SlideShare a Scribd company logo
1 of 3
PRACHI VOHRA
10603 Brigantine Circle,Anchorage,Alaska99515 | H: 907-349-2207| C: 907-347-3417 | pbvohra@gmail.com
PROFILE
Dedicated and energetic petroleum engineer with 4 years of production experience with a major oil
company. Planning yearly surveillance to monitor and improve Waterflood/ miscible gas injection
conformance. Experience in system modeling and optimization utilizing the PETEX toolkit. Planning well
work interventions for enhancing and maintaining oil production.
Open to relocation.
TECHNICAL SKILLS
 Production optimization
 Well Work generation and planning
 Surveillance planning and monitoring
 Proficiency in PROSPER and GAP
 Velocity Management
 Flow rate estimation
 Water flood conformance
 Lead Area Technical reviews
 Experience with injector startups
 Knowledge of gas lift and optimization
 Coordination with field for surface kit
maintenance and reducing deferrals
ACCOMPLISHMENTS
 Graduated BP's three year Challenger Program
 Worked with reservoir engineers for water flood conformance, benefits >1000 bbls oil per day
 Baggedseveral awards for highest IOR, most efficient, highest cumulative oil ratewell work and
best wellwork of the month
 Evaluated, recommended and executed end of life perforations in a few wells which resulted in
production increase of ~3000 bbls oil per day
 Built GAP model for FS3 as part of the state of the art PrISM model that comprised of PROSPER
models for 350 wells and their surface kit connections
 Winner of BP-UAF Scholarship
 Won 3rd place at SPE WRM 2011 student poster contest -“Novel Cement for Geothermal wells
using Zeolite”
 Appreciated for excellent team working spirit
 Admired for good communication skills
PROFESSIONAL EXPERIENCE
09/2015 to Current: Petroleum Engineer – West Gravity Drainage- Prudhoe Bay
BP Exploration Alaska - Anchorage, Alaska
 Delivering 20 MBOPD for 3 pads comprising of 50 wells
 Proposed and got approval for the N-pad debottlenecking project with expected benefits of
~1000 bbls oil per day
 Production optimization during plant upsets and managing wells deferrals
 Lead technical area reviews for understanding waterflood strategyand devise a plan to ensure
the success of a $ 50 MM project (UZI)
 Planned wellwork for a well to address low productivity of the well due to asphaltenes and
increased the oil rate by 600 bopd
 Analyzed the wellwork spend efficiency for last 7 years for 3 pads and addressed the gaps for
improving efficiency by job category
 Troubleshooting and optimizing GL rateand injection depth using PROSPER
08/2013 to 09/2015: Petroleum Engineer- East Waterflood - Prudhoe Bay
BP Exploration Alaska - Anchorage, Alaska
 Delivered 15 MBOPD for 2 pads comprising of 55 wells
 Evaluate, recommend, and plan interventions to improve water flood and MI conformance
(Brightwater, cement squeeze, re-completion, etc. Production increased ~1000 bbls oil per day)
 Monitor the WHP and injection rates to ensure the ratesand pressure arewithin the safe
operating limits and not exceeding the fracture pressure
 Experience in planning well interventions like water shutoff’s, GSO’s, acid stimulation for scale
removal, schmoo be gone for injectors, gas lift redesigns, WAG swaps and integrity testing.
 Participated in an interdisciplinary Area Performance Evaluation (APE) for one of my pads
(organize well data, well history, conformance and document list of identified opportunities)- 6
drilling prospects were identified
 Debottlenecking the water limited FS2 facility by proposing to swap DS-11 from SWI to PWI with
estimated benefits of 900 bopd
 Revived 3 long term shut in wells (LTSI) by executing wellwork which resulted in 3000 bopd
incremental oil rate.
 6 months of experience/training with well interventions (E-line, slickline, coil tubing, well
integrity, pumping and operations) on the Alaska North Slope.
 Quality control well tests, well events, production/ injection flow rateestimation, perforation
databases, velocity management to control erosion by allocating well tests in a timely manner.
08/2013 to 09/2015: Production Engineer Specialist- System Modeling and Optimization -
Prudhoe Bay
BP Exploration Alaska - Anchorage, Alaska
 Core member of the teamfor delivering state of the art PrISM (Prudhoe integratedsystem
model) model
 Built POSPER models for more than ~ 350 wells
 Built surface (GAP) model linked to PROSPER models for 5 pads and Flow Station 3 facility
 Used the chunks of the model for system optimization, PRP (pipeline replacement project)
analysis which helped with crucial capital investment decisions, wellwork and RWO benefits in a
bottlenecked system.
08/2010 to 03/2012: Graduate Research Assistant
University of Alaska Fairbanks - Fairbanks, Alaska
 Studied the additives for HTHP oil well cement
 Explored Zeolites and its potential as an additive for making lighter cement
 Studied API lab practices and procedures for oil well cement design
 Performed the initial screening of samples received from Department of Energy (DOE)
01/2011 to 05/2011: Graduate teaching Assistant
University of Alaska Fairbanks - Fairbanks, Alaska
 Conducted experiments and taught lab for finding Rock and Fluid Properties of core and oil
samples
07/2011 to 08/2011: Assistant Instructor – Alaska Summer Research Academy
University of Alaska Fairbanks - Fairbanks, Alaska
 Taught middle school students the importance of sustainable energy and ways to exploit these
resources economically
EDUCATION AND TRAINING
2012 Master of Science: Petroleum Engineering
University Of Alaska Fairbanks - Fairbanks, Alaska, US
 GPA 4.0/4.0
 Graduate Research Project: “STUDY OF CREEP PHENOMENON FOR OIL WELL CEMENT USING
FLAC”
2008 Bachelor of Engineering: Chemical Engineering
University of Pune - Pune, Maharashtra, India
 GPA 3.5/4
Experienced Petroleum Engineer Seeking New Opportunity

More Related Content

What's hot (20)

Gala's_Pipeline2015
Gala's_Pipeline2015Gala's_Pipeline2015
Gala's_Pipeline2015
 
TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016
 
Kobe Galloway2 _10-2014
Kobe Galloway2 _10-2014Kobe Galloway2 _10-2014
Kobe Galloway2 _10-2014
 
Balanced Mix Design & Cracking Test
Balanced Mix Design & Cracking TestBalanced Mix Design & Cracking Test
Balanced Mix Design & Cracking Test
 
JKULL_RESUME_AUG2016
JKULL_RESUME_AUG2016JKULL_RESUME_AUG2016
JKULL_RESUME_AUG2016
 
Victoria King Resume
Victoria King ResumeVictoria King Resume
Victoria King Resume
 
One-Page Red Hill SI RA modeling Omaha feb13
One-Page Red Hill SI RA modeling Omaha feb13One-Page Red Hill SI RA modeling Omaha feb13
One-Page Red Hill SI RA modeling Omaha feb13
 
Phillip P. Randel Resume
Phillip P. Randel ResumePhillip P. Randel Resume
Phillip P. Randel Resume
 
Gadsen Drive Emergency Gravity Sewer Repairs
Gadsen Drive Emergency Gravity Sewer RepairsGadsen Drive Emergency Gravity Sewer Repairs
Gadsen Drive Emergency Gravity Sewer Repairs
 
Facilities Engineering Presentation
Facilities Engineering PresentationFacilities Engineering Presentation
Facilities Engineering Presentation
 
Tracy Do Ha resume
Tracy Do Ha resumeTracy Do Ha resume
Tracy Do Ha resume
 
ENeilsenresume- Dec2015PE
ENeilsenresume- Dec2015PEENeilsenresume- Dec2015PE
ENeilsenresume- Dec2015PE
 
RFSresume16v2
RFSresume16v2RFSresume16v2
RFSresume16v2
 
Performance testing and specifications
Performance testing and specificationsPerformance testing and specifications
Performance testing and specifications
 
Resume- Nauss, Paul M.
Resume- Nauss, Paul M.Resume- Nauss, Paul M.
Resume- Nauss, Paul M.
 
abhinav rawat
abhinav rawatabhinav rawat
abhinav rawat
 
KJGResume2015
KJGResume2015KJGResume2015
KJGResume2015
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
 
Lightning Round on Current TWDB Studies
Lightning Round on Current TWDB StudiesLightning Round on Current TWDB Studies
Lightning Round on Current TWDB Studies
 
BADHWA 7-16
BADHWA 7-16BADHWA 7-16
BADHWA 7-16
 

Similar to Experienced Petroleum Engineer Seeking New Opportunity

PetroSync - Chemically Enhanced Water Alternating Gas
PetroSync - Chemically Enhanced Water Alternating GasPetroSync - Chemically Enhanced Water Alternating Gas
PetroSync - Chemically Enhanced Water Alternating GasPetroSync
 
Steve Davidson Engineering Resume
Steve Davidson Engineering  ResumeSteve Davidson Engineering  Resume
Steve Davidson Engineering ResumeStephen Davidson
 
ADVANCED PRODUCTION LOGGING, CASED HOLE & PRODUCTION LOG EVALUATION
ADVANCED  PRODUCTION LOGGING, CASED HOLE & PRODUCTION LOG EVALUATIONADVANCED  PRODUCTION LOGGING, CASED HOLE & PRODUCTION LOG EVALUATION
ADVANCED PRODUCTION LOGGING, CASED HOLE & PRODUCTION LOG EVALUATIONpetroEDGE
 
Ajay Kumar Sharma_Resume
Ajay Kumar Sharma_ResumeAjay Kumar Sharma_Resume
Ajay Kumar Sharma_ResumeAjay Sharma
 
Ilasi-Engineer-Resume
Ilasi-Engineer-ResumeIlasi-Engineer-Resume
Ilasi-Engineer-ResumeMichael Ilasi
 
JAVIER MIRANDA_Petrophysicist_Sep29_2016
JAVIER MIRANDA_Petrophysicist_Sep29_2016JAVIER MIRANDA_Petrophysicist_Sep29_2016
JAVIER MIRANDA_Petrophysicist_Sep29_2016Javier Miranda
 
David Garza - Resume
David Garza - ResumeDavid Garza - Resume
David Garza - ResumeDavid Garza
 
Ilasi-Engineer-Resume--Oct2014
Ilasi-Engineer-Resume--Oct2014Ilasi-Engineer-Resume--Oct2014
Ilasi-Engineer-Resume--Oct2014Michael Ilasi
 
Ilasi-Engineer-Resume_Linkedin
Ilasi-Engineer-Resume_LinkedinIlasi-Engineer-Resume_Linkedin
Ilasi-Engineer-Resume_LinkedinMichael Ilasi
 
Novi Labs SPE Presentation - Using Machine Learning To Understand Well Perfo...
Novi Labs SPE Presentation  - Using Machine Learning To Understand Well Perfo...Novi Labs SPE Presentation  - Using Machine Learning To Understand Well Perfo...
Novi Labs SPE Presentation - Using Machine Learning To Understand Well Perfo...ShaleProfile
 
Greg Quinn - Resume 20150214
Greg Quinn - Resume 20150214Greg Quinn - Resume 20150214
Greg Quinn - Resume 20150214Gregory Quinn
 
Bakken Artificial Lift & Production Optimization Congress 2014
Bakken Artificial Lift & Production Optimization Congress 2014 Bakken Artificial Lift & Production Optimization Congress 2014
Bakken Artificial Lift & Production Optimization Congress 2014 marketinglbcg
 
Hesham Mokhtar's Career portfolio update
Hesham Mokhtar's Career portfolio updateHesham Mokhtar's Career portfolio update
Hesham Mokhtar's Career portfolio updateHesham Mokhtar Ali
 

Similar to Experienced Petroleum Engineer Seeking New Opportunity (20)

PetroSync - Chemically Enhanced Water Alternating Gas
PetroSync - Chemically Enhanced Water Alternating GasPetroSync - Chemically Enhanced Water Alternating Gas
PetroSync - Chemically Enhanced Water Alternating Gas
 
Steve Davidson Engineering Resume
Steve Davidson Engineering  ResumeSteve Davidson Engineering  Resume
Steve Davidson Engineering Resume
 
ADVANCED PRODUCTION LOGGING, CASED HOLE & PRODUCTION LOG EVALUATION
ADVANCED  PRODUCTION LOGGING, CASED HOLE & PRODUCTION LOG EVALUATIONADVANCED  PRODUCTION LOGGING, CASED HOLE & PRODUCTION LOG EVALUATION
ADVANCED PRODUCTION LOGGING, CASED HOLE & PRODUCTION LOG EVALUATION
 
KASHIF DADA, PMP, P.Eng
KASHIF DADA, PMP, P.EngKASHIF DADA, PMP, P.Eng
KASHIF DADA, PMP, P.Eng
 
Ajay Kumar Sharma_Resume
Ajay Kumar Sharma_ResumeAjay Kumar Sharma_Resume
Ajay Kumar Sharma_Resume
 
Ilasi-Engineer-Resume
Ilasi-Engineer-ResumeIlasi-Engineer-Resume
Ilasi-Engineer-Resume
 
JAVIER MIRANDA_Petrophysicist_Sep29_2016
JAVIER MIRANDA_Petrophysicist_Sep29_2016JAVIER MIRANDA_Petrophysicist_Sep29_2016
JAVIER MIRANDA_Petrophysicist_Sep29_2016
 
Miller_Resume
Miller_ResumeMiller_Resume
Miller_Resume
 
David Garza - Resume
David Garza - ResumeDavid Garza - Resume
David Garza - Resume
 
Ilasi-Engineer-Resume--Oct2014
Ilasi-Engineer-Resume--Oct2014Ilasi-Engineer-Resume--Oct2014
Ilasi-Engineer-Resume--Oct2014
 
Ilasi-Engineer-Resume_Linkedin
Ilasi-Engineer-Resume_LinkedinIlasi-Engineer-Resume_Linkedin
Ilasi-Engineer-Resume_Linkedin
 
redacvEPT
redacvEPTredacvEPT
redacvEPT
 
CV-cassidy
CV-cassidyCV-cassidy
CV-cassidy
 
Novi Labs SPE Presentation - Using Machine Learning To Understand Well Perfo...
Novi Labs SPE Presentation  - Using Machine Learning To Understand Well Perfo...Novi Labs SPE Presentation  - Using Machine Learning To Understand Well Perfo...
Novi Labs SPE Presentation - Using Machine Learning To Understand Well Perfo...
 
CeeVee-13th January 2017_update
CeeVee-13th January 2017_updateCeeVee-13th January 2017_update
CeeVee-13th January 2017_update
 
Stechschulte.Kaitlin revised
Stechschulte.Kaitlin revisedStechschulte.Kaitlin revised
Stechschulte.Kaitlin revised
 
Mohsen CV
Mohsen CVMohsen CV
Mohsen CV
 
Greg Quinn - Resume 20150214
Greg Quinn - Resume 20150214Greg Quinn - Resume 20150214
Greg Quinn - Resume 20150214
 
Bakken Artificial Lift & Production Optimization Congress 2014
Bakken Artificial Lift & Production Optimization Congress 2014 Bakken Artificial Lift & Production Optimization Congress 2014
Bakken Artificial Lift & Production Optimization Congress 2014
 
Hesham Mokhtar's Career portfolio update
Hesham Mokhtar's Career portfolio updateHesham Mokhtar's Career portfolio update
Hesham Mokhtar's Career portfolio update
 

Experienced Petroleum Engineer Seeking New Opportunity

  • 1. PRACHI VOHRA 10603 Brigantine Circle,Anchorage,Alaska99515 | H: 907-349-2207| C: 907-347-3417 | pbvohra@gmail.com PROFILE Dedicated and energetic petroleum engineer with 4 years of production experience with a major oil company. Planning yearly surveillance to monitor and improve Waterflood/ miscible gas injection conformance. Experience in system modeling and optimization utilizing the PETEX toolkit. Planning well work interventions for enhancing and maintaining oil production. Open to relocation. TECHNICAL SKILLS  Production optimization  Well Work generation and planning  Surveillance planning and monitoring  Proficiency in PROSPER and GAP  Velocity Management  Flow rate estimation  Water flood conformance  Lead Area Technical reviews  Experience with injector startups  Knowledge of gas lift and optimization  Coordination with field for surface kit maintenance and reducing deferrals ACCOMPLISHMENTS  Graduated BP's three year Challenger Program  Worked with reservoir engineers for water flood conformance, benefits >1000 bbls oil per day  Baggedseveral awards for highest IOR, most efficient, highest cumulative oil ratewell work and best wellwork of the month  Evaluated, recommended and executed end of life perforations in a few wells which resulted in production increase of ~3000 bbls oil per day  Built GAP model for FS3 as part of the state of the art PrISM model that comprised of PROSPER models for 350 wells and their surface kit connections  Winner of BP-UAF Scholarship  Won 3rd place at SPE WRM 2011 student poster contest -“Novel Cement for Geothermal wells using Zeolite”  Appreciated for excellent team working spirit  Admired for good communication skills PROFESSIONAL EXPERIENCE 09/2015 to Current: Petroleum Engineer – West Gravity Drainage- Prudhoe Bay BP Exploration Alaska - Anchorage, Alaska  Delivering 20 MBOPD for 3 pads comprising of 50 wells  Proposed and got approval for the N-pad debottlenecking project with expected benefits of ~1000 bbls oil per day  Production optimization during plant upsets and managing wells deferrals  Lead technical area reviews for understanding waterflood strategyand devise a plan to ensure the success of a $ 50 MM project (UZI)  Planned wellwork for a well to address low productivity of the well due to asphaltenes and increased the oil rate by 600 bopd  Analyzed the wellwork spend efficiency for last 7 years for 3 pads and addressed the gaps for improving efficiency by job category  Troubleshooting and optimizing GL rateand injection depth using PROSPER 08/2013 to 09/2015: Petroleum Engineer- East Waterflood - Prudhoe Bay BP Exploration Alaska - Anchorage, Alaska  Delivered 15 MBOPD for 2 pads comprising of 55 wells
  • 2.  Evaluate, recommend, and plan interventions to improve water flood and MI conformance (Brightwater, cement squeeze, re-completion, etc. Production increased ~1000 bbls oil per day)  Monitor the WHP and injection rates to ensure the ratesand pressure arewithin the safe operating limits and not exceeding the fracture pressure  Experience in planning well interventions like water shutoff’s, GSO’s, acid stimulation for scale removal, schmoo be gone for injectors, gas lift redesigns, WAG swaps and integrity testing.  Participated in an interdisciplinary Area Performance Evaluation (APE) for one of my pads (organize well data, well history, conformance and document list of identified opportunities)- 6 drilling prospects were identified  Debottlenecking the water limited FS2 facility by proposing to swap DS-11 from SWI to PWI with estimated benefits of 900 bopd  Revived 3 long term shut in wells (LTSI) by executing wellwork which resulted in 3000 bopd incremental oil rate.  6 months of experience/training with well interventions (E-line, slickline, coil tubing, well integrity, pumping and operations) on the Alaska North Slope.  Quality control well tests, well events, production/ injection flow rateestimation, perforation databases, velocity management to control erosion by allocating well tests in a timely manner. 08/2013 to 09/2015: Production Engineer Specialist- System Modeling and Optimization - Prudhoe Bay BP Exploration Alaska - Anchorage, Alaska  Core member of the teamfor delivering state of the art PrISM (Prudhoe integratedsystem model) model  Built POSPER models for more than ~ 350 wells  Built surface (GAP) model linked to PROSPER models for 5 pads and Flow Station 3 facility  Used the chunks of the model for system optimization, PRP (pipeline replacement project) analysis which helped with crucial capital investment decisions, wellwork and RWO benefits in a bottlenecked system. 08/2010 to 03/2012: Graduate Research Assistant University of Alaska Fairbanks - Fairbanks, Alaska  Studied the additives for HTHP oil well cement  Explored Zeolites and its potential as an additive for making lighter cement  Studied API lab practices and procedures for oil well cement design  Performed the initial screening of samples received from Department of Energy (DOE) 01/2011 to 05/2011: Graduate teaching Assistant University of Alaska Fairbanks - Fairbanks, Alaska  Conducted experiments and taught lab for finding Rock and Fluid Properties of core and oil samples 07/2011 to 08/2011: Assistant Instructor – Alaska Summer Research Academy University of Alaska Fairbanks - Fairbanks, Alaska  Taught middle school students the importance of sustainable energy and ways to exploit these resources economically EDUCATION AND TRAINING 2012 Master of Science: Petroleum Engineering University Of Alaska Fairbanks - Fairbanks, Alaska, US  GPA 4.0/4.0  Graduate Research Project: “STUDY OF CREEP PHENOMENON FOR OIL WELL CEMENT USING FLAC” 2008 Bachelor of Engineering: Chemical Engineering University of Pune - Pune, Maharashtra, India  GPA 3.5/4