SlideShare a Scribd company logo
1 of 3
PROFESSIONAL WORK EXPERIENCE
EOG RESOURCES
WELL SITE SUPERVISIOR 10-13-2010 – 02-24-2015
Well’s 17,000’/18,000 with Oilbase Mud drilling unbalance with Rot, Head HTHP Well’s,
directional well
• Drill Eagleford Shale: Supervision of personnel in drilling of directional,H2S,HTHP,
OBM, Underbalance, w/ rot.head.
• Horizontal well lateral of 5000’ to 7000’
• Formation; Wilcox, Midway, Navarro, Olmos, Anacacho, Austin Chalk, Eagleford
EnCana Oil & GAS
Drilling Will Site Supervisor 02/05/2010 – 10/13/2010
Horizontal Well:
13 ½ Surface hole w/ 10 ¾ casing to 1200’ w/ 9.0 ppg water base mud
9 7/8 Intermediate hole w/ 7 5/8 casing to 9400’ w/ 10.5 ppg OBM
6 ¾ Pilot hole to 10,557’ . Set whipstock
6 ¾ Lateral hole section w/ 5 ½ x 5” casing 17,000’ MD ( 10,351’ TVD)
W/ 16.7 OBM
Nabors International – Kuwait & Saudi Arabia 03-15-2009 –02-05 2010
Drilling Supervisor / Sr.Rig Manager
3000 Ser Rigs 19,000 To 21,000 Ft.
• Supervision of personnel in drilling of directional,H2S,HTHP, OBM, AND Format
mud NJYN # 18
• Supervision of completion of well
• Rig W/ Canrig top drive Iron-R-Neck TM-120 & TM-80
• Depth to 19,000 ft. TVD Gas Well’s
• Working 400 KM south of Dahran, KSA, Operation al Department GDD&W
• (Gas Drilling, Development & Workerover.
• Supervisor, responsible for all Drilling, Casing, Cementing, Logging, Directional
Drilling, Completions, all systems,all functions, in order to drill & complete
efficiently, and safely
• HPHT, H2S, Gas wells within the Kingdom of Saudi Arabia.( Horizontal & Vertical
Delineation Wells)
• Fishing Tools & Procedures
Surevisor making sure all operation are done safety & efficiently
Preparing JSA , Job planning, Environment, Waste management, Well Control,
Bit’s & BHA’S (Hydraulics), Steerable Motors, Deviations, Surveys, (SS) & (DST),
Directional Drilling, MWD, All BHA’s , ( Troubleshooting, Downhole problem &
identifying such problems, )
•
•
Bargun Co. – Kuwait 04-01-2008 – 03-15-2009
Drilling Supervisor / Sr Rig Manager
Working In Kuwait on 3000 Ser. Cyber ELE. Rig as STP, Drilling Wells from 20,000 to 26,000
Feet, Directional, OBM
• RIG W/ CANRIG TOP DRIVE AND IRON-R-NECK TM-120 & TM-80
• Depth to 21,000 ft.TVD Gas Well’s
• Working 200 KM south of Kuwait City, KOC, Operation al Department GDD&W
• (Gas Drilling, Development & Workerover.
• Supervisor, responsible for all Drilling, Casing, Cementing, Logging, Directional
Drilling, Completions, all systems,all functions, in order to drill & complete
efficiently, and safely
• HPHT, H2S, Gas wells within the Kuwait KOC Operation.( Horizontal & Vertical
Delineation)
• Fishing Tools & Procedures
Surevisor making sure all operation are done safety & efficiently
Preparing JSA , Job planning, Environment, Waste management, Well CONTROL,
Bit’s & BHA’S (Hydraulics), Steerable Motors, Deviations, Surveys, (SS) & (DST),
Directional Drilling, MWD, All BHA’s , ( Troubleshooting, Downhole problem &
identifying such problems, )
•
Chesapeake Energy 01-18-2007 – 04-01-2008
Consultant Drilling Well Site Supervisor
Well’s 19,000’ with Oilbase Mud drilling unbalance with Rot, Head HTHP Well’s, directional
well
• Supervision of personnel in drilling of directional,H2S,HTHP, OBM, Underbalance,
w/ rot.head.
• Forations sand , silky sand, gummy shale, shale, limestone,chirk.
• HALEY 27-28, #1 , BOYD 5- 75 ,#1 Winker county,
• Depth to 19,000 ft.
• GAS WELLS
Working for Chesapeake operating in the Permian Basin area around Kermit , Pyote &
Mentone Texas. These well’s were18,000 to 19,000 ft.TVD . Drilled Surface T/ 5000' +
or - W/ cut brine , Set Intermediate to 12700' + OR - through the Bonesprings under
balance with cut brine. Raising as needed to control back ground gas. Drilling ahead
through the gas buster, T.D. well with oilbase mud, Logged, Set production pipe 150 ft.
under the Payzones ( Atoka formation)
Had several recorded runs on these well’s & rig of the quarter once last year with
Chesapeake Operation,
Did one re- entry side track in the same area in Pyote Texas. And a couple of these well’s
there were liners runs under intermediate,
Job duties included Chesapeake Representative & Surevisor making sure all operation
are done safety & efficiently
Preparing JSA , Job planning, Environment, Waste management, Well Control,
Bit’s & BHA’S (Hydraulics), Steerable Motors, Deviations, Surveys, (SS) & (DST),
Directional Drilling, MWD, All BHA’s , ( Troubleshooting, Downhole problem &
identifying such problems, )
•
Patterson UTI Drilling/Southland UTI Drilling 1991 – 2007
Rig Manager/Driller
• Driller to Rig Manager (Well’s 14,000’to18, 000’ with Oilbase Mud 12.0/19.0 M.W. HTHP
well’s) directional and horizontal wells Supervision of personnel in drilling of
directional,H2S,HTHP, OBM
• Depth to 14,000 ft. to 18,000 ft. Horizontal section 2000 ft. to 3000 ft.
• Oil and Gas Wells
Bit’s & BHA’S (Hydraulics), Steerable Motors, Deviations, Surveys, (SS) & (DST),
Directional Drilling, MWD, All BHA’s ( Troubleshooting, Downhole problem &
identifying such problems, ) Surevisor making sure all operation are done safety &
efficiently
Preparing JSA , Job planning, Environment, Wasteplanning, Well CONTROL,
Bit’s & BHA’S (Hydraulics), Steerable Motors, Deviations, Surveys, (SS) & (DST),
Directional Drilling, MWD, All BHA’s , ( Troubleshooting, Downhole problem &
identifying such problems, )
•

More Related Content

What's hot

Hamza CV (Mud Logger & Assistant Coring Engineer)
Hamza CV (Mud Logger & Assistant Coring Engineer)Hamza CV (Mud Logger & Assistant Coring Engineer)
Hamza CV (Mud Logger & Assistant Coring Engineer)Hamza Saeed
 
John Gramazio 2015 Resume
John Gramazio 2015 ResumeJohn Gramazio 2015 Resume
John Gramazio 2015 ResumeJOHN GRAMAZIO
 
Mike Carter's Resume April 6-1, 2016
Mike Carter's Resume April 6-1, 2016Mike Carter's Resume April 6-1, 2016
Mike Carter's Resume April 6-1, 2016Mike Carter
 
3d scanning services
3d scanning services3d scanning services
3d scanning servicessixdindia0
 
G Walters CV PDF
G Walters CV PDFG Walters CV PDF
G Walters CV PDFguy walters
 
Resume Wayne Olson Mar 2015
Resume  Wayne Olson  Mar 2015Resume  Wayne Olson  Mar 2015
Resume Wayne Olson Mar 2015Wayne Olson
 
CV Ramadan Workover & Completion rig supervisor (2015)
CV Ramadan Workover & Completion rig supervisor (2015)CV Ramadan Workover & Completion rig supervisor (2015)
CV Ramadan Workover & Completion rig supervisor (2015)Ram Atta
 
Shaun Rowe_Res may 16 the one copy
Shaun Rowe_Res may 16 the one copyShaun Rowe_Res may 16 the one copy
Shaun Rowe_Res may 16 the one copyShaun Rowe
 
J.B. Thompson Drilling Supervisor Resume'
J.B. Thompson Drilling Supervisor Resume'J.B. Thompson Drilling Supervisor Resume'
J.B. Thompson Drilling Supervisor Resume'Brad Thompson
 

What's hot (19)

Hamza CV (Mud Logger & Assistant Coring Engineer)
Hamza CV (Mud Logger & Assistant Coring Engineer)Hamza CV (Mud Logger & Assistant Coring Engineer)
Hamza CV (Mud Logger & Assistant Coring Engineer)
 
JASON BENDO
JASON BENDOJASON BENDO
JASON BENDO
 
LEO RESUME FINAL
LEO RESUME FINALLEO RESUME FINAL
LEO RESUME FINAL
 
John Gramazio 2015 Resume
John Gramazio 2015 ResumeJohn Gramazio 2015 Resume
John Gramazio 2015 Resume
 
Resume of blake
Resume of blakeResume of blake
Resume of blake
 
Mike Carter's Resume April 6-1, 2016
Mike Carter's Resume April 6-1, 2016Mike Carter's Resume April 6-1, 2016
Mike Carter's Resume April 6-1, 2016
 
3d scanning services
3d scanning services3d scanning services
3d scanning services
 
Virgil-Williams RESUME
Virgil-Williams RESUMEVirgil-Williams RESUME
Virgil-Williams RESUME
 
G Walters CV PDF
G Walters CV PDFG Walters CV PDF
G Walters CV PDF
 
Resume Wayne Olson Mar 2015
Resume  Wayne Olson  Mar 2015Resume  Wayne Olson  Mar 2015
Resume Wayne Olson Mar 2015
 
Rashid C_Synopsis_R6
Rashid C_Synopsis_R6Rashid C_Synopsis_R6
Rashid C_Synopsis_R6
 
Hydrographic construction Cairo Illinois
Hydrographic construction  Cairo IllinoisHydrographic construction  Cairo Illinois
Hydrographic construction Cairo Illinois
 
CV Ramadan Workover & Completion rig supervisor (2015)
CV Ramadan Workover & Completion rig supervisor (2015)CV Ramadan Workover & Completion rig supervisor (2015)
CV Ramadan Workover & Completion rig supervisor (2015)
 
Resume
ResumeResume
Resume
 
16. Compaction
16. Compaction16. Compaction
16. Compaction
 
Shaun Jumper 3
Shaun Jumper 3Shaun Jumper 3
Shaun Jumper 3
 
Elvee's Resume.la
Elvee's Resume.laElvee's Resume.la
Elvee's Resume.la
 
Shaun Rowe_Res may 16 the one copy
Shaun Rowe_Res may 16 the one copyShaun Rowe_Res may 16 the one copy
Shaun Rowe_Res may 16 the one copy
 
J.B. Thompson Drilling Supervisor Resume'
J.B. Thompson Drilling Supervisor Resume'J.B. Thompson Drilling Supervisor Resume'
J.B. Thompson Drilling Supervisor Resume'
 

Similar to Professional WORK EXPERIENCE (20)

A Sattar CWI Engrs
A Sattar CWI EngrsA Sattar CWI Engrs
A Sattar CWI Engrs
 
Re - Entry Drilling Project
Re - Entry Drilling ProjectRe - Entry Drilling Project
Re - Entry Drilling Project
 
MAMDOUH_CV
MAMDOUH_CVMAMDOUH_CV
MAMDOUH_CV
 
A Sattar CV-II
A Sattar CV-IIA Sattar CV-II
A Sattar CV-II
 
Osama __CNP_CV_
Osama __CNP_CV_Osama __CNP_CV_
Osama __CNP_CV_
 
Monitor drilling performance
Monitor drilling performanceMonitor drilling performance
Monitor drilling performance
 
Resume CV
Resume CVResume CV
Resume CV
 
A Sattar CV-II
A Sattar CV-IIA Sattar CV-II
A Sattar CV-II
 
Rafik's CV
Rafik's CVRafik's CV
Rafik's CV
 
Tabnak Drilling Management
Tabnak Drilling ManagementTabnak Drilling Management
Tabnak Drilling Management
 
Revista en ingles miguel lugo
Revista en ingles miguel lugoRevista en ingles miguel lugo
Revista en ingles miguel lugo
 
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
CV of Rada Jancic (Revised in April 2016)
CV of Rada Jancic (Revised in April 2016)CV of Rada Jancic (Revised in April 2016)
CV of Rada Jancic (Revised in April 2016)
 
Chinook Projects-Geosteering and drilling optimization
Chinook Projects-Geosteering and drilling optimizationChinook Projects-Geosteering and drilling optimization
Chinook Projects-Geosteering and drilling optimization
 
Demzy's Presentation on HDD
Demzy's Presentation on HDDDemzy's Presentation on HDD
Demzy's Presentation on HDD
 
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
Martin Cox - Directional Drilling - technology, development and achievements ...
Martin Cox - Directional Drilling - technology, development and achievements ...Martin Cox - Directional Drilling - technology, development and achievements ...
Martin Cox - Directional Drilling - technology, development and achievements ...
 
CV for ahmed(1)
CV for ahmed(1)CV for ahmed(1)
CV for ahmed(1)
 
OilKey Subsurface Consulting
OilKey Subsurface ConsultingOilKey Subsurface Consulting
OilKey Subsurface Consulting
 

Professional WORK EXPERIENCE

  • 1. PROFESSIONAL WORK EXPERIENCE EOG RESOURCES WELL SITE SUPERVISIOR 10-13-2010 – 02-24-2015 Well’s 17,000’/18,000 with Oilbase Mud drilling unbalance with Rot, Head HTHP Well’s, directional well • Drill Eagleford Shale: Supervision of personnel in drilling of directional,H2S,HTHP, OBM, Underbalance, w/ rot.head. • Horizontal well lateral of 5000’ to 7000’ • Formation; Wilcox, Midway, Navarro, Olmos, Anacacho, Austin Chalk, Eagleford EnCana Oil & GAS Drilling Will Site Supervisor 02/05/2010 – 10/13/2010 Horizontal Well: 13 ½ Surface hole w/ 10 ¾ casing to 1200’ w/ 9.0 ppg water base mud 9 7/8 Intermediate hole w/ 7 5/8 casing to 9400’ w/ 10.5 ppg OBM 6 ¾ Pilot hole to 10,557’ . Set whipstock 6 ¾ Lateral hole section w/ 5 ½ x 5” casing 17,000’ MD ( 10,351’ TVD) W/ 16.7 OBM Nabors International – Kuwait & Saudi Arabia 03-15-2009 –02-05 2010 Drilling Supervisor / Sr.Rig Manager 3000 Ser Rigs 19,000 To 21,000 Ft. • Supervision of personnel in drilling of directional,H2S,HTHP, OBM, AND Format mud NJYN # 18 • Supervision of completion of well • Rig W/ Canrig top drive Iron-R-Neck TM-120 & TM-80 • Depth to 19,000 ft. TVD Gas Well’s • Working 400 KM south of Dahran, KSA, Operation al Department GDD&W • (Gas Drilling, Development & Workerover. • Supervisor, responsible for all Drilling, Casing, Cementing, Logging, Directional Drilling, Completions, all systems,all functions, in order to drill & complete efficiently, and safely • HPHT, H2S, Gas wells within the Kingdom of Saudi Arabia.( Horizontal & Vertical Delineation Wells) • Fishing Tools & Procedures Surevisor making sure all operation are done safety & efficiently Preparing JSA , Job planning, Environment, Waste management, Well Control, Bit’s & BHA’S (Hydraulics), Steerable Motors, Deviations, Surveys, (SS) & (DST), Directional Drilling, MWD, All BHA’s , ( Troubleshooting, Downhole problem & identifying such problems, ) •
  • 2. • Bargun Co. – Kuwait 04-01-2008 – 03-15-2009 Drilling Supervisor / Sr Rig Manager Working In Kuwait on 3000 Ser. Cyber ELE. Rig as STP, Drilling Wells from 20,000 to 26,000 Feet, Directional, OBM • RIG W/ CANRIG TOP DRIVE AND IRON-R-NECK TM-120 & TM-80 • Depth to 21,000 ft.TVD Gas Well’s • Working 200 KM south of Kuwait City, KOC, Operation al Department GDD&W • (Gas Drilling, Development & Workerover. • Supervisor, responsible for all Drilling, Casing, Cementing, Logging, Directional Drilling, Completions, all systems,all functions, in order to drill & complete efficiently, and safely • HPHT, H2S, Gas wells within the Kuwait KOC Operation.( Horizontal & Vertical Delineation) • Fishing Tools & Procedures Surevisor making sure all operation are done safety & efficiently Preparing JSA , Job planning, Environment, Waste management, Well CONTROL, Bit’s & BHA’S (Hydraulics), Steerable Motors, Deviations, Surveys, (SS) & (DST), Directional Drilling, MWD, All BHA’s , ( Troubleshooting, Downhole problem & identifying such problems, ) • Chesapeake Energy 01-18-2007 – 04-01-2008 Consultant Drilling Well Site Supervisor Well’s 19,000’ with Oilbase Mud drilling unbalance with Rot, Head HTHP Well’s, directional well • Supervision of personnel in drilling of directional,H2S,HTHP, OBM, Underbalance, w/ rot.head. • Forations sand , silky sand, gummy shale, shale, limestone,chirk. • HALEY 27-28, #1 , BOYD 5- 75 ,#1 Winker county, • Depth to 19,000 ft. • GAS WELLS Working for Chesapeake operating in the Permian Basin area around Kermit , Pyote & Mentone Texas. These well’s were18,000 to 19,000 ft.TVD . Drilled Surface T/ 5000' + or - W/ cut brine , Set Intermediate to 12700' + OR - through the Bonesprings under balance with cut brine. Raising as needed to control back ground gas. Drilling ahead through the gas buster, T.D. well with oilbase mud, Logged, Set production pipe 150 ft. under the Payzones ( Atoka formation) Had several recorded runs on these well’s & rig of the quarter once last year with Chesapeake Operation, Did one re- entry side track in the same area in Pyote Texas. And a couple of these well’s there were liners runs under intermediate, Job duties included Chesapeake Representative & Surevisor making sure all operation are done safety & efficiently
  • 3. Preparing JSA , Job planning, Environment, Waste management, Well Control, Bit’s & BHA’S (Hydraulics), Steerable Motors, Deviations, Surveys, (SS) & (DST), Directional Drilling, MWD, All BHA’s , ( Troubleshooting, Downhole problem & identifying such problems, ) • Patterson UTI Drilling/Southland UTI Drilling 1991 – 2007 Rig Manager/Driller • Driller to Rig Manager (Well’s 14,000’to18, 000’ with Oilbase Mud 12.0/19.0 M.W. HTHP well’s) directional and horizontal wells Supervision of personnel in drilling of directional,H2S,HTHP, OBM • Depth to 14,000 ft. to 18,000 ft. Horizontal section 2000 ft. to 3000 ft. • Oil and Gas Wells Bit’s & BHA’S (Hydraulics), Steerable Motors, Deviations, Surveys, (SS) & (DST), Directional Drilling, MWD, All BHA’s ( Troubleshooting, Downhole problem & identifying such problems, ) Surevisor making sure all operation are done safety & efficiently Preparing JSA , Job planning, Environment, Wasteplanning, Well CONTROL, Bit’s & BHA’S (Hydraulics), Steerable Motors, Deviations, Surveys, (SS) & (DST), Directional Drilling, MWD, All BHA’s , ( Troubleshooting, Downhole problem & identifying such problems, ) •