Experienced Petroleum Engineer Seeking New Opportunity
1. PRACHI VOHRA
10603 Brigantine Circle,Anchorage,Alaska99515 | H: 907-349-2207| C: 907-347-3417 | pbvohra@gmail.com
PROFILE
Dedicated and energetic petroleum engineer with 4 years of production experience with a major oil
company. Planning yearly surveillance to monitor and improve Waterflood/ miscible gas injection
conformance. Experience in system modeling and optimization utilizing the PETEX toolkit. Planning well
work interventions for enhancing and maintaining oil production.
Open to relocation.
TECHNICAL SKILLS
Production optimization
Well Work generation and planning
Surveillance planning and monitoring
Proficiency in PROSPER and GAP
Velocity Management
Flow rate estimation
Water flood conformance
Lead Area Technical reviews
Experience with injector startups
Knowledge of gas lift and optimization
Coordination with field for surface kit
maintenance and reducing deferrals
ACCOMPLISHMENTS
Graduated BP's three year Challenger Program
Worked with reservoir engineers for water flood conformance, benefits >1000 bbls oil per day
Baggedseveral awards for highest IOR, most efficient, highest cumulative oil ratewell work and
best wellwork of the month
Evaluated, recommended and executed end of life perforations in a few wells which resulted in
production increase of ~3000 bbls oil per day
Built GAP model for FS3 as part of the state of the art PrISM model that comprised of PROSPER
models for 350 wells and their surface kit connections
Winner of BP-UAF Scholarship
Won 3rd place at SPE WRM 2011 student poster contest -“Novel Cement for Geothermal wells
using Zeolite”
Appreciated for excellent team working spirit
Admired for good communication skills
PROFESSIONAL EXPERIENCE
09/2015 to Current: Petroleum Engineer – West Gravity Drainage- Prudhoe Bay
BP Exploration Alaska - Anchorage, Alaska
Delivering 20 MBOPD for 3 pads comprising of 50 wells
Proposed and got approval for the N-pad debottlenecking project with expected benefits of
~1000 bbls oil per day
Production optimization during plant upsets and managing wells deferrals
Lead technical area reviews for understanding waterflood strategyand devise a plan to ensure
the success of a $ 50 MM project (UZI)
Planned wellwork for a well to address low productivity of the well due to asphaltenes and
increased the oil rate by 600 bopd
Analyzed the wellwork spend efficiency for last 7 years for 3 pads and addressed the gaps for
improving efficiency by job category
Troubleshooting and optimizing GL rateand injection depth using PROSPER
08/2013 to 09/2015: Petroleum Engineer- East Waterflood - Prudhoe Bay
BP Exploration Alaska - Anchorage, Alaska
Delivered 15 MBOPD for 2 pads comprising of 55 wells
2. Evaluate, recommend, and plan interventions to improve water flood and MI conformance
(Brightwater, cement squeeze, re-completion, etc. Production increased ~1000 bbls oil per day)
Monitor the WHP and injection rates to ensure the ratesand pressure arewithin the safe
operating limits and not exceeding the fracture pressure
Experience in planning well interventions like water shutoff’s, GSO’s, acid stimulation for scale
removal, schmoo be gone for injectors, gas lift redesigns, WAG swaps and integrity testing.
Participated in an interdisciplinary Area Performance Evaluation (APE) for one of my pads
(organize well data, well history, conformance and document list of identified opportunities)- 6
drilling prospects were identified
Debottlenecking the water limited FS2 facility by proposing to swap DS-11 from SWI to PWI with
estimated benefits of 900 bopd
Revived 3 long term shut in wells (LTSI) by executing wellwork which resulted in 3000 bopd
incremental oil rate.
6 months of experience/training with well interventions (E-line, slickline, coil tubing, well
integrity, pumping and operations) on the Alaska North Slope.
Quality control well tests, well events, production/ injection flow rateestimation, perforation
databases, velocity management to control erosion by allocating well tests in a timely manner.
08/2013 to 09/2015: Production Engineer Specialist- System Modeling and Optimization -
Prudhoe Bay
BP Exploration Alaska - Anchorage, Alaska
Core member of the teamfor delivering state of the art PrISM (Prudhoe integratedsystem
model) model
Built POSPER models for more than ~ 350 wells
Built surface (GAP) model linked to PROSPER models for 5 pads and Flow Station 3 facility
Used the chunks of the model for system optimization, PRP (pipeline replacement project)
analysis which helped with crucial capital investment decisions, wellwork and RWO benefits in a
bottlenecked system.
08/2010 to 03/2012: Graduate Research Assistant
University of Alaska Fairbanks - Fairbanks, Alaska
Studied the additives for HTHP oil well cement
Explored Zeolites and its potential as an additive for making lighter cement
Studied API lab practices and procedures for oil well cement design
Performed the initial screening of samples received from Department of Energy (DOE)
01/2011 to 05/2011: Graduate teaching Assistant
University of Alaska Fairbanks - Fairbanks, Alaska
Conducted experiments and taught lab for finding Rock and Fluid Properties of core and oil
samples
07/2011 to 08/2011: Assistant Instructor – Alaska Summer Research Academy
University of Alaska Fairbanks - Fairbanks, Alaska
Taught middle school students the importance of sustainable energy and ways to exploit these
resources economically
EDUCATION AND TRAINING
2012 Master of Science: Petroleum Engineering
University Of Alaska Fairbanks - Fairbanks, Alaska, US
GPA 4.0/4.0
Graduate Research Project: “STUDY OF CREEP PHENOMENON FOR OIL WELL CEMENT USING
FLAC”
2008 Bachelor of Engineering: Chemical Engineering
University of Pune - Pune, Maharashtra, India
GPA 3.5/4