CURRICULUM VITAE
NAME: MANUEL RAMOS DE CAMPOS ABREU BARTILOTTI
ADDRESS: Rua S. Miguel Nascente 6, 2ºC 2805-024 Pragal – Almada PORTUGAL
TELEPHONES: MOBILE. (+351 96 383 46 71) HOME. (+351 21 295 74 39)
E –MAIL: mbartilotti723@gmail.com
Skype: mannybarti113
NATIONALITY: Portuguese. CIVIL STAUS: Divorced.
DATE OF BIRTH: 13/09/1952
LANGUAGES: Portuguese. (Mother Tong), English & French. (Spoken & Written), Spanish. (Spoken) Italien. (Spoken).
ACADEMIC BACKGROUND: Old Fifth Industrial Year, plus the Second Year of the Preparatory Sections to
the Industrial Institutes of Mechanical Engineering.
PROFESSIONAL TRAINING: - Technical Drawing Course.
FLANGES ERECTION COURSE: (Male and Female, Tongue and Groove, Ring Joint) – HOLLAND
SAFETY CERTIFICATE: VOL-VCA – Safety for Operational Supervisors SCC.
EXECUTIVE SUMARY:
I have more than 30 years experience in the field of piping and steel structures in the following areas for
Construction of the: Petrochemical’s, Refineries, Gas Plants, Water Treatment Centers, Incinerator’s, Cellulose
factories, Chemicals plants, Crackers Factories and Mill factories.
After serving my time as a pipe fitter I subsequently moved into piping and steel structures Foreman and
Supervisor alternating as Piping Superintendent, QC Supervisor and Piping Field Engineer. Computer literate
such as: Windows and Office – (EXCEL and WORD).
I have gained a widened knowledge of production assemblies of piping and structure, maintenance of machines,
work preparation, materials, welding sequence and systems such as: (SMAW, GTAW, SAW, and Plasma.) and
co-ordination of workforce.
I consider my main attributes to be a self-motivated team player who works well under pressure to meet project
requirements and time schedules.
PROFESSIONAL EXPERIÊNCE:
10/08/2016 till 15/10/2016: BILFINGER/ROB
POSITION: PIPING SUPERVISOR
RESPONSIBILITIES: Activities as Piping Supervisor such as.
In this project, I worked directly with the Construction Manager, and it was he who gave the orders to the work
preparator, in order to prepare the isometric folders of the piping HVAC system that were most urgently needed
to be assembled, and of which I did copies of these same isometrics folders, so that I could give my two
Foremans so that they could begin assembling the pipes in various Pipe-Racks and in areas under my supervision.
Responsible for the daily filling and signing of the cold and hot work permits, in order to be also signed by the
Safety Supervisor at work, before the beginning of the execution of any type of work.
Responsible for the weekly progress.
PROJECT: NEW PHARMACEUTICALL FACTORY in GEEL Named GENZYME – BELGIUM
10/04/2016 till 10/07/2016: SONIM TECHNOLOGIES
POSITION: PIPING SUPERVISOR
RESPONSIBILITIES: Activities as Piping Supervisor shuch as.
Control and Supervision as well as the Planning of the Elevation sequence and Technical Resources Needed for
the allocation of several Tie-Ins to be carried out in ovens Nº. 160, Nº. 170 and Nº. 180, before and after the Shut
Down of the "Area-S", which I was a Supervisor.
PROJECT: OPTARA PROJECT at TOTAL Refinery in Antwerp - BELGIUM.
04/ 2012 till 12/ 2015: SITUBEL
POSITION: PIPING SUPERVISOR
RESPONSIBILITIES: Activities as a Piping Supervisor such as.
Responsible for the supervision of prefabrication and assembly of pipes in various companies for short-term
Projects for SITUBEL – PORTUGAL.
2. 2
04/2010 till 31/12/2011: THYSSENKRUPP
POSITION: PIPING SUPERVISOR / INSPECTOR
RESPONSIBILITIES: Activities as a piping supervisor such as.
Responsible for Supervision and Inspection the Subcontractor Company in Prefabrication and assembly of the
entire piping on "FGD_Battery-A ', B and C. Who is the {Flue Gas Desulfurization System of the Coking Plant}.
Modify and rerouting on site, the majority of the pipe work spools, and supports.
Coordinating the daily report and the weekly progress. Member of the pre-commissioning and the commissioning
Team on “FGD_Battery-A”, “FGD_Battery-B” and “FGD_Battery-C”.
PROJECT: THYSSENKRUPP / CSA, New Steel Industry of Atlântic - “BRAZIL”
06/2008 till 30/09/2009: THYSSENKRUPP
POSITION: CONSTRUCTION SUPERVISOR
RESPONSIBILITIES: Activities as piping and structural construction Supervisor such as.
Supervising and Inspection of Subcontractors Companies in the work of assembling the steel structures and
the ducts belonging to Dedusting System of the Blast Furnaces inside and outside the Stock House and Cast
House.
Coordination of the weekly progress. Cooperation and help the logistic Department.
Supervision and Inspection in the assembly of the Pressure Equalizing System of the Blast Furnace 01.
Responsible for the daily inspection of a Brazilian Company named "EBSE", situated about at 25 km from the
Premises of the Steel Plant, which was hired by ThyssenKrupp for make the Pre-fabrication of a large part of the
Piping Spools for Erection on the two Blast Furnaces.
Supervising and Inspection the Erection of piping utilities on Stock house and Cast House.
PROJECT: THYSSENKRUPP/CSA, New Steel Industry of Atlântic - “BRAZIL”
01/05/2008 till 01/06/2008: ABB S.p.A Italy
POSITION: PIPING SUPERVISOR
RESPONSIBILITIES: Activities as a piping supervisor such as.
When I started my work in Algeria, I was placed in the Piping Superintendent office next to Camp where we all
live it was also the place where was situated the workshop for prefabrication of piping for various units of
Natural Gas who were to be Remodeled.
PROJECT: BOOSTING Ph2 Hassi R’mel on Several Natural Gas Refineries – ALGERIA.
09/2007 till 30/04/2008: TECHNIP ITALY S.p.A.
POSITION: PIPING FIELD ENGINEER
RESPONSIBILITIES: Activities of Piping Field Engineer such as.
Preparation of isometrics and piping layouts, for emission to the field for pre-fabrication and erection.
Troubleshooting with the pipe through the existing Technical Queries on Work Site.
Small bore Piping Special Supports Designer.
PROJECT: Oil Sands, Primary Upgrading of the Canadian Natural Resources,limited - Horizon Plant in
Alberta - CANADA.
01/2007 till 08/2007: Consolidated Contractors International Company (S.A.L.)
POSITION: SITE SUPERINTENDENT - PIPING
RESPONSIBILITIES: Activities as a Site Superintendent – Piping such as.
Coordination of piping survey and installation in the main Piping Racks, as well as overseeing and planning the
assembly sequence of piping spools.
Assistance to the Engineering Department, control and verification that the individual isometrics of each spool,
were in agreement with the original isometric in measurements, rotations, Angles and so on.
PROJECT: Expansion of Natural Gas Plant, working within the quality control department whose abbreviation
is (Q.C.S.) in Ras Laffan Industrial City - QATAR.
06/2006 till 12/2006: ALLSEAS – ENGINEERING BV
POSITION: PIPING SUPERVISOR
RESPONSIBILITIES: Piping Supervisor works such as.
Supervision of piping pre-fabrication works in the workshop.
Supervision and plan the erection of piping spools on board the ship was converted from cargo ship to lay
pipeline sea ship.
Planning of the erection work sequence and necessary resources allocation.
PROJECT: AUDACIA OF ALLSEAS maded on the shipyards of Kppel Verolme – NETHERLANDS.
3. 3
08/2004 till 03/2006: FABRICOM – GTI – SUEZ
POSITION: PIPING FOREMAN
RESPONSIBILITIES: Coordination of prefabrication of spools in carbon steel and stainless steel with different
schedules of piping.
Planning the prefabricated piping spools for be welded on the workshop welding area.
Coordination the prefabrication of spools of piping for be installed in the modules to build a new refinery in
NORWAY.
PROJECT: WORKSHOP OF FABRICOM-GTI-SUEZ IN HOBOKEN – BÉLGIUM
08/2002 till 07/2004: ABB LUMMUS GLOBAL
POSITION: PIPING and STRUCTURES SUPERVISOR
RESPONSIBILITIES: Responsible for the Supervision of the assembling the piping spools and the steel
structures, including, coordination and supervision of labor and materials.
PROJECT: PO11 PROJECT – Lyondell, Maasvlakte – NETHERLANDS
06/2002 till 08/2002: GENIUS VOS
POSITION: PIPING FOREMAN
RESPONSIBILITIES: Receipt the Isometrics by the Workshop Supervisor who were sent from several
Petroleum Prospecting platforms anchored in the North Sea to the workshop facilities of Genius Vos, for
fabrication of the new piping spools in Carbon Steel, Stainless Steel, Duplex and Superduplex.
PROJECT: Piping fabrication in Carbon Steel, Stainless Steel, Duplex and Superduplex - GENIUS VOS
WORKSHOP in IJMUDEN - NETHERLANDS.
04/2002 till 05/2002: STORK INDUSTRY SERVICES BV
POSITION: PIPING FOREMAN
RESPONSIBILITIES: Planning the execution and assembly of piping spool’s (small bore and large bore).
PROJECT: SHELL PERNIS OIL REFINERY IN ROTTERDAM – NETHERLANDS.
01/2001 till 31/12/2001: OELE-HIDRAUVIANENSE Lda,
POSITION: CONSTRUCTION SUPERVISOR / COORDINATOR
RESPONSIBILITES: Planning the erection work sequence and necessary resources allocation for Installation
the New HVAC Machines, and new Heaters, who will be installed on the same Foundations of the hold HVAC
Machines and the Heaters was installed.
Supervising the Installation of new Chillers, and all Piping connections to the Chillers.
Responsible for the weekly progress.
PROJECT: Installation of new HVAC Equipment and the New Chillers in one of the networks operators of
National Mobil Phones named TMN in Main Headquarters in LISBON – PORTUGAL.
06/1999 till 09/2000: PONTICELLI Frères.
POSITION: WORK PREPARATOR
RESPONSIBILITIES: Activities of technical office related with Work Preparation
and Construction Engineering, such as.
Preparation the isometrics and piping layouts, for emission to the field, for pre-fabrication and erection.
PROJECT: SOLVAY PETROCHEMICAL in MARTOREL – SPAIN.
1998 till 1999: SICOM BV
POSITION: PIPING SUPERVISOR
RESPONSIBILITIES: Supervision of piping spool’s fabrication and erection.
Resolution of Project Modifications through Technical Consultations to the Engineering Department.
PROJECT: CONSTRUCTION OF A NEW PHASE IN SHELL PERNIS REFINERY – HOLLAND
1997 till 1998: DUMEZ COPISA
POSITION: QUALITY CONTROL SUPERVISOR
RESPONSIBILITIES: Do daily inspection of joints to be welded in Carbon Steel and Stainless Steel pipes such
as 304L, 309L, 316L and Duplex.
Pipe circuits checking and Punch lists.
PROJECT: PETROCHEMICAL INDUSTRY (IN CARTAGENA) – SPAIN.
4. 4
1996 till 1997: SICOM BV
POSITION: PIPING SUPERVISOR
RESPONSIBILITIES: Supervising the manufacturing of piping spools.
PROJECT: Prefabrication for the construction of a new phase in the Shell Refinery in Moerdjike –
NETHERLANDS.
04/1995 till 03/1996 GENIUS VOS
POSITION: PIPING FOREMAN
RESPONSIBILITIES: Planning the implementation of piping spools of small and large bore in Carbon Steel,
Stainless Steel, Duplex and Superduplex.
PROJECT: Piping Fabrication in Carbon Steel, Stainless Steel, Duplex and Superduplex - GENIUS VOS
WORKSHOP in IJMUDEN - NETHERLANDS.
01/1990 till 12/1994: AALBORG CISERVE Lda,
POSITION: FOREMAN COORDINATOR
RESPONSIBILITIES: Coordination of the all piping jobs, between the vessel & the piping Department
including,distribution the manpower and man-hours.
PROJECTS: Repair & Maintenance of Boilers on Board the Ships and in Shipyards in PORTUGAL and
Around the WORLD.
10/1987 till 11/1989: FKI - BABCOCK ENGINEERING CONTRACTORS (Pty)
POSITION: PIPING SUPERVISOR
RESPONSIBILITIES: Supervision of the pre-fabrication of the piping spools and their assembly in the Pipe
Racks, and in several areas that were under my supervision.
PROJECT: J.C.I.- (Saref Project-Platinum Refinery in RUSTEMBURG – SOUTH AFRICA
01/01/1985 till 31/12/1985: N-REN ITERNATIONAL
POSITION: PIPE FITTER
RESPONSIBILITIES: Execution of pre-fabrication and erection of piping spools in Carbon Steel and Stainless
Steel.
PROJECT: CHEMICAL FERTILIZER COMPLEX at TAMATAVE – MADAGASCAR
10/1981 till 03/1983: BABCOCK ENGINEERING CONTRACTORS
POSITION: PIPE FITTER & BOILERMAKER
RESPOSIBILITIES: Execution of pre-fabrication and erection of piping spools in Carbon Steel and Stainless
Steel, and assembling the Steel Structures.
PROJECTS: SHUT DOWNS IN SEVERAL POWER STATIONS – SOUTH AFRICA
04/1979 até 09/1981: A. SOUSA & SOUSA. Lda,
POSITION: PIPE FITTER
RESPONSIBILITIES: Prefabrication and assembly the jacketed pipes in a new National factory for
manufacturing the salt and water crackers and Waffles.
PROJECT: New National Factory of salt and water crackers & waffles in Mem-Martins – PORTUGAL.
01/05/1977 till 31/12/1977: MOMPOR / METALTORRE. Lda,
POSITON: PIPE FITTER
RESPONSIBILITIES: I started my career as a Pipefitter in Hydro Tests of a large part of the Crude Pipelines in
Petrogal refinery in Sines.
PROJECT: Completion the Construction of the Petrogal Refinery in SINES – PORTUGAL.