SlideShare a Scribd company logo
1 of 4
`
PROFESSIONAL OBJECTIVE
Seeking to handle increasing responsibility and challenging projects in a professionally competitive organization
that provide ample opportunities to harness my skills, knowledge and achieve recognition.
WORK EXPERIENCE
From March 2015 to Present:
 Working as Mechanical Engineer - Execution in Technip India Ltd.
 Working in JBF PTA Project located in Mangalore SEZ.
My Responsibilities in this organization :
 Responsible for execution of HVAC works, UG Piping, Bagging system and erection of DG.
 Responsible for overall development of Civil works of Coastal Housing, a Mangalore based Real Estate
company.
 Daily reporting to 2 Area Superintendent regarding the progress of work.
 Raising Technical Queries to the Design team in Head Office.
 Ensure quality work is done as per drawings.
 Providing assistance to the contractors as needed.
 To coordinate with other engineering discipline.
 Responsible for the completion of work on given target date and the front will be available for other
vendor to proceed.
 Ensure that the contractors appointed perform the work in line with our requirements and as per our
schedule.
 To ensure safety standards and procedures are implemented and followed by the contractors in
accordance with our Company guidelines.
JOB DETAILS :
1) Coastal Housing(Civil) :
 Block works, Plastering, Painting and IPS Flooring in SS1, SS2, CCR and Lab building.
 Entire civil works in SS3, ITR1, ITR2, ITR3 and Chemical Store.
 Asking our Civil and QC Engineers to cross check and give clearance to the work that is done so that we
can proceed to the next stage.
 Coordinating with other contractors so that we can get the front on time.
SAJESH.S.KUMAR
”SHIVA SADAN”
Near Hari Hara Temple
Karnad, Mulky.
Mangalore, PIN:574154
Mob:+91-9880452177
Email:sajeshkumar91@gmail.com
`
 Interacting with their Site Engineer, Planning Manager and RCM regarding site work.
 Solving out any kind of problem they are facing at site.
 Finishing the job that is set by the client JBF as a target on monthly basis.
2) Underground Piping :
• Petron Engineering Construction Limited(PECL) is the contractor.
• Incharge of entire Underground Piping other than Cooling Tower line.
• Along with this incharge of Fire Water Above ground as well.
 UG Piping include Fire Water, Chemical Water, Oily Water, Treated Sewage Water, Raw Water and Waste
Water Network. (All are PE coated CS Pipe)
 It also has Drinking Water, Sanitary Water and Rain Water Pipes.(All are PVC Pipes)
 General supervision of 500 sleepers for above ground Fire Water line along the periphery. 150 no’s for 24”
pipe and 350 no’s for 10” & 16” pipe.
 Cross checking MTO by calculating Running metres of pipes, PE coating quantity for joints and fittings and
number of fittings.
 Calculated Excavation and Back filling quantity of entire UG network.
 Checking and approving Isometric drawings provided by the contractor.
 Pipe Fit up checking before welding.
 Coordinating with civil team to build Man hole, Valve Pit, Catch Basin.
 Asking our civil Engineer to check for the co-ordinates and the level.
From July 2013 to February 2015:
 Worked as Engineer - MEP in Kanakadhara Ventures Pvt. Ltd (KVPL).
 Worked in ESIC Medical College Rajajinagar Bangalore project looking after the execution of HVAC, Fire
Fighting and Plumbing works.
My Responsibilities in this organization :
 Responsible for the entire HVAC & Plumbing works.
 Ensure that all shop drawings and technical submittals are submitted by the sub contractors and approval
obtained from the consultant.
 Coordinate with the area in charges and ensure that all the requirements of services are explained to the
supervisors and the work happens in a coordinated manner within minimum rework.
 Monitor, verify and document the work being performed through contract Engineers.
 To monitor and control expenses related to project work and ensure organizational forecasts and budgets
are met for these expenses.
 Shall be responsible to hand over the System to clients by clearing all the punch points given by the
`
clients.
JOB DETAILS :
1) HVAC :
 Executed the Equipment erection operations.
 Executed the Ducting Sheet Metal work from AHU’s, CSU’s and FCU’s.
 Executed the Piping works from Cooling Tower to Chiller and from Chiller to respective AHU’s, CSU’s and
FCU’s.
 Performed Light test to check leakage in Duct.
 Performed Hydro test to check leakage in Pipeline.
 Checking the RA bill provided by the contractor and then passing it to the QS department.
2) Fire Fighting :
 Executed Hydrant and Sprinkler Pipe Line in Shaft.
 Executed Drain Pipe Line in Shaft and branch pipe above false ceiling.
 Performed Hydra test to check leakage in Pipeline.
 Involved in the execution of Fire Suppression system.
 Involved in installation of Pumps in the Fire Pump room.
3) Plumbing :
• No Sub Contractors For Plumbing Works
• Looked after entire external Plumbing works.
 Executed Plumbing pipes in shaft - CI Pipe(100 Ø) for Waste water from toilet and labs , C.I Pipe (75 Ø) as
Antisyphonage, PVC Pipe(150 Ø) for Rain water , GI Pipe(25,32,40 and 60 Ø) for Domestic purpose and
Flush purpose and G.I Pipe (80 Ø) for fresh water riser to overhand tank in terrace.
 Installed Stone Ware and RCC pipe to connect ETP and STP Manhole.
 Executing Core Cutting wherever it is necessary.
 Marking of Manholes across the site and getting clearance for markings from concerned department.
 Asking our Civil Engineer to check for Ground Level and Inverted Level of each Manhole when it is built.
 Installed Khurra in terrace floor for rain water pipes.
`
ACADEMICS
COURSE PERCENTAGE YEAR OF COMPLETION INSTITUTION
BE- Mechanical 68.5 % (Aggregate) 2013 NMAMIT, Nitte, Udupi
XII 83% 2009 SDPT PU College, Kateel
X 86.56% 2007 SNGEM High School, Mulky
Declaration:
I here by declare that the above-mentioned particulars are true to the best of my knowledge and belief.
Place :
Date :
SAJESH.S.KUMA
R
Reference:
S.B Agarwal
Senior Manager – Construction
Technip India Ltd
Email: sbagarwal@technip.com
Phone: +91-9845842457
+91-9036002457
Personal Profile
Date of birth : 19th
September 1991
Gender : Male
Marital status : Single
Nationality : Indian
Languages known : English, Hindi, Kannada, Tulu
Permanent Address : ” SHIVA SADAN”
Near Hari Hara Temple
Karnad, Mulky.
Mangalore.
Pin : 574154

More Related Content

What's hot (20)

ARUL CV
ARUL CVARUL CV
ARUL CV
 
Resume 09_15_15 Dyno Nobel
Resume 09_15_15 Dyno NobelResume 09_15_15 Dyno Nobel
Resume 09_15_15 Dyno Nobel
 
CURRICULUM
CURRICULUMCURRICULUM
CURRICULUM
 
DARIO LOPEZ SAN DIEGO
DARIO LOPEZ SAN DIEGODARIO LOPEZ SAN DIEGO
DARIO LOPEZ SAN DIEGO
 
ISS Company Profile 2015 most updated
ISS Company Profile 2015 most updatedISS Company Profile 2015 most updated
ISS Company Profile 2015 most updated
 
Armando Beltran Resume.doc (1) copy updated
Armando Beltran Resume.doc (1) copy updated Armando Beltran Resume.doc (1) copy updated
Armando Beltran Resume.doc (1) copy updated
 
MSD Rathdrum Role
MSD Rathdrum RoleMSD Rathdrum Role
MSD Rathdrum Role
 
CV@JOMY NEW
CV@JOMY NEWCV@JOMY NEW
CV@JOMY NEW
 
Rabeesh CV 2014
Rabeesh CV  2014Rabeesh CV  2014
Rabeesh CV 2014
 
shahul HVAC - new 1
shahul HVAC - new 1shahul HVAC - new 1
shahul HVAC - new 1
 
Forecity response to hireup
Forecity response to hireupForecity response to hireup
Forecity response to hireup
 
CV-uploaded1
CV-uploaded1CV-uploaded1
CV-uploaded1
 
Resume 4
Resume 4Resume 4
Resume 4
 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
 
1. Sharib Reza(CV)
1. Sharib Reza(CV)1. Sharib Reza(CV)
1. Sharib Reza(CV)
 
CV_LEC
CV_LECCV_LEC
CV_LEC
 
CV
CVCV
CV
 
Andrew_Wellbelove's_CV_July_2016_ doc_a1
Andrew_Wellbelove's_CV_July_2016_ doc_a1Andrew_Wellbelove's_CV_July_2016_ doc_a1
Andrew_Wellbelove's_CV_July_2016_ doc_a1
 
HashimFA
HashimFAHashimFA
HashimFA
 
R.Kumar
R.KumarR.Kumar
R.Kumar
 

Similar to Sajesh CV (20)

Lory Francis Navor - CV
Lory Francis Navor - CVLory Francis Navor - CV
Lory Francis Navor - CV
 
Mech_Eng. CV updated
Mech_Eng. CV updatedMech_Eng. CV updated
Mech_Eng. CV updated
 
CV of Mohammed Uzair
CV of Mohammed UzairCV of Mohammed Uzair
CV of Mohammed Uzair
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
MANEESH resume
MANEESH resumeMANEESH resume
MANEESH resume
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
 
CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05
 
Resume
ResumeResume
Resume
 
RESUME_Chelladurai
RESUME_ChelladuraiRESUME_Chelladurai
RESUME_Chelladurai
 
Siddharth_resume_Engg.
Siddharth_resume_Engg.Siddharth_resume_Engg.
Siddharth_resume_Engg.
 
jainco
jaincojainco
jainco
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revised
 
Resume
ResumeResume
Resume
 
QC Civil A. Afzal
QC Civil A. AfzalQC Civil A. Afzal
QC Civil A. Afzal
 
ICI Magazine
ICI MagazineICI Magazine
ICI Magazine
 
Magazine
MagazineMagazine
Magazine
 
Project Review Presentation (2)
Project Review Presentation (2)Project Review Presentation (2)
Project Review Presentation (2)
 
vijay cv
vijay cvvijay cv
vijay cv
 
CV Alberto Uribe English
CV Alberto Uribe EnglishCV Alberto Uribe English
CV Alberto Uribe English
 
Saqib Shahzad CV updated
Saqib Shahzad CV updatedSaqib Shahzad CV updated
Saqib Shahzad CV updated
 

Recently uploaded

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 

Recently uploaded (20)

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 

Sajesh CV

  • 1. ` PROFESSIONAL OBJECTIVE Seeking to handle increasing responsibility and challenging projects in a professionally competitive organization that provide ample opportunities to harness my skills, knowledge and achieve recognition. WORK EXPERIENCE From March 2015 to Present:  Working as Mechanical Engineer - Execution in Technip India Ltd.  Working in JBF PTA Project located in Mangalore SEZ. My Responsibilities in this organization :  Responsible for execution of HVAC works, UG Piping, Bagging system and erection of DG.  Responsible for overall development of Civil works of Coastal Housing, a Mangalore based Real Estate company.  Daily reporting to 2 Area Superintendent regarding the progress of work.  Raising Technical Queries to the Design team in Head Office.  Ensure quality work is done as per drawings.  Providing assistance to the contractors as needed.  To coordinate with other engineering discipline.  Responsible for the completion of work on given target date and the front will be available for other vendor to proceed.  Ensure that the contractors appointed perform the work in line with our requirements and as per our schedule.  To ensure safety standards and procedures are implemented and followed by the contractors in accordance with our Company guidelines. JOB DETAILS : 1) Coastal Housing(Civil) :  Block works, Plastering, Painting and IPS Flooring in SS1, SS2, CCR and Lab building.  Entire civil works in SS3, ITR1, ITR2, ITR3 and Chemical Store.  Asking our Civil and QC Engineers to cross check and give clearance to the work that is done so that we can proceed to the next stage.  Coordinating with other contractors so that we can get the front on time. SAJESH.S.KUMAR ”SHIVA SADAN” Near Hari Hara Temple Karnad, Mulky. Mangalore, PIN:574154 Mob:+91-9880452177 Email:sajeshkumar91@gmail.com
  • 2. `  Interacting with their Site Engineer, Planning Manager and RCM regarding site work.  Solving out any kind of problem they are facing at site.  Finishing the job that is set by the client JBF as a target on monthly basis. 2) Underground Piping : • Petron Engineering Construction Limited(PECL) is the contractor. • Incharge of entire Underground Piping other than Cooling Tower line. • Along with this incharge of Fire Water Above ground as well.  UG Piping include Fire Water, Chemical Water, Oily Water, Treated Sewage Water, Raw Water and Waste Water Network. (All are PE coated CS Pipe)  It also has Drinking Water, Sanitary Water and Rain Water Pipes.(All are PVC Pipes)  General supervision of 500 sleepers for above ground Fire Water line along the periphery. 150 no’s for 24” pipe and 350 no’s for 10” & 16” pipe.  Cross checking MTO by calculating Running metres of pipes, PE coating quantity for joints and fittings and number of fittings.  Calculated Excavation and Back filling quantity of entire UG network.  Checking and approving Isometric drawings provided by the contractor.  Pipe Fit up checking before welding.  Coordinating with civil team to build Man hole, Valve Pit, Catch Basin.  Asking our civil Engineer to check for the co-ordinates and the level. From July 2013 to February 2015:  Worked as Engineer - MEP in Kanakadhara Ventures Pvt. Ltd (KVPL).  Worked in ESIC Medical College Rajajinagar Bangalore project looking after the execution of HVAC, Fire Fighting and Plumbing works. My Responsibilities in this organization :  Responsible for the entire HVAC & Plumbing works.  Ensure that all shop drawings and technical submittals are submitted by the sub contractors and approval obtained from the consultant.  Coordinate with the area in charges and ensure that all the requirements of services are explained to the supervisors and the work happens in a coordinated manner within minimum rework.  Monitor, verify and document the work being performed through contract Engineers.  To monitor and control expenses related to project work and ensure organizational forecasts and budgets are met for these expenses.  Shall be responsible to hand over the System to clients by clearing all the punch points given by the
  • 3. ` clients. JOB DETAILS : 1) HVAC :  Executed the Equipment erection operations.  Executed the Ducting Sheet Metal work from AHU’s, CSU’s and FCU’s.  Executed the Piping works from Cooling Tower to Chiller and from Chiller to respective AHU’s, CSU’s and FCU’s.  Performed Light test to check leakage in Duct.  Performed Hydro test to check leakage in Pipeline.  Checking the RA bill provided by the contractor and then passing it to the QS department. 2) Fire Fighting :  Executed Hydrant and Sprinkler Pipe Line in Shaft.  Executed Drain Pipe Line in Shaft and branch pipe above false ceiling.  Performed Hydra test to check leakage in Pipeline.  Involved in the execution of Fire Suppression system.  Involved in installation of Pumps in the Fire Pump room. 3) Plumbing : • No Sub Contractors For Plumbing Works • Looked after entire external Plumbing works.  Executed Plumbing pipes in shaft - CI Pipe(100 Ø) for Waste water from toilet and labs , C.I Pipe (75 Ø) as Antisyphonage, PVC Pipe(150 Ø) for Rain water , GI Pipe(25,32,40 and 60 Ø) for Domestic purpose and Flush purpose and G.I Pipe (80 Ø) for fresh water riser to overhand tank in terrace.  Installed Stone Ware and RCC pipe to connect ETP and STP Manhole.  Executing Core Cutting wherever it is necessary.  Marking of Manholes across the site and getting clearance for markings from concerned department.  Asking our Civil Engineer to check for Ground Level and Inverted Level of each Manhole when it is built.  Installed Khurra in terrace floor for rain water pipes.
  • 4. ` ACADEMICS COURSE PERCENTAGE YEAR OF COMPLETION INSTITUTION BE- Mechanical 68.5 % (Aggregate) 2013 NMAMIT, Nitte, Udupi XII 83% 2009 SDPT PU College, Kateel X 86.56% 2007 SNGEM High School, Mulky Declaration: I here by declare that the above-mentioned particulars are true to the best of my knowledge and belief. Place : Date : SAJESH.S.KUMA R Reference: S.B Agarwal Senior Manager – Construction Technip India Ltd Email: sbagarwal@technip.com Phone: +91-9845842457 +91-9036002457 Personal Profile Date of birth : 19th September 1991 Gender : Male Marital status : Single Nationality : Indian Languages known : English, Hindi, Kannada, Tulu Permanent Address : ” SHIVA SADAN” Near Hari Hara Temple Karnad, Mulky. Mangalore. Pin : 574154