PRABHAKAR GUPTA
106B, Nandanvan CHS,
Sec. 17, Nerul,
New Bombay 400 706, India
+91 84 548 86915
+91 98 195 41508
prab.gupta@yahoo.com
prabhakargupta@yahoo.com
Gist of Experience: More than 40 years of global experience in Fertilizers,
Petrochemicals, Refinery and Oil & Gas ~ Projects (@ 25 Years) and
Maintenance (@ 15 Years)
Projects: On behalf of EPC Contractor (Samsung Engineering) – Main Clients
ExxonMobil Indonesia, ADNOC Takreer UAE, APC Saudi, Thai Oil
Thailand EO/EG and Indian Oil, India
On behalf of Owners – SPC Saudi, Eastern Petro-Chemicals SHARQ
Saudi, RCF India
Claims Management: Contract Review (Pre & Post Award) Claims Identification,
Preparation and Resolution. Change Management. Resolution of
Technical & Contractual Matters ~ with Clients and Vendors and
also coordination with Legal Team as needed.
Project Management: Project Coordination with Clients, other EPC Contractors, Licensors,
& Vendors. Internal coordination within different functions
Engineering, Procurement, Quality Assurance and Risk
Management etc
Engineering Management: Coordination & Supervision of Engineering Activities for small
projects as part of Operating Plant Management
Cons. /Pre-Com. & Com.: Participated in supervision of Construction, Pre-commissioning and
Commissioning activities, while working on behalf of Owners
Maintenance: Eastern Petro-Chemicals SHARQ Saudi, RCF India
Maintenance Engineering: Overall responsibility for Maintenance in most modern SABIC Plants
in Saudi Arabia and RCF Mumbai / Thal.
Reliability Engineering: Reliability studies for Individual Equipment and Plants.
Having worked for Major Petrochemicals and Oil & Gas Projects on behalf of OWNERS & EPC
Contractor I have attained quite good understanding of the requirements of various functions
from OWNER / CONTRACTOR’s perspective, which believe will help me to perform in whatever
responsibilities given.
Personal:
Date of Birth: Aug 18, 1950
Academic Qualifications:
B.E. (MECH) VIKRAM UNI, UJJAIN, I Div 1971
INDIA,
M.E. (MECH) BITS, PILANI (RAJ), I Div 1973
INDIA
Year Wise Experience:
I. Nov. 2015 to Aug 2016:
CONTRACT CONSULTANT: M/S Samsung Engineering Company Ltd, Banyu Urip EMCL
EPC1 Project – Production Processing Facilities, Jakarta Indonesia
In continuation to the responsibilities before, I will be working together with Samsung
Project Team for successful conclusion of various Change Proposals which are already
submitted to COMPANY and also additional Change Proposals under consideration
and new ones ~ preparation and submission to COMPANY.
II. Oct. 2002 to Sep 2015:
Project Advisor / Contract Manager: M/S Samsung Engineering Company Ltd, Seoul,
South Korea:
M/S Samsung Engineering is Engineering Contractor for many petrochemical projects
around the globe.
I was part of Hydrocarbon Business Division, Project Management Group at SECL HO in
Seoul.
My Responsibilities:
My functions / responsibilities included the following:
 Assisting Project Director, Project Manager and Discipline Managers regarding
Engineering, Procurement and Quality Issues.
 Resolution of Technical Issues with Client & Vendors e.g. Application of
Specifications for Pumps & Compressors, Shop Test requirements for Pumps &
Compressors, Type Tests for Valves, Quality Level for Valve Castings etc. Further
details could be provided later.
 Contractual matters resolutions with Clients and Vendors
 Claims Identification / Preparation: I work in tandem with Project Director,
Project/Engineering/Procurement/Construction Manager with in SECL on
Technical & Contractual matters related to Engineering, Procurement and EPC
Contract.
 Leading Claims Management & Settlement discussions & negotiations with
Clients, Vendors and Contractors
 During the tenure of present project successfully lead claim resolutions with
Client related to FEED Issues, Project Specifications, Operation & Maintenance
Issues & Local Laws and obtained Clients acceptance for Change Orders
worth more than USD 100 Million. Further details could be provided later.
 Coordination with internal Legal Department and external consultants
 Coordination with Licensors & Statutory bodies
 Coordination with Consortium Partners
 Other miscellaneous matters
During my tenure with Samsung Engineering, I was assigned to specific projects listed
below.
 Banyu Urip (ExxonMobil-MCL) Indonesia – EPC 1 (Production Processing
Facilities) – Project Advisor (May 2010 – Continue)
 Carbon Black & Delayed Coaker Project TAKREER (ADNOC) – Contract
Manager (Sep 2012 – Feb 2014)
 TAKREER (ADNOC) RRE U&O Project – UAE – Contract Manager (Dec 2009 –
Aug 2010)
 BOROUGE 2 (ADNOC) OCU Project – UAE – Contract Manager (Oct 2007 – Dec
2009)
 APPC PDH/PP Project – Saudi Arabia – Contract Manager (Oct 2005 – Oct 2007)
 EO/EG Project for Thai Olefins Company – Thailand – Manager (Aug 2004 – Oct
2005)
 No 3 Butene 1 Project SABIC / Petrokemya – Saudi Arabia – Manager (Aug
2003 – Aug 2004)
 LAB Project / IOCL, India – Manager (Oct 2002 – Aug 2003)
III. Aug. 01 to Aug. 02:
M/S Saudi Polyolefin Company, Al-Jubail, Saudi Arabia
M/S Saudi Polyolefin Company was putting up a Propane Dehydrogenation and
Polypropylene Complex at Al-Jubail in Saudi Arabia. The process licensors were ABB
Lummus Global Inc for PDH Plant and Novolen Technologies for PP Plant. M/S Samsung
Engineering was the Engineering Contractor.
I was designated as Lead Machinery Engineer.
My main responsibilities included:
 Finalization of Equipment Specifications,
 Discussions with SECL / vendors viz. MHI, Ebara, C W&P, and KSB etc for
technical clarifications and improvisations.
 Review / Coordination of Detailed Engineering activities viz. ensuring proper
application of codes & standards, approval of data sheets, various drawings
etc.
 The plants have major machines viz. Multi Casing Centrifugal Compressors, Gas
Turbines, Axial Flow Compressors, Big Pumps, Extruders etc. The main vendors
are – MHI, Sulzer, Alstom, Ebara, C W&P etc.
I was part of Project Management Team stationed at SECL office in Seoul, Korea from
Sep 2001 to July 2002. The Project Management team consisted of personnel from –
Fluor Daniel – Management Consultant and SPC Engineers.
IV. Feb. 89 to April. 2001:
M/S Eastern Petrochemical Company (Sharq), Al-Jubail
Sharq’s Petrochemical Complex consists of three EOG plants (330K+330K+450K Tons
per Annum), two LLDPE plants and Utilities. Third EOG plant and debottelnecking of PE
plants was completed in June 2001 under 2nd Expansion Project. The total cost of 2nd
Expansion Project was about $1.3 billion.
a) Sep 2000 to April 2001:
Senior Engineer, Technical Study Group, Engineering Department, I was section head
and my responsibilities included:
 Performance Evaluation and up-gradation - Technical Audit.
 Completion of PE DBN Pending issues
 Trouble Shooting / Assistance to Maintenance & Operation,
 Preventive Maintenance & TAM Planning etc.
From Jan 2001, this function was part of Reliability Department.
b) Aug 96 to Sep 2000:
Senior Mechanical Engineer (per I/C), 2nd Exp. Project - PE DBN & 3rd EOG Plant. M/S
Chiyoda were Engineering Contractor for EOG (Process by Shell) and MHI for PE DBN
Project (Process by UCC). Job involved detailed participation with other functions viz.
Process, Instrumentation, Electrical, Civil etc. My responsibilities included:
ENGINEERING ACTIVITIES:
 Review / preparation of bid documents consisting of technical specifications
and commercial conditions.
 Participation in Basic and Detailed Engineering Activities: This involved review
and finalization of equipment specifications, approval / review of vendor
drawings, equipment layout, piping layout etc. etc. I was part of the team
stationed at MHI / Chiyoda office at Yokohama, Japan from May 1998 to Dec
1998.
 Equipment Selection: Participated in discussion with Chiyoda / MHI and vendors
viz. Kobe, Ebara, MDD, JSW, etc, for finalization of specifications for
Compressors–Centrifugal and Reciprocating, Reactors, Towers, Pumps, TPS
equipment etc. and improvisation by incorporating Sharq’s experience.
 Final inspections: Attended final inspections at Kobe Steel, Ebara, and MDD for
Compressors and Pumps etc.
CONSTRUCTION ACTIVITIES:
 Coordination of construction activities for timely completion and requirement
of operating plant. Some of the critical works in DBN – Reactor and Cycle gas
Compressor Modifications for re-rating.
 Review of Field Execution plans for main construction jobs.
 Quality Control - Witnessing critical inspection steps for ensuring Quality.
 TAM Activities: I was in-charge for the preparation activities for 1st shut down in
June 1999 and second shut down April to July 2000 for completing DBN Project.
PRE-COMMISSIONING & COMMISSIONING:
 Participating in pre-commissioning activities for Machines, Total Palletizing
System, Pneumatic Conveying etc.
 Commissioning and Performance Tests for individual equipment and plant.
c) Feb 89 to Aug 96:
I was assigned as Section Head Rotating Equipment Section for the entire complex. My
responsibilities included
 Planning, monitoring and control of Maintenance activities viz. Daily, Preventive
& Turnaround Maintenance. Condition Monitoring etc. I was overall coordinator
for total TAM many times.
 Troubleshooting and modifications.
 Participation in expansion projects for incorporating Sharq’s experience.
 Computerization of Maintenance activities: Worked for SAP
 ISO Certification: Development of Procedures & their implementation.
 Maintenance Budget Planning and control
 Training of Saudi Engineers and Technicians
V. May 86 to Feb 89:
Bombay Dyeing & Manufacturing Company, Bombay
I was working as Project Engineer for the existing chemicals and textile plants and
implemented many modifications and renovations.
My responsibilities were:
 Feasibility studies, Planning, Coordination and Execution of Projects.
 Coordination with Consultants and Statutory authorities.
VI. Nov 85 to May 86:
Bharat Petroleum Corporation, Bombay
I was working as Manager Projects for Captive Power Plant project and was associated
with preparation of bid documents and Equipment spec finalization.
VII. Oct 74 to Nov 85:
Rashtriya Chemicals and Fertilizers Ltd., Bombay
RCF’s Complex consists of Ammonia, Urea, Methanol, Complex Fertilizers, Acid etc.
plants. It has operating units at Bombay and Thal.
a) Aug 81 to Nov 85:
Plant Engineer (Mech.) Ammonia Plants Thal Project. This was a grass root project
consisting of 2X1350 TPD Ammonia Plants and 3X1500 TPD Urea Plants. I was associated
with the project from inception to commissioning and start up. M/S Haldor Topsoe was
the consultant for the project. I was associated with the following activities:
 Preparation of bid documents,
 Tech-commercial evaluation for selection of vendors and contractors
 Documents review and approval
 Stage and final inspections. I participated in final inspection for Air and
Refrigeration Compressors at Kobe Steel, Japan.
 Construction, pre-commissioning and commissioning activities for Compressor
House. The compressor house had machines from M/S Nuovo Pignone -
Synthesis Gas Compressor 22 MW, Siemens - Steam Turbines drive for Synthesis
Gas Compressor, Kobe Steel - Air & Refrigeration Compressors etc. I had the
opportunity to work with the supervisors of these companies.
 Maintenance activities for Ammonia Plants
b) Feb 78 to Aug 81:
Assistant Plant Engineer (Mech.) Complex Fertilizer Plant, Trombay Unit
I was in-charge for Mechanical Maintenance activities of the plant, including trouble
shooting, modifications, material planning control etc.
c) Oct 74 to Feb 78:
Junior Engineer (Mech.) Technical Services Department, Trombay Unit
My responsibilities included the following activities
 Non-destructive testing
 Vibration Analysis and Dynamic Balancing
 Trouble shooting and remedial measures
 Execution of pollution control schemes: We implemented two schemes viz.
Carbon Recovery for Naphtha Cracking Unit and Dust Scrubbing System for
Complex Fertilizer Plant.
VIII. Jul 73 to Oct 74:
Birla Institute of Technology and Science
I was working as Assistant Lecturer Dept. of Mechanical Engineering and was
associated with Practice School scheme of the institute and was stationed at Gwalior
Rayons Nagda and Hindustan Copper Khetri.
Last Emoluments: USD 144,000/= per Annum net of Taxes plus Medical, Local & Leave Travel,
Accommodation etc.
PRABHAKAR GUPTA

More Related Content

What's hot (20)

M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
 
latest resume
latest resumelatest resume
latest resume
 
CV- bala qa
CV- bala qaCV- bala qa
CV- bala qa
 
M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
 
Amitabha Chattopadhyay latest
Amitabha Chattopadhyay latest Amitabha Chattopadhyay latest
Amitabha Chattopadhyay latest
 
Richard Kildea. CV October 2016
Richard Kildea. CV October 2016Richard Kildea. CV October 2016
Richard Kildea. CV October 2016
 
CV 11.10.16
CV 11.10.16CV 11.10.16
CV 11.10.16
 
Manoj resume
Manoj resumeManoj resume
Manoj resume
 
A_Rashad_new_updateCV
A_Rashad_new_updateCVA_Rashad_new_updateCV
A_Rashad_new_updateCV
 
My Resume
My ResumeMy Resume
My Resume
 
GM CV-Nov16
GM CV-Nov16 GM CV-Nov16
GM CV-Nov16
 
Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15
 
Elamathi Panneerselvam CV
Elamathi Panneerselvam CVElamathi Panneerselvam CV
Elamathi Panneerselvam CV
 
Caro, Jose J 11 9
Caro, Jose J 11 9Caro, Jose J 11 9
Caro, Jose J 11 9
 
Chandra Sekhar Reddy
Chandra Sekhar ReddyChandra Sekhar Reddy
Chandra Sekhar Reddy
 
Pandiarajan CV 2015.1
Pandiarajan CV 2015.1Pandiarajan CV 2015.1
Pandiarajan CV 2015.1
 
jainco
jaincojainco
jainco
 
Mohamed Nabil Omar - CV
Mohamed Nabil Omar - CVMohamed Nabil Omar - CV
Mohamed Nabil Omar - CV
 
Kona Rao -2015
Kona Rao  -2015Kona Rao  -2015
Kona Rao -2015
 
CV of M Saidul Islam.os
CV of M Saidul Islam.osCV of M Saidul Islam.os
CV of M Saidul Islam.os
 

Viewers also liked

Viewers also liked (12)

Wes Demirjian Report Out
Wes Demirjian Report OutWes Demirjian Report Out
Wes Demirjian Report Out
 
Del pago
Del pagoDel pago
Del pago
 
evaluacion del tercer bloque
evaluacion del tercer bloqueevaluacion del tercer bloque
evaluacion del tercer bloque
 
CORREOS ELECTRONICOS
CORREOS ELECTRONICOSCORREOS ELECTRONICOS
CORREOS ELECTRONICOS
 
Tetraedro incompleto
Tetraedro incompletoTetraedro incompleto
Tetraedro incompleto
 
5 Correos Electronicos
5 Correos Electronicos5 Correos Electronicos
5 Correos Electronicos
 
miss usiu BANNER-PRINT
miss usiu BANNER-PRINTmiss usiu BANNER-PRINT
miss usiu BANNER-PRINT
 
Eastman Report Out
Eastman Report OutEastman Report Out
Eastman Report Out
 
doc02681420141023102537
doc02681420141023102537doc02681420141023102537
doc02681420141023102537
 
redes
redesredes
redes
 
Summer Internship Recap
Summer Internship RecapSummer Internship Recap
Summer Internship Recap
 
Home worker
Home workerHome worker
Home worker
 

Similar to Prabhakar_CV (20)

Ashok Kumar Das-Biodata
Ashok Kumar Das-BiodataAshok Kumar Das-Biodata
Ashok Kumar Das-Biodata
 
Resume_Anup Kumar Singh
Resume_Anup Kumar SinghResume_Anup Kumar Singh
Resume_Anup Kumar Singh
 
VIPUL VICHARE_CURRICULUM_VITAE_7
VIPUL VICHARE_CURRICULUM_VITAE_7VIPUL VICHARE_CURRICULUM_VITAE_7
VIPUL VICHARE_CURRICULUM_VITAE_7
 
CV-Anto-2016
CV-Anto-2016CV-Anto-2016
CV-Anto-2016
 
DKSHAH RESUME
DKSHAH RESUMEDKSHAH RESUME
DKSHAH RESUME
 
Ramanuja CV-
Ramanuja CV-Ramanuja CV-
Ramanuja CV-
 
Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019
 
Profile -Gaurav Pant
Profile  -Gaurav PantProfile  -Gaurav Pant
Profile -Gaurav Pant
 
Mohammed Yousuf cv
Mohammed Yousuf cvMohammed Yousuf cv
Mohammed Yousuf cv
 
aravind ..
aravind ..aravind ..
aravind ..
 
Curriculam vitae deepak
Curriculam vitae deepakCurriculam vitae deepak
Curriculam vitae deepak
 
Final Mukesh Resume
Final Mukesh Resume Final Mukesh Resume
Final Mukesh Resume
 
Ranjith_Kumar R - CV
Ranjith_Kumar R - CVRanjith_Kumar R - CV
Ranjith_Kumar R - CV
 
Curriculum Vitae of R M Rico
Curriculum Vitae of R M RicoCurriculum Vitae of R M Rico
Curriculum Vitae of R M Rico
 
CV-Pon
CV-PonCV-Pon
CV-Pon
 
updated CV
updated CVupdated CV
updated CV
 
prashant resume latest
prashant resume latestprashant resume latest
prashant resume latest
 
DEEPES - Copy (2)
DEEPES - Copy (2)DEEPES - Copy (2)
DEEPES - Copy (2)
 
Rajkumar_M Resume
Rajkumar_M ResumeRajkumar_M Resume
Rajkumar_M Resume
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 

Prabhakar_CV

  • 1. PRABHAKAR GUPTA 106B, Nandanvan CHS, Sec. 17, Nerul, New Bombay 400 706, India +91 84 548 86915 +91 98 195 41508 prab.gupta@yahoo.com prabhakargupta@yahoo.com Gist of Experience: More than 40 years of global experience in Fertilizers, Petrochemicals, Refinery and Oil & Gas ~ Projects (@ 25 Years) and Maintenance (@ 15 Years) Projects: On behalf of EPC Contractor (Samsung Engineering) – Main Clients ExxonMobil Indonesia, ADNOC Takreer UAE, APC Saudi, Thai Oil Thailand EO/EG and Indian Oil, India On behalf of Owners – SPC Saudi, Eastern Petro-Chemicals SHARQ Saudi, RCF India Claims Management: Contract Review (Pre & Post Award) Claims Identification, Preparation and Resolution. Change Management. Resolution of Technical & Contractual Matters ~ with Clients and Vendors and also coordination with Legal Team as needed. Project Management: Project Coordination with Clients, other EPC Contractors, Licensors, & Vendors. Internal coordination within different functions Engineering, Procurement, Quality Assurance and Risk Management etc Engineering Management: Coordination & Supervision of Engineering Activities for small projects as part of Operating Plant Management Cons. /Pre-Com. & Com.: Participated in supervision of Construction, Pre-commissioning and Commissioning activities, while working on behalf of Owners Maintenance: Eastern Petro-Chemicals SHARQ Saudi, RCF India Maintenance Engineering: Overall responsibility for Maintenance in most modern SABIC Plants in Saudi Arabia and RCF Mumbai / Thal. Reliability Engineering: Reliability studies for Individual Equipment and Plants. Having worked for Major Petrochemicals and Oil & Gas Projects on behalf of OWNERS & EPC Contractor I have attained quite good understanding of the requirements of various functions from OWNER / CONTRACTOR’s perspective, which believe will help me to perform in whatever responsibilities given.
  • 2. Personal: Date of Birth: Aug 18, 1950 Academic Qualifications: B.E. (MECH) VIKRAM UNI, UJJAIN, I Div 1971 INDIA, M.E. (MECH) BITS, PILANI (RAJ), I Div 1973 INDIA Year Wise Experience: I. Nov. 2015 to Aug 2016: CONTRACT CONSULTANT: M/S Samsung Engineering Company Ltd, Banyu Urip EMCL EPC1 Project – Production Processing Facilities, Jakarta Indonesia In continuation to the responsibilities before, I will be working together with Samsung Project Team for successful conclusion of various Change Proposals which are already submitted to COMPANY and also additional Change Proposals under consideration and new ones ~ preparation and submission to COMPANY. II. Oct. 2002 to Sep 2015: Project Advisor / Contract Manager: M/S Samsung Engineering Company Ltd, Seoul, South Korea: M/S Samsung Engineering is Engineering Contractor for many petrochemical projects around the globe. I was part of Hydrocarbon Business Division, Project Management Group at SECL HO in Seoul. My Responsibilities: My functions / responsibilities included the following:  Assisting Project Director, Project Manager and Discipline Managers regarding Engineering, Procurement and Quality Issues.  Resolution of Technical Issues with Client & Vendors e.g. Application of Specifications for Pumps & Compressors, Shop Test requirements for Pumps & Compressors, Type Tests for Valves, Quality Level for Valve Castings etc. Further details could be provided later.  Contractual matters resolutions with Clients and Vendors  Claims Identification / Preparation: I work in tandem with Project Director, Project/Engineering/Procurement/Construction Manager with in SECL on Technical & Contractual matters related to Engineering, Procurement and EPC Contract.  Leading Claims Management & Settlement discussions & negotiations with Clients, Vendors and Contractors  During the tenure of present project successfully lead claim resolutions with Client related to FEED Issues, Project Specifications, Operation & Maintenance
  • 3. Issues & Local Laws and obtained Clients acceptance for Change Orders worth more than USD 100 Million. Further details could be provided later.  Coordination with internal Legal Department and external consultants  Coordination with Licensors & Statutory bodies  Coordination with Consortium Partners  Other miscellaneous matters During my tenure with Samsung Engineering, I was assigned to specific projects listed below.  Banyu Urip (ExxonMobil-MCL) Indonesia – EPC 1 (Production Processing Facilities) – Project Advisor (May 2010 – Continue)  Carbon Black & Delayed Coaker Project TAKREER (ADNOC) – Contract Manager (Sep 2012 – Feb 2014)  TAKREER (ADNOC) RRE U&O Project – UAE – Contract Manager (Dec 2009 – Aug 2010)  BOROUGE 2 (ADNOC) OCU Project – UAE – Contract Manager (Oct 2007 – Dec 2009)  APPC PDH/PP Project – Saudi Arabia – Contract Manager (Oct 2005 – Oct 2007)  EO/EG Project for Thai Olefins Company – Thailand – Manager (Aug 2004 – Oct 2005)  No 3 Butene 1 Project SABIC / Petrokemya – Saudi Arabia – Manager (Aug 2003 – Aug 2004)  LAB Project / IOCL, India – Manager (Oct 2002 – Aug 2003) III. Aug. 01 to Aug. 02: M/S Saudi Polyolefin Company, Al-Jubail, Saudi Arabia M/S Saudi Polyolefin Company was putting up a Propane Dehydrogenation and Polypropylene Complex at Al-Jubail in Saudi Arabia. The process licensors were ABB Lummus Global Inc for PDH Plant and Novolen Technologies for PP Plant. M/S Samsung Engineering was the Engineering Contractor. I was designated as Lead Machinery Engineer. My main responsibilities included:  Finalization of Equipment Specifications,  Discussions with SECL / vendors viz. MHI, Ebara, C W&P, and KSB etc for technical clarifications and improvisations.  Review / Coordination of Detailed Engineering activities viz. ensuring proper application of codes & standards, approval of data sheets, various drawings etc.  The plants have major machines viz. Multi Casing Centrifugal Compressors, Gas Turbines, Axial Flow Compressors, Big Pumps, Extruders etc. The main vendors are – MHI, Sulzer, Alstom, Ebara, C W&P etc. I was part of Project Management Team stationed at SECL office in Seoul, Korea from Sep 2001 to July 2002. The Project Management team consisted of personnel from – Fluor Daniel – Management Consultant and SPC Engineers. IV. Feb. 89 to April. 2001:
  • 4. M/S Eastern Petrochemical Company (Sharq), Al-Jubail Sharq’s Petrochemical Complex consists of three EOG plants (330K+330K+450K Tons per Annum), two LLDPE plants and Utilities. Third EOG plant and debottelnecking of PE plants was completed in June 2001 under 2nd Expansion Project. The total cost of 2nd Expansion Project was about $1.3 billion. a) Sep 2000 to April 2001: Senior Engineer, Technical Study Group, Engineering Department, I was section head and my responsibilities included:  Performance Evaluation and up-gradation - Technical Audit.  Completion of PE DBN Pending issues  Trouble Shooting / Assistance to Maintenance & Operation,  Preventive Maintenance & TAM Planning etc. From Jan 2001, this function was part of Reliability Department. b) Aug 96 to Sep 2000: Senior Mechanical Engineer (per I/C), 2nd Exp. Project - PE DBN & 3rd EOG Plant. M/S Chiyoda were Engineering Contractor for EOG (Process by Shell) and MHI for PE DBN Project (Process by UCC). Job involved detailed participation with other functions viz. Process, Instrumentation, Electrical, Civil etc. My responsibilities included: ENGINEERING ACTIVITIES:  Review / preparation of bid documents consisting of technical specifications and commercial conditions.  Participation in Basic and Detailed Engineering Activities: This involved review and finalization of equipment specifications, approval / review of vendor drawings, equipment layout, piping layout etc. etc. I was part of the team stationed at MHI / Chiyoda office at Yokohama, Japan from May 1998 to Dec 1998.  Equipment Selection: Participated in discussion with Chiyoda / MHI and vendors viz. Kobe, Ebara, MDD, JSW, etc, for finalization of specifications for Compressors–Centrifugal and Reciprocating, Reactors, Towers, Pumps, TPS equipment etc. and improvisation by incorporating Sharq’s experience.  Final inspections: Attended final inspections at Kobe Steel, Ebara, and MDD for Compressors and Pumps etc. CONSTRUCTION ACTIVITIES:  Coordination of construction activities for timely completion and requirement of operating plant. Some of the critical works in DBN – Reactor and Cycle gas Compressor Modifications for re-rating.  Review of Field Execution plans for main construction jobs.  Quality Control - Witnessing critical inspection steps for ensuring Quality.  TAM Activities: I was in-charge for the preparation activities for 1st shut down in June 1999 and second shut down April to July 2000 for completing DBN Project. PRE-COMMISSIONING & COMMISSIONING:  Participating in pre-commissioning activities for Machines, Total Palletizing System, Pneumatic Conveying etc.  Commissioning and Performance Tests for individual equipment and plant. c) Feb 89 to Aug 96: I was assigned as Section Head Rotating Equipment Section for the entire complex. My responsibilities included  Planning, monitoring and control of Maintenance activities viz. Daily, Preventive & Turnaround Maintenance. Condition Monitoring etc. I was overall coordinator for total TAM many times.
  • 5.  Troubleshooting and modifications.  Participation in expansion projects for incorporating Sharq’s experience.  Computerization of Maintenance activities: Worked for SAP  ISO Certification: Development of Procedures & their implementation.  Maintenance Budget Planning and control  Training of Saudi Engineers and Technicians V. May 86 to Feb 89: Bombay Dyeing & Manufacturing Company, Bombay I was working as Project Engineer for the existing chemicals and textile plants and implemented many modifications and renovations. My responsibilities were:  Feasibility studies, Planning, Coordination and Execution of Projects.  Coordination with Consultants and Statutory authorities. VI. Nov 85 to May 86: Bharat Petroleum Corporation, Bombay I was working as Manager Projects for Captive Power Plant project and was associated with preparation of bid documents and Equipment spec finalization. VII. Oct 74 to Nov 85: Rashtriya Chemicals and Fertilizers Ltd., Bombay RCF’s Complex consists of Ammonia, Urea, Methanol, Complex Fertilizers, Acid etc. plants. It has operating units at Bombay and Thal. a) Aug 81 to Nov 85: Plant Engineer (Mech.) Ammonia Plants Thal Project. This was a grass root project consisting of 2X1350 TPD Ammonia Plants and 3X1500 TPD Urea Plants. I was associated with the project from inception to commissioning and start up. M/S Haldor Topsoe was the consultant for the project. I was associated with the following activities:  Preparation of bid documents,  Tech-commercial evaluation for selection of vendors and contractors  Documents review and approval  Stage and final inspections. I participated in final inspection for Air and Refrigeration Compressors at Kobe Steel, Japan.  Construction, pre-commissioning and commissioning activities for Compressor House. The compressor house had machines from M/S Nuovo Pignone - Synthesis Gas Compressor 22 MW, Siemens - Steam Turbines drive for Synthesis Gas Compressor, Kobe Steel - Air & Refrigeration Compressors etc. I had the opportunity to work with the supervisors of these companies.  Maintenance activities for Ammonia Plants b) Feb 78 to Aug 81: Assistant Plant Engineer (Mech.) Complex Fertilizer Plant, Trombay Unit I was in-charge for Mechanical Maintenance activities of the plant, including trouble shooting, modifications, material planning control etc. c) Oct 74 to Feb 78: Junior Engineer (Mech.) Technical Services Department, Trombay Unit My responsibilities included the following activities  Non-destructive testing  Vibration Analysis and Dynamic Balancing  Trouble shooting and remedial measures
  • 6.  Execution of pollution control schemes: We implemented two schemes viz. Carbon Recovery for Naphtha Cracking Unit and Dust Scrubbing System for Complex Fertilizer Plant. VIII. Jul 73 to Oct 74: Birla Institute of Technology and Science I was working as Assistant Lecturer Dept. of Mechanical Engineering and was associated with Practice School scheme of the institute and was stationed at Gwalior Rayons Nagda and Hindustan Copper Khetri. Last Emoluments: USD 144,000/= per Annum net of Taxes plus Medical, Local & Leave Travel, Accommodation etc. PRABHAKAR GUPTA