1. Curriculum vitae
Career Over view:
A result-orientated team player with strong leadership skills and
possesses rich experience (over 16.5 years) in Project Management.
Competent at global sourcing with extensive international experience in
contracts management and managing business negotiations both in
Projects and O&M (Operation and Maintenance) environment.
Experienced in onshore & offshore, upstream & downstream oil & gas
projects.
Possesses excellent knowledge in Project and Contracts. Very good
communicator, well organized, take initiative, flexible, work well under
any circumstances including pressure, work effectively with
peers/management/vendors, and quickly facilitate resolution of complex
issues. Created a reputation as "team orientated” with ability to
streamline procurement process and accomplish task.
Specialties: Proven expertise to develop Proposal / Quotation
documents, negotiating terms and conditions, price, preparing award
recommendations, Contract Preparation, Contract Administration,
negotiating agreement Change Orders/Close outs, preparing and
negotiating claims, Project Management, recruitment, development and
assessment, etc.
.
Sanjeev B. Barwal
Project Manager
E – Mail – sbarwal@paramoffshore.co.in
2. Activities Carried on During Services Period:-
1. Taking handing over of Project Charter, basis and estimation
document.
2. Analyzing possibility of achieving schedule target, cost target,
margin target; with given contractual constraints, assumptions,
inherited risk etc. If found ok then going ahead with further project
management activities or bring the observations to management’s
notice.
3. Developing project management plan, finalizing project team,
preparing WBS & scope base line, finalizing schedule base line,
cost base line, communication plan, meeting calendar etc.,
preparing risk register.
4. Conducting KICK-OFF meeting to declare project objective and to
bring all stakeholder into a same platform.
5. Interfacing with client, communicating with client on contractual
and commercial.
6. Reviewing progress periodically with Schedule Variance (SV) and
costvariance (CV). Keeping a tab on the milestone dates.
7. Periodic team meeting with the project team, finding progress
issues,resolving issues,reviewing progress as planned.
8. Facing progress review meeting with client, taking decisions,
giving commitments to client and taking counter commitment from
client.
9. Addressing contractual issues like posting delays from client side
with in stipulated contractual notice period.
10. Controlling on the change requests and following the change
management protocol. Implement only approved changes and
informing approved changes to all stake holders.
11. Executing project in a manner where technical & quality needs are
complied, time frame maintained, customer satisfaction achieved
with in the budgeted cost.
Areas of expertise lie in
Project Control
Project Management
Project Planning
Construction Management
Installation
Pre – Commissioning
Material Management
Supply Management
Strategic Sourcing
Inspection
Quality Control Mgt.
Safety & Compliance mgt.
Budget Analysis
Construction Planning &
Scheduling
Estimating & job costing
3. Academic Qualification:
Bachelor of Commerce – Mumbai.
Diploma in Mechanical Engg.
Professional Qualification:-
1. Diploma in Industrial Safety Management System Specialization in Offshore Industry from IIERM,
Mumbai established by Jan Shikshan Sansthan Mumbai,
2. Basic Industrial Safety Course from Jan Shikshan Sansthan Mumbai. Established by Govt. of India,
Ministry of Human Resources Development.
3. Advance Industrial Safety Course from Jan Shikshan Sansthan Mumbai. Established by Govt. of
India, Ministry of Human Resources Development.
4. Scaffolding Erection & Dismantling from International Certification Services on 27th
March. – 2009.
Training & Course:
i. Three years training with Defiance Ministry (National Cadet Crops) 1st MAH ARMD CORE -
Mumbai.
ii. Basic Fire Fighting - Sir Mohamed Yusuf Association – 1998.
iii. Personnel Safety Technique from United Marine Academy.
iv. Elementary First Aid From United Marine Academy.
iv. Basic Fire Fighting From Gulf Technical & Safety Training Centre L.L.C.
v. Advance Fire Fighting From Gulf Technical & Safety Training Centre L.L.C.
vi. Sea Survival Course from Gulf Technical & Safety Training Centre L.L.C.
vii. H2s & Breathing Course from Gulf Technical & Safety Training Centre L.L.C.
ix. Helicopter Landing Officer from Gulf Technical & Safety Training Cater L.L.C.
x. Basic Fire Fighting - Sir Mohamed Yusuf Association – 2008.
xi. Personnel Safety Technique From United Marine Academy – 2008.
xii. Elementary First Aid From United Marine Academy – 2008.
xiii. Helicopter Under - Water Escape Training – 2008.
4. ASSIGNMENT DURING 16 YEARS:-
A. WorkingLast from14 YearswithParam Offshore ServicesPvt.Ltd.Asa ProjectManager.
B. Worked2 Yearsfor OnlandOffshore Engg. Services(I) Pvt.Ltd.
C. Worked5 Months forOffshore Hook – Up ConstructionServicesPvt.Ltd.
A. Param Offshore Services Pvt. Ltd.
1. Pipe Replacement Project – III, Mumbai High for Leighton as a Site – In - Charge
from2011 to 2014.
Loading of Load Out from Mundra Port, Loading Offloading of Hose Reel,
Fabrication of I – Tube, J – Tube, Sea Fastening / Lashing to the material / Hook –
Up and CommissioningEtc.
2. IOCL PARADIP BOOT REFINERY PROJECTS, ORISSA for Param Offshore Services
Pvt.Ltd. beinga ProjectManagerfrom June – 2012 to Jan. – 2013.
8” To 20” Pipe Lying,Hydro– TestingwithTie – inJoint.
3. Strom Water Pipe Line Out Fall To Sea – IOCL , Paradeep for Leighton Welspun
as a Site – In– Charge fromJuly – 2011 to May – 2012.
64” Pipe Line Laying 2.9 Km. C.S. and 1.6 Km. HDEP pipe line, Hydro – Testing
and Pre – Commissioning.
4. Neelam Heera Re – Construction, Mumbai High for ONGC / ESSAR / DASS as a
Construction Manager from Aug. – 2009 to June – 2010
Fabrication of C.S / S.S. Pipe Spool, Installation of Sum Caisson, Wastage Heat
Recovery Unit, Crane Installation by Manual, Open Drain / Close Drain System,
ProductionLine,Gas& fuel Line Etc.
5. Pipe Replacement Project – II, Mumbai High for Leighton as a Site – In – Charge
from2009 to 2011.
Loading of Load Out from Mundra Port, Loading Offloading of Hose Reel,
Fabrication of I – Tube, J – Tube, Sea Fastening / Lashing to the material / Hook –
Up and CommissioningEtc.
5. 6. BG Jacket Recovery Inspection – Pipavav Port Gujarat for Swiber Offshore / BG
Explorationasa Site – In - Charge from1st
March, 2009 To April,2009.
Inspectionof all jointandTestingof JacketLegs,Extensionof MudMett.
7. JERP-II Reliance Petroleum Ltd. Jamnagar – Gujarat for Param Offshore Services
Pvt.Ltd. as an ProjectManager fromDec. 2007 to Feb– 2009.
Fabrication of UG & AG Piping Spool and Laying / Erection with Support
Structure the Same, Hydro – Testing, Installation of Dynamic & Static Equipment
Up to 50 MT.
8. Removal of Grillage from Barge Sea Foster – Pipavav Port – Gujarat for BG
Exploration and Production India Ltd. As a Site – In - Charge From May – 2007 to
June – 2007.
Removal of Grillage Structure Use for Process Platform and Sea fastening for
Compressor Module 750 MT.
9. Secondary Cycle Piping Package, Kaiga # 3 & 4, Kaiga – Karwar – Karnataka as a
ProjectManager from15th
June 2005 to April 2007.
Fabrication/Installationof PipingandStructure Flushing, Hydro - Testing and
Pre - Commissioning.
10. Hook-Up & Commissioning of Sabratha Platform – Libya for Saipem / OHCS as a
Safety Officer from 20th Oct, 2004 to 19th March – 2005.
11. Hook-Up & Commissioning of Block 5 Developments at A1- Shaheen Field – QATAR
for Saipem / OHCS as a Safety Officer from 17th June, 2003 TO 11th Nov, 2003.
Platform, Living Quarters Compressor, Module and Flare Bridge & Platforms.
12. N – 11 & N – 12 Project -Top Side Modification and Hook – Up Of Well– Mumbai
for ONGC/ J. Ray Mc Dermott Eastern Hemisphere Ltd. / OHCS as a Fire Man from
7th Jan, 2003 TO 15th May, 2003.
13. 12 – CLAMP – ON Project (MNCO) Mumbai High North Field for ONGC / Dolphin as
a Rigging Supervisor from 22 Oct, 2002 to 19 Dec, 2002.
14. BPB Shut Down Project – Mumbai High South Field BLQ – 2 Platform for ONGC / L &
T / Das as an Site – In - Charge from Jan. – 2002 to April – 2002.
6. 15. RELIANCE REFINARY JAMNAGER – SHUT DOWN – Worked as a Site – In – Charge
from Sep. – 2001 to Dec. – 2001.
Scaffolding Erection & Dismantling at Cocker Plant.
B. Worked 2 Years forOnland OffshoreEngg.Services(I) Pvt.Ltd.
1. Hindustan Petroleum Corporation Ltd. – As a Site – In – Charge from March
2001 to June – 2001.
FabricationandInstallationof Petrol Pumpsasbelow mentionlocation:-
A. Sholapur– Maharastra
B. Parley – Maharastra
C. Lattur – Maharastra
D. VivekVihar–Delhi
E. Sahadra – Delhi
F. Gokul Puri – Delhi
2. HPCL – Depot at Guntakal – Andhra Pradesh as a Site – In – Charge from Aug –
2000 to Oct. – 2000.
Fabrication& Erectionof Structure:-
TTLF Gantry, TTLF – Pump Hose, Parking Shad, Calibration Shade, Security Tower
and FloodLightTower37 Mtr Height(Manual)
3. HPCL – Depot at Gulbarga – Karnataka as a Site – In – Charge March – 2000 to
Aug. – 2000.
Fabrication& Erectionof Structure:-
TTLF Gantry, TTLF – Pump Hose, Parking Shad, Calibration Shade, Walk Way,
SecurityTowerandFloodLightTower37 Mtr Height(Manual)
4. HPCL – Depot at Gulbarga – Karnataka as a Site – In – Charge from Oct. – 2000
to March – 2001.
Fabrication& Layingof cross CountryPipe Line (RailwaySiding)
Fire Water System, Installation of Fire Freighting Equipment and Pre
Commissioning.
5. HPCL – Depot at Manmad – Maharastra as a Site – In – Charge from June 1999
to March – 2000.
Fabrication& Erectionof Structure:-
TTLF Gantry, TTLF – Pump Hose, Parking Shad, Calibration Shad, Walk Way,
SecurityTowerandFloodLightTower37 Mtr Height(Manual).
7. 22 Mtr. TubularBridge single liftbyusingderrickpoleandchainblock.
Fabrication& Installationof Exchange –FeetShade.
Installation&CommissioningKetheticProtectionSystem.
C. Worked 5 Months forOffshoreHook –Up Construction ServicesPvt.Ltd.
1. BCP – B Hook – Up & Commissioning Project – Mumbai High South Field for ONGC /
Hyundai Heavy Industries (S. Korea) as a Fire & Safety from 15th Dec – 1998 to 15th April
– 1999.
BCP – B Hook – Up & Commissioningwith Modification atBPB/ BLQ – II.
8. PERSONNEL INFORMATION:-
Name: Sanjeev B. Barwal
D. O. B.: 09.08.1973
Place of Birth: Sandhole – Mandi.
Father’s Name: Baldev Singh Barwal
Permanente Add.:- V.P.O. – Balyali, Sandhole, Taluka – Sandhole,
Dist. – Mandi, State – Himanchal Pradesh, Pin No. – 176090.
Temporary Add.:- PHASE -II, E1/6, C-10, VRINDAWAN SOCIETY, NERUL (WEST) NAVI MUMBAI.
Religion: Hindu
Nationality: Indian
Marital status: Married
Passport Detail: Passport No. –B O 441784
: Issue Date: - 23.07.1999
: Expiry Date: - 22.07.2019
You’re truly Date:
Sanjeev Barwal
Place: Mumbai