
norms on Site.
Coordination of the weekly progress. Cooperation and help the logistic Department.
Supervision and Inspection in the assembly of the Pressure Equalizing System of the Blast Furnace 01.
Responsible for the daily inspection of a Brazilian Company named "EBSE", situated about at 25 km from the
Permises of the Steel Plant, which was hired by ThyssenKrupp for make the Pre-fabrication of a large part of the
Piping Spools for Erection of the two Blast Furnaces.
Supervising and Inspection the Erection of piping utilities on Stock house and Cast House.
PROJECT: THYSSENKRUPP/CSA, New Steel Industry of Atlântic - “BRAZIL”
30/05/2008 till 01/06/2008: FDO-ABB ENGINEERING, Ltd.
POSITION: PIPING SUPERVISOR
RESPONSIBILITIES: Activities as a piping supervisor such as.
When I started my work in Algeria, I was placed in the Piping Superintendent office next to Camp where we all
live it was also the place where was situated the workshop prefabrication of piping for various units of Natural
Gas who were to be Remodeled.
After a few days, I was requested by the Site Manager to work together studying what types of welding
procedures that we had on our hands to weld the tie-ins at several refineries Renewal of Natural Gas that could
not stop the refining the Natural Gas.
During the time I was working in conjunction with the Site Manager, he asked me to perform all the calculations
necessary to make Water hydraulic testing for a Refinery Gas Renewal that was within the board of Hassi R’mel.
The volume of Water Calculated by me, would be transported to the refinery by a Sisterna Truck.
Supervise several workers and instruct them the method for opening the flanges of gas pipelines that were already
empty and no traces of gas to be able to take with proper security the Scratched Ring Joint, and then they could
insert the new Ring Joint without any problem in one of the areas of the refinery that was already stopped and
prepared to conduct this kind of work, knowing that the refinery has always been in continuous process of
Refining the Natural Gas.
PROJECT: BOOSTING Ph2 Hassi R’mel on Several Natural Gas Refineries – ALGERIA.
3. 3
09/2007 till 30/04/2008: TECHNIP ITALY
POSITION: PIPING FIELD ENGINEER
RESPONSIBILITIES: Activities of Piping Field Engineer such as.
Preparation of isometrics and piping layouts, for emission to the field for pre-fabrication and erection.
Troubleshooting with the pipe through the existing Technical Queries on Work Site.
Small bore Piping Special Supports Designer.
Preparation of Test Folders, and Punch Lists of erected piping.
I was one of the Team Members for Verification and Approval well as the signature of the
Signing of Documents Required for delivery to the Client the Reinstallation of piping after the execution of the
tests.
PROJECT: Canadian Natural Resources Oil Sands (C.N.R.L.) HORIZON PLANT - CANADA.
01/2007 till 08/2007: Consolidated Contractors International Company (S.A.L.)
POSITION: SITE SUPERINTENDENT - PIPING
RESPONSIBILITIES: Activities as a Site Superintendent – Piping such as.
Coordination of the Piping Survey on Pipe Racks, supervise and plan the erection sequence.
Coordination of the Piping Flushing works.
Assistance to the Engineering Department, control and verification that the individual isometrics each reel, were
in agreement with the original isometric in measurements, rotations, Angles and so on.
Coordination of the progress of sub-contractor’s works and weekly planning.
Resolve of projects deviations.
PROJECT: Expansion of Gas Plant in the department of Quality Control Section whose acronym is (Q.C.S.) in
Ras Laffan Industrial City – QATAR.
06/2006 till 12/2006: ALLSEAS – ENGINEERING BV
POSITION: PIPING SUPERVISOR
RESPONSIBILITIES: Piping Supervisor works such as.
Supervision of pre-fabrication works in the workshop.
Supervision and plan the erection of piping spools on board the ship was converted from cargo ship to lay
pipeline on sea ship.
Planning of the erection work sequence and necessary resources allocation.
Co-ordination and supervision of both labour and materials.
Resolve of project deviations by means of Site Technical Queries.
The Conversion of the Cargo Ship to Ship for laying pipelines on the bottom of the sea belonging to Allseas was
completed in the shipyards of Keppel Verolme in the NETHERLANDS.
PROJECT: ALLSEAS / KEPPEL VEROLME – THE NETHERLANDS
08/2004 till 03/2006: FABRICOM – GTI – SUEZ
POSITION: PIPING FOREMAN
RESPONSIBILITIES: Activities of Piping Foreman such as.
Coordination of prefabrication of spools in carbon steel and stainless steel with different schedules of piping.
Responsible for daily progress of piping spools already tacked weld.
Planning the prefabricated piping spools for be welded on the workshop welding area.
Assistance to hand-over.
Co-ordination the Prefabrication of spools of piping for be installed in the modules in the area where they were
being manufactured and assembled modules that after being with all pipe
spools mounted properly, and be accepted by the Quality Control these same modules were
loaded on ships able to transport the modules to build a new refinery in NORWAY.
PROJECT: WORKSHOP OF FABRICOM-GTI-SUEZ IN HOBOKEN – BÉLGIUM
4. 4
07/2002 till 07/2004; ABB LUMMUS GLOBAL
POSITION: PIPING and STRUCTURES SUPERVISOR
RESPONSIBILITIES: Responsible for the erection of the pipe and structure works, including.
Co-ordination and supervision of both labour and materials.
Resolve of project deviations by means of Technical Queries.
Planning of the erection work sequence and necessary resources allocation.
PROJECT: PO11 Project – Lyondell, Maasvlakte – NETHERLANDS
02/2002 till 06/2002: GENIUS VOS
POSITION: PIPING FOREMAN
RESPONSIBILITIES: Activities as a Piping Foreman such as.
Receipt of the Isometric by the Workshop Supervisor who were sent from various Petroleum Prospecting
platforms around the North Sea to the workshop facilities of Genius Vos, for the manufacture of new pipe spools
in Carbon Steel, Stainless Steel, Duplex and Superduplex, to replace the spool pipes that were already in the
process of corrosion and wear of the various platforms, which the Genius Vos provided consumables for the
maintenance of anchored Platforms on the Sea, as well as a Technical Support.
Planning the implementation of piping spools of small and large bore in Carbon Steel, Stainless Steel, Duplex
and Super Duplex.
Planning the execution of the tests required of new pipe spools in Carbon Steel, Stainless Steel, Duplex and
Super Duplex.
Repairs onshore of small Petroleum Prospecting platforms that were transported from the North Sea to a land
adjacent to the Genius Vos Workshop.
PROJECT: Piping Fabrication in Carbon Steel, Stainless Steel, Duplex and Super Duplex - GENIUS VOS
WORKSHOP in IJMUDEN - NETHERLANDS.
08/2001 till 01/2002: STORK INDUSTRY SERVICES BV
POSITION: PIPING FOREMAN
RESPONSIBILITIES: Responsibilities of Piping Foreman were.
Planning the execution of piping spool’s (small bore and large bore).
Planning the execution of piping spools and implementation of the necessary tests.
Planning the execution of construction the piping supports.
Planning the Erection of Piping Spools.
Supervising the Erection of Piping Spools.
Coordination the Fabrication the Spools of Piping..
PROJECT: SHELL PERNIS OIL REFINERY IN ROTTERDAM – NETHERLANDS
01/2001 till 31/12/2001: OELE-HIDRAUVIANENSE Lda,
POSITION: CONSTRUCTION SUPERVISOR / ENGINEER
RESPONSIBILITES: Responsible for the construction of the piping and structural works including.
Planning the erection work sequence and necessary resources allocation for Installation the New HVAC
Machines, and new Heaters, who will be installed on the same Foundations of the Hold HVAC Machines and the
Heaters was installed.
Supervising the Installation of new Chillers, and all Piping connections to the Chillers.
Co-ordination and supervision of both labour and materials.
In this project, I was the one who drew all new piping isometrics that was prefabricated and assembled in
brackets also designed by me that were installed next to the existing piping.
PROJECT: Installation of new HVAC equipment in one of the networks operators of National Mobil
Phones named TMN in Main Headquarters in LISBON – PORTUGAL
5. 5
06/1999 till 09/2000: PONTICELLI Frères.
POSITION: WORK PREPARATOR
RESPONSIBILITIES: Activities of technical office related with Work Preparation
and Construction Engineering, such as.
Preparation the isometrics and piping layouts, for emission to the field, for pre-fabrication and erection.
Preparation and release Piping Supports construction work-packages. Resolve of piping Technical Queries.
Monitoring of Pipe Assemblies and monitoring of pipe materials, as well as giving technical support in the field
of Construction.
Preparation the “As Builts”, Test Packs and Punch List’s.
PROJECT: SOLVAY PETROCHEMICAL in MARTOREL – SPAIN.
1998 till 1999: SICOM BV
POSITION: PIPING SUPERVISOR
RESPONSIBILITIES: Main technical activities were as follows.
Supervision of Spool’s Fabrication and Erection.
Resolution of Project Modifications through Technical Consultations to the Engineering Department.
Planning of the erection work sequence and necessary resources allocation.
PROJECT: CONSTRUCTION OF A NEW PHASE IN SHELL PERNIS REFINERY – HOLLAND
1997 till 1998: DUMEZ COPISA
POSITION: QUALITY CONTROL SUPERVISOR
RESPONSIBILITIES: Activities of Quality Control Supervisor such as.
Daily inspection of joints to be welded in Carbon Steel and Stainless Steel pipes such as 304L, 316L and Duplex.
Daily inspection of the welders portable stoves in order to confirm that I those same stoves were connected to the
electrical current in order to maintain a temperature between 80°C and 150°C, and if not contained Carbon Steel
Electrodes mixed with Stainless Steel Electrodes.
Visual inspection of welds on Carbon steel pipes, stainless steel pipes and Duplex.
Verification of welding procedures, and providing the documentation necessary for different types of welding in
the work, such as welding in Carbon Steel Pipes, Stainless Steel Pipes 304L, 316L and Duplex.
Preparation the Documentation and monitoring the release of thePpiping Spools for Abrasive Sand Blasting and
Painting of the respective Piping Spools.
Pipe circuits checking and punch lists.
PROJECT: PETROCHEMICAL INDUSTRY (IN CARTAGENA) – SPAIN
1996 till 1997: SICOM BV
POSITION: PIPING SUPERVISOR
RESPONSIBILITIES: Main technical activities were.
Supervising the manufacturing of piping spools.
Resolution of the changes made in isometrics through technical consultations to the Engineering Workshop.
Planning of prefabrication of the sequence of piping spools and forward these same piping spools to the
Department of Welding Workshop of SICOM BV in Vlissingen.
PROJECT: Prefabrication for the construction of a new phase in the Shell Refinery in Moerdjike -
NETHERLANDS.
6. 6
1994 till 1996: EUROTUNNELS
POSITION: PIPING FOREMAN
RESPONSIBILITIES: These activities are.
Coordination the Erection of the Equipments and piping spoos.
Resolve the project modifications on field.
Planning the Erection work sequence and the necessary resources for piping allocation.
Assistance to hand-over
PROJECT: MEDICAL FACTORY in FRIBOURG - SWITZERLAND
1990 till 1994: AALBORG CISERVE Lda,
POSITION: FOREMAN COORDINATOR
RESPONSIBILITIES: Main technical activities were.
Coordination of the all piping jobs, between the vessel & the piping Department including,distribution the
manpower and man-hours.
Planning and analise all documents presented by the owners of the Ships for do the piping jobs on different
vessels like VLCCs, Tankers, LPGs, Gas Carriers, Rigs and etc…
PROJECTS: Repair & Maintenance of Boilers on Board the Ships and in Shipyards in PORTUGAL and
AROUND THE WORLD.
1987 till 1989: BABCOK – AFRICA
POSITION: PIPING SUPERVISOR
RESPONSIBILITIES: Main technical activities were.
Supervision of Spool’s Fabrication and Erection.
Resolve of project modifications by means of Site Technical Queries.
Planning the Elevation sequence and the resources required for the allocation of Piping Spools and Equipments.
PROJECT: J.C.I.- (Saref Project-Platinum Refinery in RUSTEMBURG – SOUTH AFRICA
1985 till 1987: N-REN ITERNATIONAL
POSITION: PIPE FITTER
RESPONSIBILITIES: Main technical activities were.
Execution of pre-fabrication and erection of piping spools in Carbon Steel and Stainless Steel.
Execution of piping supports.
Execution the steam tracing with ½” stainless steel pipe in one of the areas of the Complex, were almost the
piping was stainless steel.
PROJECT: CHEMICAL FERTILIZER COMPLEX at TAMATAVE – MADAGASCAR
1981 till 1984: BABCOCK – AFRICA
POSITION: PIPE FITTER & BOILERMAKER
RESPOSIBILITIES: Main technical activities were.
Execution of pre-fabrication and erection of piping spools in Carbon Steel and Stainless Steel.
Execution of piping support’s.
Execution the fabrication and erection of Steel Structures.
Most of the work I did there, was in stops of several Power Stations in South Africa.
PROJECTS: SHUT DOWNS IN SEVERAL POWER STATIONS – REPUBLIC OF SOUTH AFRICA
7. 7
1979 till 1981: A. SOUSA & SOUSA. Lda,
POSITION: PIPE FITTER
RESPONSIBILITIES: Main technical activities were.
Prefabrication and assembly the jacketed pipes in a new National factory for manufacturing the salt and water
crackers and Waffles.
Prefabrication and assembly of supports, where they would be installed the jacketed pipes.
PROJECT: NEW NATIONAL FACTORY OF SALT and WATER CRACKERS & WAFFLES IN MEM-
MARTINS – PORTUGAL.
01/05/1977 till 31/12/1977: MOMPOR / METALTORRE. Lda,
POSITON: PIPE FITTER
RESPONSIBILITIES: Main technical activities were.
I started my career as a Pipefitter in Hydro Tests of a large part of the Crude Pipelines in Petrogal refinery in
Sines.
I was hired by Metaltorre it was one of the companies who hired hand labor to MOMPOR that was one
of several companies that also rented their work to Mompor, for EX :. The Portuguese Nervion,
Gremetal, and many more companies. All these companies were hired by Technip France, to carry out
the construction and completion of the new refinery belonging to the Consortium of Petrogal, which
was the Sines Refinery.
PROJECT: COMPLETE THE CONSTRUCTION OF THE PETROGAL REFINERY in SINES –
PORTUGAL.