SlideShare a Scribd company logo
1 of 5
Download to read offline
PT. SINGGAR MULIA
Engineering Consultants
TEGUH RAHARDJO
Process Safety Engineer
Page 1 of 5
Place / Date of Birth : Surabaya / 2 March 1981
Nationality : Indonesia
Marital Status : Married
Religion : Moslem
Work Experience : 6 years
EDUCATION
FORMAL
Graduated from Chemical Engineering Sepuluh Nopember
Institute of Technology, Surabaya, Indonesia.
INFORMAL
Computer Skill
MS Office (Word, Excel, and Power point); Visio technical,
HYSYS, Pipenet 1.6, PHAST 6.7 and Flaresim 4.0
Design Standard and Code:
Quite familiar with NFPA, API, CCPS, DNV related to Process
and technical safety concern
EMPLOYMENT EXPERIENCE
April 2013 - Present
PT Singgar Mulia
Process Safety Engineer
December 2010 - April 2013
PT. Inti Karya Persada Tehnik
Plant Service Engineer
April 2008 – March 2010
PT. Inti Karya Persada Tehnik
Plant Service Engineer
PROJECT EXPERIENCE
PT. SINGGAR MULIA Engineering Consultant
April 2013 - Present
Process Safety Engineer
Client : PT PERTAMINA EP (PT PEP)
Project :
Cikarang–Tegal Pacing Development Project (FEED)
Responbilities :
- Assist to coordinate prosess safety team regarding interface
with other discipline of PTSM (internally)
- Prepare Safety in Design And Loss Prevention Philosophy
- Prepare Fire Water Demand and Pond Calculation
- Prepare Fire Water Hydraulic Calculation
- Review Safety & Fire Fighting Layout
- Review Hazardous Area Classification
- Review Foam Calculation
Client : PETROCHINA INTERNATIONAL JABUNG Ltd.
Project :
FEED Geragai Modification for BCD-5
Responbilities :
- Prepare HSE Design Philosophy
- Prepare Fire Water Demand
- Prepare Hazardous Area Classification
- Prepare PID Fire Water System
- Prepare Escape Route and Safety Equipment Layout
- Assist to coordinate prosess safety team regarding interface
with other discipline of PTSM.
Client : SANTOS NORTHWEST NATUNA B.V.
Project :
AAL FPSO DEVELOPMENT PROJECT
Responbilities :
- Prepare Emergency System Survivability Assessment (ESSA).
- Prepare Fire and Safety Equipment List.
- Prepare Hazardous Area Classification Report
- Prepare Fire Risk Management Plan
Client : PHE ONWJ
Project :
FEED OO-OC-OX FIELD DEVELOPMENT PROJECT
Responbilities :
- Prepare Offshore Vent Radiation and Gas Dispersion Study.
- Assisst to prepare Offshore Escape and Evacuation
Philosophy.
- Prepare Onshore Foam System Calculation.
- Prepare Onshore Deluge System Calculation.
- Prepare Onshore Firewater Demand Calculation.
- Prepare Onshore Fire Water Ring Main & Deluge System
Layout.
- Prepare PID Fire Water Fighting System
- Prepare Fire Water Fighting System Study (Adequacy check of
hydraulic calculation)
Project :
PHA FOLLOW UP HAZOP/ HAZID 2014 at UNIFORM F/S
Responbilities :
- Prepare Engineering Study to Review Requirement For Fire
Fighting Provision at Switchgear Room.
- Prepare Engineering Study to Review Escape Evacuation Risk
(EERA)
PT. SINGGAR MULIA
Engineering Consultants
TEGUH RAHARDJO
Process Safety Engineer
Page 2 of 5
Project :
PHA FOLLOW UP HAZOP/ HAZID 2014 at LIMA F/S AND
BRAVO F/S
Responbilities :
- Prepare Engineering Study to Review Riser Guard
Requirement.
- Prepare Engineering Study to Determine Risk And Mitigation
- Prepare Engineering Study to Review Gas Dispersion For Flare
System.
Project :
ENGINEERING SPESIFICATION DEVELOPMENT 2014
Responbilities :
- Assist to prepare Guidance for Ship Collision Analysis Study.
Project :
FEED SPA & KLD WELLHEAD PLATFORM DEVELOPMENT
Responbilities :
- Prepare Emergency System Survivability Analysis (ESSA),
- Prepare Safety Critical Equipment (SCE) List,
- Prepare Ship Impact Analysis.
Project :
ENGINEERING SPESIFICATION DEVELOPMENT 2013
Responbilities :
- Assist to prepare Guidance for Escape, Refuge, Evacuation
and Rescue for Fixed Installation
Project :
LLB-LLD NEW GAS LIFT PIPELINE
Responbilities :
- Prepare Hazardous Area Classification Schedule
Project :
MB2 FIREWATER STUDY
Responbilities :
Assist team take the firewater system conceptual study,
including :
 Firewater hydraulic simulation
 Foam system calculation
 Comparation between proposed option.
Client : SANTOS(MADURA OFFSHORE) PTY LTD
Project :
OYONG FSO TERMINAL RENTAL, OPERATION AND
MAINTENANCE SERVICES
Responbilities :
- Prepare Hazardous Area Classification Schedule for FSO MT
Surya Putra Jaya
Client : TOTAL E&P INDONESIE
Project :
OILY WATER LINE REPLACEMENT (TO GRP PIPE)
Responbilities :
- Prepare Surge Analysis for OWTU Piping System.
Client : PT PERTAMINA EP (PT PEP)
Project :
Pakugajah Development Project (FEED)
Responbilities :
- Assist to coordinate prosess safety team regarding interface
with other discipline of PTSM and with client of PT PEP.
- Review plot plan in the view of fire radiation and explosion.
- Prepare Firewater Demand Calculation
- Prepare Data Sheet for Deluge Valve
- Review Fire and Alarm System Philosophy
- Prepare Training Requirement and Philosophy
- Review Spesification for Clean Agent / Suppression System
- Review Spesification for Carbon Dioxide Suppression System
- Review Spesification for Emergency Shower and Eyewash
System
- Review Calculation Foam System
- Review Safety & Fire Fighting Layout
- Review Emergency Escape & Evacuation Plan
- Review HSE Detail Drawing
- Review Data Sheet for Fire Sprinkler
- Review Data Sheet for Emergency Eyewash and Safety
Shower System
- Review Data Sheet for Fire Extinguisher System
- Review Safety Equipment List
- Review MTO for HSE
- HAZID/HAZOP Meeting
- HAZID/HAZOP Close Out Report
PT. SINGGAR MULIA
Engineering Consultants
TEGUH RAHARDJO
Process Safety Engineer
Page 3 of 5
PT. Inti Karya Persada Tehnik EPCCompany
December 2010 – April 2013
Plant Service Engineer (Including HSE Enginer and
Precomm. Field Engineer)
Client : PT PERTAMINA
Project :
FEED ARUN LNG RECEIVING – HUB &REGASIFICATION
TERMINAL
Responbilities :
- Prepare Fire Protection System Design Basis And Philosophy
- Prepare Safety in Design and Loss Prevention Philosophy
- Prepare Fire & Gas Design Basis And Philosophy
- Prepare fire fighting equipment datasheet
- Design Indoor & Outdoor Fire & Gas Detection System
- Prepare Material Take Off and Work Volume of Fire Fighting &
Safety System
- Prepare Material Take Off and Work Volume of
Precomm/commissioning activities
- Prepare node list for Hazop Review Meeting
Client : ConocoPhillips
Project :
SUBAN BYPASS PLANT
Responbilities :
- Prepare Requisition and Technical Bid Evaluation for fire
protection system
- Prepare Fire Protection equipment layout, PID Fire Water
Distribution, PFD Fire Water System
- Prepare Verification report of Fire Explosion & Risk Analysis
(FERA) Study
- Prepare fire protection equipment datasheet
- Prepare node list for Hazid and Hazop Review Meeting
- Assigned as Scribber for Hazid and Hazop Review Meeting
- Prepare Site Acceptance Test Procedure of Fire Protection
System
- Prepare System Definition, Mark-up Drawing, System
Summary List, Precomm. Checklist, and Precomm. Test Sheet
as precommissioning technical preparation
- Prepare System Definition, Mark-up Drawing, System
Summary List, Precomm Checklist, and Precomm
- Test Sheet as precommissioning technical preparation
- Preparing Mechanical Completion Dossier in order to Handed
over the Plant from contractor to owner
- Coordinate Precommissioning/commissioning activities
Client : PT PERTAMINA GEOTHERMAL ENERGY
Project :
GEOTHERMAL PRODUCTION AND RE-INJECTION FACILITY
UNIT IV 20 MW IN LAHENDONG GEOTHERMAL AREA –
NORTH SULAWESI
Responbilities :
- Prepare System Definition, Mark-up Drawing, System
Summary List, Precomm Checklist, and Precomm
- Test Sheet as precommissioning technical preparation
- Estimate lube oil consumed for rotating equipment
- Preparing Mechanical Completion Dossier in order to Handed
over the Plant from contractor to owner
- Precommissioning/commissioning activities
- Updating the progress of Precommissioning/Commissiong
activities
Client : PT PERTAMINA GEOTHERMAL ENERGY
Project :
EPCC OF GEOTHERMAL PRODUCTION AND RE-INJECTION
FACILITY UNIT 1 &2 GEOTHERMAL ULUBELU - LAMPUNG
Responbilities :
- Scribber of HAZOP review meeting
Client : PT PUPUK KALIMANTAN TIMUR
Project :
2500 MTPD AMMONIA AND 3500 MTPD UREA PRODUCTION
FACILITY
Responbilities :
- Prepare System Definition, Mark-up Drawing, System
Summary List, Precomm Checklist, and Precomm
- Test Sheet, Precommissioning Procedure as
precommissioning technical preparation
- Assist to other discipline for precommissioning execution plan
in the Utility-Offsite Area and Urea Area
PT. Inti Karya Persada Tehnik EPCCompany
April 2008 – March 2010
Plant Service Engineer (Including HSE Enginer and
Precomm. Field Engineer)
Client : MEDCO EP INDONESIA
Project :
SINGA GAS DEVELOPMENT
Responbilities :
- Prepare Technical Bid Evaluation from Fire Protection
Equipment
- Prepare Mechanical Completion Dossier for Central Processing
Plant of Singa Gas Plant consist of
- System Summary List, System Definition, Mark-up drawing
(P&ID, One Line Diagram, Safety layout,etc.)
PT. SINGGAR MULIA
Engineering Consultants
TEGUH RAHARDJO
Process Safety Engineer
Page 4 of 5
- Preparing Mechanical Completion Dossier for Central
Processing Plant of Singa Gas Plant in order to
- Handed over the Plant from contractor to owner
- Supporting Precommissioning/commissioning activities
- Updating the progress of Precommissioning/Commissiong
activities
PT. SINGGAR MULIA
Engineering Consultants
TEGUH RAHARDJO
Process Safety Engineer
Page 5 of 5
I, the undersigned, certify that to the best of my knowledge and believe, the bio data contained in this CV
correctly describe myself, my qualifications and my expertise.
TEGUH RAHARDJO 02 July 2015

More Related Content

What's hot

What's hot (20)

Javed Sultan
Javed SultanJaved Sultan
Javed Sultan
 
Resume Feroz Habid
Resume Feroz HabidResume Feroz Habid
Resume Feroz Habid
 
tayssircv_(2)1
tayssircv_(2)1tayssircv_(2)1
tayssircv_(2)1
 
CV-022516-Linkedin
CV-022516-LinkedinCV-022516-Linkedin
CV-022516-Linkedin
 
NRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATIONNRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATION
 
ptsresume[1]
ptsresume[1]ptsresume[1]
ptsresume[1]
 
Ambrose Elugbe - CV
Ambrose Elugbe - CVAmbrose Elugbe - CV
Ambrose Elugbe - CV
 
Tim Rathsam Work History
Tim Rathsam Work HistoryTim Rathsam Work History
Tim Rathsam Work History
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
CV__ Doan Thi Hong Thu - English - March 2015
CV__ Doan Thi Hong Thu  - English - March 2015CV__ Doan Thi Hong Thu  - English - March 2015
CV__ Doan Thi Hong Thu - English - March 2015
 
Ramanuja Sharma_CV
Ramanuja Sharma_CVRamanuja Sharma_CV
Ramanuja Sharma_CV
 
DRC Resume 2015 Rev 2
DRC Resume 2015 Rev 2DRC Resume 2015 Rev 2
DRC Resume 2015 Rev 2
 
CV_sharaa
CV_sharaaCV_sharaa
CV_sharaa
 
ramCV
ramCVramCV
ramCV
 
EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16
 
Resume Dennis Kehoe 2015
Resume Dennis Kehoe 2015Resume Dennis Kehoe 2015
Resume Dennis Kehoe 2015
 
CLARK PE RESUME
CLARK PE RESUMECLARK PE RESUME
CLARK PE RESUME
 
Resume
ResumeResume
Resume
 
LGC PP-ABC Int
LGC PP-ABC IntLGC PP-ABC Int
LGC PP-ABC Int
 
Adeel Shaikh CV
Adeel Shaikh CVAdeel Shaikh CV
Adeel Shaikh CV
 

Similar to Process Safety Engineer CV

Similar to Process Safety Engineer CV (20)

CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
 
AMAN_HSE DESIGN_CV
AMAN_HSE DESIGN_CVAMAN_HSE DESIGN_CV
AMAN_HSE DESIGN_CV
 
MPK - Resume
MPK - ResumeMPK - Resume
MPK - Resume
 
EPLopez RESUME
EPLopez RESUMEEPLopez RESUME
EPLopez RESUME
 
Atiqah Ismail CV
Atiqah Ismail CVAtiqah Ismail CV
Atiqah Ismail CV
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
Ukeje cv updated
Ukeje cv updatedUkeje cv updated
Ukeje cv updated
 
Francis resume
Francis resumeFrancis resume
Francis resume
 
Tandur_Poornima_CV
Tandur_Poornima_CVTandur_Poornima_CV
Tandur_Poornima_CV
 
SRINIVASAN_LATEST RESUME_01-12-2016
SRINIVASAN_LATEST RESUME_01-12-2016SRINIVASAN_LATEST RESUME_01-12-2016
SRINIVASAN_LATEST RESUME_01-12-2016
 
Sougata Chatterjee_Resume
Sougata Chatterjee_ResumeSougata Chatterjee_Resume
Sougata Chatterjee_Resume
 
Muhammad Resume
Muhammad ResumeMuhammad Resume
Muhammad Resume
 
Crisostomo, Jose M Resume 2016_General
Crisostomo, Jose M Resume 2016_GeneralCrisostomo, Jose M Resume 2016_General
Crisostomo, Jose M Resume 2016_General
 
CV_Romeo_2016Latest
CV_Romeo_2016LatestCV_Romeo_2016Latest
CV_Romeo_2016Latest
 
JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV Instrument
 
RESUME_MOUNICA BODAPUDI_2
RESUME_MOUNICA BODAPUDI_2RESUME_MOUNICA BODAPUDI_2
RESUME_MOUNICA BODAPUDI_2
 
Resume bambang
Resume bambangResume bambang
Resume bambang
 
Resume Rohan Badadhe
Resume Rohan BadadheResume Rohan Badadhe
Resume Rohan Badadhe
 
Ukeje CV
Ukeje CVUkeje CV
Ukeje CV
 

Process Safety Engineer CV

  • 1. PT. SINGGAR MULIA Engineering Consultants TEGUH RAHARDJO Process Safety Engineer Page 1 of 5 Place / Date of Birth : Surabaya / 2 March 1981 Nationality : Indonesia Marital Status : Married Religion : Moslem Work Experience : 6 years EDUCATION FORMAL Graduated from Chemical Engineering Sepuluh Nopember Institute of Technology, Surabaya, Indonesia. INFORMAL Computer Skill MS Office (Word, Excel, and Power point); Visio technical, HYSYS, Pipenet 1.6, PHAST 6.7 and Flaresim 4.0 Design Standard and Code: Quite familiar with NFPA, API, CCPS, DNV related to Process and technical safety concern EMPLOYMENT EXPERIENCE April 2013 - Present PT Singgar Mulia Process Safety Engineer December 2010 - April 2013 PT. Inti Karya Persada Tehnik Plant Service Engineer April 2008 – March 2010 PT. Inti Karya Persada Tehnik Plant Service Engineer PROJECT EXPERIENCE PT. SINGGAR MULIA Engineering Consultant April 2013 - Present Process Safety Engineer Client : PT PERTAMINA EP (PT PEP) Project : Cikarang–Tegal Pacing Development Project (FEED) Responbilities : - Assist to coordinate prosess safety team regarding interface with other discipline of PTSM (internally) - Prepare Safety in Design And Loss Prevention Philosophy - Prepare Fire Water Demand and Pond Calculation - Prepare Fire Water Hydraulic Calculation - Review Safety & Fire Fighting Layout - Review Hazardous Area Classification - Review Foam Calculation Client : PETROCHINA INTERNATIONAL JABUNG Ltd. Project : FEED Geragai Modification for BCD-5 Responbilities : - Prepare HSE Design Philosophy - Prepare Fire Water Demand - Prepare Hazardous Area Classification - Prepare PID Fire Water System - Prepare Escape Route and Safety Equipment Layout - Assist to coordinate prosess safety team regarding interface with other discipline of PTSM. Client : SANTOS NORTHWEST NATUNA B.V. Project : AAL FPSO DEVELOPMENT PROJECT Responbilities : - Prepare Emergency System Survivability Assessment (ESSA). - Prepare Fire and Safety Equipment List. - Prepare Hazardous Area Classification Report - Prepare Fire Risk Management Plan Client : PHE ONWJ Project : FEED OO-OC-OX FIELD DEVELOPMENT PROJECT Responbilities : - Prepare Offshore Vent Radiation and Gas Dispersion Study. - Assisst to prepare Offshore Escape and Evacuation Philosophy. - Prepare Onshore Foam System Calculation. - Prepare Onshore Deluge System Calculation. - Prepare Onshore Firewater Demand Calculation. - Prepare Onshore Fire Water Ring Main & Deluge System Layout. - Prepare PID Fire Water Fighting System - Prepare Fire Water Fighting System Study (Adequacy check of hydraulic calculation) Project : PHA FOLLOW UP HAZOP/ HAZID 2014 at UNIFORM F/S Responbilities : - Prepare Engineering Study to Review Requirement For Fire Fighting Provision at Switchgear Room. - Prepare Engineering Study to Review Escape Evacuation Risk (EERA)
  • 2. PT. SINGGAR MULIA Engineering Consultants TEGUH RAHARDJO Process Safety Engineer Page 2 of 5 Project : PHA FOLLOW UP HAZOP/ HAZID 2014 at LIMA F/S AND BRAVO F/S Responbilities : - Prepare Engineering Study to Review Riser Guard Requirement. - Prepare Engineering Study to Determine Risk And Mitigation - Prepare Engineering Study to Review Gas Dispersion For Flare System. Project : ENGINEERING SPESIFICATION DEVELOPMENT 2014 Responbilities : - Assist to prepare Guidance for Ship Collision Analysis Study. Project : FEED SPA & KLD WELLHEAD PLATFORM DEVELOPMENT Responbilities : - Prepare Emergency System Survivability Analysis (ESSA), - Prepare Safety Critical Equipment (SCE) List, - Prepare Ship Impact Analysis. Project : ENGINEERING SPESIFICATION DEVELOPMENT 2013 Responbilities : - Assist to prepare Guidance for Escape, Refuge, Evacuation and Rescue for Fixed Installation Project : LLB-LLD NEW GAS LIFT PIPELINE Responbilities : - Prepare Hazardous Area Classification Schedule Project : MB2 FIREWATER STUDY Responbilities : Assist team take the firewater system conceptual study, including :  Firewater hydraulic simulation  Foam system calculation  Comparation between proposed option. Client : SANTOS(MADURA OFFSHORE) PTY LTD Project : OYONG FSO TERMINAL RENTAL, OPERATION AND MAINTENANCE SERVICES Responbilities : - Prepare Hazardous Area Classification Schedule for FSO MT Surya Putra Jaya Client : TOTAL E&P INDONESIE Project : OILY WATER LINE REPLACEMENT (TO GRP PIPE) Responbilities : - Prepare Surge Analysis for OWTU Piping System. Client : PT PERTAMINA EP (PT PEP) Project : Pakugajah Development Project (FEED) Responbilities : - Assist to coordinate prosess safety team regarding interface with other discipline of PTSM and with client of PT PEP. - Review plot plan in the view of fire radiation and explosion. - Prepare Firewater Demand Calculation - Prepare Data Sheet for Deluge Valve - Review Fire and Alarm System Philosophy - Prepare Training Requirement and Philosophy - Review Spesification for Clean Agent / Suppression System - Review Spesification for Carbon Dioxide Suppression System - Review Spesification for Emergency Shower and Eyewash System - Review Calculation Foam System - Review Safety & Fire Fighting Layout - Review Emergency Escape & Evacuation Plan - Review HSE Detail Drawing - Review Data Sheet for Fire Sprinkler - Review Data Sheet for Emergency Eyewash and Safety Shower System - Review Data Sheet for Fire Extinguisher System - Review Safety Equipment List - Review MTO for HSE - HAZID/HAZOP Meeting - HAZID/HAZOP Close Out Report
  • 3. PT. SINGGAR MULIA Engineering Consultants TEGUH RAHARDJO Process Safety Engineer Page 3 of 5 PT. Inti Karya Persada Tehnik EPCCompany December 2010 – April 2013 Plant Service Engineer (Including HSE Enginer and Precomm. Field Engineer) Client : PT PERTAMINA Project : FEED ARUN LNG RECEIVING – HUB &REGASIFICATION TERMINAL Responbilities : - Prepare Fire Protection System Design Basis And Philosophy - Prepare Safety in Design and Loss Prevention Philosophy - Prepare Fire & Gas Design Basis And Philosophy - Prepare fire fighting equipment datasheet - Design Indoor & Outdoor Fire & Gas Detection System - Prepare Material Take Off and Work Volume of Fire Fighting & Safety System - Prepare Material Take Off and Work Volume of Precomm/commissioning activities - Prepare node list for Hazop Review Meeting Client : ConocoPhillips Project : SUBAN BYPASS PLANT Responbilities : - Prepare Requisition and Technical Bid Evaluation for fire protection system - Prepare Fire Protection equipment layout, PID Fire Water Distribution, PFD Fire Water System - Prepare Verification report of Fire Explosion & Risk Analysis (FERA) Study - Prepare fire protection equipment datasheet - Prepare node list for Hazid and Hazop Review Meeting - Assigned as Scribber for Hazid and Hazop Review Meeting - Prepare Site Acceptance Test Procedure of Fire Protection System - Prepare System Definition, Mark-up Drawing, System Summary List, Precomm. Checklist, and Precomm. Test Sheet as precommissioning technical preparation - Prepare System Definition, Mark-up Drawing, System Summary List, Precomm Checklist, and Precomm - Test Sheet as precommissioning technical preparation - Preparing Mechanical Completion Dossier in order to Handed over the Plant from contractor to owner - Coordinate Precommissioning/commissioning activities Client : PT PERTAMINA GEOTHERMAL ENERGY Project : GEOTHERMAL PRODUCTION AND RE-INJECTION FACILITY UNIT IV 20 MW IN LAHENDONG GEOTHERMAL AREA – NORTH SULAWESI Responbilities : - Prepare System Definition, Mark-up Drawing, System Summary List, Precomm Checklist, and Precomm - Test Sheet as precommissioning technical preparation - Estimate lube oil consumed for rotating equipment - Preparing Mechanical Completion Dossier in order to Handed over the Plant from contractor to owner - Precommissioning/commissioning activities - Updating the progress of Precommissioning/Commissiong activities Client : PT PERTAMINA GEOTHERMAL ENERGY Project : EPCC OF GEOTHERMAL PRODUCTION AND RE-INJECTION FACILITY UNIT 1 &2 GEOTHERMAL ULUBELU - LAMPUNG Responbilities : - Scribber of HAZOP review meeting Client : PT PUPUK KALIMANTAN TIMUR Project : 2500 MTPD AMMONIA AND 3500 MTPD UREA PRODUCTION FACILITY Responbilities : - Prepare System Definition, Mark-up Drawing, System Summary List, Precomm Checklist, and Precomm - Test Sheet, Precommissioning Procedure as precommissioning technical preparation - Assist to other discipline for precommissioning execution plan in the Utility-Offsite Area and Urea Area PT. Inti Karya Persada Tehnik EPCCompany April 2008 – March 2010 Plant Service Engineer (Including HSE Enginer and Precomm. Field Engineer) Client : MEDCO EP INDONESIA Project : SINGA GAS DEVELOPMENT Responbilities : - Prepare Technical Bid Evaluation from Fire Protection Equipment - Prepare Mechanical Completion Dossier for Central Processing Plant of Singa Gas Plant consist of - System Summary List, System Definition, Mark-up drawing (P&ID, One Line Diagram, Safety layout,etc.)
  • 4. PT. SINGGAR MULIA Engineering Consultants TEGUH RAHARDJO Process Safety Engineer Page 4 of 5 - Preparing Mechanical Completion Dossier for Central Processing Plant of Singa Gas Plant in order to - Handed over the Plant from contractor to owner - Supporting Precommissioning/commissioning activities - Updating the progress of Precommissioning/Commissiong activities
  • 5. PT. SINGGAR MULIA Engineering Consultants TEGUH RAHARDJO Process Safety Engineer Page 5 of 5 I, the undersigned, certify that to the best of my knowledge and believe, the bio data contained in this CV correctly describe myself, my qualifications and my expertise. TEGUH RAHARDJO 02 July 2015