Stig-Arne Kristoffersen
2010
Exploration Drilling Schedule Optimization System
EDSOS
Drilling
Scheduler
Task
Tracker
Pre-Well
Approval
Well
Approval
Post-Well
Approval
Lead and Prospect
Generation
Lead and Prospect
Review
E-WAP Drilling well
Discovery
Suspend
Abandon
Flex based GUI
GIS
Drag and Drop
Customized
Views
Active and Back-
Up wells
Optimization
2 main components required for
effective and efficient, real-time decision making
Exploration Drilling Schedule Optimization System
TASK
TRACKER
Pre-Approval Well Approval Post-Approval
Lead and Prospect
Generation
Lead and Prospect
Review
Approval Control
System
Drilling
Discovery
Suspend
Abandon
Exploration Drilling Schedule Optimization System
DRILLING
SCHEDULER
Flex based GUI
GIS
infrastructure/topography
Drag and Drop
Customized
Views
RegionOperational
Planning
Team Interpreter
Region Team Interpreter
Exploration
Exploration
Active and Back-up
Wells
(include and/or not)
Optimization
1. Manually
drag and
drop wells
into well slots
2. Optimizer
will run
scenarios
based on
constraints in
metrics
REAL TIME
IMPACT
OF CHANGES
http://www.actenum.com/Actenum_works_with_other_common_software_tools
Exploration Well Schedule Optimizer (EWSO)
EXPLORATION OBJECTIVES
• Replace Oil Production
• Increase Gas Reserves
OPTIMIZATION and IMPACT ANALYSIS
• Optimize the Drilling Schedule based on proposed
changes to one or more Metrics.
• Analyze the impact of proposed changes to Well
Slot Allocation and/or Metrics.
• Most metrics are variable and EWSO must have the
capability to run sensitivities to analyze the impact
of various possibilities.
• Some of the Metrics are fixed (e.g. Budgets and Rig
Years) and therefore, EWSO must have the
capability to display the impact of proposed
changes on them.
will facilitate
real-time Impact Analysis and Optimization
to meet Objectives
OPTIMIZATION ENGINE
 Oil Volume*
 Onshore
 Region 1
 Region 2
 Region 3
 Offshore
 Region 1
 Region 2
 Region 3
 Stratigraphic split
 Exploration by regions if required
 Unconventional resources
 Exploration by regions if required
note: applies to exploration wildcat and delineation wells
* risked mean
Exploration Well Schedule Optimizer (EWSO)
METRICS
critical factors measured
to evaluate performance
relative to Objectives
 Gas Volume*
 Onshore
 Region 1
 Region 2
 Region 3
 Offshore
 Region 1
 Region 2
 Region 3
 Stratigraphic split
 Exploration by regions if required
 Unconventional resources
 Exploration by regions if required
note: applies to exploration wildcat and delineation wells
* risked mean
Exploration Well Schedule Optimizer (EWSO)
METRICS
critical factors measured
to evaluate performance
relative to Objectives
 Drilling Costs
 Budget
 Drilling Schedule
 Rig Years
 Well Slot Allocation (may be scheduled or contingent)
 Drilling Logistics
 Rig Move Distances onshore and time/ contracts for offshore
 Drilling Rig Capability
 Gas or Oil
 Onshore or Offshore
 Sour Spec (H2S)
 Depth Rating - horsepower for onshore, rig type for offshore
Exploration Well Schedule Optimizer (EWSO)
METRICS
critical factors measured
to evaluate performance
relative to Objectives
BUSINESS RULES
FOR OBJECTIVES AND METRICS
 Well Slot Allocation
 geographic limitations for rigs
 gas versus oil rig and oil versus gas rig change
 maximum limit of mobilization distances and costs
 activity distribution between divisions and oil and gas
 will allow exploration wells to be moved, but not development wells
 will allow exploration wells to be slotted between development wells
 in this case, approval will be required from Production on moves involving changes in
development well schedule
 will not allow wells to be moved into the 4-6 month window prior to spud
 will not allow wells to be moved into 6 month window prior to spud
unless staking and/or site preparation has been initiated/approved
 Portfolio Profile
 risk profile of active wells in Drilling Schedule (POS and objectives)
 adherence to Exploration Strategies (focus areas)
must be built into EWSO to ensure that
proposed changes are technically feasible,
and in compliance with Business and Operating Plans,
as well as Aramco policies and procedures
Exploration Well Schedule Optimizer (EWSO)
Stig-Arne Kristoffersen
2010
optimizes drilling schedule
tracks well planning and operations activities
performs real-time impact analysis of proposed changes
enables effective, efficient decision making

More Related Content

What's hot

Chinook Projects-Geosteering and drilling optimization
Chinook Projects-Geosteering and drilling optimizationChinook Projects-Geosteering and drilling optimization
Chinook Projects-Geosteering and drilling optimizationChinook Consulting Services
 
Professional WORK EXPERIENCE
Professional WORK EXPERIENCEProfessional WORK EXPERIENCE
Professional WORK EXPERIENCEJesse Marley
 
Spry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - TutorialSpry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - TutorialVR M
 
Prachi Vohra-Resume
Prachi Vohra-ResumePrachi Vohra-Resume
Prachi Vohra-ResumePrachi Vohra
 
Tabnak Drilling Management
Tabnak Drilling ManagementTabnak Drilling Management
Tabnak Drilling ManagementMojrian Web
 
Victoria King Resume
Victoria King ResumeVictoria King Resume
Victoria King ResumeVictoria King
 
8bcf3a981ad3421f9e3686e477e35778
8bcf3a981ad3421f9e3686e477e357788bcf3a981ad3421f9e3686e477e35778
8bcf3a981ad3421f9e3686e477e35778ephremyohannes2
 
One-Page Red Hill SI RA modeling Omaha feb13
One-Page Red Hill SI RA modeling Omaha feb13One-Page Red Hill SI RA modeling Omaha feb13
One-Page Red Hill SI RA modeling Omaha feb13Jeffrey Hart
 
Process And Chemial Industry Soil
Process And Chemial Industry   SoilProcess And Chemial Industry   Soil
Process And Chemial Industry Soiljaapverheul
 
TGS GPS- Barents Sea Post Well Analysis 2014
TGS GPS- Barents Sea Post Well Analysis 2014TGS GPS- Barents Sea Post Well Analysis 2014
TGS GPS- Barents Sea Post Well Analysis 2014TGS
 
RV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaRV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaMichaelUberti
 
Reservoir simulation
Reservoir simulation Reservoir simulation
Reservoir simulation Parvez Nophel
 

What's hot (20)

Chinook Projects-Geosteering and drilling optimization
Chinook Projects-Geosteering and drilling optimizationChinook Projects-Geosteering and drilling optimization
Chinook Projects-Geosteering and drilling optimization
 
Hydrographic construction Cairo Illinois
Hydrographic construction  Cairo IllinoisHydrographic construction  Cairo Illinois
Hydrographic construction Cairo Illinois
 
Professional WORK EXPERIENCE
Professional WORK EXPERIENCEProfessional WORK EXPERIENCE
Professional WORK EXPERIENCE
 
Spry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - TutorialSpry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - Tutorial
 
Senior
SeniorSenior
Senior
 
Prachi Vohra-Resume
Prachi Vohra-ResumePrachi Vohra-Resume
Prachi Vohra-Resume
 
cgts_services
cgts_servicescgts_services
cgts_services
 
Tabnak Drilling Management
Tabnak Drilling ManagementTabnak Drilling Management
Tabnak Drilling Management
 
SPECIFIC ACHIEVEMENTS_BGR
SPECIFIC ACHIEVEMENTS_BGRSPECIFIC ACHIEVEMENTS_BGR
SPECIFIC ACHIEVEMENTS_BGR
 
My Resume
My ResumeMy Resume
My Resume
 
Arun Kumar CV New
Arun Kumar CV NewArun Kumar CV New
Arun Kumar CV New
 
Victoria King Resume
Victoria King ResumeVictoria King Resume
Victoria King Resume
 
8bcf3a981ad3421f9e3686e477e35778
8bcf3a981ad3421f9e3686e477e357788bcf3a981ad3421f9e3686e477e35778
8bcf3a981ad3421f9e3686e477e35778
 
One-Page Red Hill SI RA modeling Omaha feb13
One-Page Red Hill SI RA modeling Omaha feb13One-Page Red Hill SI RA modeling Omaha feb13
One-Page Red Hill SI RA modeling Omaha feb13
 
Petrel course
Petrel coursePetrel course
Petrel course
 
Process And Chemial Industry Soil
Process And Chemial Industry   SoilProcess And Chemial Industry   Soil
Process And Chemial Industry Soil
 
TGS GPS- Barents Sea Post Well Analysis 2014
TGS GPS- Barents Sea Post Well Analysis 2014TGS GPS- Barents Sea Post Well Analysis 2014
TGS GPS- Barents Sea Post Well Analysis 2014
 
RV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaRV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey Australia
 
Masters Report
Masters ReportMasters Report
Masters Report
 
Reservoir simulation
Reservoir simulation Reservoir simulation
Reservoir simulation
 

Viewers also liked

Brand Management-Analysis of Energy/ Infrastructure Brands
Brand Management-Analysis of Energy/ Infrastructure Brands Brand Management-Analysis of Energy/ Infrastructure Brands
Brand Management-Analysis of Energy/ Infrastructure Brands Apurva Mittal
 
Öncel Akademi: İstatistiksel Sismoloji
Öncel Akademi: İstatistiksel SismolojiÖncel Akademi: İstatistiksel Sismoloji
Öncel Akademi: İstatistiksel SismolojiAli Osman Öncel
 
Presentazione di ANDASA per il European Cinema & audiovisual days
Presentazione di ANDASA per il European Cinema & audiovisual daysPresentazione di ANDASA per il European Cinema & audiovisual days
Presentazione di ANDASA per il European Cinema & audiovisual daysCRS4 Research Center in Sardinia
 
ÖNCEL AKADEMİ: DÜNYA ÇEVRE GÜNÜ KONUŞMASI
ÖNCEL AKADEMİ: DÜNYA ÇEVRE GÜNÜ KONUŞMASIÖNCEL AKADEMİ: DÜNYA ÇEVRE GÜNÜ KONUŞMASI
ÖNCEL AKADEMİ: DÜNYA ÇEVRE GÜNÜ KONUŞMASIAli Osman Öncel
 
Slide ACTIVE - Digital Asset Management - Collana Seminari CRS4 2015
Slide ACTIVE - Digital Asset Management - Collana Seminari CRS4 2015Slide ACTIVE - Digital Asset Management - Collana Seminari CRS4 2015
Slide ACTIVE - Digital Asset Management - Collana Seminari CRS4 2015CRS4 Research Center in Sardinia
 
Near Surface Geoscience Conference 2014, Athens - Real-­time or full­‐precisi...
Near Surface Geoscience Conference 2014, Athens - Real-­time or full­‐precisi...Near Surface Geoscience Conference 2014, Athens - Real-­time or full­‐precisi...
Near Surface Geoscience Conference 2014, Athens - Real-­time or full­‐precisi...CRS4 Research Center in Sardinia
 
Dinamica Molecolare e Modellistica dell'interazione di lipidi col recettore P...
Dinamica Molecolare e Modellistica dell'interazione di lipidi col recettore P...Dinamica Molecolare e Modellistica dell'interazione di lipidi col recettore P...
Dinamica Molecolare e Modellistica dell'interazione di lipidi col recettore P...CRS4 Research Center in Sardinia
 
Real-time or full-precision CRS imaging using a cloud computing portal: multi...
Real-time or full-precision CRS imaging using a cloud computing portal: multi...Real-time or full-precision CRS imaging using a cloud computing portal: multi...
Real-time or full-precision CRS imaging using a cloud computing portal: multi...CRS4 Research Center in Sardinia
 
Innovazione e infrastrutture cloud per lo sviluppo di applicativi web e mobil...
Innovazione e infrastrutture cloud per lo sviluppo di applicativi web e mobil...Innovazione e infrastrutture cloud per lo sviluppo di applicativi web e mobil...
Innovazione e infrastrutture cloud per lo sviluppo di applicativi web e mobil...CRS4 Research Center in Sardinia
 

Viewers also liked (20)

Brand Management-Analysis of Energy/ Infrastructure Brands
Brand Management-Analysis of Energy/ Infrastructure Brands Brand Management-Analysis of Energy/ Infrastructure Brands
Brand Management-Analysis of Energy/ Infrastructure Brands
 
CRS4, general description
CRS4, general descriptionCRS4, general description
CRS4, general description
 
poster-2nd-FINAL
poster-2nd-FINALposter-2nd-FINAL
poster-2nd-FINAL
 
SmartGeo/Eiagrid portal (Guido Satta, CRS4)
SmartGeo/Eiagrid portal (Guido Satta, CRS4)SmartGeo/Eiagrid portal (Guido Satta, CRS4)
SmartGeo/Eiagrid portal (Guido Satta, CRS4)
 
Öncel Akademi: İstatistiksel Sismoloji
Öncel Akademi: İstatistiksel SismolojiÖncel Akademi: İstatistiksel Sismoloji
Öncel Akademi: İstatistiksel Sismoloji
 
Presentazione di ANDASA per il European Cinema & audiovisual days
Presentazione di ANDASA per il European Cinema & audiovisual daysPresentazione di ANDASA per il European Cinema & audiovisual days
Presentazione di ANDASA per il European Cinema & audiovisual days
 
ÖNCEL AKADEMİ: DÜNYA ÇEVRE GÜNÜ KONUŞMASI
ÖNCEL AKADEMİ: DÜNYA ÇEVRE GÜNÜ KONUŞMASIÖNCEL AKADEMİ: DÜNYA ÇEVRE GÜNÜ KONUŞMASI
ÖNCEL AKADEMİ: DÜNYA ÇEVRE GÜNÜ KONUŞMASI
 
Amit Kumar (CRS4, Università di Cagliari)
Amit Kumar (CRS4, Università di Cagliari)Amit Kumar (CRS4, Università di Cagliari)
Amit Kumar (CRS4, Università di Cagliari)
 
Slide ACTIVE - Digital Asset Management - Collana Seminari CRS4 2015
Slide ACTIVE - Digital Asset Management - Collana Seminari CRS4 2015Slide ACTIVE - Digital Asset Management - Collana Seminari CRS4 2015
Slide ACTIVE - Digital Asset Management - Collana Seminari CRS4 2015
 
Exploration – A Serious Game
Exploration – A Serious GameExploration – A Serious Game
Exploration – A Serious Game
 
Near Surface Geoscience Conference 2014, Athens - Real-­time or full­‐precisi...
Near Surface Geoscience Conference 2014, Athens - Real-­time or full­‐precisi...Near Surface Geoscience Conference 2014, Athens - Real-­time or full­‐precisi...
Near Surface Geoscience Conference 2014, Athens - Real-­time or full­‐precisi...
 
Dinamica Molecolare e Modellistica dell'interazione di lipidi col recettore P...
Dinamica Molecolare e Modellistica dell'interazione di lipidi col recettore P...Dinamica Molecolare e Modellistica dell'interazione di lipidi col recettore P...
Dinamica Molecolare e Modellistica dell'interazione di lipidi col recettore P...
 
screen95
screen95screen95
screen95
 
Real-time or full-precision CRS imaging using a cloud computing portal: multi...
Real-time or full-precision CRS imaging using a cloud computing portal: multi...Real-time or full-precision CRS imaging using a cloud computing portal: multi...
Real-time or full-precision CRS imaging using a cloud computing portal: multi...
 
Nu 5c Mayorcomen 07
Nu 5c Mayorcomen 07Nu 5c Mayorcomen 07
Nu 5c Mayorcomen 07
 
Machine Learning
Machine LearningMachine Learning
Machine Learning
 
Innovazione e infrastrutture cloud per lo sviluppo di applicativi web e mobil...
Innovazione e infrastrutture cloud per lo sviluppo di applicativi web e mobil...Innovazione e infrastrutture cloud per lo sviluppo di applicativi web e mobil...
Innovazione e infrastrutture cloud per lo sviluppo di applicativi web e mobil...
 
Iscola linea B 2016
Iscola linea B 2016Iscola linea B 2016
Iscola linea B 2016
 
Progetto ANDASA, Modello piattaforma
Progetto ANDASA, Modello piattaformaProgetto ANDASA, Modello piattaforma
Progetto ANDASA, Modello piattaforma
 
poster-1
poster-1poster-1
poster-1
 

Similar to EWSO

Ajay Kumar Sharma_Resume
Ajay Kumar Sharma_ResumeAjay Kumar Sharma_Resume
Ajay Kumar Sharma_ResumeAjay Sharma
 
Production technology & optimization engineer achievements
Production technology & optimization engineer achievementsProduction technology & optimization engineer achievements
Production technology & optimization engineer achievementsJoseph Bracic
 
Operation & intervention engineer achievements
Operation & intervention engineer achievementsOperation & intervention engineer achievements
Operation & intervention engineer achievementsJoseph Bracic
 
Luis Romualdez_CRC_Oxy
Luis Romualdez_CRC_OxyLuis Romualdez_CRC_Oxy
Luis Romualdez_CRC_Oxyromualdez luis
 
Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.walaa ahmed ahmed attiia
 
Table of ContentsProject ObjectiveRationale for Projec.docx
Table of ContentsProject ObjectiveRationale for Projec.docxTable of ContentsProject ObjectiveRationale for Projec.docx
Table of ContentsProject ObjectiveRationale for Projec.docxssuserf9c51d
 
Enersight operation execution scheduling
Enersight operation execution schedulingEnersight operation execution scheduling
Enersight operation execution schedulingelittuma
 
Innovation of Coal Seam Gas Well-Construction Process in Australia:
Innovation of Coal Seam Gas Well-Construction Process in Australia:Innovation of Coal Seam Gas Well-Construction Process in Australia:
Innovation of Coal Seam Gas Well-Construction Process in Australia:Thomas Bennett
 
SE Val Ver presentation
SE Val Ver presentationSE Val Ver presentation
SE Val Ver presentationKurt Holobaugh
 

Similar to EWSO (20)

A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Cv elkhan muradaliyev
Cv elkhan muradaliyevCv elkhan muradaliyev
Cv elkhan muradaliyev
 
Oam mechanical eng
Oam mechanical engOam mechanical eng
Oam mechanical eng
 
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
Cv career history
Cv   career historyCv   career history
Cv career history
 
A Sattar CV-II
A Sattar CV-IIA Sattar CV-II
A Sattar CV-II
 
Ajay Kumar Sharma_Resume
Ajay Kumar Sharma_ResumeAjay Kumar Sharma_Resume
Ajay Kumar Sharma_Resume
 
1 ior-eor rd-plans
1 ior-eor  rd-plans1 ior-eor  rd-plans
1 ior-eor rd-plans
 
Production technology & optimization engineer achievements
Production technology & optimization engineer achievementsProduction technology & optimization engineer achievements
Production technology & optimization engineer achievements
 
Operation & intervention engineer achievements
Operation & intervention engineer achievementsOperation & intervention engineer achievements
Operation & intervention engineer achievements
 
A Sattar CV-II
A Sattar CV-IIA Sattar CV-II
A Sattar CV-II
 
Luis Romualdez_CRC_Oxy
Luis Romualdez_CRC_OxyLuis Romualdez_CRC_Oxy
Luis Romualdez_CRC_Oxy
 
Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.
 
JakeA_resume Oct14
JakeA_resume Oct14JakeA_resume Oct14
JakeA_resume Oct14
 
Table of ContentsProject ObjectiveRationale for Projec.docx
Table of ContentsProject ObjectiveRationale for Projec.docxTable of ContentsProject ObjectiveRationale for Projec.docx
Table of ContentsProject ObjectiveRationale for Projec.docx
 
Enersight operation execution scheduling
Enersight operation execution schedulingEnersight operation execution scheduling
Enersight operation execution scheduling
 
Innovation of Coal Seam Gas Well-Construction Process in Australia:
Innovation of Coal Seam Gas Well-Construction Process in Australia:Innovation of Coal Seam Gas Well-Construction Process in Australia:
Innovation of Coal Seam Gas Well-Construction Process in Australia:
 
SE Val Ver presentation
SE Val Ver presentationSE Val Ver presentation
SE Val Ver presentation
 

More from Stig-Arne Kristoffersen

Storre behov for att effektivt rekrytera
Storre behov for att effektivt rekryteraStorre behov for att effektivt rekrytera
Storre behov for att effektivt rekryteraStig-Arne Kristoffersen
 
Lågutbildade, arbetslösa mindre delaktiga i informationssamhället
Lågutbildade, arbetslösa  mindre delaktiga i informationssamhälletLågutbildade, arbetslösa  mindre delaktiga i informationssamhället
Lågutbildade, arbetslösa mindre delaktiga i informationssamhälletStig-Arne Kristoffersen
 
Digital mogenhet - nödvändigt för alla företag
Digital mogenhet - nödvändigt för alla företagDigital mogenhet - nödvändigt för alla företag
Digital mogenhet - nödvändigt för alla företagStig-Arne Kristoffersen
 
Mining and artificial intelligence - a new paradigm growing!
Mining and artificial intelligence - a new paradigm growing!Mining and artificial intelligence - a new paradigm growing!
Mining and artificial intelligence - a new paradigm growing!Stig-Arne Kristoffersen
 
Matchning av dem långt från arbetsmarknaden
Matchning av dem långt från arbetsmarknadenMatchning av dem långt från arbetsmarknaden
Matchning av dem långt från arbetsmarknadenStig-Arne Kristoffersen
 
s AI s - seismic Artificial Intelligence system
s AI s - seismic Artificial Intelligence systems AI s - seismic Artificial Intelligence system
s AI s - seismic Artificial Intelligence systemStig-Arne Kristoffersen
 
Hitta varandra med Algoritmer som fungerar för alla!
Hitta varandra med Algoritmer som fungerar för alla!Hitta varandra med Algoritmer som fungerar för alla!
Hitta varandra med Algoritmer som fungerar för alla!Stig-Arne Kristoffersen
 
Arbetsförmedling och Rekrytering - en samverkan
Arbetsförmedling och Rekrytering - en samverkan Arbetsförmedling och Rekrytering - en samverkan
Arbetsförmedling och Rekrytering - en samverkan Stig-Arne Kristoffersen
 
Vatten från olika källor i Västra Götaland
Vatten från olika källor i Västra GötalandVatten från olika källor i Västra Götaland
Vatten från olika källor i Västra GötalandStig-Arne Kristoffersen
 
Bättre match mellan jobbsökare och arbetsgivare
Bättre match mellan jobbsökare och arbetsgivareBättre match mellan jobbsökare och arbetsgivare
Bättre match mellan jobbsökare och arbetsgivareStig-Arne Kristoffersen
 
Vilken riktning tar rekryteringen i närmaste framtid?
Vilken riktning tar rekryteringen i närmaste framtid?Vilken riktning tar rekryteringen i närmaste framtid?
Vilken riktning tar rekryteringen i närmaste framtid?Stig-Arne Kristoffersen
 

More from Stig-Arne Kristoffersen (20)

Storre behov for att effektivt rekrytera
Storre behov for att effektivt rekryteraStorre behov for att effektivt rekrytera
Storre behov for att effektivt rekrytera
 
Distans for-imot
Distans for-imotDistans for-imot
Distans for-imot
 
SKL behover dig
SKL behover digSKL behover dig
SKL behover dig
 
Jobbsokning under pandemin
Jobbsokning under pandeminJobbsokning under pandemin
Jobbsokning under pandemin
 
Hockey vanskapsprogram
Hockey vanskapsprogramHockey vanskapsprogram
Hockey vanskapsprogram
 
Kultur och fritid
Kultur och fritidKultur och fritid
Kultur och fritid
 
Varumärke inom Svensk hockey
Varumärke inom Svensk hockeyVarumärke inom Svensk hockey
Varumärke inom Svensk hockey
 
Lågutbildade, arbetslösa mindre delaktiga i informationssamhället
Lågutbildade, arbetslösa  mindre delaktiga i informationssamhälletLågutbildade, arbetslösa  mindre delaktiga i informationssamhället
Lågutbildade, arbetslösa mindre delaktiga i informationssamhället
 
Digital mogenhet - nödvändigt för alla företag
Digital mogenhet - nödvändigt för alla företagDigital mogenhet - nödvändigt för alla företag
Digital mogenhet - nödvändigt för alla företag
 
Mining and artificial intelligence - a new paradigm growing!
Mining and artificial intelligence - a new paradigm growing!Mining and artificial intelligence - a new paradigm growing!
Mining and artificial intelligence - a new paradigm growing!
 
Matchning av dem långt från arbetsmarknaden
Matchning av dem långt från arbetsmarknadenMatchning av dem långt från arbetsmarknaden
Matchning av dem långt från arbetsmarknaden
 
s AI s - seismic Artificial Intelligence system
s AI s - seismic Artificial Intelligence systems AI s - seismic Artificial Intelligence system
s AI s - seismic Artificial Intelligence system
 
Transform unstructured e&p information
Transform unstructured e&p informationTransform unstructured e&p information
Transform unstructured e&p information
 
Den passiva arbetssökaren
Den passiva arbetssökarenDen passiva arbetssökaren
Den passiva arbetssökaren
 
Hitta varandra med Algoritmer som fungerar för alla!
Hitta varandra med Algoritmer som fungerar för alla!Hitta varandra med Algoritmer som fungerar för alla!
Hitta varandra med Algoritmer som fungerar för alla!
 
Hitta varandra i arbetsmarknaden!
Hitta varandra i arbetsmarknaden!Hitta varandra i arbetsmarknaden!
Hitta varandra i arbetsmarknaden!
 
Arbetsförmedling och Rekrytering - en samverkan
Arbetsförmedling och Rekrytering - en samverkan Arbetsförmedling och Rekrytering - en samverkan
Arbetsförmedling och Rekrytering - en samverkan
 
Vatten från olika källor i Västra Götaland
Vatten från olika källor i Västra GötalandVatten från olika källor i Västra Götaland
Vatten från olika källor i Västra Götaland
 
Bättre match mellan jobbsökare och arbetsgivare
Bättre match mellan jobbsökare och arbetsgivareBättre match mellan jobbsökare och arbetsgivare
Bättre match mellan jobbsökare och arbetsgivare
 
Vilken riktning tar rekryteringen i närmaste framtid?
Vilken riktning tar rekryteringen i närmaste framtid?Vilken riktning tar rekryteringen i närmaste framtid?
Vilken riktning tar rekryteringen i närmaste framtid?
 

EWSO

  • 2. Exploration Drilling Schedule Optimization System EDSOS Drilling Scheduler Task Tracker Pre-Well Approval Well Approval Post-Well Approval Lead and Prospect Generation Lead and Prospect Review E-WAP Drilling well Discovery Suspend Abandon Flex based GUI GIS Drag and Drop Customized Views Active and Back- Up wells Optimization 2 main components required for effective and efficient, real-time decision making
  • 3. Exploration Drilling Schedule Optimization System TASK TRACKER Pre-Approval Well Approval Post-Approval Lead and Prospect Generation Lead and Prospect Review Approval Control System Drilling Discovery Suspend Abandon
  • 4. Exploration Drilling Schedule Optimization System DRILLING SCHEDULER Flex based GUI GIS infrastructure/topography Drag and Drop Customized Views RegionOperational Planning Team Interpreter Region Team Interpreter Exploration Exploration Active and Back-up Wells (include and/or not) Optimization 1. Manually drag and drop wells into well slots 2. Optimizer will run scenarios based on constraints in metrics REAL TIME IMPACT OF CHANGES http://www.actenum.com/Actenum_works_with_other_common_software_tools
  • 5. Exploration Well Schedule Optimizer (EWSO) EXPLORATION OBJECTIVES • Replace Oil Production • Increase Gas Reserves OPTIMIZATION and IMPACT ANALYSIS • Optimize the Drilling Schedule based on proposed changes to one or more Metrics. • Analyze the impact of proposed changes to Well Slot Allocation and/or Metrics. • Most metrics are variable and EWSO must have the capability to run sensitivities to analyze the impact of various possibilities. • Some of the Metrics are fixed (e.g. Budgets and Rig Years) and therefore, EWSO must have the capability to display the impact of proposed changes on them. will facilitate real-time Impact Analysis and Optimization to meet Objectives OPTIMIZATION ENGINE
  • 6.  Oil Volume*  Onshore  Region 1  Region 2  Region 3  Offshore  Region 1  Region 2  Region 3  Stratigraphic split  Exploration by regions if required  Unconventional resources  Exploration by regions if required note: applies to exploration wildcat and delineation wells * risked mean Exploration Well Schedule Optimizer (EWSO) METRICS critical factors measured to evaluate performance relative to Objectives
  • 7.  Gas Volume*  Onshore  Region 1  Region 2  Region 3  Offshore  Region 1  Region 2  Region 3  Stratigraphic split  Exploration by regions if required  Unconventional resources  Exploration by regions if required note: applies to exploration wildcat and delineation wells * risked mean Exploration Well Schedule Optimizer (EWSO) METRICS critical factors measured to evaluate performance relative to Objectives
  • 8.  Drilling Costs  Budget  Drilling Schedule  Rig Years  Well Slot Allocation (may be scheduled or contingent)  Drilling Logistics  Rig Move Distances onshore and time/ contracts for offshore  Drilling Rig Capability  Gas or Oil  Onshore or Offshore  Sour Spec (H2S)  Depth Rating - horsepower for onshore, rig type for offshore Exploration Well Schedule Optimizer (EWSO) METRICS critical factors measured to evaluate performance relative to Objectives
  • 9. BUSINESS RULES FOR OBJECTIVES AND METRICS  Well Slot Allocation  geographic limitations for rigs  gas versus oil rig and oil versus gas rig change  maximum limit of mobilization distances and costs  activity distribution between divisions and oil and gas  will allow exploration wells to be moved, but not development wells  will allow exploration wells to be slotted between development wells  in this case, approval will be required from Production on moves involving changes in development well schedule  will not allow wells to be moved into the 4-6 month window prior to spud  will not allow wells to be moved into 6 month window prior to spud unless staking and/or site preparation has been initiated/approved  Portfolio Profile  risk profile of active wells in Drilling Schedule (POS and objectives)  adherence to Exploration Strategies (focus areas) must be built into EWSO to ensure that proposed changes are technically feasible, and in compliance with Business and Operating Plans, as well as Aramco policies and procedures Exploration Well Schedule Optimizer (EWSO)
  • 10. Stig-Arne Kristoffersen 2010 optimizes drilling schedule tracks well planning and operations activities performs real-time impact analysis of proposed changes enables effective, efficient decision making