SUMMER TRAINING REPORT
SUBMITTED BY:-
Sonu kr.
B.TECH (ELECTRICAL ENGG )
SUMMER TRAINING REPORT
I take this opportunity to express my gratitude to those whose
Active help and support makes this report possible in the
present Form.
First of all, I express my sincere gratitude to Shri U.K. Pandey
SDO, Pathri Power House, Bhadrabad for insisting in me the
drive to work hard and for inculcating in me the discipline to
think clearly.
It is the endless guidance and constant encouragement of
Executive Engineer, Junior Engineer and all the staff of circle
and division office and I would like to express my heartfelt
gratitude to them for providing me necessary technical
information. Definitely the knowledge, I received during this
training session was a lifetime experience and it will serve as a
foundation for my Career in Water Resources Department.
SUMMER TRAINING REPORT
1. INTRODUCTION
2. SALIENT FEATURES
3. HYDRO POWER PLANT
4. TYPES OF HYDRO POWER PLANT
i. STORAGE PLANT:
ii. PUMPED STORAGE PLANT:
iii. RUN-OF-RIVER PLANT:
5. TRANSFORMER
6. SCHEME TO RUN THE TURBINES
7. CONCLUSION
SUMMER TRAINING REPORT
Hydro power plant Pathri is situated on the upper
Ganges, 10 km west of the city of Haridwar. It is the
first hydropower plant on the canal, fed by glaciers of
the mighty Himalayas. The Bhim Goda barrage was
built mainly for flood control, irrigation and power
generation.
The Power Station was commissioned in
the year 1955. The surface Power Station comprises of
3 units of 6.8 MW each with Kaplan turbines of 8400
HP output.
This plant is redesign by ANDRITZ HYDRO, In
August 2014, the installation and commissioning of
all components were completed.
 3 x 6.8 MW / 8 MVA
 Voltage: 11 kV
 Head: 9.88 m
 Speed: 125 rpm
 Runner diameter: 3,890 mm
SUMMER TRAINING REPORT
 Location-BHADRABAD (HARIDWAR)
 Installed Capacity — 3x6.8 MW
 Type of power station— RUN OF RIVER
 Commissioning year— 1995
 Water conductor system-HRT(Head Race Tunnel)
 Water outlet— TRC
 Design head—9.75m
 Discharge—253 m^3/s
 Turbine type— KAPLAN
 Generator type— UMBRELLA
 Generator output – 8MVA
 Main transformer –11/66 KV
 Switchyard – 66kv
SUMMER TRAINING REPORT
A generating station which utilizes the potential energy
of water at a high level for the generation of electrical
energy is known as hydro-electric power station. As we
know that the power plant is defined as the place where
power is generated from a given source, so here the
source is hydro that’s why we called it hydro power
plant.
In hydro power plant we use gravitational force of
fluid water to run the turbine which is coupled with electric
generator to produce electricity. This power plant plays an
important role to protect our fossil fuel which is limited,
because the generated electricity in hydro power station is
the use of water which is renewable source of energy and
available in lots of amount without any cost.
The big advantage of hydro power is the water which the
main stuff to produce electricity in hydro power plant is free,
it not contain any type of pollution and after generated
electricity the price of electricity is average not too much
high.
SUMMER TRAINING REPORT
We start to generate electricity from hydro power in 1882
when United States (US) establishes a first hydro power
station which generate 12.5 kilowatts (KW) of power. In
between 1905-1911 largest hydro power station (Roosevelt
Dam) is built by the united state and its generated capacity is
increased from 4500 kW to 36,000 kW.
If we compare the countries on the basis of generated
electricity by the means of hydro power, Canada on the top
after that United State then Brazil then Russia then China
then Norway and at 7th number India is present. India fulfills
the 3.5 % power to the total world power through hydro
power plants.
In India scope of hydro power is very good, first hydro power
station, capacity of 130kW establishes in Asia at mounts of
Darjeeling in 1898 and after that in 1902 Shimsh
(Shivanasamudra) is established and both located in India.
Now a day in India the leading hydro power plant is located
of river Naptha Jhakri hydro project of 1500MW in Himachal
Pradesh. In India main boost come in the field of hydro
power in august 1998 when the Government of India
publicized a plan on ‘Hydro Power Development’ after that in
November 2008 once again Indian government announced
this plan and as a result India become leading country list to
produce hydro power. This is a general idea about hydro
power plant.
SUMMER TRAINING REPORT
1. RESERVOIR:-A reservoir is the unit that holds the water from
the river.
2. DAM:-A dam is a civil construction that provides the appropriate speed to
the water to run the turbine.
3. PENSTOCK:- Penstock is the large pipes through which the
water flows from the reservoir to the turbine.
4. TURBINE:- Turbines are turned by the force of water on their
blades.
5. POWER PLANTS:- Power plants are the source that is meant for
power generation and transmission.
6. GENERATOR:- a generator is a device that converts the
mechanical energy of the turbine into the electrical energy.
7. CONTROL GATES:- Control gate are meant for the control of
flow of water.
SUMMER TRAINING REPORT
HYDRO POWER PLANTS are classified into three types:
1. STORAGE PLANT
2. PUMPED STORAGE PLANT
3. RUN OF RIVER PLANT.
1. STORAGE PLANT:
A Storage plant is Impound and store water in a reservoir formed
behind a dam. During peak demands, enough water can be
released to meet the additional demand through the plant. Water
flow rate from the storage plant may change greatly and may
involve dramatic environmental. The consequences including soil
erosion, degrading shorelines, crop damage, disrupting fisheries
and other wildlife, and even flooding.
SUMMER TRAINING REPORT
2. Pumped-storage hydropower:
Pumped storage hydropower provides peak-load supply,
harnessing water which is cycled between a lower and upper
reservoir by pumps which use surplus energy from the system at
times of low demand. When electricity demand is high, water is
released back to the lower reservoir through turbines to produce
electricity.
3. RUN OF RIVER PLANT :-
Run-of-the-river hydroelectric systems are hydroelectric systems that
harvest the energy from flowing water to generate electricity in the
absence of a large dam and reservoir - which is how they differ from
conventional impoundment hydroelectric facilities. The primary
difference between this type of hydroelectric generation and others is
that run-of-the-river primarily uses the flow rate of water to generate
power instead of the power from water falling a large distance,
although water may still experience some vertical drop in a run-of-
the-river system. Another main difference between traditional
hydropower is that run-of-the-river hydro is used in areas where there
is little to no water storage, such as in a river.
SUMMER TRAINING REPORT
In run-of-the-river systems, running water from a river is guided
down a channel or penstock. There can be some change in altitude at
this point, so there may still be some contribution from falling water.
The diverted water is brought to an electricity generating house. In
this house, the running water drives a turbine, running
a generator and generating electricity. After being used, water is fed
back into the river downstream.
In this case, there is generally only some small-scale dam that is built
to allow energy generation without a significantly large reservoir.
Kaplan turbine
SUMMER TRAINING REPORT
Alternator connected with Kaplan turbine.
SUMMER TRAINING REPORT
A hydro power plant
SUMMER TRAINING REPORT
Usually power is generated and distributed in three phase system, and
therefore it is obvious that we would need three phase transformers to
step up and step down voltages.
Advantages of three phase transformers:-
 One 'three phase transformer' occupies less space than a gang of
three 'single phase transformers'.
 Single 'three phase' unit is more economical
 The overall bus-bar structure, switchgear and installation
of 'three phase transformer' is simpler.
3-phase transformer
SUMMER TRAINING REPORT
Three phase transformer connections in three phase system,
the three phases can be connected in either star or delta
configuration.
In pathri power house DELTA- STAR configuration.
Delta-Star (Δ-Y)
 The primary winding is connected in delta and the secondary
winding is connected in star with neutral grounded. Thus it can
be used to provide 3-phase 4-wire service.
 This type of connection is mainly used in step-up transformer at
the beginning of transmission line.
 The ratio of secodary to primary line voltage is √3 times the
transformation ratio.
 There is 30° shift between the primary and secondary line
voltages.
SUMMER TRAINING REPORT
1. Switch on the governor oil pump.
2. Open the oil valve for lubrication of upper guide
bearing.
3. Open the oil valve for governor.
4. Start the grease pump for thrut bearing pump and
T.V.G.
5. Open the cooling water valve.
6. Check that whether oil level of pressure tank is normal.
7. Raise the intake gates.
8. Open the control valves for guide veins and runner
blades.
9. Turn off the generating heater.
10. Open the lock valve.
11. Open the runner blade.
12. Open the load limit and run the turbine up to 50 rpm.
13. Bring the runner in the normal state.
14. Open the load limit completely.
Bring the turbine to the normal speed (i.e.125 rpm).15.
SUMMER TRAINING REPORT
The training session at Pathri Power House Circle, Bhadrabad was
the most enjoyable session for me. I Joined Circle office on 05th
June
2017 under the guidance of SDO– Shri. U.K. Pandey Training
session ended on 05th
July 2017 .
I learned the design procedure for preparation of General Layout
& design of Power Houses. The designs include Large/ Small/Mini
Hydroelectric Power Houses.
It was nice experience for me since I could realize the importance of
Power House Circle at last, I am thankful to SDO– Shri. U.K. Pandey
Saheb and all the staff of circle office for providing me an
opportunity to enjoy the thrill of design and providing all the
necessary documents and related procedure.
Sonu kr.
B.Tech(Electrical engg.)

More Related Content

What's hot

Hybrid power generation by and solar –wind
Hybrid power generation by and solar –windHybrid power generation by and solar –wind
Hybrid power generation by and solar –wind
Uday Wankar
 
Wireless Charging of Electric Vehicles seminar report
Wireless Charging of Electric Vehicles seminar reportWireless Charging of Electric Vehicles seminar report
Wireless Charging of Electric Vehicles seminar report
Pritam Kumar Singh
 

What's hot (20)

KSEB Training Reporty
KSEB Training ReportyKSEB Training Reporty
KSEB Training Reporty
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
Hydro Power Plant
Hydro Power PlantHydro Power Plant
Hydro Power Plant
 
Pumped storage hydro power plant
Pumped storage hydro power plantPumped storage hydro power plant
Pumped storage hydro power plant
 
Microgrid. iettrichy
Microgrid. iettrichyMicrogrid. iettrichy
Microgrid. iettrichy
 
Water purification with solar energy by praveen kumar singh rec bijnor
Water purification with solar energy by praveen kumar singh rec bijnorWater purification with solar energy by praveen kumar singh rec bijnor
Water purification with solar energy by praveen kumar singh rec bijnor
 
seminar on hydropower presentation
seminar on hydropower presentationseminar on hydropower presentation
seminar on hydropower presentation
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
solar still
solar stillsolar still
solar still
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
Internship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plantInternship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plant
 
Hybrid power generation by and solar –wind
Hybrid power generation by and solar –windHybrid power generation by and solar –wind
Hybrid power generation by and solar –wind
 
Foot Step Power Generation Using piezoelectric material
Foot Step Power Generation Using piezoelectric materialFoot Step Power Generation Using piezoelectric material
Foot Step Power Generation Using piezoelectric material
 
A report on solar power plant visit
A report on solar power plant visitA report on solar power plant visit
A report on solar power plant visit
 
Grid connected pv solar power plant
Grid connected pv solar power plantGrid connected pv solar power plant
Grid connected pv solar power plant
 
MicroGrid and Energy Storage System COMPLETE DETAILS NEW PPT
MicroGrid and Energy Storage System COMPLETE DETAILS NEW PPTMicroGrid and Energy Storage System COMPLETE DETAILS NEW PPT
MicroGrid and Energy Storage System COMPLETE DETAILS NEW PPT
 
Thermal power plant ppt
Thermal power plant pptThermal power plant ppt
Thermal power plant ppt
 
Wireless Charging of Electric Vehicles seminar report
Wireless Charging of Electric Vehicles seminar reportWireless Charging of Electric Vehicles seminar report
Wireless Charging of Electric Vehicles seminar report
 
Hydro Electric Power plant
Hydro Electric Power plantHydro Electric Power plant
Hydro Electric Power plant
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 

Similar to Pathri power house report

orca_share_media1554943191261.pptx
orca_share_media1554943191261.pptxorca_share_media1554943191261.pptx
orca_share_media1554943191261.pptx
Johnwil Sunio
 

Similar to Pathri power house report (20)

Hydroelectric powerplant
Hydroelectric powerplant Hydroelectric powerplant
Hydroelectric powerplant
 
Hydro Power Plant
Hydro Power PlantHydro Power Plant
Hydro Power Plant
 
waris.pptx
waris.pptxwaris.pptx
waris.pptx
 
hydro power plant
hydro power planthydro power plant
hydro power plant
 
Hydro electric power plant ppt
Hydro electric power plant pptHydro electric power plant ppt
Hydro electric power plant ppt
 
Hydro power plant presentation project by pratik diyora 100420106008
Hydro power plant presentation project by pratik diyora 100420106008Hydro power plant presentation project by pratik diyora 100420106008
Hydro power plant presentation project by pratik diyora 100420106008
 
RRVUN hydro power plant
RRVUN hydro power plantRRVUN hydro power plant
RRVUN hydro power plant
 
HYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in India
HYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in IndiaHYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in India
HYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in India
 
orca_share_media1554943191261.pptx
orca_share_media1554943191261.pptxorca_share_media1554943191261.pptx
orca_share_media1554943191261.pptx
 
Hydropower
HydropowerHydropower
Hydropower
 
Hydroelectric power plant
Hydroelectric power plantHydroelectric power plant
Hydroelectric power plant
 
Hydroelectric power plant
Hydroelectric power plantHydroelectric power plant
Hydroelectric power plant
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
Hydro Electric Power Plant
Hydro Electric Power Plant Hydro Electric Power Plant
Hydro Electric Power Plant
 
Nhpc
NhpcNhpc
Nhpc
 
Hydro power plants
Hydro power plants Hydro power plants
Hydro power plants
 
Hydroelectric Power Plant (and Pumped Storage Power Plant)
Hydroelectric Power Plant (and Pumped Storage Power Plant)Hydroelectric Power Plant (and Pumped Storage Power Plant)
Hydroelectric Power Plant (and Pumped Storage Power Plant)
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
UKAI HYDRO POWER PLANT VISIT
UKAI HYDRO POWER PLANT VISITUKAI HYDRO POWER PLANT VISIT
UKAI HYDRO POWER PLANT VISIT
 
RPS.pptx
RPS.pptxRPS.pptx
RPS.pptx
 

Recently uploaded

Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
pritamlangde
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systems
meharikiros2
 

Recently uploaded (20)

Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systems
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata Model
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 

Pathri power house report

  • 1. SUMMER TRAINING REPORT SUBMITTED BY:- Sonu kr. B.TECH (ELECTRICAL ENGG )
  • 2. SUMMER TRAINING REPORT I take this opportunity to express my gratitude to those whose Active help and support makes this report possible in the present Form. First of all, I express my sincere gratitude to Shri U.K. Pandey SDO, Pathri Power House, Bhadrabad for insisting in me the drive to work hard and for inculcating in me the discipline to think clearly. It is the endless guidance and constant encouragement of Executive Engineer, Junior Engineer and all the staff of circle and division office and I would like to express my heartfelt gratitude to them for providing me necessary technical information. Definitely the knowledge, I received during this training session was a lifetime experience and it will serve as a foundation for my Career in Water Resources Department.
  • 3. SUMMER TRAINING REPORT 1. INTRODUCTION 2. SALIENT FEATURES 3. HYDRO POWER PLANT 4. TYPES OF HYDRO POWER PLANT i. STORAGE PLANT: ii. PUMPED STORAGE PLANT: iii. RUN-OF-RIVER PLANT: 5. TRANSFORMER 6. SCHEME TO RUN THE TURBINES 7. CONCLUSION
  • 4. SUMMER TRAINING REPORT Hydro power plant Pathri is situated on the upper Ganges, 10 km west of the city of Haridwar. It is the first hydropower plant on the canal, fed by glaciers of the mighty Himalayas. The Bhim Goda barrage was built mainly for flood control, irrigation and power generation. The Power Station was commissioned in the year 1955. The surface Power Station comprises of 3 units of 6.8 MW each with Kaplan turbines of 8400 HP output. This plant is redesign by ANDRITZ HYDRO, In August 2014, the installation and commissioning of all components were completed.  3 x 6.8 MW / 8 MVA  Voltage: 11 kV  Head: 9.88 m  Speed: 125 rpm  Runner diameter: 3,890 mm
  • 5. SUMMER TRAINING REPORT  Location-BHADRABAD (HARIDWAR)  Installed Capacity — 3x6.8 MW  Type of power station— RUN OF RIVER  Commissioning year— 1995  Water conductor system-HRT(Head Race Tunnel)  Water outlet— TRC  Design head—9.75m  Discharge—253 m^3/s  Turbine type— KAPLAN  Generator type— UMBRELLA  Generator output – 8MVA  Main transformer –11/66 KV  Switchyard – 66kv
  • 6. SUMMER TRAINING REPORT A generating station which utilizes the potential energy of water at a high level for the generation of electrical energy is known as hydro-electric power station. As we know that the power plant is defined as the place where power is generated from a given source, so here the source is hydro that’s why we called it hydro power plant. In hydro power plant we use gravitational force of fluid water to run the turbine which is coupled with electric generator to produce electricity. This power plant plays an important role to protect our fossil fuel which is limited, because the generated electricity in hydro power station is the use of water which is renewable source of energy and available in lots of amount without any cost. The big advantage of hydro power is the water which the main stuff to produce electricity in hydro power plant is free, it not contain any type of pollution and after generated electricity the price of electricity is average not too much high.
  • 7. SUMMER TRAINING REPORT We start to generate electricity from hydro power in 1882 when United States (US) establishes a first hydro power station which generate 12.5 kilowatts (KW) of power. In between 1905-1911 largest hydro power station (Roosevelt Dam) is built by the united state and its generated capacity is increased from 4500 kW to 36,000 kW. If we compare the countries on the basis of generated electricity by the means of hydro power, Canada on the top after that United State then Brazil then Russia then China then Norway and at 7th number India is present. India fulfills the 3.5 % power to the total world power through hydro power plants. In India scope of hydro power is very good, first hydro power station, capacity of 130kW establishes in Asia at mounts of Darjeeling in 1898 and after that in 1902 Shimsh (Shivanasamudra) is established and both located in India. Now a day in India the leading hydro power plant is located of river Naptha Jhakri hydro project of 1500MW in Himachal Pradesh. In India main boost come in the field of hydro power in august 1998 when the Government of India publicized a plan on ‘Hydro Power Development’ after that in November 2008 once again Indian government announced this plan and as a result India become leading country list to produce hydro power. This is a general idea about hydro power plant.
  • 8. SUMMER TRAINING REPORT 1. RESERVOIR:-A reservoir is the unit that holds the water from the river. 2. DAM:-A dam is a civil construction that provides the appropriate speed to the water to run the turbine. 3. PENSTOCK:- Penstock is the large pipes through which the water flows from the reservoir to the turbine. 4. TURBINE:- Turbines are turned by the force of water on their blades. 5. POWER PLANTS:- Power plants are the source that is meant for power generation and transmission. 6. GENERATOR:- a generator is a device that converts the mechanical energy of the turbine into the electrical energy. 7. CONTROL GATES:- Control gate are meant for the control of flow of water.
  • 9. SUMMER TRAINING REPORT HYDRO POWER PLANTS are classified into three types: 1. STORAGE PLANT 2. PUMPED STORAGE PLANT 3. RUN OF RIVER PLANT. 1. STORAGE PLANT: A Storage plant is Impound and store water in a reservoir formed behind a dam. During peak demands, enough water can be released to meet the additional demand through the plant. Water flow rate from the storage plant may change greatly and may involve dramatic environmental. The consequences including soil erosion, degrading shorelines, crop damage, disrupting fisheries and other wildlife, and even flooding.
  • 10. SUMMER TRAINING REPORT 2. Pumped-storage hydropower: Pumped storage hydropower provides peak-load supply, harnessing water which is cycled between a lower and upper reservoir by pumps which use surplus energy from the system at times of low demand. When electricity demand is high, water is released back to the lower reservoir through turbines to produce electricity. 3. RUN OF RIVER PLANT :- Run-of-the-river hydroelectric systems are hydroelectric systems that harvest the energy from flowing water to generate electricity in the absence of a large dam and reservoir - which is how they differ from conventional impoundment hydroelectric facilities. The primary difference between this type of hydroelectric generation and others is that run-of-the-river primarily uses the flow rate of water to generate power instead of the power from water falling a large distance, although water may still experience some vertical drop in a run-of- the-river system. Another main difference between traditional hydropower is that run-of-the-river hydro is used in areas where there is little to no water storage, such as in a river.
  • 11. SUMMER TRAINING REPORT In run-of-the-river systems, running water from a river is guided down a channel or penstock. There can be some change in altitude at this point, so there may still be some contribution from falling water. The diverted water is brought to an electricity generating house. In this house, the running water drives a turbine, running a generator and generating electricity. After being used, water is fed back into the river downstream. In this case, there is generally only some small-scale dam that is built to allow energy generation without a significantly large reservoir. Kaplan turbine
  • 12. SUMMER TRAINING REPORT Alternator connected with Kaplan turbine.
  • 13. SUMMER TRAINING REPORT A hydro power plant
  • 14. SUMMER TRAINING REPORT Usually power is generated and distributed in three phase system, and therefore it is obvious that we would need three phase transformers to step up and step down voltages. Advantages of three phase transformers:-  One 'three phase transformer' occupies less space than a gang of three 'single phase transformers'.  Single 'three phase' unit is more economical  The overall bus-bar structure, switchgear and installation of 'three phase transformer' is simpler. 3-phase transformer
  • 15. SUMMER TRAINING REPORT Three phase transformer connections in three phase system, the three phases can be connected in either star or delta configuration. In pathri power house DELTA- STAR configuration. Delta-Star (Δ-Y)  The primary winding is connected in delta and the secondary winding is connected in star with neutral grounded. Thus it can be used to provide 3-phase 4-wire service.  This type of connection is mainly used in step-up transformer at the beginning of transmission line.  The ratio of secodary to primary line voltage is √3 times the transformation ratio.  There is 30° shift between the primary and secondary line voltages.
  • 16. SUMMER TRAINING REPORT 1. Switch on the governor oil pump. 2. Open the oil valve for lubrication of upper guide bearing. 3. Open the oil valve for governor. 4. Start the grease pump for thrut bearing pump and T.V.G. 5. Open the cooling water valve. 6. Check that whether oil level of pressure tank is normal. 7. Raise the intake gates. 8. Open the control valves for guide veins and runner blades. 9. Turn off the generating heater. 10. Open the lock valve. 11. Open the runner blade. 12. Open the load limit and run the turbine up to 50 rpm. 13. Bring the runner in the normal state. 14. Open the load limit completely. Bring the turbine to the normal speed (i.e.125 rpm).15.
  • 17. SUMMER TRAINING REPORT The training session at Pathri Power House Circle, Bhadrabad was the most enjoyable session for me. I Joined Circle office on 05th June 2017 under the guidance of SDO– Shri. U.K. Pandey Training session ended on 05th July 2017 . I learned the design procedure for preparation of General Layout & design of Power Houses. The designs include Large/ Small/Mini Hydroelectric Power Houses. It was nice experience for me since I could realize the importance of Power House Circle at last, I am thankful to SDO– Shri. U.K. Pandey Saheb and all the staff of circle office for providing me an opportunity to enjoy the thrill of design and providing all the necessary documents and related procedure. Sonu kr. B.Tech(Electrical engg.)