Transformer Vector Group
& Its Effect on Phase Shift of
+Ve and –Ve phase
sequence current
component
between secondary and primary
Understanding Transformer
Vector Group
■
■
■
■
Transformer is magnetically coupled circuit
Its primary and secondary voltages either in
phase or out of phase
To say them in phase or out of phase will all
depend upon polarity considerations
Before to discussing polarity we will see
something about notational basics of
electricity
Transformer as magnetically
coupled device
This transformer is drawn such that whenever current enters from
top side of Primary, exits from top side of the secondary
Think about
emphasize
on the word
drawn
Transformer as magnetically
coupled device
This transformer is drawn such that whenever current enters from
top side of Primary, exits from Bottom side of the
secondary
Think about
emphasize
on the word
drawn
Polarity Marking on Transformer
A
B
a
b
A’
B’
a’
b’
The facts in previous slides can be represented in more
simplistic way by polarity marking as below in figure A
and Figure B respectively
Figure - A
Figure - B
Polarity Marking on Transformer
■ As for as one single phase transformer
considered polarity marking carries a
little meaning. Thus you will never see
such polarity marking on single phase
transformer. But if you want to connect
these single phase transformer for a
particular purpose. Then this polarity
marking are much use full
Vector diagram for single phase
transformer - 1
A
B
a
b
VAB
Vab
Voltage of a
wrt b is in
phase with
voltage of A
wrt B
Vector diagram for single phase
transformer - 2
VA’B’
A’
B’
a’
b’
Voltage of a’
wrt b’ is out
of phase
with voltage of
A’ wrt B’
Vb’a’
a’ at arrow tail and b’ at
arrow head Vb’a’ . arrow
direction is reverse to that
of physical arrow marking
near secondary coil and is
in phase with primary
voltage. To resolve such
confusion use consistent
Vcoa’nb’ventionand references
as in previous slide
Polarity marking on transformer
■ Consider a simple case of paralleling the
transformer in figure A and B.
A
B
a
b
A
’
B
’
a
’
b
’
Connect like
polarity
Kirchhoff's voltage law (KVL)
■ The directed sum of the electrical
potential differences (voltage) around
any closed circuit must be zero.
(http://en.wikipedia.org/wiki/Kirchhoff
%27s_circuit_laws) as on 11/09/10
Polarity marking on transformer
■ Consider another case of voltage doubling
by using both transformer as from figure A
B
A a
b
A
B
a
b
Connect dislike
polarity
X
Y
L
Apply KVL
Apply KVL starting from point L and traverse the
loop anti clockwise with convention that voltage
mentioned by double subscript notation with arrow
head wrt tail traversed in the direction of arrow is
+Ve else -Ve
VXY – Vab – Vab = 0
VXY = Vab + Vab
VAB
Vab Vab
VXY
w
■ Consider yet another case of voltage
doubling by using one transformer as
figure A and other as figure B
A
B
a
b
A’
B’
a’
b’
Connect dislike
polarity
X
Y
L
Apply KVL
VXY - Vab – Vb’a’ = 0
VXY = Vab+ Vb’a’
Vab
Va’b’
Vb’a,’
VXY
w
Polarity of the transformer
If a transformer is considered as black box
this fact can be shown by a dot on
respective terminal of primary and
secondary. Here voltage Vab is considered
to be in phase with VAB
Transformer redefined once again to avoid confusion between
HV/LV and Primary/ Secondary (useful while defining vector
group)
(From http://en.wikipedia.org/wiki/Transformer 13/09/10)
■
■ A transformer is a device that transfers electrical energy from one
circuit to another through inductively coupled conductors the
transformer's coils. A varying current in the first or primary winding
creates a varying magnetic flux in the transformer's core, and thus a
varying magnetic field through the secondary winding. This varying
magnetic field induces a varying electromotive force (EMF) or "voltage"
in the secondary winding. This effect is called mutual induction.
■ If a load is connected to the secondary, an electric current will flow in
the secondary winding and electrical energy will be transferred from the
primary circuit through the transformer to the load. In an ideal
transformer, the induced voltage in the secondary winding (VS) is in
proportion to the primary voltage (VP), and is given by the ratio of the
number of turns in the secondary (NS) to the number of turns in the
primary (NP) as follows:
(Power Flows From Primary To Secondary)
Vs Ns
---- = -----
Vp Np
(From http://en.wikipedia.org/wiki/Vector_group 13/09/10)
A Vector group is the International Electro
technical Commission (IEC) method of
categorizing the primary and secondary
winding configurations of three-phase
transformers. Within a polyphase
system power transformer it indicates
the windings configurations and the
difference in phase angle between
them.
Transformer Vector Group
The point of confusion is in how to use
this notation in a step-up transformer.
As the IEC60076-1 standard has
stated, the notation is HV-LV in
sequence. For example, a step-up
transformer with a delta-connected
primary (LV), and star-connected
secondary (HV), is not written as 'dY11‘,
but 'Yd1'. The 1 indicates the LV
winding lags the HV by 30 degrees.
Transformer Vector Group
Vector Group of Step-Up Transformer
Power
Flow
Secondary
HV
Primary
LV
dY11 LV Can’t be reference
Yd1 Select HV as reference
Transformer Vector Group
■ Depends upon Polarity as well as external
terminal marking
■
■
■
■ Because phase difference between two
magnetically coupled circuit is either 180 or 0
Hence whenever IEC specifies phase
difference it shall be treated as with respect
to line voltages
Hence terminal marking is affecting on vector
group and important
If external terminal marking changed Yd11
group may become Yd5
3 Phase Supply Review
Vb Vy
Vry
Vr
Vyb
Vbr
With this back ground now we
are ready to understand
transformer connections for
Yd11 Transformer
Throughout this example instead of labels, colors are used purposely
Let the 3 ph. Transformer individual windings are connected as shown in
fig-A so as to form HV side Y and LV side delta.
This transformer is redrawn in fig-B so as to make it easy to account for
shift of 120 deg. between individual phases.
Note the associated limb colors in primary and secondary of fig-A and
Fig-B.
Associated limbs are kept parallel in Fig-B.
External leads of secondary are of Red, Yellow, Blue, different color than
that of limb
Color Red, Yellow, Blue carries normal meaning of Vr,Vy,Vb
Fig-A
Fig-B
By
resemblance
from previous
sheet
Transform to resemble with 3 Ph review
taken previously. Notice the changes in
vector diagram for color and direction
Dark Yellow limb voltage of
LV (Reversed) is line (R phase to
Y phase) voltage
Teal limb voltage of LV
(Reversed) is line (Y phase to B
phase) voltage
Brown limb voltage of LV
(Reversed) is line (B phase to R
phase) voltage
12 O'clock
11 O'clock
As stated previously transformer
vector group depends up on its
terminal marking.
How it happens we will see in
next 2 slides (This type of
connections are ANSI standard)
We may call it as Yd5
Transformer
Change the terminal marking in respect of secondary
such that in front of R Ph of primary there shall be
Yellow phase of secondary and so on. Revised
drawing is shown below
Fig-A
Fig-B
By
resemblance
from previous
sheet
Transform to resemble with 3 Ph review
taken previously. Notice the changes in
vector diagram for color and direction
Dark Yellow limb voltage of
LV (Reversed) is line (Y phase to
B phase) voltage
Teal limb voltage of LV
(Reversed) is line (B phase to R
phase) voltage
Brown limb voltage of LV
(Reversed) is line (R phase to Y
phase) voltage
12 O'clock
5 O'clock
Most commonly used vector
groups
■ Dy1
■ Yd1
■ Dy5
■ Yd5
■ Dy11
■ Yd11
Connections for Yd1 T/F
Here connections of Yd1
transformer are described to
demonstrate effect of polarity of
delta connections on
transformer vector group
Change the connections of delta
with respect to it’s polarity
Fig-A
Fig-B
By
resemblance
from previous
sheet
Transform to resemble with 3 Ph review
taken previously. Notice the changes in
vector diagram for color only shown doted to
indicate it out of phase wrt HV
Dark Yellow limb voltage of
LV is line (Y phase to B phase)
voltage
Teal limb voltage of LV is
line (B phase to R phase) voltage
Brown limb voltage of LV
is line (R phase to Y phase)
voltage
5 O'clock
Final Results
1800 to
compensate for
out of phase
primary and
secondary
12 O'clock
Or instead of shifting R Ph
secondary voltage at last stage,
we will redraw the same by
different way so that primary and
secondary windings shall have
similar arrow markings ( may call
as a tricky way)
Change the connections of delta
with respect to it’s polarity
Fig-A
Fig-B
By
resemblance
from previous
sheet
Transform to resemble with 3 Ph review
taken previously. Notice the changes in
vector diagram for color only
Dark Yellow limb voltage of
LV is line (Y phase to B phase)
voltage
Teal limb voltage of LV is
line (B phase to R phase) voltage
Brown limb voltage of LV
is line (R phase to Y phase)
voltage
12 O'clock
1 O'clock
For the standard Yd1 transformer
discussed previously now we will
check relationship between +Ve
and –Ve sequence currents
reflected on primary with respect
to that of on secondary
Let the power flows from Y side to D
side. Show the currents instead of
voltages
Fig-A
Fig-B
Note : Primary Y Winding currents shown out of phase wrt
secondary. However source currents follows secondary
limb current.
C
Apply KCL at point C
Secondary R Ph Line Current + Teal Limb Current =
Brown Limb Current
Secondary R Ph Line Current = Brown Limb Current
- Teal Limb Current
& Brown limb current is primary current
IS
`
Di
IP Yi
For Yd1 Transformer with
Y as primary and D as
secondary Y Side Line
Currents Leads D side
Line Current by 300
Let the power flows from D side to Y
side. Show the currents instead of
voltages
Fig-A
Fig-B
Note: Secondary load current follows secondary winding
current
C
Apply KCL at point C
Primary R Ph Line Current + Teal Limb Current =
Brown Limb Current
Primary R Ph Line Current = Brown Limb Current -
Teal Limb Current
& Brown limb current is primary current
IP
For Yd1 Transformer with
D as primary and Y as
secondary Y Side Line
Currents Leads D side
Line Current by 300
`
Di
IS Yi
To check the situation for –Ve
sequence currents of Yd1
transformer let its source is
replaced by RBY source hence
new circuit will be
Let the power flows from Y side to D
side. Show the currents instead of
voltages and interchange Y and B
limb in primary. Redraw secondary
Fig-A
Fig-B
Note : Primary Y Winding currents shown out of phase wrt
secondary. However source currents follows secondary
limb current.
Apply KCL at point C
Secondary R Ph Line Current + Teal Limb Current =
Brown Limb Current
Secondary R Ph Line Current = Brown Limb Current
- Teal Limb Current
& Brown limb current is primary current
IP2
`
IS2 Di
Yi
For Yd1 Transformer with
Y as primary and D as
secondary For –Ve
Sequence Y Side Line
Currents lags D side Line
Current by 300
Fig-B
Results of Yd11 and Yd1 for +Ve
sequence and –Ve sequence are
tabulated as below
For Yd1
transformer
Y side current leads
D side current by 300
For Yd11
transformer
Y side current lags D
side current by 300
For +Ve
sequence
current
component
For -Ve
sequence
current
component
Y side current lags D
side current by 300
Y side current leads
D side current by 300
a
b
c
A
B
C
N
A shortcut to identify vector
group
12 O’Clock
1 O’Clock
Yd1
Yd1 and Dy11 are duels
A
B
C
a
b
c
a
b
c
n
N
A
B
C
D
Yy
d1
11
understandingtransformervectorgroup-180629014651.pptx

More Related Content

Similar to understandingtransformervectorgroup-180629014651.pptx

Basic Electronics (Rectifiers) by Er. Swapnil Kaware
Basic Electronics (Rectifiers) by Er. Swapnil KawareBasic Electronics (Rectifiers) by Er. Swapnil Kaware
Basic Electronics (Rectifiers) by Er. Swapnil KawareProf. Swapnil V. Kaware
 
BEF 12403 - Week 6 - Series-Parallel Resistor Circuits.ppt
BEF 12403 - Week 6 - Series-Parallel Resistor Circuits.pptBEF 12403 - Week 6 - Series-Parallel Resistor Circuits.ppt
BEF 12403 - Week 6 - Series-Parallel Resistor Circuits.pptLiewChiaPing
 
lecture note AC fundamental LESSON 2.pptx
lecture note AC fundamental LESSON 2.pptxlecture note AC fundamental LESSON 2.pptx
lecture note AC fundamental LESSON 2.pptxkifle203
 
TRANSFORMER VECTOR GROUP.pdf
TRANSFORMER VECTOR GROUP.pdfTRANSFORMER VECTOR GROUP.pdf
TRANSFORMER VECTOR GROUP.pdfAmala Joseph
 
CHAPTER 3 - Three Phase Network.ppt
CHAPTER 3 - Three Phase Network.pptCHAPTER 3 - Three Phase Network.ppt
CHAPTER 3 - Three Phase Network.pptLiewChiaPing
 
Electrical circuit ii (eee 121)
Electrical circuit ii (eee 121)Electrical circuit ii (eee 121)
Electrical circuit ii (eee 121)Md. Areful Islam
 
Electrical transmission line
Electrical transmission lineElectrical transmission line
Electrical transmission lineDhananjay Jha
 
Ekeeda - First Year Enginering - Basic Electrical Engineering
Ekeeda - First Year Enginering - Basic Electrical EngineeringEkeeda - First Year Enginering - Basic Electrical Engineering
Ekeeda - First Year Enginering - Basic Electrical EngineeringEkeedaPvtLtd
 
Ekeeda backlinks
Ekeeda backlinksEkeeda backlinks
Ekeeda backlinksEkeeda
 
Transformer by vinay chawla
Transformer by vinay chawlaTransformer by vinay chawla
Transformer by vinay chawlavinaychawla28
 
Fundamentals of power system
Fundamentals of power systemFundamentals of power system
Fundamentals of power systemBalaram Das
 
153010010 mohammad babor
153010010  mohammad  babor153010010  mohammad  babor
153010010 mohammad baborBabor10
 
Basic of Electronics study materials
Basic of Electronics study  materialsBasic of Electronics study  materials
Basic of Electronics study materialsBalajiK109
 
unit-1-Three phase circuits and power systems.pdf
unit-1-Three phase circuits and power systems.pdfunit-1-Three phase circuits and power systems.pdf
unit-1-Three phase circuits and power systems.pdfdeepaMS4
 

Similar to understandingtransformervectorgroup-180629014651.pptx (20)

Basic Electronics (Rectifiers) by Er. Swapnil Kaware
Basic Electronics (Rectifiers) by Er. Swapnil KawareBasic Electronics (Rectifiers) by Er. Swapnil Kaware
Basic Electronics (Rectifiers) by Er. Swapnil Kaware
 
BEF 12403 - Week 6 - Series-Parallel Resistor Circuits.ppt
BEF 12403 - Week 6 - Series-Parallel Resistor Circuits.pptBEF 12403 - Week 6 - Series-Parallel Resistor Circuits.ppt
BEF 12403 - Week 6 - Series-Parallel Resistor Circuits.ppt
 
lecture note AC fundamental LESSON 2.pptx
lecture note AC fundamental LESSON 2.pptxlecture note AC fundamental LESSON 2.pptx
lecture note AC fundamental LESSON 2.pptx
 
TRANSFORMER VECTOR GROUP.pdf
TRANSFORMER VECTOR GROUP.pdfTRANSFORMER VECTOR GROUP.pdf
TRANSFORMER VECTOR GROUP.pdf
 
CHAPTER 3 - Three Phase Network.ppt
CHAPTER 3 - Three Phase Network.pptCHAPTER 3 - Three Phase Network.ppt
CHAPTER 3 - Three Phase Network.ppt
 
Shazab
ShazabShazab
Shazab
 
Unit2-AC_Circuits.ppt
Unit2-AC_Circuits.pptUnit2-AC_Circuits.ppt
Unit2-AC_Circuits.ppt
 
Circuit Theory- (Electronics)
Circuit Theory- (Electronics)Circuit Theory- (Electronics)
Circuit Theory- (Electronics)
 
Electrical circuit ii (eee 121)
Electrical circuit ii (eee 121)Electrical circuit ii (eee 121)
Electrical circuit ii (eee 121)
 
Electrical transmission line
Electrical transmission lineElectrical transmission line
Electrical transmission line
 
Ekeeda - First Year Enginering - Basic Electrical Engineering
Ekeeda - First Year Enginering - Basic Electrical EngineeringEkeeda - First Year Enginering - Basic Electrical Engineering
Ekeeda - First Year Enginering - Basic Electrical Engineering
 
Ekeeda backlinks
Ekeeda backlinksEkeeda backlinks
Ekeeda backlinks
 
Transformer by vinay chawla
Transformer by vinay chawlaTransformer by vinay chawla
Transformer by vinay chawla
 
EEE 5
EEE 5EEE 5
EEE 5
 
Fundamentals of power system
Fundamentals of power systemFundamentals of power system
Fundamentals of power system
 
Chapter02
Chapter02Chapter02
Chapter02
 
153010010 mohammad babor
153010010  mohammad  babor153010010  mohammad  babor
153010010 mohammad babor
 
Basic of Electronics study materials
Basic of Electronics study  materialsBasic of Electronics study  materials
Basic of Electronics study materials
 
Transformers
TransformersTransformers
Transformers
 
unit-1-Three phase circuits and power systems.pdf
unit-1-Three phase circuits and power systems.pdfunit-1-Three phase circuits and power systems.pdf
unit-1-Three phase circuits and power systems.pdf
 

More from Satish Pydimarla

Testing_of_transformers_adjusted.ppt
Testing_of_transformers_adjusted.pptTesting_of_transformers_adjusted.ppt
Testing_of_transformers_adjusted.pptSatish Pydimarla
 
Zaragoza Factory_Our product_ EN.ppt
Zaragoza Factory_Our product_ EN.pptZaragoza Factory_Our product_ EN.ppt
Zaragoza Factory_Our product_ EN.pptSatish Pydimarla
 
transformerprotection-180102061059.pdf
transformerprotection-180102061059.pdftransformerprotection-180102061059.pdf
transformerprotection-180102061059.pdfSatish Pydimarla
 
3-Phase-Transformer (1).pptx
3-Phase-Transformer (1).pptx3-Phase-Transformer (1).pptx
3-Phase-Transformer (1).pptxSatish Pydimarla
 
Presentation-Kalinga Stadium.pptx
Presentation-Kalinga Stadium.pptxPresentation-Kalinga Stadium.pptx
Presentation-Kalinga Stadium.pptxSatish Pydimarla
 
transformeronno-load-200825063948.pptx
transformeronno-load-200825063948.pptxtransformeronno-load-200825063948.pptx
transformeronno-load-200825063948.pptxSatish Pydimarla
 
332038674-Vector-Group-of-Transformers.ppt
332038674-Vector-Group-of-Transformers.ppt332038674-Vector-Group-of-Transformers.ppt
332038674-Vector-Group-of-Transformers.pptSatish Pydimarla
 
Understanding_lightning_protection.pptx
Understanding_lightning_protection.pptxUnderstanding_lightning_protection.pptx
Understanding_lightning_protection.pptxSatish Pydimarla
 
Construction of HV Transmission Lines etc.pptx
Construction of HV Transmission Lines etc.pptxConstruction of HV Transmission Lines etc.pptx
Construction of HV Transmission Lines etc.pptxSatish Pydimarla
 
high-voltage-dc-transmission-hvdc PKP.pptx
high-voltage-dc-transmission-hvdc PKP.pptxhigh-voltage-dc-transmission-hvdc PKP.pptx
high-voltage-dc-transmission-hvdc PKP.pptxSatish Pydimarla
 
First day Module ( Power_Scenario etc).pptx
First day Module ( Power_Scenario  etc).pptxFirst day Module ( Power_Scenario  etc).pptx
First day Module ( Power_Scenario etc).pptxSatish Pydimarla
 
Substation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSubstation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSatish Pydimarla
 

More from Satish Pydimarla (20)

9310091.ppt
9310091.ppt9310091.ppt
9310091.ppt
 
control room.pptx
control room.pptxcontrol room.pptx
control room.pptx
 
Thermovision Test.ppt
Thermovision Test.pptThermovision Test.ppt
Thermovision Test.ppt
 
4143813.ppt
4143813.ppt4143813.ppt
4143813.ppt
 
Testing_of_transformers_adjusted.ppt
Testing_of_transformers_adjusted.pptTesting_of_transformers_adjusted.ppt
Testing_of_transformers_adjusted.ppt
 
Zaragoza Factory_Our product_ EN.ppt
Zaragoza Factory_Our product_ EN.pptZaragoza Factory_Our product_ EN.ppt
Zaragoza Factory_Our product_ EN.ppt
 
transformerprotection-180102061059.pdf
transformerprotection-180102061059.pdftransformerprotection-180102061059.pdf
transformerprotection-180102061059.pdf
 
3-Phase-Transformer (1).pptx
3-Phase-Transformer (1).pptx3-Phase-Transformer (1).pptx
3-Phase-Transformer (1).pptx
 
Electrical_Engg_Basic.PPT
Electrical_Engg_Basic.PPTElectrical_Engg_Basic.PPT
Electrical_Engg_Basic.PPT
 
Presentation-Kalinga Stadium.pptx
Presentation-Kalinga Stadium.pptxPresentation-Kalinga Stadium.pptx
Presentation-Kalinga Stadium.pptx
 
transformeronno-load-200825063948.pptx
transformeronno-load-200825063948.pptxtransformeronno-load-200825063948.pptx
transformeronno-load-200825063948.pptx
 
332038674-Vector-Group-of-Transformers.ppt
332038674-Vector-Group-of-Transformers.ppt332038674-Vector-Group-of-Transformers.ppt
332038674-Vector-Group-of-Transformers.ppt
 
tcee-161003100321.pptx
tcee-161003100321.pptxtcee-161003100321.pptx
tcee-161003100321.pptx
 
Understanding_lightning_protection.pptx
Understanding_lightning_protection.pptxUnderstanding_lightning_protection.pptx
Understanding_lightning_protection.pptx
 
Understanding VCB.pptx
Understanding VCB.pptxUnderstanding VCB.pptx
Understanding VCB.pptx
 
CT & PT.pptx
CT & PT.pptxCT & PT.pptx
CT & PT.pptx
 
Construction of HV Transmission Lines etc.pptx
Construction of HV Transmission Lines etc.pptxConstruction of HV Transmission Lines etc.pptx
Construction of HV Transmission Lines etc.pptx
 
high-voltage-dc-transmission-hvdc PKP.pptx
high-voltage-dc-transmission-hvdc PKP.pptxhigh-voltage-dc-transmission-hvdc PKP.pptx
high-voltage-dc-transmission-hvdc PKP.pptx
 
First day Module ( Power_Scenario etc).pptx
First day Module ( Power_Scenario  etc).pptxFirst day Module ( Power_Scenario  etc).pptx
First day Module ( Power_Scenario etc).pptx
 
Substation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSubstation_equipment_ (1).pptx
Substation_equipment_ (1).pptx
 

Recently uploaded

Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 

Recently uploaded (20)

Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 

understandingtransformervectorgroup-180629014651.pptx

  • 1. Transformer Vector Group & Its Effect on Phase Shift of +Ve and –Ve phase sequence current component between secondary and primary
  • 2. Understanding Transformer Vector Group ■ ■ ■ ■ Transformer is magnetically coupled circuit Its primary and secondary voltages either in phase or out of phase To say them in phase or out of phase will all depend upon polarity considerations Before to discussing polarity we will see something about notational basics of electricity
  • 3. Transformer as magnetically coupled device This transformer is drawn such that whenever current enters from top side of Primary, exits from top side of the secondary Think about emphasize on the word drawn
  • 4. Transformer as magnetically coupled device This transformer is drawn such that whenever current enters from top side of Primary, exits from Bottom side of the secondary Think about emphasize on the word drawn
  • 5. Polarity Marking on Transformer A B a b A’ B’ a’ b’ The facts in previous slides can be represented in more simplistic way by polarity marking as below in figure A and Figure B respectively Figure - A Figure - B
  • 6. Polarity Marking on Transformer ■ As for as one single phase transformer considered polarity marking carries a little meaning. Thus you will never see such polarity marking on single phase transformer. But if you want to connect these single phase transformer for a particular purpose. Then this polarity marking are much use full
  • 7. Vector diagram for single phase transformer - 1 A B a b VAB Vab Voltage of a wrt b is in phase with voltage of A wrt B
  • 8. Vector diagram for single phase transformer - 2 VA’B’ A’ B’ a’ b’ Voltage of a’ wrt b’ is out of phase with voltage of A’ wrt B’ Vb’a’ a’ at arrow tail and b’ at arrow head Vb’a’ . arrow direction is reverse to that of physical arrow marking near secondary coil and is in phase with primary voltage. To resolve such confusion use consistent Vcoa’nb’ventionand references as in previous slide
  • 9. Polarity marking on transformer ■ Consider a simple case of paralleling the transformer in figure A and B. A B a b A ’ B ’ a ’ b ’ Connect like polarity
  • 10. Kirchhoff's voltage law (KVL) ■ The directed sum of the electrical potential differences (voltage) around any closed circuit must be zero. (http://en.wikipedia.org/wiki/Kirchhoff %27s_circuit_laws) as on 11/09/10
  • 11. Polarity marking on transformer ■ Consider another case of voltage doubling by using both transformer as from figure A B A a b A B a b Connect dislike polarity X Y L
  • 12. Apply KVL Apply KVL starting from point L and traverse the loop anti clockwise with convention that voltage mentioned by double subscript notation with arrow head wrt tail traversed in the direction of arrow is +Ve else -Ve VXY – Vab – Vab = 0 VXY = Vab + Vab VAB Vab Vab VXY w
  • 13. ■ Consider yet another case of voltage doubling by using one transformer as figure A and other as figure B A B a b A’ B’ a’ b’ Connect dislike polarity X Y L
  • 14. Apply KVL VXY - Vab – Vb’a’ = 0 VXY = Vab+ Vb’a’ Vab Va’b’ Vb’a,’ VXY w
  • 15. Polarity of the transformer If a transformer is considered as black box this fact can be shown by a dot on respective terminal of primary and secondary. Here voltage Vab is considered to be in phase with VAB
  • 16. Transformer redefined once again to avoid confusion between HV/LV and Primary/ Secondary (useful while defining vector group) (From http://en.wikipedia.org/wiki/Transformer 13/09/10) ■ ■ A transformer is a device that transfers electrical energy from one circuit to another through inductively coupled conductors the transformer's coils. A varying current in the first or primary winding creates a varying magnetic flux in the transformer's core, and thus a varying magnetic field through the secondary winding. This varying magnetic field induces a varying electromotive force (EMF) or "voltage" in the secondary winding. This effect is called mutual induction. ■ If a load is connected to the secondary, an electric current will flow in the secondary winding and electrical energy will be transferred from the primary circuit through the transformer to the load. In an ideal transformer, the induced voltage in the secondary winding (VS) is in proportion to the primary voltage (VP), and is given by the ratio of the number of turns in the secondary (NS) to the number of turns in the primary (NP) as follows: (Power Flows From Primary To Secondary) Vs Ns ---- = ----- Vp Np
  • 17. (From http://en.wikipedia.org/wiki/Vector_group 13/09/10) A Vector group is the International Electro technical Commission (IEC) method of categorizing the primary and secondary winding configurations of three-phase transformers. Within a polyphase system power transformer it indicates the windings configurations and the difference in phase angle between them. Transformer Vector Group
  • 18. The point of confusion is in how to use this notation in a step-up transformer. As the IEC60076-1 standard has stated, the notation is HV-LV in sequence. For example, a step-up transformer with a delta-connected primary (LV), and star-connected secondary (HV), is not written as 'dY11‘, but 'Yd1'. The 1 indicates the LV winding lags the HV by 30 degrees. Transformer Vector Group
  • 19. Vector Group of Step-Up Transformer Power Flow Secondary HV Primary LV dY11 LV Can’t be reference Yd1 Select HV as reference
  • 20. Transformer Vector Group ■ Depends upon Polarity as well as external terminal marking ■ ■ ■ ■ Because phase difference between two magnetically coupled circuit is either 180 or 0 Hence whenever IEC specifies phase difference it shall be treated as with respect to line voltages Hence terminal marking is affecting on vector group and important If external terminal marking changed Yd11 group may become Yd5
  • 21. 3 Phase Supply Review Vb Vy Vry Vr Vyb Vbr
  • 22. With this back ground now we are ready to understand transformer connections for Yd11 Transformer
  • 23. Throughout this example instead of labels, colors are used purposely Let the 3 ph. Transformer individual windings are connected as shown in fig-A so as to form HV side Y and LV side delta. This transformer is redrawn in fig-B so as to make it easy to account for shift of 120 deg. between individual phases. Note the associated limb colors in primary and secondary of fig-A and Fig-B. Associated limbs are kept parallel in Fig-B. External leads of secondary are of Red, Yellow, Blue, different color than that of limb Color Red, Yellow, Blue carries normal meaning of Vr,Vy,Vb Fig-A Fig-B
  • 24. By resemblance from previous sheet Transform to resemble with 3 Ph review taken previously. Notice the changes in vector diagram for color and direction Dark Yellow limb voltage of LV (Reversed) is line (R phase to Y phase) voltage Teal limb voltage of LV (Reversed) is line (Y phase to B phase) voltage Brown limb voltage of LV (Reversed) is line (B phase to R phase) voltage 12 O'clock 11 O'clock
  • 25. As stated previously transformer vector group depends up on its terminal marking. How it happens we will see in next 2 slides (This type of connections are ANSI standard) We may call it as Yd5 Transformer
  • 26. Change the terminal marking in respect of secondary such that in front of R Ph of primary there shall be Yellow phase of secondary and so on. Revised drawing is shown below Fig-A Fig-B
  • 27. By resemblance from previous sheet Transform to resemble with 3 Ph review taken previously. Notice the changes in vector diagram for color and direction Dark Yellow limb voltage of LV (Reversed) is line (Y phase to B phase) voltage Teal limb voltage of LV (Reversed) is line (B phase to R phase) voltage Brown limb voltage of LV (Reversed) is line (R phase to Y phase) voltage 12 O'clock 5 O'clock
  • 28. Most commonly used vector groups ■ Dy1 ■ Yd1 ■ Dy5 ■ Yd5 ■ Dy11 ■ Yd11
  • 29. Connections for Yd1 T/F Here connections of Yd1 transformer are described to demonstrate effect of polarity of delta connections on transformer vector group
  • 30. Change the connections of delta with respect to it’s polarity Fig-A Fig-B
  • 31. By resemblance from previous sheet Transform to resemble with 3 Ph review taken previously. Notice the changes in vector diagram for color only shown doted to indicate it out of phase wrt HV Dark Yellow limb voltage of LV is line (Y phase to B phase) voltage Teal limb voltage of LV is line (B phase to R phase) voltage Brown limb voltage of LV is line (R phase to Y phase) voltage 5 O'clock Final Results 1800 to compensate for out of phase primary and secondary 12 O'clock
  • 32. Or instead of shifting R Ph secondary voltage at last stage, we will redraw the same by different way so that primary and secondary windings shall have similar arrow markings ( may call as a tricky way)
  • 33. Change the connections of delta with respect to it’s polarity Fig-A Fig-B
  • 34. By resemblance from previous sheet Transform to resemble with 3 Ph review taken previously. Notice the changes in vector diagram for color only Dark Yellow limb voltage of LV is line (Y phase to B phase) voltage Teal limb voltage of LV is line (B phase to R phase) voltage Brown limb voltage of LV is line (R phase to Y phase) voltage 12 O'clock 1 O'clock
  • 35. For the standard Yd1 transformer discussed previously now we will check relationship between +Ve and –Ve sequence currents reflected on primary with respect to that of on secondary
  • 36. Let the power flows from Y side to D side. Show the currents instead of voltages Fig-A Fig-B
  • 37. Note : Primary Y Winding currents shown out of phase wrt secondary. However source currents follows secondary limb current. C Apply KCL at point C Secondary R Ph Line Current + Teal Limb Current = Brown Limb Current Secondary R Ph Line Current = Brown Limb Current - Teal Limb Current & Brown limb current is primary current IS ` Di IP Yi For Yd1 Transformer with Y as primary and D as secondary Y Side Line Currents Leads D side Line Current by 300
  • 38. Let the power flows from D side to Y side. Show the currents instead of voltages Fig-A Fig-B
  • 39. Note: Secondary load current follows secondary winding current C Apply KCL at point C Primary R Ph Line Current + Teal Limb Current = Brown Limb Current Primary R Ph Line Current = Brown Limb Current - Teal Limb Current & Brown limb current is primary current IP For Yd1 Transformer with D as primary and Y as secondary Y Side Line Currents Leads D side Line Current by 300 ` Di IS Yi
  • 40. To check the situation for –Ve sequence currents of Yd1 transformer let its source is replaced by RBY source hence new circuit will be
  • 41. Let the power flows from Y side to D side. Show the currents instead of voltages and interchange Y and B limb in primary. Redraw secondary Fig-A Fig-B
  • 42. Note : Primary Y Winding currents shown out of phase wrt secondary. However source currents follows secondary limb current. Apply KCL at point C Secondary R Ph Line Current + Teal Limb Current = Brown Limb Current Secondary R Ph Line Current = Brown Limb Current - Teal Limb Current & Brown limb current is primary current IP2 ` IS2 Di Yi For Yd1 Transformer with Y as primary and D as secondary For –Ve Sequence Y Side Line Currents lags D side Line Current by 300 Fig-B
  • 43. Results of Yd11 and Yd1 for +Ve sequence and –Ve sequence are tabulated as below For Yd1 transformer Y side current leads D side current by 300 For Yd11 transformer Y side current lags D side current by 300 For +Ve sequence current component For -Ve sequence current component Y side current lags D side current by 300 Y side current leads D side current by 300
  • 44. a b c A B C N A shortcut to identify vector group 12 O’Clock 1 O’Clock Yd1
  • 45. Yd1 and Dy11 are duels A B C a b c a b c n N A B C D Yy d1 11