EXISTING AND
PROPOSED
HYDROPOWER PLANTS
IN NEPAL
PREPARED BY:DHANA KRISHNA
MAHARJAN
O69/BME/414
1
CONTENTS:
 Hydropower scenario in Nepal
1.1. Hydel possibilities and capabilities
1.2. Production , demand and supply of Hydel
 Existing hydel plants
 Proposed hydel plants
2
1.1. HYDEL CAPABILITIES AND
POSSIBILITIES
 Nepal has more than 6000 rivers.
 Bestowed with 2.27% of world water resources we have a
huge Hydropower potential. In terms of MW , potential is
estimated at 83,000MW of which half i.e. 42,000MW is
considered to be technically and economically viable.
3
1.2. Production Demand and supplyof
Hydel
 Till date has been able to develop only approx. 677.06MW of
hydropower (477.53MW owned NEA and 199.53MW by private sector)
 Bulk of economically feasible generation hasn’t been realised yet.
 The annual peak demand of Integrated Power System in fiscal year
2013/2014 is estimated to be 1,201MW with 410MW power estimated to
have been shed.
 Demand is increased by 9.7% compared to previous fiscal year 13/14.
 76.3% of total population has excess to electric power.i.e 2.56 million of
Nepalese have excess to electric power.
4
EXISTING HYDROPLANTS IN
NEPAL(>10MW)
HYDROPLANTS CAPCITY(
MW)
Kaligandaki ‘A’ HP,syangja(Krishna
gandaki)
144
Middle Marsyangdi HP, Rasuwa 70
Marshyangdi HP,Tanan 69
Khimti HP, Dolakhahu 60
Kulekhani I HP, Makawanpur 60
Bhotekoshi HP, Sindhupalchok 36
Kulekhani II HP, Makawanpur 32
Trishuli HP , Nuwakot 21
Chilime HP, Rasuwa 20
5
Contd…
HYDROPOWER PLANTS CAPACITY(M
)
Gandaki HP, Nuwakot 15
Devighat HP, Nuwakot 14.1
Modikhola HP , Parbat 14.8
Upper Modi P, parbat 14
Sunkoshi HP, Sindhupalchok 10.05
Indrawati HP, Sindupalchok 7.5
6
PROPSED HYDRO PLANTS
 Kulekhani III Hydro plant (14MW)
* Located immediately downstream of
kulekhani II Powerstation.
* Owned by GN and NEA.
* Initial total estimated cost was 2.43billion.
* Project was scheduled to be completed by
December 7, 2011 but the project was
Halted by civil contractor citing various problem.
* project resumed in March 23, 2012.
* Commissiong date 13th September 2014.
* By the end of FY 2013/14 approx. 80% of
construction work has been completed and
is in process of approval.
7
CONTD…
 Chameliya Hydroelectric Project (30MW)
* Was started in 2007 under joint funding of GoN, NEA and Korean loan and was scheduled
to be completed in March 2015.
* located at Darcha district.
* By the end of FY 2013/14 , approx. 94% overall progress has been achieved with total
expense of RS.12 billion.
 Rahughat Hydrolectric project (32MW)
* located near Beni of Myagdi district.
* Type:ROR
* Initiated with joint fund of GoN and NEA
with soft loan from Export Import Bank of India.
* commissioning date: 2016
(withsoft loan from India)
8
Contd…
 Upper Trisuli 3A Hydro Project (60MW)
* TYPE: ROR
* Located in Rasuwa and Nuwakot district.
* Construction was initiated in FY 2010/11
financed by a soft loan from China Exim Bank
* The estimated cost is 125,775 Million US$.
* Project has started from 1st june 2011
commissioned till 1st May 2014.
9
Contd..
 Project NEA ‘s subsidiaryCompany (PPP model)
Project Capacity
(MW)
Type Commissionig Date
Upper Tamakoshi 456 PROR 2unit march 2015;4unit march
Sanjan 14.3 ROR December,2015
Upper Sanjan 42 ROR July, 2015
Rasuwagadhi 102 ROR 2016
Bhotekoshi 111 ROR December,2016
Trisuli-3B 37 ROR
Bheri-Babai Diversion 48 ROR 2018(under Irrigation Dept.)
Budhi Ganga 20 PROR
10
Planned Hydro Development
Hydropower poject Instaled Capacity
(MW)
Type Commissioning date
Arun-II 900 PROR Will take abt. 4 tears
Upper Karnali 900 PROR Will take abt. 3 yrs
Upper Marshyangdi 600 ROR -
Tamakoshi III 650 PROR -
West seti 750 STO 2020
Uper Seti 140 STO 2019
Buchi Gandaki 600 STO -
Lower Arun 400 PROR -
Kabol-A 37 ROR -
Upper Modi-A 47 ROR -
Upper Trisuli-1 216 ROR -
11
In addition about 1.5 dozens project
of different size are under various
stages of implementation. There is
more than 300MW of project with
different capacities from IIPS that are
under construction….
12
SOURCE:
www.nea.com/anuualReport-2014.
Hydropower in Nepal-facts and figure /
nepalvista.com
List of power stations in Nepal-Wikipedia
Bossnepal.com/list-of-major-
hydropower-stations-in-Nepal/
13

THANK YOU
14

More Related Content

What's hot

What's hot (18)

Koodankulam
KoodankulamKoodankulam
Koodankulam
 
Dams And Hydroelectricity In Maharashtra | Art Integrated Project | Science P...
Dams And Hydroelectricity In Maharashtra | Art Integrated Project | Science P...Dams And Hydroelectricity In Maharashtra | Art Integrated Project | Science P...
Dams And Hydroelectricity In Maharashtra | Art Integrated Project | Science P...
 
The future of hydro power in kenya
The future of hydro power in kenyaThe future of hydro power in kenya
The future of hydro power in kenya
 
Ghazi Barotha Hydropower project Internship Report
Ghazi Barotha Hydropower project Internship ReportGhazi Barotha Hydropower project Internship Report
Ghazi Barotha Hydropower project Internship Report
 
Energy
EnergyEnergy
Energy
 
Pakistan dams
Pakistan damsPakistan dams
Pakistan dams
 
Nagarjuna sagar dam
Nagarjuna sagar damNagarjuna sagar dam
Nagarjuna sagar dam
 
Nagarjun sagar dam
Nagarjun sagar damNagarjun sagar dam
Nagarjun sagar dam
 
Tehri dam
Tehri damTehri dam
Tehri dam
 
Energy crises in pakistan
Energy crises in pakistanEnergy crises in pakistan
Energy crises in pakistan
 
Nl infrastructure oct 3 - oct 9, 2015
Nl infrastructure oct 3 - oct 9, 2015Nl infrastructure oct 3 - oct 9, 2015
Nl infrastructure oct 3 - oct 9, 2015
 
Final report
Final reportFinal report
Final report
 
REPORT-NHPC
REPORT-NHPCREPORT-NHPC
REPORT-NHPC
 
MAITHON HYDEL DOC FILE
MAITHON HYDEL DOC FILEMAITHON HYDEL DOC FILE
MAITHON HYDEL DOC FILE
 
Hep
HepHep
Hep
 
Kalabagh dam update
Kalabagh dam updateKalabagh dam update
Kalabagh dam update
 
Tidal waves
Tidal wavesTidal waves
Tidal waves
 
Rooppur Atomic Power Plant
Rooppur Atomic Power PlantRooppur Atomic Power Plant
Rooppur Atomic Power Plant
 

Similar to Fluid Machine

Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Nikhil Jaipurkar
 
Shp development in india
Shp development  in indiaShp development  in india
Shp development in indiaArvind Gupta
 
Field project report nhpc
Field project report nhpcField project report nhpc
Field project report nhpcsahil286
 
Hydro power scenario in india 2013
Hydro power scenario in india 2013Hydro power scenario in india 2013
Hydro power scenario in india 2013Vipul Kumar
 
Development projects of neepal
Development projects of neepalDevelopment projects of neepal
Development projects of neepaljivanadhikari
 
Future of Hydro Power Development in India
Future of Hydro Power Development in IndiaFuture of Hydro Power Development in India
Future of Hydro Power Development in IndiaIPPAI
 
Life cycle of tarbella dam
Life cycle of tarbella dam Life cycle of tarbella dam
Life cycle of tarbella dam JunaidAshraf31
 
Review and Analysis of National Pride Project UPPER TAMAKOSHI HYDROPOWER PRO...
Review and Analysis of National Pride Project UPPER TAMAKOSHIHYDROPOWER PRO...Review and Analysis of National Pride Project UPPER TAMAKOSHIHYDROPOWER PRO...
Review and Analysis of National Pride Project UPPER TAMAKOSHI HYDROPOWER PRO...AlizaRLShrestha1
 
26900721058_OE-ME701D.pptx
26900721058_OE-ME701D.pptx26900721058_OE-ME701D.pptx
26900721058_OE-ME701D.pptxSukantaMandal17
 
Sustainibility assessment in hydropower project a case study of nyadi hp
Sustainibility assessment in hydropower project a case study of nyadi hpSustainibility assessment in hydropower project a case study of nyadi hp
Sustainibility assessment in hydropower project a case study of nyadi hpSuwash Acharya
 
China pakistan economic corridor Project
China pakistan economic corridor ProjectChina pakistan economic corridor Project
China pakistan economic corridor Projectanwaar azad
 
12 B .Storage CEA.pptx
12 B .Storage CEA.pptx12 B .Storage CEA.pptx
12 B .Storage CEA.pptxssuser0f80df
 
Presentation for NFRCC 16.11.2022 revised.pptx
Presentation for NFRCC 16.11.2022 revised.pptxPresentation for NFRCC 16.11.2022 revised.pptx
Presentation for NFRCC 16.11.2022 revised.pptxmuk7971
 
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.Oswar Mungkasa
 
Sectoral Overview and Investment Opportunities
Sectoral Overview and Investment OpportunitiesSectoral Overview and Investment Opportunities
Sectoral Overview and Investment OpportunitiesNepal Investment Summit
 

Similar to Fluid Machine (20)

Powerful parbati
Powerful parbatiPowerful parbati
Powerful parbati
 
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)
 
Shp development in india
Shp development  in indiaShp development  in india
Shp development in india
 
Field project report nhpc
Field project report nhpcField project report nhpc
Field project report nhpc
 
Hydro power scenario in india 2013
Hydro power scenario in india 2013Hydro power scenario in india 2013
Hydro power scenario in india 2013
 
Development projects of neepal
Development projects of neepalDevelopment projects of neepal
Development projects of neepal
 
Small
SmallSmall
Small
 
Future of Hydro Power Development in India
Future of Hydro Power Development in IndiaFuture of Hydro Power Development in India
Future of Hydro Power Development in India
 
Life cycle of tarbella dam
Life cycle of tarbella dam Life cycle of tarbella dam
Life cycle of tarbella dam
 
Review and Analysis of National Pride Project UPPER TAMAKOSHI HYDROPOWER PRO...
Review and Analysis of National Pride Project UPPER TAMAKOSHIHYDROPOWER PRO...Review and Analysis of National Pride Project UPPER TAMAKOSHIHYDROPOWER PRO...
Review and Analysis of National Pride Project UPPER TAMAKOSHI HYDROPOWER PRO...
 
26900721058_OE-ME701D.pptx
26900721058_OE-ME701D.pptx26900721058_OE-ME701D.pptx
26900721058_OE-ME701D.pptx
 
Sustainibility assessment in hydropower project a case study of nyadi hp
Sustainibility assessment in hydropower project a case study of nyadi hpSustainibility assessment in hydropower project a case study of nyadi hp
Sustainibility assessment in hydropower project a case study of nyadi hp
 
China pakistan economic corridor Project
China pakistan economic corridor ProjectChina pakistan economic corridor Project
China pakistan economic corridor Project
 
ARNAB12.pdf
ARNAB12.pdfARNAB12.pdf
ARNAB12.pdf
 
12 B .Storage CEA.pptx
12 B .Storage CEA.pptx12 B .Storage CEA.pptx
12 B .Storage CEA.pptx
 
Project report
Project reportProject report
Project report
 
Presentation for NFRCC 16.11.2022 revised.pptx
Presentation for NFRCC 16.11.2022 revised.pptxPresentation for NFRCC 16.11.2022 revised.pptx
Presentation for NFRCC 16.11.2022 revised.pptx
 
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
 
Sectoral Overview and Investment Opportunities
Sectoral Overview and Investment OpportunitiesSectoral Overview and Investment Opportunities
Sectoral Overview and Investment Opportunities
 
NHPC Training Report
NHPC Training ReportNHPC Training Report
NHPC Training Report
 

More from rujan timsina

hydraulic machinery turbines
hydraulic machinery turbineshydraulic machinery turbines
hydraulic machinery turbinesrujan timsina
 
major existing hydroelectric plant in world
major existing hydroelectric plant in worldmajor existing hydroelectric plant in world
major existing hydroelectric plant in worldrujan timsina
 
jet propulsion priciple
jet propulsion priciplejet propulsion priciple
jet propulsion priciplerujan timsina
 
impact of jets on the moving plate
impact of jets on the moving plateimpact of jets on the moving plate
impact of jets on the moving platerujan timsina
 
Dynamic force exerted by Fluid jet on stationary plate
Dynamic force exerted by Fluid jet on stationary plateDynamic force exerted by Fluid jet on stationary plate
Dynamic force exerted by Fluid jet on stationary platerujan timsina
 
Dynamic force exerted by Fluid jet - Fluid Machine
Dynamic force exerted by Fluid jet - Fluid MachineDynamic force exerted by Fluid jet - Fluid Machine
Dynamic force exerted by Fluid jet - Fluid Machinerujan timsina
 
appplication of linear momentum principal
appplication of linear momentum principalappplication of linear momentum principal
appplication of linear momentum principalrujan timsina
 
linear momentum and impulse equations
linear momentum and impulse equationslinear momentum and impulse equations
linear momentum and impulse equationsrujan timsina
 
404 dynamic force and power
404 dynamic force and power404 dynamic force and power
404 dynamic force and powerrujan timsina
 
403 development of water turbine
403 development of water turbine403 development of water turbine
403 development of water turbinerujan timsina
 
History and Development of water wheels
History and Development of water wheelsHistory and Development of water wheels
History and Development of water wheelsrujan timsina
 

More from rujan timsina (15)

turbine
turbineturbine
turbine
 
pelton turbine
pelton turbinepelton turbine
pelton turbine
 
hydraulic machinery turbines
hydraulic machinery turbineshydraulic machinery turbines
hydraulic machinery turbines
 
major existing hydroelectric plant in world
major existing hydroelectric plant in worldmajor existing hydroelectric plant in world
major existing hydroelectric plant in world
 
Fluid Machine
Fluid MachineFluid Machine
Fluid Machine
 
jet propulsion priciple
jet propulsion priciplejet propulsion priciple
jet propulsion priciple
 
impact of jets on the moving plate
impact of jets on the moving plateimpact of jets on the moving plate
impact of jets on the moving plate
 
Dynamic force exerted by Fluid jet on stationary plate
Dynamic force exerted by Fluid jet on stationary plateDynamic force exerted by Fluid jet on stationary plate
Dynamic force exerted by Fluid jet on stationary plate
 
Dynamic force exerted by Fluid jet - Fluid Machine
Dynamic force exerted by Fluid jet - Fluid MachineDynamic force exerted by Fluid jet - Fluid Machine
Dynamic force exerted by Fluid jet - Fluid Machine
 
appplication of linear momentum principal
appplication of linear momentum principalappplication of linear momentum principal
appplication of linear momentum principal
 
linear momentum and impulse equations
linear momentum and impulse equationslinear momentum and impulse equations
linear momentum and impulse equations
 
404 dynamic force and power
404 dynamic force and power404 dynamic force and power
404 dynamic force and power
 
403 development of water turbine
403 development of water turbine403 development of water turbine
403 development of water turbine
 
Turbo machinery
Turbo machineryTurbo machinery
Turbo machinery
 
History and Development of water wheels
History and Development of water wheelsHistory and Development of water wheels
History and Development of water wheels
 

Recently uploaded

GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 

Recently uploaded (20)

GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 

Fluid Machine

  • 1. EXISTING AND PROPOSED HYDROPOWER PLANTS IN NEPAL PREPARED BY:DHANA KRISHNA MAHARJAN O69/BME/414 1
  • 2. CONTENTS:  Hydropower scenario in Nepal 1.1. Hydel possibilities and capabilities 1.2. Production , demand and supply of Hydel  Existing hydel plants  Proposed hydel plants 2
  • 3. 1.1. HYDEL CAPABILITIES AND POSSIBILITIES  Nepal has more than 6000 rivers.  Bestowed with 2.27% of world water resources we have a huge Hydropower potential. In terms of MW , potential is estimated at 83,000MW of which half i.e. 42,000MW is considered to be technically and economically viable. 3
  • 4. 1.2. Production Demand and supplyof Hydel  Till date has been able to develop only approx. 677.06MW of hydropower (477.53MW owned NEA and 199.53MW by private sector)  Bulk of economically feasible generation hasn’t been realised yet.  The annual peak demand of Integrated Power System in fiscal year 2013/2014 is estimated to be 1,201MW with 410MW power estimated to have been shed.  Demand is increased by 9.7% compared to previous fiscal year 13/14.  76.3% of total population has excess to electric power.i.e 2.56 million of Nepalese have excess to electric power. 4
  • 5. EXISTING HYDROPLANTS IN NEPAL(>10MW) HYDROPLANTS CAPCITY( MW) Kaligandaki ‘A’ HP,syangja(Krishna gandaki) 144 Middle Marsyangdi HP, Rasuwa 70 Marshyangdi HP,Tanan 69 Khimti HP, Dolakhahu 60 Kulekhani I HP, Makawanpur 60 Bhotekoshi HP, Sindhupalchok 36 Kulekhani II HP, Makawanpur 32 Trishuli HP , Nuwakot 21 Chilime HP, Rasuwa 20 5
  • 6. Contd… HYDROPOWER PLANTS CAPACITY(M ) Gandaki HP, Nuwakot 15 Devighat HP, Nuwakot 14.1 Modikhola HP , Parbat 14.8 Upper Modi P, parbat 14 Sunkoshi HP, Sindhupalchok 10.05 Indrawati HP, Sindupalchok 7.5 6
  • 7. PROPSED HYDRO PLANTS  Kulekhani III Hydro plant (14MW) * Located immediately downstream of kulekhani II Powerstation. * Owned by GN and NEA. * Initial total estimated cost was 2.43billion. * Project was scheduled to be completed by December 7, 2011 but the project was Halted by civil contractor citing various problem. * project resumed in March 23, 2012. * Commissiong date 13th September 2014. * By the end of FY 2013/14 approx. 80% of construction work has been completed and is in process of approval. 7
  • 8. CONTD…  Chameliya Hydroelectric Project (30MW) * Was started in 2007 under joint funding of GoN, NEA and Korean loan and was scheduled to be completed in March 2015. * located at Darcha district. * By the end of FY 2013/14 , approx. 94% overall progress has been achieved with total expense of RS.12 billion.  Rahughat Hydrolectric project (32MW) * located near Beni of Myagdi district. * Type:ROR * Initiated with joint fund of GoN and NEA with soft loan from Export Import Bank of India. * commissioning date: 2016 (withsoft loan from India) 8
  • 9. Contd…  Upper Trisuli 3A Hydro Project (60MW) * TYPE: ROR * Located in Rasuwa and Nuwakot district. * Construction was initiated in FY 2010/11 financed by a soft loan from China Exim Bank * The estimated cost is 125,775 Million US$. * Project has started from 1st june 2011 commissioned till 1st May 2014. 9
  • 10. Contd..  Project NEA ‘s subsidiaryCompany (PPP model) Project Capacity (MW) Type Commissionig Date Upper Tamakoshi 456 PROR 2unit march 2015;4unit march Sanjan 14.3 ROR December,2015 Upper Sanjan 42 ROR July, 2015 Rasuwagadhi 102 ROR 2016 Bhotekoshi 111 ROR December,2016 Trisuli-3B 37 ROR Bheri-Babai Diversion 48 ROR 2018(under Irrigation Dept.) Budhi Ganga 20 PROR 10
  • 11. Planned Hydro Development Hydropower poject Instaled Capacity (MW) Type Commissioning date Arun-II 900 PROR Will take abt. 4 tears Upper Karnali 900 PROR Will take abt. 3 yrs Upper Marshyangdi 600 ROR - Tamakoshi III 650 PROR - West seti 750 STO 2020 Uper Seti 140 STO 2019 Buchi Gandaki 600 STO - Lower Arun 400 PROR - Kabol-A 37 ROR - Upper Modi-A 47 ROR - Upper Trisuli-1 216 ROR - 11
  • 12. In addition about 1.5 dozens project of different size are under various stages of implementation. There is more than 300MW of project with different capacities from IIPS that are under construction…. 12
  • 13. SOURCE: www.nea.com/anuualReport-2014. Hydropower in Nepal-facts and figure / nepalvista.com List of power stations in Nepal-Wikipedia Bossnepal.com/list-of-major- hydropower-stations-in-Nepal/ 13