SlideShare a Scribd company logo
1 of 14
Download to read offline
c
&
E E R
SKYPOD
RESIDENCE
BOON PEW
& ASSOCIATES
M & E
ENGINEER
WORK SCOPE
MECHANICAL AND
ELECTRICAL
SYSTEM
CONTENT
INTRODUCTION
PERSONAL &
COMPANY PROFILE
M&E ENGINEER
PROJECT
2
1
5
3
ROLES & RESPONSIBILITIES OF A M&E
ENGINEER IN A CONSTRUSTION
RELATION BETWEEN OTHER PROFESSIONS
SKYPOD RESIDENCE
ROLES & RESPONSIBLILITIES
OF OUR INTERVIEWEE IN
THIS PROJECT
PROBLEMS FACED AND
SOLUTION
INTRODUCTION
What comes to mind when you think of mechanical and
electrical engineering? Think you know what this profession
is all about? Ever wondered what it takes to be a M&E
engineer? In this month’s issue, we have conducted an
exclusive interview with a M&E engineer, Ir Kew Boon Pew.
Through our interview session, we have learned and found
out so much more about the world of mechanical and
electrical engineering. There are a lot more that lies within a
M&E engineer. Get the inside scoop of their job description,
responsibility and challenges all in this magazine.
1
PERSONAL
COMPANY PROFILE
Ir Kew Boon Pew, aged 49 in 2015, was born in the year of 1966 in
Malaysia. He finished his primary and secondary studies locally and headed to
University of New South Wales, Sydney, Australia for tertiary studies in the year
of 1982. He took up Mechanical & Electrical (M&E) Engineering course there. He
graduated after six years of studies and returned to Malaysia in the year of 1989.
Since then, he started working as a M&E engineer in Sepakat Setia Perunding,
which is presently a leading multi-disciplinary engineering consultancy firm in
Malaysia. He worked there with a basic salary of RM1800.00 per month. After a
period of time working under the company, Mr. Kew had gained enough working
experience and thus he sat for the Board of Engineer Malaysia (BEM) Exams. In the
year of 1993, he had successfully received the title “Ir” from BEM at the age of 27.
Four years later, he opened his own company namely “Kew & Associates”, which is
a M&E engineer firm at Bandar Puteri, Puchong. Up until now, he has handled over
20 massive projects and is still striving for the better in the future.
1997. Kew & Associates has a total of 10 employees including 5 draftsmen and
5 graduate M&E engineers. His company has involved in many small and
massive projects such as low rise and high rise apartments, condominiums,
factories and etc.
KEW & ASSOCIATES JURUTERA PERUNDING | M & E | CONSULTING ENGINEERS
No.26-2, Jalan Puteri ½, Bandar Puteri, 47100 Puchong, Selangor Darul Ehsan.
Kew & Associates was established by Ir Kew Boon Pew himself in
STUDIED AT
UNSW
WORKED IN MALAYSIA
AFTER GRADUATE
ENTITLED AS A
PROFESSSIONAL
ENGINEER
ESTABLISHED
KEW&ASSOCIATES
S
AGE
27 years old16 years old 22 years old 31 years old
“Ir”
2
Before any project begins, discussion must
be done with the clients. The concepts,
requirements and thoughts regarding the
construction will be discussed. The M&E
engineer will design and implement systems
that are practical and most energy efficient. He
will also create many systems based on the
different requirements and purposes. Then,
Tender drawings will be produced.
Later on, the M&E engineer will produce detail
drawings
Not only that, the mechanical & electrical
engineer has to approach several authorities to
get approval.
M&E engineer has to do testing work
every 2-3 days to ensure systems are built
according to requirements. This process
usually lasts for about one month. Testing
of lifts usually takes a longer time as
inspection from JKKP is needed in order to
get the APA number of the lifts.
ROLES AND RESPONSIBILITIES
IN A CONSTRUCTION PROJECT
Before Construction
During Construction
contractor. The M&E engineer has do
site inspection to make sure that the
contractors do according to plan.
To improve on their work, the M&E
engineer and team will have meeting
every period of time in order to check
progress and coordinate with other
building teams such as civil and structural
(C&S) engineers.
After Construction
This process is lead by the main
Upon completion of the project, the
3
M&E
ENGINEER
ARCHITECT
CIVIL AND
STRUCTURAL
(C&S)ENGINEER
CLIENTS
NOMINATED
SUBCONTRACTOR
M&E Engineer needs to deal with many people in a project such as
architect, civil and structural engineer, clients, nominated subcontractor and so on.
In every project, M&E engineer needs to design the mechanical and electrical
system of a building according to client’s needs and requirements. Besides, M&E
engineer needs to determine the spaces, whether it is sufficient for the mechanical
and electrical system based on the architect’s drawings, if there is insufficient
space, M&E engineer need to inform architect to make changes. Apart from that,
M&E engineer also needs to coordinate with C&S engineer to make sure structure
of the building suits the mechanical and electrical system. M&E engineer also needs
to inspect the progress of mechanical and electrical system and solve problems
faced by nominated contractor during mechanical and electrical system
construction.
M&E ENGINEER
IN THE CONSTRUCTION TEAM
4
SK
S
K
Y
P
O
d
INTRODUCTION TO
SKYPOD
Skypod is a fully integrated
mixed-development located in
the highly sought-after
township of Bandar Puchong
Jaya. This freehold
development comprises two
tower blocks with 26 storeys.
All units feature practical and
elegant designs to capitalize on
space, natural lighting and
environmentally friendly
elements. Located below the
residences is the convenience
of retail shops.
Client of this project is a
developer named IOI group.
The construction is leaded by
Jasmurni Construction
Sendirian Berhad follow by 8
nominated subcontractor.
This project started in May
2012 and was expected to
complete in January 2015 but it
was delayed due to insufficient
workers.
PROJECT
5
When the project first started, the mechanical and electrical
(M&E) engineer, Ir Kew Boon Pew had a discussion with the
client. The discussion includes the concepts, requirements and
thoughts of the client for the project. Later on, he conducted a
meeting with his draftsmen and the draftsmen produced tender
drawings. After tender, Ir Kew checked the shop drawings from
subcontractors showing conduit run, cable run and etc. At the
same time, Ir Kew received plans from the architects and checked
on it. After finalizing everything, he started to get approval from
local authorities by sending a formal letter (including calculation
of the amount of electricity needed for every unit in the building
and etc.) to respective authorities.
During the construction stage, Ir Kew was in charge of monitoring
the mechanical and electrical components of the building. This
includes the sewerage works, the electrical, telephone & extra-
low voltage (ELV) services, lift services, swimming pool & jacuzzi
system, sanitary plumbing services, fire protection services, air
conditioning & mechanical ventilation services and internal water
reticulation.
S
K
Y
P
O
D
Roles &
responsibilities
Ir. Kew boon pew
6
Sample of approval letter to
local authorities
Calculation of the amount
of electricity needed for
every unit in the building
s a m p l e
S
K
Y
P
O
D
7
Mechanical &
Electrical system
FIRE PROTECTION SYSTEM The fire protection system built in
Skypod includes the sprinkler system, standpipe system and the fire alarm
system. First, the sprinkler system provide early fire control, helping to
mitigate the hazards for occupants and firefighters alike. Next, the
standpipe system consist of a fixed piping system and hose valve
connections to preclude the need for long hose lays within tall buildings. It
is combined with the sprinkler systems as they both are fed by a single
water supply. Lastly, the fire alarm system consist of interconnected
devices and controls to alert building occupants to fire. Ir Kew had to
ensure the fire protection system to be installed and runs smoothly by
doing monitoring work during construction.
INTERNAL WATER RETICULATION The internal water
reticulation sector includes the design, operation and maintenance of
water distribution and wastewater collection system. It comprises all
the public pipe works in the building including the pumping systems,
access chambers and their construction and maintenance. During
construction, Ir Kew had to monitor the work of installation piping from
bulk meter to domestic water tank at all the shop front.
S
K
Y
P
O
D
8
SWIMMING POOL mechanic system built in Skypod
includes swimming pool pumps, filters and automatic salt water
chlorination system. The pumps act as the heart of the entire
sewers had sufficient capacity. The factors that should be
considered for the capacity are the peak hourly rates of flow and
the peak rates of flow from industrial plants. Besides that, Ir Kew
had to verify that the sanitary sewers are at a certain grade and
alignment to transport sewage from residential area to the point
of disposal.
Mechanical &
Electrical system
mechanical system. What is does
is that it circulates water through
the filter and heater. The filters
process the water in the pool as it
is pumped. As for the automatic
salt water chlorination system, it
purifies water effectively, ensuring
that the pool is free from harmful
bacteria.
SEWERAGE SYSTEM For
the sewerage system of Skypod,
Ir Kew had to make sure that the
sanitary sewers were designed
with suitable materials. He also
had to assure that the sanitary
S
K
Y
P
O
D
9
LIFT SYSTEM Skypod consist of 2 towers and have 10 lifts in
total, tower 1 consist of 2 lift lobby and each lobby comprises 3
lifts including a fire lift, tower 2 has only 1 lift lobby with 4 lifts
including a fire lift. Ir Kew has to ensure the lift systems function
well according to several factors such as personal spaces,
interpersonal distances, physical dimensions. He has to be
concern about circulation efficiency, for example the location and
arrangement of the lifts and the coordination with lobby,
stairway and corridor.
AIR CONDITIONING & MECHANICAL
VENTILATION Skypod is designed and constructed in such a
way that the form and fabric of the building minimizes the use of
mechanical ventilating or cooling systems for cooling purposes.
Besides, the ventilating and cooling systems installed by Ir Kew in
Skypod are energy efficient and are capable of being controlled to
achieve optimum energy efficient. These air-conditioning and
mechanical ventilation for cooling purposes lead to increased
energy use and higher carbon dioxide emissions. Therefore,
controls should be done to prevent the operation of simultaneous
heating and cooling within any area of the building.
Mechanical &
Electrical system
S
K
Y
P
O
D
10
The problems faced during the construction of
Skypod includes the fan ducting issue, TNB
inspection issue and the fire alarm panel issue.
Firstly, regarding the fan ducting issue, a few fan
ducts mounted at Skypod are not accurately 2.1m
from the ground. Hence, Ir Kew had to liaise with the
Civil & Structural engineer to ensure clear shaft of
2.1m and then reinstallation of fan ducts was
conducted. Next, another problem faced was TNB
inspection issue. Refer to TNB site inspection dated
02/05/14, Ir Kew had to monitor the installation
work of 2 layers 3 nos 150mm dia. HDPE pipe to be
extended beyond external drain apron as per TNB
requirement. Lastly, the initial use of zonal fire alarm
control panel had been replaced with one repeater
fire alarm panel at the guard house. This is because
when several floors or zones are monitored by one
fire alarm control panel, a repeater fire alarm panel
can replace the zonal fire alarm control panel on
each floor or in each zone for easy identification.
S
K
Y
P
O
D
Problems faced &
ITS Solution
11
WEE SUE WEN
TAN MIN CHUEN
Ir KEW BOON PEW
NG KWANG ZHOU
TAM ZHAO WEI
YEAP PHAY SHIAN
Through our interview session with Ir Kew Boon Pew, we have
gained more knowledge about the work scope of a M&E
engineer. We get to further understand the relationship
between a M&E engineer and our future profession (architect
or quantity surveyor). This has definitely give us advantages
when we step into the world of construction. Being a M&E
engineer is never a simple nor easy task. They hold great
responsibilities in the construction industry. We are truly
grateful that Mr. Kew is willing to share his experience and
stories with us. It is an awesome learning journey after all.
From Left:
12

More Related Content

What's hot

up dated ARUNA.SUBRA CURRICULUM vita up to 2016 feb - Copy
up dated ARUNA.SUBRA CURRICULUM vita up to 2016 feb - Copyup dated ARUNA.SUBRA CURRICULUM vita up to 2016 feb - Copy
up dated ARUNA.SUBRA CURRICULUM vita up to 2016 feb - CopyAruna Subbu
 
Nermin Smajic Resume 3.2016
Nermin Smajic  Resume  3.2016Nermin Smajic  Resume  3.2016
Nermin Smajic Resume 3.2016Nermin Smajic
 
ROBERT BROWN CV 2015
ROBERT BROWN CV 2015ROBERT BROWN CV 2015
ROBERT BROWN CV 2015Robert Brown
 
AHMED MAAMOUN CV 4-2016
AHMED MAAMOUN CV 4-2016AHMED MAAMOUN CV 4-2016
AHMED MAAMOUN CV 4-2016Ahmed Maamoun
 
ELECTRICAL ENGINEER CV M
ELECTRICAL ENGINEER CV MELECTRICAL ENGINEER CV M
ELECTRICAL ENGINEER CV Musama gamal
 
Anderson, Perry - PLA E & I Construction Manager CV 2015 - Copy
Anderson, Perry - PLA   E & I Construction Manager CV 2015 - CopyAnderson, Perry - PLA   E & I Construction Manager CV 2015 - Copy
Anderson, Perry - PLA E & I Construction Manager CV 2015 - CopyPerry Anderson
 
Davis Calonsag Resume 2003 Word 2
Davis Calonsag Resume 2003 Word 2Davis Calonsag Resume 2003 Word 2
Davis Calonsag Resume 2003 Word 2Davis Calonsag
 
Mechanical & electrical engineering
Mechanical & electrical engineeringMechanical & electrical engineering
Mechanical & electrical engineeringZheng Chee Cham
 
Raj kumar singh (MEP)
Raj kumar singh (MEP)Raj kumar singh (MEP)
Raj kumar singh (MEP)Raj Singh
 

What's hot (20)

Brijesh cv
Brijesh cvBrijesh cv
Brijesh cv
 
Muthuselvan Bio
Muthuselvan BioMuthuselvan Bio
Muthuselvan Bio
 
up dated ARUNA.SUBRA CURRICULUM vita up to 2016 feb - Copy
up dated ARUNA.SUBRA CURRICULUM vita up to 2016 feb - Copyup dated ARUNA.SUBRA CURRICULUM vita up to 2016 feb - Copy
up dated ARUNA.SUBRA CURRICULUM vita up to 2016 feb - Copy
 
Nermin Smajic Resume 3.2016
Nermin Smajic  Resume  3.2016Nermin Smajic  Resume  3.2016
Nermin Smajic Resume 3.2016
 
Bobby resume
Bobby resumeBobby resume
Bobby resume
 
ROBERT BROWN CV 2015
ROBERT BROWN CV 2015ROBERT BROWN CV 2015
ROBERT BROWN CV 2015
 
AHMED MAAMOUN CV 4-2016
AHMED MAAMOUN CV 4-2016AHMED MAAMOUN CV 4-2016
AHMED MAAMOUN CV 4-2016
 
ELECTRICAL ENGINEER CV M
ELECTRICAL ENGINEER CV MELECTRICAL ENGINEER CV M
ELECTRICAL ENGINEER CV M
 
Ahmed.Hassan_CV
Ahmed.Hassan_CVAhmed.Hassan_CV
Ahmed.Hassan_CV
 
Anderson, Perry - PLA E & I Construction Manager CV 2015 - Copy
Anderson, Perry - PLA   E & I Construction Manager CV 2015 - CopyAnderson, Perry - PLA   E & I Construction Manager CV 2015 - Copy
Anderson, Perry - PLA E & I Construction Manager CV 2015 - Copy
 
RFFlores resume
RFFlores resumeRFFlores resume
RFFlores resume
 
Rama Rao MW CV
Rama Rao  MW CVRama Rao  MW CV
Rama Rao MW CV
 
Engr Qamar R
Engr Qamar REngr Qamar R
Engr Qamar R
 
Davis Calonsag Resume 2003 Word 2
Davis Calonsag Resume 2003 Word 2Davis Calonsag Resume 2003 Word 2
Davis Calonsag Resume 2003 Word 2
 
CP_AMEZZ
CP_AMEZZCP_AMEZZ
CP_AMEZZ
 
Mechanical & electrical engineering
Mechanical & electrical engineeringMechanical & electrical engineering
Mechanical & electrical engineering
 
Raj kumar singh (MEP)
Raj kumar singh (MEP)Raj kumar singh (MEP)
Raj kumar singh (MEP)
 
Babar -1
Babar -1Babar -1
Babar -1
 
Company profile
Company profileCompany profile
Company profile
 
Resume
ResumeResume
Resume
 

Viewers also liked

Future job scope of mechanical engineering
Future job scope of mechanical engineeringFuture job scope of mechanical engineering
Future job scope of mechanical engineeringCGCLandran
 
ProTec Recent Projects Brochure
ProTec Recent Projects BrochureProTec Recent Projects Brochure
ProTec Recent Projects BrochureSteven MacDonald
 
Trifecta IA/ID P.SILS redesign
Trifecta IA/ID P.SILS redesignTrifecta IA/ID P.SILS redesign
Trifecta IA/ID P.SILS redesigngueste15eb3
 
To όραμα του Απόστολού Πέτρου, Σχολιασμοί
To όραμα του Απόστολού Πέτρου, ΣχολιασμοίTo όραμα του Απόστολού Πέτρου, Σχολιασμοί
To όραμα του Απόστολού Πέτρου, ΣχολιασμοίNikiforakg
 
Вакантные площади ТРЦ «Карнавал»
Вакантные площади ТРЦ «Карнавал»Вакантные площади ТРЦ «Карнавал»
Вакантные площади ТРЦ «Карнавал»eyesupreme
 
omiemartizon portfolio as stylist-PD
omiemartizon portfolio as stylist-PD omiemartizon portfolio as stylist-PD
omiemartizon portfolio as stylist-PD Omie Herrera Martizon
 
What is communication
What is communicationWhat is communication
What is communicationSamia Hassan
 
BS IEQ presentation-slides (1)
BS IEQ presentation-slides (1)BS IEQ presentation-slides (1)
BS IEQ presentation-slides (1)ashleyyeap
 
Future Job Scope of Mechanical engineering
Future Job Scope of Mechanical engineeringFuture Job Scope of Mechanical engineering
Future Job Scope of Mechanical engineeringCGCLandran
 

Viewers also liked (16)

Future job scope of mechanical engineering
Future job scope of mechanical engineeringFuture job scope of mechanical engineering
Future job scope of mechanical engineering
 
ProTec Recent Projects Brochure
ProTec Recent Projects BrochureProTec Recent Projects Brochure
ProTec Recent Projects Brochure
 
Blog
BlogBlog
Blog
 
Twitter
TwitterTwitter
Twitter
 
Software
SoftwareSoftware
Software
 
Trifecta IA/ID P.SILS redesign
Trifecta IA/ID P.SILS redesignTrifecta IA/ID P.SILS redesign
Trifecta IA/ID P.SILS redesign
 
To όραμα του Απόστολού Πέτρου, Σχολιασμοί
To όραμα του Απόστολού Πέτρου, ΣχολιασμοίTo όραμα του Απόστολού Πέτρου, Σχολιασμοί
To όραμα του Απόστολού Πέτρου, Σχολιασμοί
 
Вакантные площади ТРЦ «Карнавал»
Вакантные площади ТРЦ «Карнавал»Вакантные площади ТРЦ «Карнавал»
Вакантные площади ТРЦ «Карнавал»
 
omiemartizon portfolio as stylist-PD
omiemartizon portfolio as stylist-PD omiemartizon portfolio as stylist-PD
omiemartizon portfolio as stylist-PD
 
What is communication
What is communicationWhat is communication
What is communication
 
BS IEQ presentation-slides (1)
BS IEQ presentation-slides (1)BS IEQ presentation-slides (1)
BS IEQ presentation-slides (1)
 
Um culto bem preparado
Um culto bem preparadoUm culto bem preparado
Um culto bem preparado
 
Future Job Scope of Mechanical engineering
Future Job Scope of Mechanical engineeringFuture Job Scope of Mechanical engineering
Future Job Scope of Mechanical engineering
 
Enfermedades de origen hídrico
Enfermedades de origen hídricoEnfermedades de origen hídrico
Enfermedades de origen hídrico
 
Europass-CV-20141121-GonzalezMotos-EN
Europass-CV-20141121-GonzalezMotos-ENEuropass-CV-20141121-GonzalezMotos-EN
Europass-CV-20141121-GonzalezMotos-EN
 
Filtration (1)
Filtration (1)Filtration (1)
Filtration (1)
 

Similar to ICI Magazine (20)

compony profile 2015
compony profile 2015compony profile 2015
compony profile 2015
 
Sajesh CV
Sajesh CVSajesh CV
Sajesh CV
 
ASLAM CV PDF (02-April2015)
ASLAM CV PDF (02-April2015)ASLAM CV PDF (02-April2015)
ASLAM CV PDF (02-April2015)
 
Update profile 2015
Update profile 2015Update profile 2015
Update profile 2015
 
WHY CHOOSE US
WHY CHOOSE USWHY CHOOSE US
WHY CHOOSE US
 
Euggine atinda.cv.2018
Euggine atinda.cv.2018Euggine atinda.cv.2018
Euggine atinda.cv.2018
 
SgurrEnergy India - Leading Global Solar Engineering Consultant
SgurrEnergy India - Leading Global Solar Engineering ConsultantSgurrEnergy India - Leading Global Solar Engineering Consultant
SgurrEnergy India - Leading Global Solar Engineering Consultant
 
Kksc company profile
Kksc company profileKksc company profile
Kksc company profile
 
CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016
 
Oct. -2015-CV
Oct. -2015-CVOct. -2015-CV
Oct. -2015-CV
 
Syscon Grade A Level 1 ASP
Syscon Grade A Level 1 ASP Syscon Grade A Level 1 ASP
Syscon Grade A Level 1 ASP
 
CV-uploaded1
CV-uploaded1CV-uploaded1
CV-uploaded1
 
Profile, F E S Int.
Profile, F E S Int.Profile, F E S Int.
Profile, F E S Int.
 
shahul updated resume
shahul updated resumeshahul updated resume
shahul updated resume
 
The Ultimate Guide to MEP in Construction 2024
The Ultimate Guide to MEP in Construction 2024The Ultimate Guide to MEP in Construction 2024
The Ultimate Guide to MEP in Construction 2024
 
RESUME-Sijin
RESUME-SijinRESUME-Sijin
RESUME-Sijin
 
Engr Nuhu Solomon Updated CV v1
Engr Nuhu Solomon Updated CV v1Engr Nuhu Solomon Updated CV v1
Engr Nuhu Solomon Updated CV v1
 
Company profile
Company profileCompany profile
Company profile
 
Mepl presentation
Mepl presentationMepl presentation
Mepl presentation
 
Resume Sivakumar SKTJ
Resume Sivakumar SKTJResume Sivakumar SKTJ
Resume Sivakumar SKTJ
 

More from ashleyyeap

CSI JOURNAL cover page
CSI JOURNAL cover pageCSI JOURNAL cover page
CSI JOURNAL cover pageashleyyeap
 
Fm group assignment
Fm group assignment Fm group assignment
Fm group assignment ashleyyeap
 
Pp2 assignment-final
Pp2 assignment-finalPp2 assignment-final
Pp2 assignment-finalashleyyeap
 
PP2 final account assignment calculations
PP2 final account assignment calculationsPP2 final account assignment calculations
PP2 final account assignment calculationsashleyyeap
 
Fm august 2018 group assignment brief
Fm august 2018 group assignment briefFm august 2018 group assignment brief
Fm august 2018 group assignment briefashleyyeap
 
Building Economics Assignment Report
Building Economics Assignment ReportBuilding Economics Assignment Report
Building Economics Assignment Reportashleyyeap
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal ashleyyeap
 
PP2 Seminar Presentation
PP2 Seminar PresentationPP2 Seminar Presentation
PP2 Seminar Presentationashleyyeap
 
Pp2 final account assignment excel
Pp2 final account assignment excelPp2 final account assignment excel
Pp2 final account assignment excelashleyyeap
 
Pp2 assignment-final
Pp2 assignment-finalPp2 assignment-final
Pp2 assignment-finalashleyyeap
 
Pp2 coursework 2 201808
Pp2 coursework 2   201808Pp2 coursework 2   201808
Pp2 coursework 2 201808ashleyyeap
 
Measurement Assignment
Measurement AssignmentMeasurement Assignment
Measurement Assignmentashleyyeap
 
Professional Practice 1 Tutorial 3
Professional Practice 1 Tutorial 3Professional Practice 1 Tutorial 3
Professional Practice 1 Tutorial 3ashleyyeap
 
Professional Practice 1 Tutorial 7
Professional Practice 1 Tutorial 7Professional Practice 1 Tutorial 7
Professional Practice 1 Tutorial 7ashleyyeap
 
Professional Practice I Assignment Slides
Professional Practice I Assignment SlidesProfessional Practice I Assignment Slides
Professional Practice I Assignment Slidesashleyyeap
 
Professional Practice I Assignment
Professional Practice I AssignmentProfessional Practice I Assignment
Professional Practice I Assignmentashleyyeap
 
Estimating Assignment
Estimating Assignment Estimating Assignment
Estimating Assignment ashleyyeap
 
Software Assignment
Software AssignmentSoftware Assignment
Software Assignmentashleyyeap
 
Management Science Assignment
Management Science Assignment Management Science Assignment
Management Science Assignment ashleyyeap
 

More from ashleyyeap (20)

CSI JOURNAL cover page
CSI JOURNAL cover pageCSI JOURNAL cover page
CSI JOURNAL cover page
 
CSI JOURNAL
CSI JOURNALCSI JOURNAL
CSI JOURNAL
 
Fm group assignment
Fm group assignment Fm group assignment
Fm group assignment
 
Pp2 assignment-final
Pp2 assignment-finalPp2 assignment-final
Pp2 assignment-final
 
PP2 final account assignment calculations
PP2 final account assignment calculationsPP2 final account assignment calculations
PP2 final account assignment calculations
 
Fm august 2018 group assignment brief
Fm august 2018 group assignment briefFm august 2018 group assignment brief
Fm august 2018 group assignment brief
 
Building Economics Assignment Report
Building Economics Assignment ReportBuilding Economics Assignment Report
Building Economics Assignment Report
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal
 
PP2 Seminar Presentation
PP2 Seminar PresentationPP2 Seminar Presentation
PP2 Seminar Presentation
 
Pp2 final account assignment excel
Pp2 final account assignment excelPp2 final account assignment excel
Pp2 final account assignment excel
 
Pp2 assignment-final
Pp2 assignment-finalPp2 assignment-final
Pp2 assignment-final
 
Pp2 coursework 2 201808
Pp2 coursework 2   201808Pp2 coursework 2   201808
Pp2 coursework 2 201808
 
Measurement Assignment
Measurement AssignmentMeasurement Assignment
Measurement Assignment
 
Professional Practice 1 Tutorial 3
Professional Practice 1 Tutorial 3Professional Practice 1 Tutorial 3
Professional Practice 1 Tutorial 3
 
Professional Practice 1 Tutorial 7
Professional Practice 1 Tutorial 7Professional Practice 1 Tutorial 7
Professional Practice 1 Tutorial 7
 
Professional Practice I Assignment Slides
Professional Practice I Assignment SlidesProfessional Practice I Assignment Slides
Professional Practice I Assignment Slides
 
Professional Practice I Assignment
Professional Practice I AssignmentProfessional Practice I Assignment
Professional Practice I Assignment
 
Estimating Assignment
Estimating Assignment Estimating Assignment
Estimating Assignment
 
Software Assignment
Software AssignmentSoftware Assignment
Software Assignment
 
Management Science Assignment
Management Science Assignment Management Science Assignment
Management Science Assignment
 

Recently uploaded

Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 

Recently uploaded (20)

Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 

ICI Magazine

  • 1. c & E E R SKYPOD RESIDENCE BOON PEW & ASSOCIATES M & E ENGINEER WORK SCOPE MECHANICAL AND ELECTRICAL SYSTEM
  • 2. CONTENT INTRODUCTION PERSONAL & COMPANY PROFILE M&E ENGINEER PROJECT 2 1 5 3 ROLES & RESPONSIBILITIES OF A M&E ENGINEER IN A CONSTRUSTION RELATION BETWEEN OTHER PROFESSIONS SKYPOD RESIDENCE ROLES & RESPONSIBLILITIES OF OUR INTERVIEWEE IN THIS PROJECT PROBLEMS FACED AND SOLUTION
  • 3. INTRODUCTION What comes to mind when you think of mechanical and electrical engineering? Think you know what this profession is all about? Ever wondered what it takes to be a M&E engineer? In this month’s issue, we have conducted an exclusive interview with a M&E engineer, Ir Kew Boon Pew. Through our interview session, we have learned and found out so much more about the world of mechanical and electrical engineering. There are a lot more that lies within a M&E engineer. Get the inside scoop of their job description, responsibility and challenges all in this magazine. 1
  • 4. PERSONAL COMPANY PROFILE Ir Kew Boon Pew, aged 49 in 2015, was born in the year of 1966 in Malaysia. He finished his primary and secondary studies locally and headed to University of New South Wales, Sydney, Australia for tertiary studies in the year of 1982. He took up Mechanical & Electrical (M&E) Engineering course there. He graduated after six years of studies and returned to Malaysia in the year of 1989. Since then, he started working as a M&E engineer in Sepakat Setia Perunding, which is presently a leading multi-disciplinary engineering consultancy firm in Malaysia. He worked there with a basic salary of RM1800.00 per month. After a period of time working under the company, Mr. Kew had gained enough working experience and thus he sat for the Board of Engineer Malaysia (BEM) Exams. In the year of 1993, he had successfully received the title “Ir” from BEM at the age of 27. Four years later, he opened his own company namely “Kew & Associates”, which is a M&E engineer firm at Bandar Puteri, Puchong. Up until now, he has handled over 20 massive projects and is still striving for the better in the future. 1997. Kew & Associates has a total of 10 employees including 5 draftsmen and 5 graduate M&E engineers. His company has involved in many small and massive projects such as low rise and high rise apartments, condominiums, factories and etc. KEW & ASSOCIATES JURUTERA PERUNDING | M & E | CONSULTING ENGINEERS No.26-2, Jalan Puteri ½, Bandar Puteri, 47100 Puchong, Selangor Darul Ehsan. Kew & Associates was established by Ir Kew Boon Pew himself in STUDIED AT UNSW WORKED IN MALAYSIA AFTER GRADUATE ENTITLED AS A PROFESSSIONAL ENGINEER ESTABLISHED KEW&ASSOCIATES S AGE 27 years old16 years old 22 years old 31 years old “Ir” 2
  • 5. Before any project begins, discussion must be done with the clients. The concepts, requirements and thoughts regarding the construction will be discussed. The M&E engineer will design and implement systems that are practical and most energy efficient. He will also create many systems based on the different requirements and purposes. Then, Tender drawings will be produced. Later on, the M&E engineer will produce detail drawings Not only that, the mechanical & electrical engineer has to approach several authorities to get approval. M&E engineer has to do testing work every 2-3 days to ensure systems are built according to requirements. This process usually lasts for about one month. Testing of lifts usually takes a longer time as inspection from JKKP is needed in order to get the APA number of the lifts. ROLES AND RESPONSIBILITIES IN A CONSTRUCTION PROJECT Before Construction During Construction contractor. The M&E engineer has do site inspection to make sure that the contractors do according to plan. To improve on their work, the M&E engineer and team will have meeting every period of time in order to check progress and coordinate with other building teams such as civil and structural (C&S) engineers. After Construction This process is lead by the main Upon completion of the project, the 3
  • 6. M&E ENGINEER ARCHITECT CIVIL AND STRUCTURAL (C&S)ENGINEER CLIENTS NOMINATED SUBCONTRACTOR M&E Engineer needs to deal with many people in a project such as architect, civil and structural engineer, clients, nominated subcontractor and so on. In every project, M&E engineer needs to design the mechanical and electrical system of a building according to client’s needs and requirements. Besides, M&E engineer needs to determine the spaces, whether it is sufficient for the mechanical and electrical system based on the architect’s drawings, if there is insufficient space, M&E engineer need to inform architect to make changes. Apart from that, M&E engineer also needs to coordinate with C&S engineer to make sure structure of the building suits the mechanical and electrical system. M&E engineer also needs to inspect the progress of mechanical and electrical system and solve problems faced by nominated contractor during mechanical and electrical system construction. M&E ENGINEER IN THE CONSTRUCTION TEAM 4
  • 7. SK S K Y P O d INTRODUCTION TO SKYPOD Skypod is a fully integrated mixed-development located in the highly sought-after township of Bandar Puchong Jaya. This freehold development comprises two tower blocks with 26 storeys. All units feature practical and elegant designs to capitalize on space, natural lighting and environmentally friendly elements. Located below the residences is the convenience of retail shops. Client of this project is a developer named IOI group. The construction is leaded by Jasmurni Construction Sendirian Berhad follow by 8 nominated subcontractor. This project started in May 2012 and was expected to complete in January 2015 but it was delayed due to insufficient workers. PROJECT 5
  • 8. When the project first started, the mechanical and electrical (M&E) engineer, Ir Kew Boon Pew had a discussion with the client. The discussion includes the concepts, requirements and thoughts of the client for the project. Later on, he conducted a meeting with his draftsmen and the draftsmen produced tender drawings. After tender, Ir Kew checked the shop drawings from subcontractors showing conduit run, cable run and etc. At the same time, Ir Kew received plans from the architects and checked on it. After finalizing everything, he started to get approval from local authorities by sending a formal letter (including calculation of the amount of electricity needed for every unit in the building and etc.) to respective authorities. During the construction stage, Ir Kew was in charge of monitoring the mechanical and electrical components of the building. This includes the sewerage works, the electrical, telephone & extra- low voltage (ELV) services, lift services, swimming pool & jacuzzi system, sanitary plumbing services, fire protection services, air conditioning & mechanical ventilation services and internal water reticulation. S K Y P O D Roles & responsibilities Ir. Kew boon pew 6
  • 9. Sample of approval letter to local authorities Calculation of the amount of electricity needed for every unit in the building s a m p l e S K Y P O D 7
  • 10. Mechanical & Electrical system FIRE PROTECTION SYSTEM The fire protection system built in Skypod includes the sprinkler system, standpipe system and the fire alarm system. First, the sprinkler system provide early fire control, helping to mitigate the hazards for occupants and firefighters alike. Next, the standpipe system consist of a fixed piping system and hose valve connections to preclude the need for long hose lays within tall buildings. It is combined with the sprinkler systems as they both are fed by a single water supply. Lastly, the fire alarm system consist of interconnected devices and controls to alert building occupants to fire. Ir Kew had to ensure the fire protection system to be installed and runs smoothly by doing monitoring work during construction. INTERNAL WATER RETICULATION The internal water reticulation sector includes the design, operation and maintenance of water distribution and wastewater collection system. It comprises all the public pipe works in the building including the pumping systems, access chambers and their construction and maintenance. During construction, Ir Kew had to monitor the work of installation piping from bulk meter to domestic water tank at all the shop front. S K Y P O D 8
  • 11. SWIMMING POOL mechanic system built in Skypod includes swimming pool pumps, filters and automatic salt water chlorination system. The pumps act as the heart of the entire sewers had sufficient capacity. The factors that should be considered for the capacity are the peak hourly rates of flow and the peak rates of flow from industrial plants. Besides that, Ir Kew had to verify that the sanitary sewers are at a certain grade and alignment to transport sewage from residential area to the point of disposal. Mechanical & Electrical system mechanical system. What is does is that it circulates water through the filter and heater. The filters process the water in the pool as it is pumped. As for the automatic salt water chlorination system, it purifies water effectively, ensuring that the pool is free from harmful bacteria. SEWERAGE SYSTEM For the sewerage system of Skypod, Ir Kew had to make sure that the sanitary sewers were designed with suitable materials. He also had to assure that the sanitary S K Y P O D 9
  • 12. LIFT SYSTEM Skypod consist of 2 towers and have 10 lifts in total, tower 1 consist of 2 lift lobby and each lobby comprises 3 lifts including a fire lift, tower 2 has only 1 lift lobby with 4 lifts including a fire lift. Ir Kew has to ensure the lift systems function well according to several factors such as personal spaces, interpersonal distances, physical dimensions. He has to be concern about circulation efficiency, for example the location and arrangement of the lifts and the coordination with lobby, stairway and corridor. AIR CONDITIONING & MECHANICAL VENTILATION Skypod is designed and constructed in such a way that the form and fabric of the building minimizes the use of mechanical ventilating or cooling systems for cooling purposes. Besides, the ventilating and cooling systems installed by Ir Kew in Skypod are energy efficient and are capable of being controlled to achieve optimum energy efficient. These air-conditioning and mechanical ventilation for cooling purposes lead to increased energy use and higher carbon dioxide emissions. Therefore, controls should be done to prevent the operation of simultaneous heating and cooling within any area of the building. Mechanical & Electrical system S K Y P O D 10
  • 13. The problems faced during the construction of Skypod includes the fan ducting issue, TNB inspection issue and the fire alarm panel issue. Firstly, regarding the fan ducting issue, a few fan ducts mounted at Skypod are not accurately 2.1m from the ground. Hence, Ir Kew had to liaise with the Civil & Structural engineer to ensure clear shaft of 2.1m and then reinstallation of fan ducts was conducted. Next, another problem faced was TNB inspection issue. Refer to TNB site inspection dated 02/05/14, Ir Kew had to monitor the installation work of 2 layers 3 nos 150mm dia. HDPE pipe to be extended beyond external drain apron as per TNB requirement. Lastly, the initial use of zonal fire alarm control panel had been replaced with one repeater fire alarm panel at the guard house. This is because when several floors or zones are monitored by one fire alarm control panel, a repeater fire alarm panel can replace the zonal fire alarm control panel on each floor or in each zone for easy identification. S K Y P O D Problems faced & ITS Solution 11
  • 14. WEE SUE WEN TAN MIN CHUEN Ir KEW BOON PEW NG KWANG ZHOU TAM ZHAO WEI YEAP PHAY SHIAN Through our interview session with Ir Kew Boon Pew, we have gained more knowledge about the work scope of a M&E engineer. We get to further understand the relationship between a M&E engineer and our future profession (architect or quantity surveyor). This has definitely give us advantages when we step into the world of construction. Being a M&E engineer is never a simple nor easy task. They hold great responsibilities in the construction industry. We are truly grateful that Mr. Kew is willing to share his experience and stories with us. It is an awesome learning journey after all. From Left: 12