ELECTRICAL
TRANSMISSION
Line
---By Dhananjay Jha, Engineer (E), SJVN
 Electrical transmission system is the
means of transmitting power from
generating station to different load
centres.
---By Dhananjay Jha, Engineer (E), SJVN
 Transmission Network
 Conductor
 Earthwire
 Inuslator
 Tower
---By Dhananjay Jha, Engineer (E), SJVN
 Network
 Transmission line model
 Characteristics
 Conductors
 Insulators
 Earthwire
---By Dhananjay Jha, Engineer (E), SJVN
 Generating Station
 Transmission Line
 Sub-Stations
---By Dhananjay Jha, Engineer (E), SJVN
 Associated system
 Voltage magnitudes & angle
 Active and reactive power
---By Dhananjay Jha, Engineer (E), SJVN
---By Dhananjay Jha, Engineer (E), SJVN
A transmission line can be represented by a 2-port network – a
network that can be isolated from the outside world by two
connections (ports) as shown:
---By Dhananjay Jha, Engineer (E), SJVN
If the network is linear, an elementary circuits theorem (analogous to
Thevenin’s theorem) establishes the relationship between the sending and
receiving end voltages and currents as
S R R
S R R
V AV BI
I CV DI
 
 
Here constants A and D are dimensionless, a constant B has units of ,
and a constant C is measured in siemens. These constants are sometimes
referred to as generalized circuit constants, or ABCD constants.
•Upto 80 Km
•Shunt capacitance is neglected and resistance & inductance are lumped
together.
•Therefore, IS = IR = I
Hence the ABCD constants for the short transmission line model, are
1
0
1
A
B Z
C
D




Considering medium-length lines (80 to 250 Km-
long).
•The shunt admittance is also included for
calculations. However, the total admittance is
usually modeled ( model) as two capacitors of
equal values (each corresponding to a half of total
admittance) placed at the sending and receiving
ends.
The current through the receiving end capacitor can be found as :
2
2
C R
Y
I V
And the current through the series impedance elements is :
2
ser R R
Y
I V I 
---By Dhananjay Jha, Engineer (E), SJVN
From the Kirchhoff’s voltage law, the sending end voltage is
 2 1
2
ser RS RC R RRZI V Z I I V
YZ
V V ZI
 
   
 
    
The source current will be
1 1 2 1 1
22 2 4
S R RC ser C C R S R R
Y Y
I I I I I V
ZY
V
ZY
I Y II V      
   
      
  


Therefore, the ABCD constants of a medium-length transmission line are
1
2
1
4
1
2
ZY
A
B Z
ZY
C Y
ZY
D
 

 
  
 
 
If the shunt capacitance of the line is
ignored, the ABCD constants are the
constants for a short transmission line.
• For long lines, it is not accurate enough to approximate the shunt
admittance by two constant capacitors at either end of the line.
Instead, both the shunt capacitance and the series impedance must be
treated as distributed quantities.
• The voltages and currents on the line is found by solving differential
equations of the line.
 
sinh
'
tanh 2
'
2
d
Z Z
d
d
Y Y
d






Here, Z is the series impedance of the line,
Y is the shunt admittance of the line,
d is the length of the line,
 is the propagation constant of the line.
yz 
where y is the shunt admittance per kilometer and z is the
series impedance per km.
The ABCD constants for a long transmission line are
' '
1
2
'
' '
' 1
4
' '
1
2
Z Y
A
B Z
Z Y
C Y
Z Y
D
 

 
  
 
 
AC voltages are usually expressed as phasors.
Load with lagging power factor.
Load with unity power factor.
Load with leading power factor.
For a given source voltage VS and
magnitude of the line current, the
received voltage is lower for
lagging loads and higher for
leading loads.
In overhead transmission lines, the line reactance XL is normally much larger than
the line resistance R; therefore, the line resistance is often neglected. We consider
next some important transmission line characteristics…
1. The effect of load changes
Assuming that a single generator
supplies a single load through a
transmission line.
Assuming that the generator is ideal, an increase of load will increase a
real and (or) reactive power drawn from the generator and, therefore,
the line current.
1) If more load is added with the same lagging power factor, the
magnitude of the line current increases but the current remains at the
same angle  with respect to VR as before.
The voltage drop across the reactance increases but stays at the same
angle.
Assuming zero line resistance and source voltage to
be of constant magnitude:
voltage drop across reactance jXLI will stretch
between VR and VS.
Therefore, when a lagging load increases, the received voltage
decreases.
2) An increase in a unity PF load,
on the other hand, will slightly
decrease the received voltage at
the end of the transmission line.
Vs = VR + jXLI
3) Finally, an increase in a load with
leading PF increases the received
(terminal) voltage of the transmission line.
 In a summary:
1. If lagging (inductive) loads are added at the end of a line, the
voltage at the end of the transmission line decreases .
2. If leading (capacitive) loads are added at the end of a line, the
voltage at the end of the transmission line increases.
---By Dhananjay Jha, Engineer (E), SJVN
The voltage regulation of a transmission
line is
 VReg = (Vnl - Vfl )/ Vfl
where Vnl and Vfl are the no-load and full
load voltages at the line output.
---By Dhananjay Jha, Engineer (E), SJVN
2. Power flow in a transmission line
The real power input to a 3-phase transmission line can be computed as
,3 cos 3 cosin S S S LL S S SP V I V I  
where VS is the magnitude of the source (input) line-to-neutral voltage and VLL,S is
the magnitude of the source (input) line-to-line voltage.
Similarly, the real output power from the transmission line is
,3 cos 3 cosout R R R LL R R RP V I V I  
The reactive power input to a 3-phase transmission line can be computed as
,3 sin 3 sinin S S S LL S S SQ V I V I  
The apparent power input to a 3-phase transmission line can be
computed as
,3 sin 3 sinout R R R LL R R RQ V I V I  
And the reactive output power is
,3 3in S S LL S SS V I V I 
And the apparent output power is
,3 3out R R LL R RS V I V I 
A simplified phasor diagram of a transmission line indicating that IS = IR = I.
Further it can be observed that the vertical segment bc can be expressed as
either VS sin or XLIcos. Therefore:
sin
cos S
L
V
I
X

 
Therefore, the power supplied by a transmission line depends on the angle between
the phasors representing the input and output voltages.
The maximum power supplied by the transmission line occurs when  = 900:
max
3 S R
L
V V
P
X

This maximum power is called the steady-state stability limit of the transmission
line. The real transmission lines have non-zero resistance and, therefore, overheat
long before this point. Full-load angles of 250 are more typical for real
transmission lines.
Then the output power of the transmission line equals to its input
power:
3 sinS R
L
V V
P
X


 Few interesting observations can be made from the power
expressions:
 The maximum power handling capability of a transmission
line is a function of the square of its voltage. For instance, if
all other parameters are equal, a 220 kV line will have 4 times
the power handling capability of a 110 kV transmission line.
 Therefore, it is beneficial to increase the voltage. However,
very high voltages is limit by other factors.
---By Dhananjay Jha, Engineer (E), SJVN
 The maximum power handling capability of a transmission line is
inversely proportional to its series reactance, which may be a
serious problem for long transmission lines. Some very long lines
include series capacitors to reduce the total series reactance and
thus increase the total power handling capability of the line.
 In a normal operation of a power system, the magnitudes of
voltages VS and VR do not change much, therefore, the angle 
basically controls the power flowing through the line. It is
possible to control power flow by placing a phase-shifting
transformer at one end of the line and varying voltage phase.
3. Transmission line efficiency
The efficiency of the transmission line is
100%out
in
P
P
  
4. Transmission line ratings
One of the main limiting factors in transmission line operation is its resistive
heating. Since this heating is a function of the square of the current flowing through
the line and does not depend on its phase angle, transmission lines are typically
rated at a nominal voltage and apparent power.
5. Transmission line limits
Several practical constrains limit the maximum real and reactive power that a
transmission line can supply. The most important constrains are:
1. The maximum steady-state current must be limited to prevent the overheating in
the transmission line. The power lost in a line is approximated as
2
3loss LP I R
The greater the current flow, the greater the resistive heating losses.
2. The voltage drop in a practical line should be limited to approximately 5%. In
other words, the ratio of the magnitude of the receiving end voltage to the
magnitude of the sending end voltage should be greater than 95%.
This limit prevents excessive voltage variations in a power system.
3. The angle  in a transmission line should typically be  300 ensuring that the
power flow in the transmission line is well below the static stability limit and,
therefore, the power system can handle transients.
 Any of these limits can be more or less important in different
circumstances.
 In short lines, where series reactance X is relatively small, the
resistive heating usually limits the power that the line can supply.
 In longer lines operating at lagging power factors, the voltage
drop across the line is usually the limiting factor.
 In longer lines operating at leading power factors, the maximum
angle  can be the limiting f actor.
---By Dhananjay Jha, Engineer (E), SJVN
 Standard Voltage - 66,110,132, 220, 400 KV
or above
 Selection Criterion of Economic Voltage –
 Quantum of power to be evacuated
 Length of line
 Voltage regulation
 Power loss in Transmission
 Surge impedance level
---By Dhananjay Jha, Engineer (E), SJVN
Economic Voltage of Transmission of Power
Nc
KVAL
V
*1506.1
5.5 
V = Transmission voltage (KV) (L-L).
L = Distance of transmission line in KM
KVA=Power to be transferred
Nc= Number of circuits
Empirical Formula
---By Dhananjay Jha, Engineer (E), SJVN
---By Dhananjay Jha, Engineer (E), SJVN
 Aluminium Conductor Steel Reinforced consists of a
solid or stranded steel core surrounded by one or more
layers of strands of 1350 aluminium. The high-strength
ACSR 8/1, 12/7 and 16/19 standings', are used mostly
for overhead ground wires, extra long spans, river
crossings, etc. The inner core wires of ACSR is of zinc
coated (galvanized) steel.
---By Dhananjay Jha, Engineer (E), SJVN
 Nomenclature :- Al/Steel/dia.
 Panther :- 30/7/3.0 mm
 Zebra :- 54/7/3.18mm
 Snowbird :- 42/3.98 + 7/2.21mm
 Moose :- 54/7/3.53mm
---By Dhananjay Jha, Engineer (E), SJVN
 AAC (All Aluminium Conductor)
 AAAC (All Aluminium Alloy Conductor)
 AL-59
 ACCC (Aluminium conductor composite core)
---By Dhananjay Jha, Engineer (E), SJVN
ACSR Moose AAAC Moose Al-59
Dia. (mm) 31.77 31.05 31.50
Cross sectional area
(sq-mm)
597 570 586.59
Ambient
Temperature
(deg.C)
40 40 40
Current carrying
capacity(A) at 75 C
728 699 759
At 95 C NA 952 976
SAG (m) at 85 C 13.26 14.15 14.52
---By Dhananjay Jha, Engineer (E), SJVN
Mechanical Requirement
 Tensile Strength(For Tension)
 Strain Strength(For Vibration)
 Mechanical Requirement
 Electrical Requirement
---By Dhananjay Jha, Engineer (E), SJVN
o Continuous current rating.
o Short time current carrying rating.
o Voltage drop
o Power loss
o Minimum dia to avoid corona
o Length of line
---By Dhananjay Jha, Engineer (E), SJVN
According to short time rating conductor size is given
by-
Where A=area of conductor(mm2)
IF= fault current(KA)
t= fault duration(1 sec.)
tIA F **58.7
---By Dhananjay Jha, Engineer (E), SJVN
Visual corona voltage in fair weather condition is
given by-
 V0= corona starting voltage, KV(rms)
 r= radius of conductor in cm
 D= GMD equivalent spacing between conductors in cm
 m= roughness factor
= 1.0 for clean smooth conductor
=0.85 for stranded conductor





 
 r
D
n
r
r
mV log
)3.01(
1.210

---By Dhananjay Jha, Engineer (E), SJVN
Voltage gradient at the surface of conductor at operating voltage-







r
D
Log
V
n
g 3
0
Corona discharge form at the surface of conductor if g0≥ corona
starting gradient i.e.
r
rmg
)3.01(
1.21
0

  
(rms kv/cm)
---By Dhananjay Jha, Engineer (E), SJVN
 River crossing
 Weight/ Dia. - Less Weight/Dia ratio conductor swing more.
---By Dhananjay Jha, Engineer (E), SJVN
In overhead transmission lines, the conductors are suspended
from a pole or a tower via insulators.
Insulator are required to support the line conductor and
provide clearance from ground and structure.
 Insulator material-
 High grade Electrical Porcelain
 Toughened Glass
 Fiber Glass
---By Dhananjay Jha, Engineer (E), SJVN
 System over voltage factors shall be
evaluated.
 Due to switching
 Power frequency
 Lightning
---By Dhananjay Jha, Engineer (E), SJVN
 Switching over-voltage :
 Switching off of long lines on no load
 Energizing lines of no load
---By Dhananjay Jha, Engineer (E), SJVN
 Power frequency over voltage
 Loaded line interrupted at one end
 Occurrence of fault
 Open line suddenly connected to load
---By Dhananjay Jha, Engineer (E), SJVN
---By Dhananjay Jha, Engineer (E), SJVN
Type of Insulator-
 Pin type insulator
 Suspension insulator
 Strain insulator
---By Dhananjay Jha, Engineer (E), SJVN
 Pin Type Insulator : Used for transmission and
distribution of electric power at voltages up
to 33 kV
---By Dhananjay Jha, Engineer (E), SJVN
 Suspension : For voltages greater than 33 kV,
it is a usual practice to use suspension type
insulators
---By Dhananjay Jha, Engineer (E), SJVN
 Strain : A dead end or anchor pole or tower is used
where a straight section of line ends, or angles off
in another direction.
---By Dhananjay Jha, Engineer (E), SJVN
 Disc insulator are joint by their ball pins and
socket in their caps to form string.
 No of insulator disc is decided by system
voltage, switching and lighting over voltage
amplitude and pollution level.
 Insulator string can be used either suspension
or tension.
 Swing of suspension string due to wind has to
be taken into consider.
Fig. single string
Fig. Double string
---By Dhananjay Jha, Engineer (E), SJVN
Earth wire provided above the phase conductor across the line
and grounded at every tower.
 It shield the line conductor from direct strokes
 Reduces voltage stress across the insulating strings during lightning
strokes
Design criterion:
 Shield angle
 25°-30° up to 220 KV
 20° for 400 KV and above
 Earth wire should be adequate to carry very short duration lightning
surge current of 100 KA without excessive over heating
---By Dhananjay Jha, Engineer (E), SJVN
tIA  5
A= Area(in mm2) of conductor
I =current in KA
t = Time in second
Area of Steel Wire = 3*A(mm2)
 For EHV line it is suggested as 70 mm2 (7/3.66 mm).
 ACSR is used as earth wire (12/3.0 mm AL+7/3.0 mm steel)
 OPGW
EARTH WIRE
---By Dhananjay Jha, Engineer (E), SJVN
 Optical Ground Wire
 Advantages :
 Serves the dual purpose of ground wire and
communication.
 High speed data transmission.

---By Dhananjay Jha, Engineer (E), SJVN
OPGW
---By Dhananjay Jha, Engineer (E), SJVN
---By Dhananjay Jha, Engineer (E), SJVN
---By Dhananjay Jha, Engineer (E), SJVN
 A Smart Grid is an electricity network that can
intelligently integrate the actions of all users connected
to it – generators, consumers and those that do both –
in order to efficiently deliver sustainable, economic
and secure electricity supplies. European Smart Grid
Technology Platform
 SG3 defines Smart Grids as the concept of
modernizing the electric grid. The Smart Grid is
integrating the electrical and information technologies
in between any point of generation and any point of
consumption. Smart Grid Working Group 3
---By Dhananjay Jha, Engineer (E), SJVN
 The aim of smart grid is to provide real-time
monitoring and control, and thus improve the
overall efficiency of the entire system apart from
inclusion of renewable energy resources into the
system.
---By Dhananjay Jha, Engineer (E), SJVN
 Presently, the Indian electricity system faces
a number of challenges:
 Shortage of power
 Power Theft
 Poor access to electricity in rural areas
 Huge losses in the grid
 Inefficient power consumption
 Poor reliability
---By Dhananjay Jha, Engineer (E), SJVN
 The Smart Grid is a transition of the present
energy system into a new era of reliability,
availability and efficiency.
 The smart grid vision involves a uniformly
integrated communication system with the present
power system.
---By Dhananjay Jha, Engineer (E), SJVN
 The India Smart Grid Task Force (ISGTF) is an
inter-ministerial group set up under the
chairmanship of Shri Sam Pitroda in September
2010 to serve as Government's focal point for
activities related to Smart Grid and to evolve a
road map for Smart Grids in India.
---By Dhananjay Jha, Engineer (E), SJVN
 Indian Smart Grid Forum (ISGF) was set up in
2010 to provide a mechanism through which
academia, industry, utilities and other stakeholders
could participate in the development of Indian
smart grid systems and provide relevant inputs to
the government’s decision-making.
---By Dhananjay Jha, Engineer (E), SJVN
 UHBVN,Haryana
 CESC, Mysore
 TSECL, Tripura
 KSEB, Kerala
 Electricity department-Govt. of Puducherry
 UGVCL, Gujrat
 AP CPDCL, Andhra Pradesh
 APDCL, Assam
 MSEDCL, Maharashtra
 CSPDCL, Chattisgarh
 HPSEB, Himachal Pradesh
 PSPCL, Punjab
 WBSEDCL, West Bengal
 JVVNL, Rajasthan
---By Dhananjay Jha, Engineer (E), SJVN
 HPSEB, Himachal Pradesh
 Project Area- Kala Amb
 No. of Consumers-650
 Total Cost- 17.85 Cr.
 MoP Share-Rs. 8.92 Cr.
---By Dhananjay Jha, Engineer (E), SJVN
 Benefits Envisaged
 Shifting peak load
 Reduction in penalties
 Reduction in outages
 Status- RFP (Request for Proposal) issued on
25.08.2014.
---By Dhananjay Jha, Engineer (E), SJVN
---By Dhananjay Jha, Engineer (E), SJVN

More Related Content

What's hot

Power transmission(ppt)
Power transmission(ppt)Power transmission(ppt)
Power transmission(ppt)
zeeshan715
 
Objectives of shunt compensation
Objectives of shunt compensationObjectives of shunt compensation
Objectives of shunt compensation
Ayyarao T S L V
 

What's hot (20)

EXPERIMENTAL DETERMINATION AND ANALYSIS OF TRANSMISSION LINE PERFORMANCE
EXPERIMENTAL DETERMINATION AND ANALYSIS OF TRANSMISSION LINE PERFORMANCEEXPERIMENTAL DETERMINATION AND ANALYSIS OF TRANSMISSION LINE PERFORMANCE
EXPERIMENTAL DETERMINATION AND ANALYSIS OF TRANSMISSION LINE PERFORMANCE
 
Minor project
Minor projectMinor project
Minor project
 
Surge impedance sil
Surge impedance silSurge impedance sil
Surge impedance sil
 
Power transmission(ppt)
Power transmission(ppt)Power transmission(ppt)
Power transmission(ppt)
 
RGPV EX7102 UNITIII
RGPV EX7102 UNITIIIRGPV EX7102 UNITIII
RGPV EX7102 UNITIII
 
Objectives of shunt compensation
Objectives of shunt compensationObjectives of shunt compensation
Objectives of shunt compensation
 
Electrical power system
Electrical power system Electrical power system
Electrical power system
 
Power transmission & distribution
Power transmission & distributionPower transmission & distribution
Power transmission & distribution
 
RGPV BE 104 Unit II
RGPV BE 104 Unit IIRGPV BE 104 Unit II
RGPV BE 104 Unit II
 
Lcl filter design
Lcl filter designLcl filter design
Lcl filter design
 
High voltage transmission
High voltage transmissionHigh voltage transmission
High voltage transmission
 
Transmission lines
Transmission linesTransmission lines
Transmission lines
 
Types of transmission lines
Types of transmission linesTypes of transmission lines
Types of transmission lines
 
Simplified analysis of graetz circuit copy - copy
Simplified analysis of graetz circuit   copy - copySimplified analysis of graetz circuit   copy - copy
Simplified analysis of graetz circuit copy - copy
 
3 phase ac circuit
3 phase ac circuit3 phase ac circuit
3 phase ac circuit
 
Control of hvdc system
Control of hvdc systemControl of hvdc system
Control of hvdc system
 
RGPV EX7102 unit I
RGPV EX7102 unit IRGPV EX7102 unit I
RGPV EX7102 unit I
 
RGPV NOTES ON FACTS EX8303 unit I & II
RGPV NOTES ON FACTS EX8303 unit I & IIRGPV NOTES ON FACTS EX8303 unit I & II
RGPV NOTES ON FACTS EX8303 unit I & II
 
RGPV Unit i ex503 - copy
RGPV Unit i ex503 - copyRGPV Unit i ex503 - copy
RGPV Unit i ex503 - copy
 
Calculations of a.c distributions methods & 3 phase unbalanced loads &amp...
Calculations of a.c distributions methods & 3 phase unbalanced loads &amp...Calculations of a.c distributions methods & 3 phase unbalanced loads &amp...
Calculations of a.c distributions methods & 3 phase unbalanced loads &amp...
 

Similar to 153010010 mohammad babor

performance of transmission lines of long,medium and short length
performance of transmission lines of long,medium and short lengthperformance of transmission lines of long,medium and short length
performance of transmission lines of long,medium and short length
amrinder14
 
power system 1 unit 2 ppt (2).pptx
power system 1 unit 2 ppt (2).pptxpower system 1 unit 2 ppt (2).pptx
power system 1 unit 2 ppt (2).pptx
monikavardia
 
EE8402 Transmission and Distribution
EE8402 Transmission and DistributionEE8402 Transmission and Distribution
EE8402 Transmission and Distribution
rmkceteee
 

Similar to 153010010 mohammad babor (20)

performance of transmission lines of long,medium and short length
performance of transmission lines of long,medium and short lengthperformance of transmission lines of long,medium and short length
performance of transmission lines of long,medium and short length
 
Chapter 3 transmission line performance
Chapter 3  transmission line performanceChapter 3  transmission line performance
Chapter 3 transmission line performance
 
Module-2 Short Line and Problems (1) - Copy.pptx
Module-2 Short Line and Problems  (1) - Copy.pptxModule-2 Short Line and Problems  (1) - Copy.pptx
Module-2 Short Line and Problems (1) - Copy.pptx
 
Tranp.pptx
Tranp.pptxTranp.pptx
Tranp.pptx
 
Cp13.pptx
Cp13.pptxCp13.pptx
Cp13.pptx
 
representation-of-transmission-lines.pdf
representation-of-transmission-lines.pdfrepresentation-of-transmission-lines.pdf
representation-of-transmission-lines.pdf
 
TRANSMISSION LINES and capacity.pptx
TRANSMISSION LINES and capacity.pptxTRANSMISSION LINES and capacity.pptx
TRANSMISSION LINES and capacity.pptx
 
lecture note AC fundamental LESSON 2.pptx
lecture note AC fundamental LESSON 2.pptxlecture note AC fundamental LESSON 2.pptx
lecture note AC fundamental LESSON 2.pptx
 
TRANSMISSION LINES and capacity.pdf
TRANSMISSION LINES and capacity.pdfTRANSMISSION LINES and capacity.pdf
TRANSMISSION LINES and capacity.pdf
 
power system 1 unit 2 ppt (2).pptx
power system 1 unit 2 ppt (2).pptxpower system 1 unit 2 ppt (2).pptx
power system 1 unit 2 ppt (2).pptx
 
Line modeling-and-performance
Line modeling-and-performanceLine modeling-and-performance
Line modeling-and-performance
 
power system 1 unit 2 ppt (2).pptx
power system 1 unit 2 ppt (2).pptxpower system 1 unit 2 ppt (2).pptx
power system 1 unit 2 ppt (2).pptx
 
Transformer
TransformerTransformer
Transformer
 
Alternating Current
Alternating CurrentAlternating Current
Alternating Current
 
Transient in Power system
Transient in Power systemTransient in Power system
Transient in Power system
 
chapter 3 part 1.ppt
chapter 3 part 1.pptchapter 3 part 1.ppt
chapter 3 part 1.ppt
 
EE8402 Transmission and Distribution
EE8402 Transmission and DistributionEE8402 Transmission and Distribution
EE8402 Transmission and Distribution
 
Transformers
TransformersTransformers
Transformers
 
Transformer_theory.pptx
Transformer_theory.pptxTransformer_theory.pptx
Transformer_theory.pptx
 
TRANSIENT IN POWER SYSTEM
TRANSIENT IN POWER SYSTEMTRANSIENT IN POWER SYSTEM
TRANSIENT IN POWER SYSTEM
 

Recently uploaded

Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
MateoGardella
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 

Recently uploaded (20)

Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 

153010010 mohammad babor

  • 2.  Electrical transmission system is the means of transmitting power from generating station to different load centres. ---By Dhananjay Jha, Engineer (E), SJVN
  • 3.  Transmission Network  Conductor  Earthwire  Inuslator  Tower ---By Dhananjay Jha, Engineer (E), SJVN
  • 4.  Network  Transmission line model  Characteristics  Conductors  Insulators  Earthwire ---By Dhananjay Jha, Engineer (E), SJVN
  • 5.  Generating Station  Transmission Line  Sub-Stations ---By Dhananjay Jha, Engineer (E), SJVN
  • 6.  Associated system  Voltage magnitudes & angle  Active and reactive power ---By Dhananjay Jha, Engineer (E), SJVN
  • 7. ---By Dhananjay Jha, Engineer (E), SJVN
  • 8. A transmission line can be represented by a 2-port network – a network that can be isolated from the outside world by two connections (ports) as shown: ---By Dhananjay Jha, Engineer (E), SJVN
  • 9. If the network is linear, an elementary circuits theorem (analogous to Thevenin’s theorem) establishes the relationship between the sending and receiving end voltages and currents as S R R S R R V AV BI I CV DI     Here constants A and D are dimensionless, a constant B has units of , and a constant C is measured in siemens. These constants are sometimes referred to as generalized circuit constants, or ABCD constants.
  • 10. •Upto 80 Km •Shunt capacitance is neglected and resistance & inductance are lumped together. •Therefore, IS = IR = I Hence the ABCD constants for the short transmission line model, are 1 0 1 A B Z C D    
  • 11. Considering medium-length lines (80 to 250 Km- long). •The shunt admittance is also included for calculations. However, the total admittance is usually modeled ( model) as two capacitors of equal values (each corresponding to a half of total admittance) placed at the sending and receiving ends.
  • 12. The current through the receiving end capacitor can be found as : 2 2 C R Y I V And the current through the series impedance elements is : 2 ser R R Y I V I  ---By Dhananjay Jha, Engineer (E), SJVN
  • 13. From the Kirchhoff’s voltage law, the sending end voltage is  2 1 2 ser RS RC R RRZI V Z I I V YZ V V ZI              The source current will be 1 1 2 1 1 22 2 4 S R RC ser C C R S R R Y Y I I I I I V ZY V ZY I Y II V                       Therefore, the ABCD constants of a medium-length transmission line are 1 2 1 4 1 2 ZY A B Z ZY C Y ZY D             If the shunt capacitance of the line is ignored, the ABCD constants are the constants for a short transmission line.
  • 14. • For long lines, it is not accurate enough to approximate the shunt admittance by two constant capacitors at either end of the line. Instead, both the shunt capacitance and the series impedance must be treated as distributed quantities. • The voltages and currents on the line is found by solving differential equations of the line.
  • 15.   sinh ' tanh 2 ' 2 d Z Z d d Y Y d       Here, Z is the series impedance of the line, Y is the shunt admittance of the line, d is the length of the line,  is the propagation constant of the line. yz  where y is the shunt admittance per kilometer and z is the series impedance per km.
  • 16. The ABCD constants for a long transmission line are ' ' 1 2 ' ' ' ' 1 4 ' ' 1 2 Z Y A B Z Z Y C Y Z Y D            
  • 17. AC voltages are usually expressed as phasors. Load with lagging power factor. Load with unity power factor. Load with leading power factor. For a given source voltage VS and magnitude of the line current, the received voltage is lower for lagging loads and higher for leading loads.
  • 18. In overhead transmission lines, the line reactance XL is normally much larger than the line resistance R; therefore, the line resistance is often neglected. We consider next some important transmission line characteristics… 1. The effect of load changes Assuming that a single generator supplies a single load through a transmission line. Assuming that the generator is ideal, an increase of load will increase a real and (or) reactive power drawn from the generator and, therefore, the line current. 1) If more load is added with the same lagging power factor, the magnitude of the line current increases but the current remains at the same angle  with respect to VR as before.
  • 19. The voltage drop across the reactance increases but stays at the same angle. Assuming zero line resistance and source voltage to be of constant magnitude: voltage drop across reactance jXLI will stretch between VR and VS. Therefore, when a lagging load increases, the received voltage decreases. 2) An increase in a unity PF load, on the other hand, will slightly decrease the received voltage at the end of the transmission line. Vs = VR + jXLI
  • 20. 3) Finally, an increase in a load with leading PF increases the received (terminal) voltage of the transmission line.
  • 21.  In a summary: 1. If lagging (inductive) loads are added at the end of a line, the voltage at the end of the transmission line decreases . 2. If leading (capacitive) loads are added at the end of a line, the voltage at the end of the transmission line increases. ---By Dhananjay Jha, Engineer (E), SJVN
  • 22. The voltage regulation of a transmission line is  VReg = (Vnl - Vfl )/ Vfl where Vnl and Vfl are the no-load and full load voltages at the line output. ---By Dhananjay Jha, Engineer (E), SJVN
  • 23. 2. Power flow in a transmission line The real power input to a 3-phase transmission line can be computed as ,3 cos 3 cosin S S S LL S S SP V I V I   where VS is the magnitude of the source (input) line-to-neutral voltage and VLL,S is the magnitude of the source (input) line-to-line voltage. Similarly, the real output power from the transmission line is ,3 cos 3 cosout R R R LL R R RP V I V I   The reactive power input to a 3-phase transmission line can be computed as ,3 sin 3 sinin S S S LL S S SQ V I V I  
  • 24. The apparent power input to a 3-phase transmission line can be computed as ,3 sin 3 sinout R R R LL R R RQ V I V I   And the reactive output power is ,3 3in S S LL S SS V I V I  And the apparent output power is ,3 3out R R LL R RS V I V I 
  • 25. A simplified phasor diagram of a transmission line indicating that IS = IR = I. Further it can be observed that the vertical segment bc can be expressed as either VS sin or XLIcos. Therefore: sin cos S L V I X   
  • 26. Therefore, the power supplied by a transmission line depends on the angle between the phasors representing the input and output voltages. The maximum power supplied by the transmission line occurs when  = 900: max 3 S R L V V P X  This maximum power is called the steady-state stability limit of the transmission line. The real transmission lines have non-zero resistance and, therefore, overheat long before this point. Full-load angles of 250 are more typical for real transmission lines. Then the output power of the transmission line equals to its input power: 3 sinS R L V V P X  
  • 27.  Few interesting observations can be made from the power expressions:  The maximum power handling capability of a transmission line is a function of the square of its voltage. For instance, if all other parameters are equal, a 220 kV line will have 4 times the power handling capability of a 110 kV transmission line.  Therefore, it is beneficial to increase the voltage. However, very high voltages is limit by other factors. ---By Dhananjay Jha, Engineer (E), SJVN
  • 28.  The maximum power handling capability of a transmission line is inversely proportional to its series reactance, which may be a serious problem for long transmission lines. Some very long lines include series capacitors to reduce the total series reactance and thus increase the total power handling capability of the line.  In a normal operation of a power system, the magnitudes of voltages VS and VR do not change much, therefore, the angle  basically controls the power flowing through the line. It is possible to control power flow by placing a phase-shifting transformer at one end of the line and varying voltage phase.
  • 29. 3. Transmission line efficiency The efficiency of the transmission line is 100%out in P P   
  • 30. 4. Transmission line ratings One of the main limiting factors in transmission line operation is its resistive heating. Since this heating is a function of the square of the current flowing through the line and does not depend on its phase angle, transmission lines are typically rated at a nominal voltage and apparent power. 5. Transmission line limits Several practical constrains limit the maximum real and reactive power that a transmission line can supply. The most important constrains are: 1. The maximum steady-state current must be limited to prevent the overheating in the transmission line. The power lost in a line is approximated as 2 3loss LP I R The greater the current flow, the greater the resistive heating losses.
  • 31. 2. The voltage drop in a practical line should be limited to approximately 5%. In other words, the ratio of the magnitude of the receiving end voltage to the magnitude of the sending end voltage should be greater than 95%. This limit prevents excessive voltage variations in a power system. 3. The angle  in a transmission line should typically be  300 ensuring that the power flow in the transmission line is well below the static stability limit and, therefore, the power system can handle transients.
  • 32.  Any of these limits can be more or less important in different circumstances.  In short lines, where series reactance X is relatively small, the resistive heating usually limits the power that the line can supply.  In longer lines operating at lagging power factors, the voltage drop across the line is usually the limiting factor.  In longer lines operating at leading power factors, the maximum angle  can be the limiting f actor. ---By Dhananjay Jha, Engineer (E), SJVN
  • 33.  Standard Voltage - 66,110,132, 220, 400 KV or above  Selection Criterion of Economic Voltage –  Quantum of power to be evacuated  Length of line  Voltage regulation  Power loss in Transmission  Surge impedance level ---By Dhananjay Jha, Engineer (E), SJVN
  • 34. Economic Voltage of Transmission of Power Nc KVAL V *1506.1 5.5  V = Transmission voltage (KV) (L-L). L = Distance of transmission line in KM KVA=Power to be transferred Nc= Number of circuits Empirical Formula ---By Dhananjay Jha, Engineer (E), SJVN
  • 35. ---By Dhananjay Jha, Engineer (E), SJVN
  • 36.  Aluminium Conductor Steel Reinforced consists of a solid or stranded steel core surrounded by one or more layers of strands of 1350 aluminium. The high-strength ACSR 8/1, 12/7 and 16/19 standings', are used mostly for overhead ground wires, extra long spans, river crossings, etc. The inner core wires of ACSR is of zinc coated (galvanized) steel. ---By Dhananjay Jha, Engineer (E), SJVN
  • 37.  Nomenclature :- Al/Steel/dia.  Panther :- 30/7/3.0 mm  Zebra :- 54/7/3.18mm  Snowbird :- 42/3.98 + 7/2.21mm  Moose :- 54/7/3.53mm ---By Dhananjay Jha, Engineer (E), SJVN
  • 38.  AAC (All Aluminium Conductor)  AAAC (All Aluminium Alloy Conductor)  AL-59  ACCC (Aluminium conductor composite core) ---By Dhananjay Jha, Engineer (E), SJVN
  • 39. ACSR Moose AAAC Moose Al-59 Dia. (mm) 31.77 31.05 31.50 Cross sectional area (sq-mm) 597 570 586.59 Ambient Temperature (deg.C) 40 40 40 Current carrying capacity(A) at 75 C 728 699 759 At 95 C NA 952 976 SAG (m) at 85 C 13.26 14.15 14.52 ---By Dhananjay Jha, Engineer (E), SJVN
  • 40. Mechanical Requirement  Tensile Strength(For Tension)  Strain Strength(For Vibration)  Mechanical Requirement  Electrical Requirement ---By Dhananjay Jha, Engineer (E), SJVN
  • 41. o Continuous current rating. o Short time current carrying rating. o Voltage drop o Power loss o Minimum dia to avoid corona o Length of line ---By Dhananjay Jha, Engineer (E), SJVN
  • 42. According to short time rating conductor size is given by- Where A=area of conductor(mm2) IF= fault current(KA) t= fault duration(1 sec.) tIA F **58.7 ---By Dhananjay Jha, Engineer (E), SJVN
  • 43. Visual corona voltage in fair weather condition is given by-  V0= corona starting voltage, KV(rms)  r= radius of conductor in cm  D= GMD equivalent spacing between conductors in cm  m= roughness factor = 1.0 for clean smooth conductor =0.85 for stranded conductor         r D n r r mV log )3.01( 1.210  ---By Dhananjay Jha, Engineer (E), SJVN
  • 44. Voltage gradient at the surface of conductor at operating voltage-        r D Log V n g 3 0 Corona discharge form at the surface of conductor if g0≥ corona starting gradient i.e. r rmg )3.01( 1.21 0     (rms kv/cm) ---By Dhananjay Jha, Engineer (E), SJVN
  • 45.  River crossing  Weight/ Dia. - Less Weight/Dia ratio conductor swing more. ---By Dhananjay Jha, Engineer (E), SJVN
  • 46. In overhead transmission lines, the conductors are suspended from a pole or a tower via insulators.
  • 47. Insulator are required to support the line conductor and provide clearance from ground and structure.  Insulator material-  High grade Electrical Porcelain  Toughened Glass  Fiber Glass ---By Dhananjay Jha, Engineer (E), SJVN
  • 48.  System over voltage factors shall be evaluated.  Due to switching  Power frequency  Lightning ---By Dhananjay Jha, Engineer (E), SJVN
  • 49.  Switching over-voltage :  Switching off of long lines on no load  Energizing lines of no load ---By Dhananjay Jha, Engineer (E), SJVN
  • 50.  Power frequency over voltage  Loaded line interrupted at one end  Occurrence of fault  Open line suddenly connected to load ---By Dhananjay Jha, Engineer (E), SJVN
  • 51. ---By Dhananjay Jha, Engineer (E), SJVN
  • 52. Type of Insulator-  Pin type insulator  Suspension insulator  Strain insulator ---By Dhananjay Jha, Engineer (E), SJVN
  • 53.  Pin Type Insulator : Used for transmission and distribution of electric power at voltages up to 33 kV ---By Dhananjay Jha, Engineer (E), SJVN
  • 54.  Suspension : For voltages greater than 33 kV, it is a usual practice to use suspension type insulators ---By Dhananjay Jha, Engineer (E), SJVN
  • 55.  Strain : A dead end or anchor pole or tower is used where a straight section of line ends, or angles off in another direction. ---By Dhananjay Jha, Engineer (E), SJVN
  • 56.  Disc insulator are joint by their ball pins and socket in their caps to form string.  No of insulator disc is decided by system voltage, switching and lighting over voltage amplitude and pollution level.  Insulator string can be used either suspension or tension.  Swing of suspension string due to wind has to be taken into consider. Fig. single string Fig. Double string ---By Dhananjay Jha, Engineer (E), SJVN
  • 57. Earth wire provided above the phase conductor across the line and grounded at every tower.  It shield the line conductor from direct strokes  Reduces voltage stress across the insulating strings during lightning strokes Design criterion:  Shield angle  25°-30° up to 220 KV  20° for 400 KV and above  Earth wire should be adequate to carry very short duration lightning surge current of 100 KA without excessive over heating ---By Dhananjay Jha, Engineer (E), SJVN
  • 58. tIA  5 A= Area(in mm2) of conductor I =current in KA t = Time in second Area of Steel Wire = 3*A(mm2)  For EHV line it is suggested as 70 mm2 (7/3.66 mm).  ACSR is used as earth wire (12/3.0 mm AL+7/3.0 mm steel)  OPGW EARTH WIRE ---By Dhananjay Jha, Engineer (E), SJVN
  • 59.  Optical Ground Wire  Advantages :  Serves the dual purpose of ground wire and communication.  High speed data transmission.  ---By Dhananjay Jha, Engineer (E), SJVN
  • 60. OPGW ---By Dhananjay Jha, Engineer (E), SJVN
  • 61. ---By Dhananjay Jha, Engineer (E), SJVN
  • 62. ---By Dhananjay Jha, Engineer (E), SJVN
  • 63.  A Smart Grid is an electricity network that can intelligently integrate the actions of all users connected to it – generators, consumers and those that do both – in order to efficiently deliver sustainable, economic and secure electricity supplies. European Smart Grid Technology Platform  SG3 defines Smart Grids as the concept of modernizing the electric grid. The Smart Grid is integrating the electrical and information technologies in between any point of generation and any point of consumption. Smart Grid Working Group 3 ---By Dhananjay Jha, Engineer (E), SJVN
  • 64.  The aim of smart grid is to provide real-time monitoring and control, and thus improve the overall efficiency of the entire system apart from inclusion of renewable energy resources into the system. ---By Dhananjay Jha, Engineer (E), SJVN
  • 65.  Presently, the Indian electricity system faces a number of challenges:  Shortage of power  Power Theft  Poor access to electricity in rural areas  Huge losses in the grid  Inefficient power consumption  Poor reliability ---By Dhananjay Jha, Engineer (E), SJVN
  • 66.  The Smart Grid is a transition of the present energy system into a new era of reliability, availability and efficiency.  The smart grid vision involves a uniformly integrated communication system with the present power system. ---By Dhananjay Jha, Engineer (E), SJVN
  • 67.  The India Smart Grid Task Force (ISGTF) is an inter-ministerial group set up under the chairmanship of Shri Sam Pitroda in September 2010 to serve as Government's focal point for activities related to Smart Grid and to evolve a road map for Smart Grids in India. ---By Dhananjay Jha, Engineer (E), SJVN
  • 68.  Indian Smart Grid Forum (ISGF) was set up in 2010 to provide a mechanism through which academia, industry, utilities and other stakeholders could participate in the development of Indian smart grid systems and provide relevant inputs to the government’s decision-making. ---By Dhananjay Jha, Engineer (E), SJVN
  • 69.  UHBVN,Haryana  CESC, Mysore  TSECL, Tripura  KSEB, Kerala  Electricity department-Govt. of Puducherry  UGVCL, Gujrat  AP CPDCL, Andhra Pradesh  APDCL, Assam  MSEDCL, Maharashtra  CSPDCL, Chattisgarh  HPSEB, Himachal Pradesh  PSPCL, Punjab  WBSEDCL, West Bengal  JVVNL, Rajasthan ---By Dhananjay Jha, Engineer (E), SJVN
  • 70.  HPSEB, Himachal Pradesh  Project Area- Kala Amb  No. of Consumers-650  Total Cost- 17.85 Cr.  MoP Share-Rs. 8.92 Cr. ---By Dhananjay Jha, Engineer (E), SJVN
  • 71.  Benefits Envisaged  Shifting peak load  Reduction in penalties  Reduction in outages  Status- RFP (Request for Proposal) issued on 25.08.2014. ---By Dhananjay Jha, Engineer (E), SJVN
  • 72. ---By Dhananjay Jha, Engineer (E), SJVN