REQUIREMENT OF HYDRO-METEOROLOGICAL DATA
for
1070 MW Naba Hydro Electric Project
Upper Subansiri District,
Arunachal Pradesh
BACKGROUND
 1070 MW Naba Hydroelectric Power Project is located on upper reaches of Subansiri
River near Naba Village, in Upper Subansiri District of Arunachal Pradesh.
 The Memorandum of Agreement (MoA) between Government of Arunachal Pradesh
And M/s Abir Infrastructure Private Limited was signed on 26th April 2011 for
Implementation of the Subansiri basin ranging from EL ±1035m Up to EL ±780 m.
 As Per Terms of MoA M/S Abir Infrastructure Private Limited floated a Special Purpose
Vehicle (SPV) named Naba Power Private Limited for development of Naba HE Project.
PROJECT LOCATION
 Naba HE Project is located in upper reaches of Subansiri river near Naba village. The
dam site coordinates are 28o22’ 18.53” N latitude & 93o 35’ 52.63” E longitude and the
powerhouse site coordinates are 28o23’ 30.18” N latitude & 93o 40’ 56.50” E longitude.
 The dam site of this project is located about 42 km upstream of nacho town in upper
Subansiri district of Arunachal Pradesh. Powerhouse site is located on right bank of
Subansiri river near Naba village.
 Powerhouse and dam site can be accessed by all-weather roads connecting Daporijo-
Limeking road running on right bank of the river. Major villages/towns present along
the Daporijo – Limeking road are Taliha, Kodak, Siyum, Aying moring, and Nacho &
Limeking.
 The nearest railhead is located Silapather, Assam. Nearest airport is at Dibrugarh in
assam.
PROJECT LOCATION MAP
Naba Project Location
PROJECT COMPONENTS
 A Concrete Gravity Dam of 99.19 m height (above foundation level) and 285 m length
at top with FRL at EL.1028 m has been proposed for Naba HEP.
 A Central spillway comprising of 7 Nos. of sluice type and 1 No. of surface type spillway
have been proposed to pass the design flood of 12500 cumecs.
 The design discharge of 465.76 cumecs will be conveyed through one number of
concrete lined 12.0m dia. horseshoe shaped HRT 9669m long and two no. of pressure
shafts (8.5m dia. & 7.0m dia.) further branched to powerhouse with 5 units of vertical
francis turbine of 200 MW each for power generation.
 To utilize the environmental releases, Dam Toe Powerhouse with installed capacity of
55MW + 15MW has been proposed.
GENERAL LAYOUT OF NABA HEP
HYDROLOGY AND VIEWS OF CWC
 During the PFR stage, the hydrological studies for Naba HEP has been carried out
considering the available discharge data at Chouldawaghat, Gerukamukh and Menga
discharge observations sites for the period 1973-2008.
 Since the discharge data used for water availability studies is up to 2007-08 only, CWC
recommended to use latest discharge data of subsequent years and update the
hydrological studies for the project.
CHOULDHAWAGHAT G&D SITE
 CWC has established Chouldhawaghat Gauge Discharge site on Subansiri River which
is a tributary of River Brahmaputra in Lakhimpur District.
 The coordinates of Chouldhawaghat GD site are 94o15’10”E longitude and
27o26’51”N latitude and the hydro-meteorological data collected from
Chouldhawaghat GD site comes under classified data of Brahmaputra Basin
Organization.
 For firming up the hydrological studies and to get the approval of Water Availability
studies from CWC/CEA, the Hydro-Meteorological data of Chouldhawaghat GD site is
required.
 As per Hydro-Meteorological Data Dissemination Policy, 2018 request has been made
to the Chief Engineer, Brahmaputra Basin Organization for release of classified
Chouldhawaghat GD site data.
REQUIREMENT OF HYDRO-METEOROLOGICAL DATA OF
CHOULDHAWAGHAT SITE
 Requisition has been made from M/s Greenew Urja Private Limited with ref. to
GUPL/NABA/CWC/BBO/20220706 dated 6th July 2022. NOC for collection of Hydro-
Meteorological data on behalf of Naba Power Pvt. Ltd was also attached.
 General Hydro-Meteorological Data Request Form requesting the Chouldhawaghat site
data from 2002-03 to 2021-22 for monsoon and non-monsoon periods along with
Secrecy Undertaking form has been sent to the Chief Engineer, Brahmaputra Basin
Organization.
 Long term Hydro-Meteorological Data services of CWC Chouldhawaghat GD site will
help in developing reliable hydrological parameters and firming up hydrological studies
for Naba HEP.
 Therefore, it is requested to make available the requisitioned Hydro-meteorological
data of CWC Chouldhawaghat site for finalization of Hydrology studies of Naba HEP
DPR.
REQUISITION LETTER M/S GUPL
NOC ON BEHALF OF M/S NPPL
JUSTIFICATION NOTE
SECRECY UNDERTAKING FORM
CONCLUSION
 1070 MW Naba HEP Project in Subansiri Basin of Arunachal Pradesh is being
developed by M/s. Naba Power Pvt. Ltd in Joint Sector with Govt. of Arunachal
Pradesh (GoAP).
 For the preparation of DPR and Hydrological Studies for the project, Hydro-
Meteorological Data of CWC Chouldhawaghat site located in Subansiri basin is
needed.
 Details of required data with necessary information duly filled in Justification Note
along with Secrecy Undertaking form has been sent to the Chief Engineer,
Brahmaputra Basin Organization requesting data of Chouldhawaghat site.
 The requested data may kindly be provided for finalization of Hydrological studies for
Naba HEP and to get further approval from CWC/CEA so that this project of national
importance can be taken up.
THANK YOU

More Related Content

Similar to Requirement of Chouldhawaghat Data_Naba HEP.pptx

Report on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectReport on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectRubnawaz Bhatti
 
Kaigah Hydropower Project
Kaigah Hydropower ProjectKaigah Hydropower Project
Kaigah Hydropower ProjectAli Sial
 
UKAI HYDRO POWER PLANT VISIT
UKAI HYDRO POWER PLANT VISITUKAI HYDRO POWER PLANT VISIT
UKAI HYDRO POWER PLANT VISITSAURAV DAYAL SING
 
Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16Kachinga-Wankunda Phiri
 
Hydro Energy By Sta Jafri
Hydro Energy By Sta JafriHydro Energy By Sta Jafri
Hydro Energy By Sta JafriIEEEP Karachi
 
26900721058_OE-ME701D.pptx
26900721058_OE-ME701D.pptx26900721058_OE-ME701D.pptx
26900721058_OE-ME701D.pptxSukantaMandal17
 
Exaple of use of decision support system planning dss (p) kerala state
Exaple of use of decision support system planning dss (p)   kerala stateExaple of use of decision support system planning dss (p)   kerala state
Exaple of use of decision support system planning dss (p) kerala statehydrologyproject0
 
Copy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOMCopy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOMB SARKAR
 
Applicability of pressure retarded osmosis power generation
Applicability of pressure retarded osmosis power generationApplicability of pressure retarded osmosis power generation
Applicability of pressure retarded osmosis power generationRajani Kanth
 
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...Er. Abhushan Neupane
 
EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...
EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...
EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...zubeditufail
 
Gis hydrology river_in_summary of river link project_with images_05.08.2013
Gis hydrology river_in_summary of river link project_with images_05.08.2013Gis hydrology river_in_summary of river link project_with images_05.08.2013
Gis hydrology river_in_summary of river link project_with images_05.08.2013apndesai
 

Similar to Requirement of Chouldhawaghat Data_Naba HEP.pptx (20)

Report on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectReport on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic project
 
Kaigah Hydropower Project
Kaigah Hydropower ProjectKaigah Hydropower Project
Kaigah Hydropower Project
 
Powerful parbati
Powerful parbatiPowerful parbati
Powerful parbati
 
UKAI HYDRO POWER PLANT VISIT
UKAI HYDRO POWER PLANT VISITUKAI HYDRO POWER PLANT VISIT
UKAI HYDRO POWER PLANT VISIT
 
Kerala sw
Kerala swKerala sw
Kerala sw
 
Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16
 
REPORT-NHPC
REPORT-NHPCREPORT-NHPC
REPORT-NHPC
 
Construction of PCC Parapet
Construction of PCC Parapet Construction of PCC Parapet
Construction of PCC Parapet
 
Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15
 
The report on ghazi brotha dam
The report on ghazi brotha damThe report on ghazi brotha dam
The report on ghazi brotha dam
 
Ntpc training report
Ntpc training reportNtpc training report
Ntpc training report
 
Hydro Energy By Sta Jafri
Hydro Energy By Sta JafriHydro Energy By Sta Jafri
Hydro Energy By Sta Jafri
 
26900721058_OE-ME701D.pptx
26900721058_OE-ME701D.pptx26900721058_OE-ME701D.pptx
26900721058_OE-ME701D.pptx
 
Exaple of use of decision support system planning dss (p) kerala state
Exaple of use of decision support system planning dss (p)   kerala stateExaple of use of decision support system planning dss (p)   kerala state
Exaple of use of decision support system planning dss (p) kerala state
 
Copy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOMCopy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOM
 
Applicability of pressure retarded osmosis power generation
Applicability of pressure retarded osmosis power generationApplicability of pressure retarded osmosis power generation
Applicability of pressure retarded osmosis power generation
 
Fluid Machine
Fluid MachineFluid Machine
Fluid Machine
 
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...
 
EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...
EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...
EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...
 
Gis hydrology river_in_summary of river link project_with images_05.08.2013
Gis hydrology river_in_summary of river link project_with images_05.08.2013Gis hydrology river_in_summary of river link project_with images_05.08.2013
Gis hydrology river_in_summary of river link project_with images_05.08.2013
 

Recently uploaded

Performance enhancement of machine learning algorithm for breast cancer diagn...
Performance enhancement of machine learning algorithm for breast cancer diagn...Performance enhancement of machine learning algorithm for breast cancer diagn...
Performance enhancement of machine learning algorithm for breast cancer diagn...IJECEIAES
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashidFaiyazSheikh
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfJNTUA
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsMathias Magdowski
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxMustafa Ahmed
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualBalamuruganV28
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Studentskannan348865
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...Amil baba
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...IJECEIAES
 
Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2T.D. Shashikala
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptamrabdallah9
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxKarpagam Institute of Teechnology
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...josephjonse
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024EMMANUELLEFRANCEHELI
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisDr.Costas Sachpazis
 
AI in Healthcare Innovative use cases and applications.pdf
AI in Healthcare Innovative use cases and applications.pdfAI in Healthcare Innovative use cases and applications.pdf
AI in Healthcare Innovative use cases and applications.pdfmahaffeycheryld
 
Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..MaherOthman7
 
Piping and instrumentation diagram p.pdf
Piping and instrumentation diagram p.pdfPiping and instrumentation diagram p.pdf
Piping and instrumentation diagram p.pdfAshrafRagab14
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailingAshishSingh1301
 

Recently uploaded (20)

Performance enhancement of machine learning algorithm for breast cancer diagn...
Performance enhancement of machine learning algorithm for breast cancer diagn...Performance enhancement of machine learning algorithm for breast cancer diagn...
Performance enhancement of machine learning algorithm for breast cancer diagn...
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Students
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...
 
Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.ppt
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptx
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
 
AI in Healthcare Innovative use cases and applications.pdf
AI in Healthcare Innovative use cases and applications.pdfAI in Healthcare Innovative use cases and applications.pdf
AI in Healthcare Innovative use cases and applications.pdf
 
Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..
 
Piping and instrumentation diagram p.pdf
Piping and instrumentation diagram p.pdfPiping and instrumentation diagram p.pdf
Piping and instrumentation diagram p.pdf
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailing
 

Requirement of Chouldhawaghat Data_Naba HEP.pptx

  • 1. REQUIREMENT OF HYDRO-METEOROLOGICAL DATA for 1070 MW Naba Hydro Electric Project Upper Subansiri District, Arunachal Pradesh
  • 2. BACKGROUND  1070 MW Naba Hydroelectric Power Project is located on upper reaches of Subansiri River near Naba Village, in Upper Subansiri District of Arunachal Pradesh.  The Memorandum of Agreement (MoA) between Government of Arunachal Pradesh And M/s Abir Infrastructure Private Limited was signed on 26th April 2011 for Implementation of the Subansiri basin ranging from EL ±1035m Up to EL ±780 m.  As Per Terms of MoA M/S Abir Infrastructure Private Limited floated a Special Purpose Vehicle (SPV) named Naba Power Private Limited for development of Naba HE Project.
  • 3. PROJECT LOCATION  Naba HE Project is located in upper reaches of Subansiri river near Naba village. The dam site coordinates are 28o22’ 18.53” N latitude & 93o 35’ 52.63” E longitude and the powerhouse site coordinates are 28o23’ 30.18” N latitude & 93o 40’ 56.50” E longitude.  The dam site of this project is located about 42 km upstream of nacho town in upper Subansiri district of Arunachal Pradesh. Powerhouse site is located on right bank of Subansiri river near Naba village.  Powerhouse and dam site can be accessed by all-weather roads connecting Daporijo- Limeking road running on right bank of the river. Major villages/towns present along the Daporijo – Limeking road are Taliha, Kodak, Siyum, Aying moring, and Nacho & Limeking.  The nearest railhead is located Silapather, Assam. Nearest airport is at Dibrugarh in assam.
  • 4. PROJECT LOCATION MAP Naba Project Location
  • 5. PROJECT COMPONENTS  A Concrete Gravity Dam of 99.19 m height (above foundation level) and 285 m length at top with FRL at EL.1028 m has been proposed for Naba HEP.  A Central spillway comprising of 7 Nos. of sluice type and 1 No. of surface type spillway have been proposed to pass the design flood of 12500 cumecs.  The design discharge of 465.76 cumecs will be conveyed through one number of concrete lined 12.0m dia. horseshoe shaped HRT 9669m long and two no. of pressure shafts (8.5m dia. & 7.0m dia.) further branched to powerhouse with 5 units of vertical francis turbine of 200 MW each for power generation.  To utilize the environmental releases, Dam Toe Powerhouse with installed capacity of 55MW + 15MW has been proposed.
  • 6. GENERAL LAYOUT OF NABA HEP
  • 7. HYDROLOGY AND VIEWS OF CWC  During the PFR stage, the hydrological studies for Naba HEP has been carried out considering the available discharge data at Chouldawaghat, Gerukamukh and Menga discharge observations sites for the period 1973-2008.  Since the discharge data used for water availability studies is up to 2007-08 only, CWC recommended to use latest discharge data of subsequent years and update the hydrological studies for the project.
  • 8. CHOULDHAWAGHAT G&D SITE  CWC has established Chouldhawaghat Gauge Discharge site on Subansiri River which is a tributary of River Brahmaputra in Lakhimpur District.  The coordinates of Chouldhawaghat GD site are 94o15’10”E longitude and 27o26’51”N latitude and the hydro-meteorological data collected from Chouldhawaghat GD site comes under classified data of Brahmaputra Basin Organization.  For firming up the hydrological studies and to get the approval of Water Availability studies from CWC/CEA, the Hydro-Meteorological data of Chouldhawaghat GD site is required.  As per Hydro-Meteorological Data Dissemination Policy, 2018 request has been made to the Chief Engineer, Brahmaputra Basin Organization for release of classified Chouldhawaghat GD site data.
  • 9. REQUIREMENT OF HYDRO-METEOROLOGICAL DATA OF CHOULDHAWAGHAT SITE  Requisition has been made from M/s Greenew Urja Private Limited with ref. to GUPL/NABA/CWC/BBO/20220706 dated 6th July 2022. NOC for collection of Hydro- Meteorological data on behalf of Naba Power Pvt. Ltd was also attached.  General Hydro-Meteorological Data Request Form requesting the Chouldhawaghat site data from 2002-03 to 2021-22 for monsoon and non-monsoon periods along with Secrecy Undertaking form has been sent to the Chief Engineer, Brahmaputra Basin Organization.  Long term Hydro-Meteorological Data services of CWC Chouldhawaghat GD site will help in developing reliable hydrological parameters and firming up hydrological studies for Naba HEP.  Therefore, it is requested to make available the requisitioned Hydro-meteorological data of CWC Chouldhawaghat site for finalization of Hydrology studies of Naba HEP DPR.
  • 11. NOC ON BEHALF OF M/S NPPL
  • 14. CONCLUSION  1070 MW Naba HEP Project in Subansiri Basin of Arunachal Pradesh is being developed by M/s. Naba Power Pvt. Ltd in Joint Sector with Govt. of Arunachal Pradesh (GoAP).  For the preparation of DPR and Hydrological Studies for the project, Hydro- Meteorological Data of CWC Chouldhawaghat site located in Subansiri basin is needed.  Details of required data with necessary information duly filled in Justification Note along with Secrecy Undertaking form has been sent to the Chief Engineer, Brahmaputra Basin Organization requesting data of Chouldhawaghat site.  The requested data may kindly be provided for finalization of Hydrological studies for Naba HEP and to get further approval from CWC/CEA so that this project of national importance can be taken up.