CURRICULUM-VITAE
Sharib Reza
H.No. : 7 A Tyagi Vihar Nangloi,
New Delhi-110041
Mob : +91-9650283141 (Mumbai)
E mail Id: sharib1986@rediffmail.com
E mail Id: sharibreza1986@gmail.com
PROFILE: - Electrical QC Inspector / Electrical Engineer :- Installation, Testing and
Commissioning of Air Insulated Substations, Gas Insulated Substations. Town
Development (Building & Housing) Electrical Project & Kaust Research Park
Infrastructure Electrical Project.
CAREER OBJECTIVE
●I look forward to a career, which would help me hone my creative, and problem solving skills and
to work in a competitive and challenging environment part of motivated to be a Team.
TECHNICAL QUALIFICATIONS
EDUCATIONAL BOARD/UNIVERSITY SCHOOL/COLLEG YEAR AGG.
3YEAR DIPLOMA
ELECTRICAL
ENGINEERING
BOARD OF TECHNICAL
EDUCATION DELHI
C.R.R.I.T
NEW DELHI JUNE-2007 62.89 %
HSSC (XII)
A M U ALIGARH SENIOR SECONDARY
SCHOOL ALIGARH JUNE- 2004 70.75 %
HC( X) BIHAR BOARD
NATIONAL HIGH
SCHOOL
KISHANGANJ
JUNE- 2001 58.91 %
Approved QC Certificate & Special Training Certificates
● Saudi Armco Approved Electrical QC Inspector.
● 6 Week Training in Electrical Engineering field from Northern Railway Shed Shakurbasti
New Delhi, July-2006.
● 1 Month Electrical Quality Training in old Delhi railway Substation in SSC/ACC/DLI, Delhi
June 2008.
09.6-Years, Experience & Specialization.
●Electrical(QA/QC) Engineering having 9.6 years of Experience in Project Management, Quality
Assurance/ Quality Control, Installation and testing /commission of electrical system of various
EPC projects. Extensive work experience in various fields like Erection, Testing and
Commissioning of AIS substation and GIS substation in 11kv, 33kv, 66kv, 132kv, 220kv.Thuwal
Town Development (Building & Housing) Electrical Project & Kaust Research Park Infrastructure
Electrical Project . Familiar with International standards and codes like (NEC, IEC, IEEE, BS,
ANSI, NEMA, ISA, NFPA-70), fully familiar with Saudi Aramco Standard & Alstom Standard.
Summary of Responsibilities & Duties for Electrical Construction Project
Technical:-
• Review of drawings, material submittal, and method of statement.
• Review of project documents in accordance with approved matrix.
• Follow and maintain Company standards of Quality in accordance with Company Quality
System requirements.
• Checking/ Planning / Implementing/ Controlling / Handling Info / Instructions / Interpersonal
Relationship/Orally informing /Investigating.
• Monitoring and scheduling of manpower and material consumption to avoid wastages.
• Preparation of ITP, checklist, Testing and commissioning forms and procedures.
• Monitoring status of measuring and Test Equipment used at site.
• Routine area surveillance of Electrical/instrumentation Installation activities.
• To ensure performance of the work in strict accordance with the drawings and specification.
• Ensure that Quality Management System implemented as per ISO9001: 2008,
Applicable codes, standard and project specifications.
• Review of vendor’s Material submittal, Factory Acceptance Test reports for acceptance.
• Inspection of site project work (Above ground//Below ground) as per NEMA STD,
NEC code and approved project quality plan.
• Adhere to safe working methods & report to the resident engineer for any accidents on site.
• Co-ordinate and co-operate with Engineer & site Foreman for all the Installation activities.
• Erection, Testing and Commissioning of 11KV, 33KV, 132KV, 220KV AIS Substation.
• Erection, Testing and Commissioning of 220KV &66KV Gas Insulated Substation.
• Erection, Testing and Commissioning of Power Transformer &Distribution Transformers.
• Installation, Testing and Commissioning of LT panels, HT panels and Control panels.
• LT cable, MV cable & HT cable Laying (both in Trenches and Cable Tray).
• Process the joint measurement forms and maintain the records of their status.
• Providing technical inputs for methodologies of construction.
• Preparation of punch list for electrical system, fire alarm system works.
• Familiar with International standards and codes like (NEC, IEC, IEEE, BS, ANSI, NEMA,
ISA, NEMA 250, NEMA VE-1, NEMA VE-2, NFPA-70).
Management:-
• Managing various Erection works, giving quality and safety as prime importance.
• Management of sub-contractors at site.
• Material Management, Scheduling of all activities.
• Resource mobilization and resource sharing among various teams at site.
• Quality work and timely completion/ Quality assurance and documentation.
• Review meetings & team management/Prepare and maintain Inspection records.
• Prepare & Maintain the all inspection records of QA/QC documents.
• Contractors billings certification & quantity survey.
• Client Handling and Contractor Management.
Client Relationships:-
• Dealings with Client for various issues coming at site, Billing and Invoicing.
• Attending customer complaints, compliance to customer requirement.
• Invoicing Settlements, Billing Settlements and Client Handling for Quality works.
• Coordinating with Saudi Aramco PMT, and coordinating with client inspection representative.
• Coordination and ensuring presence of clients representatives PMT, PID and Proponent for
Electrical system & fire alarm system for pre-commissioning stage.
Safety Responsibilities:-
• Should know the Hazardous area in applicable of Construction/Safety as prime importance.
• Facility Maintenance projects and the necessary precautions to be taken.
• Take reasonable care of own health and safety and that of others in the workplace.
1) Company Profile:-
M/s AL-OBAYAN CONTRACTING EST. Khobar, Saudi Arabia.
Al-Obayan is one of the leading contracting company around the Saudi Arabia. Al-Obayan
Contracting Company is fully Saudi owned. Providing services for all phases of a project, and
specialize in residential, commercial buildings, office buildings, hospitals, schools and
Infrastructure.
Designation : Electrical QC Inspector
Company : AL-Obayan Contracting Est.
Project/Site : HAW_GOSP-2(Switchyard)
Client/Developer : Saudi Aramco.
Duration : 23 October -2016 To 12 December-2016 (2 months)
Responsibility and Duties at projects site:-
• Surveillance of ongoing site activities & guiding electrical team at site as per approved
project specification, IFC drawings, ITP & check list.
• To ensure performance of the work in strict accordance with the drawings and specification.
• To inspect and record the construction works carried out by contractor on site and resolve
the site generated quarries by co-ordinating with the Engineer.
• Co-ordination with construction team for execution of electrical system. In accordance with
project specification and as per approved IFC layouts.
• Coordinating with Saudi Aramco PMT, other discipline QC Supervisors, Inspectors and
Construction Engineers to make sure that activity carried out as per sequence and approved
plan to avoid reworks, delay or rejection at job site.
• Inspection for the Electrical & Instrumentation Duct Bank installation, Cable trenches prior
to cable pulling and after cable pulling to release for the next activities. Also inspection of
cable tray installation on the main pipe rack, including substation & main control building.
Inspection for the instrumentation and paging system cables pulling / installation
underground and above ground cable installation and Fiber Optic Cable installation.
• Maintain a detailed diary of the day’s work activities, issues, work approved or rejected,
hours of operation, labour and equipment used etc, and sign at the end of each day.
• Responsible for preparation of RFI with reference to approved ITP & check list which made
in accordance NEC & other international standard.
• Responsible to raise RFI to client representative for final acceptance, once satisfied during
internal inspection at site.
• Supporting hand to internal quality personnel for preparation of RFI with reference to ITP
& check list.
2) Company Profile:-
M/s AL-MUHAIDIB CONTRACTING CO. LTD. Jeddah, Kingdom of Saudi Arabia.
This is one of the leading contracting company around the Saudi Arabia and abroad. Al-Muhaidib
Contracting Company was established in 1398 (H), 1977 (G) and is fully Saudi owned. Providing
services for all phases of a project, and specialize in Oil & Gas and Infrastructure, which, alongside
General Construction, constitute of company core business.
Since its inception, Al-Muhaidib Contracting Company has been engaged in the
construction of residential and commercial buildings, office buildings, hospitals, schools, sewer
lines, water lines, wastewater treatment plants, water purification and desalination plants. As I
joined this company as follows.
Designation : Electrical QC Inspector
Company : AL-Muhaidib Contracting Co. Ltd.
Project/Site (I) : "Thuwal Town Development Electrical Project, Phase-1
Substation Works, MDP panel, Power Panel, Lighting Panel
Building Lighting, Lightning System, Grounding system,
Medical Clinic all Electrical works, Grand Mosque all Electrical
Works, all seven school Electrical works at Thuwal Jeddah,Saudi
Arabia
(II) : Kaust Research Park Infrastructure Project Zone-01,02&03.
Construction of Satellite substation-04, Satellite substation-05
Alternate Exchange Building, all RMU for zone-01,02,03. at
King Abdullah University of Technology, Thuwal, Kaust, Jeddah,
Saudi Arabia.
Client/Developer : Saudi Aramco Company.
Duration : 10 July -2013 To 12 September-2015( 2.5 years)
Responsibility and Duties at projects site:-
• Supervision, monitoring and inspection of total construction activities carried out by
contractor on site on behalf of employer in accordance with specification, approved
drawings and method statements.
• Inspection for the installation of all kinds of field mounted instruments and electrical
equipments, MCC panels, switch gears, power/control panels, lighting panels, annunciation
panels, transformer protection panels and interposing panels, RMU, Package substation.
• Responsible for the installation of (J.B’s) Junction Boxes, Local Control panels, Primary
and Secondary cable tray, PVC/RGS/PVC coated RGS conduit installation, instrument
impulse piping / tubing installation, conduits sealing and fiber damming as per standard and
procedure.
• Inspection for the installation of Grounding grid cable, Grounding Electrodes, Ground
wells, Ground Bus bar in the field and Building connection to the equipment as per the
international standard NEC and approved Project drawing & specification.
• Inspection for the Electrical & Instrumentation Duct Bank installation, Cable trenches prior
to cable pulling and after cable pulling to release for the next activities. Also inspection of
cable tray installation on the main pipe rack, including substation & main control building.
Inspection for the instrumentation and paging system cables pulling / installation
underground and above ground cable installation and Fiber Optic Cable installation.
• To ensure performance of the work in strict accordance with the drawings and specification.
• To inspect and record the construction works carried out by contractor on site and resolve
the site generated quarries by co-ordinating with the Engineer.
• Co-ordination with construction team for execution of electrical system. In accordance with
project specification and as per approved IFC layouts.
• Be fair and firm in dealings with the contractor. Consider the alternatives and consequences
carefully before making decisions.
• Write inspection reports, Worksheets, (NCR) Non-compliance Reports and makes Log book
entry on the inspection finding and maintain inspection records.
• Coordinate with the laboratory technician and arrange for sampling and testing of
satisfactorily completed work and quality assurance testing of suspect materials.
• Maintain a detailed diary of the day’s work activities, issues, work approved or rejected,
hours of operation, labour and equipment used etc, and sign at the end of each day.
• Responsible for preparation of RFI with reference to approved ITP & check list which made
in accordance NEC & other international standard.
• Responsible to raise RFI to client representative for final acceptance, once satisfied during
internal inspection at site.
• Supporting hand to internal quality personnel for preparation of RFI with reference to ITP
& check list.
• Check temperature, compaction, joints and surface of asphalt.
• Check all form works, reinforcement etc before concrete pouring.
• Surveillance of ongoing site activities & guiding electrical team at site as per approved
project specification, IFC drawings, ITP & check list.
• Coordination with construction team, internal QC & pre commissioning coordinator for the
closure of punch list items & EIL items as per approved drawing, project specifications, ITP
& check list.
• Responsible for the implementation of ISO 9001, QMS requirement, Project Quality Plan
and Schedule “Q” Quality Management System of Saudi Aramco which include Material,
installation, testing and pre-commissioning of electrical system.
• Preparation of Inspection & Test Plan (ITP) and associated Check List based on
International Standard, Code, Saudi Aramco Project and Engineering Practices.
• Inspection of ongoing installation and site surveillance on daily basis & Supervision and
Inspection of all construction activities carried out by contractor on site.
• Coordinating with Saudi Aramco PMT, other discipline QC Supervisors, Inspectors and
Construction Engineers to make sure that activity carried out as per sequence and approved
plan to avoid reworks, delay or rejection at job site.
• Responsible to make sure that Documentation and Records are maintained as per Schedule
“Q” requirement of Saudi Aramco and as per ISO 9001: 2008 QMS requirement.
• Surveillance of ongoing activities at site on daily basis to make sure that all the activities
performed at site based on approved specification, latest drawing, ITP, Method statement,
and work executed as per approved project Quality plan.
• Inspection of electrical installations at site like Grounding/cad welding, Duct Bank ,
RGS/EMT conduits, Raceway, Cable Ladder, Cable pulling for HV/LV cables, HV/LV
cable jointing and termination, Power transformer, HV/LV switchgear, Lighting
System/Lighting pole.
• Generate client Requests for Inspection (RFI) where required proving sufficient notice for
Hold, Witness and Inspection points. After the receiving RFI from sub contractor.
• Issue of internal log book entry / NCR to construction team for not executing work as per
IFC drawings, Project spec and quality requirement.
• Preparation of weekly schedule for inspection and coordinating with client inspection
representative.
• Review of Supplier/Manufacturer Technical submittals and coordinating with
supplier/manufacturer representative for compliance requirement (FAT reports) based on
Project specification.
• Responsible for preparation of punch list in line with ITP requirements and to close the
same.
• Monitoring and maintaining the QA/QC records and reports as per ISO 9001:2008 QMS
requirement.
• Preparation of Final as built drawing for scheme changes as per Client requirement, single
line diagram, cable schedules, cable route lay out drawings Equipment laid out drawings.
• Preparation of Quality Plan, Work Procedure for all Electrical activities including but not
limited to (a) Procedure for Storage, Handling and Preservation.( b) Procedure for Material
receiving.( c) Procedure for Electrical installation at job site as per Saudi Aramco Schedule
Q requirement.
• Responsible for response to client Inspector logbook entries and pass to construction team
to rectify the same as per requirement.
• Responsible joint inspection with Saudi Aramco Inspection Department at job site.
• Attending the weekly meeting with Saudi Aramco to resolve all the non conformity exist at
site and to discuss all the issue related to Quality requirement at job site.
• Responsible to check the calibration certificate validity of measurement equipment like
earth tester, insulation resistance tester etc. prior to take into use.
• Responsible to assist to quality supervise & quality managers for preparing the ITP & check
list as per site requirement in accordance with standard.
• Coordination with construction team, PID & proponent for the closure of punch list items &
EIL items as per approved drawing, project specifications, ITP & check list.
• Coordination and ensuring presence of clients representatives for fire alarm control system
& electrical system pre-commissioning stage.
• To inspect and record the construction works carried out by contractor on site and resolve
the site generated quarries by co-ordinating with the Resident Engineer.
• Coordinate with the laboratory technician and arrange for sampling and testing of
satisfactorily completed work and quality assurance testing of suspect materials.
• Maintain a detailed diary of the day’s work activities, issues, work approved or rejected,
hours of operation, labour and equipment used etc, and sign at the end of each day.
• Drafting site instructions for any required variations from, or additions to, the contract
documents.
• Report questionable methods of operations by the contractor to the Engineer.
• Maintaining records of site resources, daily progress of work, inspections, construction and
workshop drawings, method statements and ITPs (Inspector Testing Plans). Making special
notes and document the contract activities that may lead to claims.
• Supervision and Inspection of `additional works’ and `out of scope works’ carried out by
contractor.
• Responsible for the preparation of Punch list for the activities carried out by the
construction group.
3) Company Profile:
M/s ALSTOM T&D INDIA LIMITED. Noida, India.
Alstom, is one of leading Electrical contracting company and it providing the most advanced
electrical grid solutions to meet world electricity demand with an increased demand for energy
worldwide. Alstom Grid’s dedicated teams combine their skills to deliver customer-valued
solutions to build smarter, more stable, more efficient and environmentally friendly electricity grids
worldwide.
And this company working in this field in Iinda, since 07 years. The Alstom Company has
been Engaged in the construction sector – Power, Transport, Substations, Grid, Switchgears for air-
insulated substations (AIS) or gas-insulated substations (GIS), Instrument transformers, circuit
breakers, disconnectors, power transformers, and substation automation solutions. Alstom Grid
offers services to optimize the Power grid including, Energy Management Systems (EMS),
Distribution Management Systems (DMS), Market Management Systems (MMS). As I joined this
company as follows.
Designation : Electrical QC Engineer
Company : M/s Alstom T&D India Ltd
Projects/Site:- (I) 66/11KV GIS substation, Adani South Port Mundra Gujarat.
(II) 220/66/33KV AIS substation, Getco Lunawada Gujarat.
Client/Developer : Adani Port Gujrat / Getco Gujarat
Duration : 01-07- 2011 TO 30-06-2013 (2.1 Years)
Reason for leaving : Abroad opportunity.
Responsibility and Duties at projects site:-
• To monitor the construction process to ensure all quality requirements by performing all
the in-process stage inspection activities during the fabrication, installation, final testing of
the product/ process are met in accordance to the Organization procedures, contract
requirements and relevant international Codes/ Standards of practice.
• Follow and maintain Company standards of Quality in accordance with Company Quality
System requirements.
• To check, inspect and test incoming raw materials/ instruments to ensure that they meet
project contract specification/ contract requirements.
• To perform the in-process inspection as per QC procedures and Inspection and Test plan
(ITP).
• Erection, testing & commissioning substation electrical equipments such as CT, PT, CB,
ISO, LA and CRP panels Inspection.
• 66KV GIS substation such as Line bay, Transformer bay, Bus Coupler bay &VT bay
Installation Inspection.
• Routine area surveillance of instrumentation/electrical erection activities.
• Inspection & Witnessing according to Project specification and QCP & ITP.
• Erection testing and commissioning of Power & Distribution Transformers Inspection.
• Erection testing and commissioning of LT & HT panels, Control panels Inspection.
• Monitoring the work activities of Sub-contractors and ensuring that work has done as per
the IFC drawing and standard.
• Review and comment on quality control program developed by construction, contractors
( like electrical/Instrument Calibration Procedure, Loop folder prior to preparation, High
and Medium voltage cable splicing, Hi-Pot testing, Cable Pulling, Pressure test Procedure)
for approval.
• Perform material receiving inspection for all Electrical and Instrumentation materials
(including skids) delivered to the site.
• Perform depth design review to verify conformance to company engineering standards and
specification on project in the construction stage.
• Write inspection reports, Worksheets, (NCR) Non-compliance Reports and makes Log book
entry on the inspection finding and maintain inspection records.
• Performance other miscellaneous related duties as directed by the QA/QC Manager.
• Maintain the all inspection records of QA/QC documents.
• Responsible for the implementation, monitoring and documentation of the quality plane to
ensure its effectiveness. Also turnover of quality documents & records to client such record
Construction Inspection Record Book, Project Completion System, including all test
reports and related all documents.
• Inspection for the installation of all kinds of field mounted instruments and electrical
equipments, MCC panels, switch gears, power/control panels, lighting panels, annunciation
panels, transformer protection panels and interposing panels.
• Also familiar with latest Calibration & Calibration Certificates, all test and measuring
instruments/electrical are in operational & calibrated condition, which will be utilized.
• Also responsible for checking , verifying and reviewing the construction drawings covering
specification, IFC, P& ID, other attachments prior to installation.
• Responsible for the installation of (J.B’s) Junction Boxes, Local Control panels, Primary
and Secondary cable tray, A/G & U/G conduit installation, instrument impulse piping /
tubing installation, conduits sealing and fiber damming as per standard and procedure.
• Responsible for the preparation of Punch list for the activities carried out by the
construction group.
• Plan, scheduled, co-ordinate and provide work direction to contractor inspectors.
• Inviting to Client for Witness Inspection/ Test as per the Approved ITP.
• Inspection for the Electrical & Instrumentation Duct Bank installation, Cable trenches prior
to cable pulling and after cable pulling to release for the next activities. Also inspection of
cable tray installation on the main pipe rack, including substation & main control building.
Inspection for the instrumentation and paging system cables pulling / installation
underground and above ground cable installation.
• Inspection for the installation of Grounding grid cable, Grounding Electrodes, Ground
wells, Ground Bus bar in the field and Building connection to the equipment as per the
international standard NEC and approved Project drawing & specification.
• Also Coordinates with Clients PID (Project Inspection Department) for Project Inspection
and stage wise activities for witness or Hold Points.
• Preparing and reviewing QCP, ITP and Inspection check list for procurement and
construction according to Project quality plan (PQP).
• To coordinate with Client/ Consultant for the verification of process inspection for varies
QC activities and signing off all QC documents.
• To follow and ensure the proper filling system (in accordance to the Organization
procedure) with full traceability for retrieving the document.
• To perform the quality control activities while installation and pre commissioning of High,
Medium & Low voltage switch gears, protective relays and Motor Control Centers.
• To undertake verification of Cable Laying (both in Trenches and Cable Tray).
• To undertake functional Tests of all electrical equipment including MCC, Transformers,
Relay Panels, CT, PTs and UPS.
• To undertake inspection during installation and pre commissioning of Cathodic Protection
• To read Electrical drawings, Termination drawing and Cable Schedules.
• To undertake installation and Pre commissioning inspection of Power and Distribution
transformers, High, Medium & Low voltage panel boards.
• To undertake inspection of cable Trays and Cable laying installation for various types of
instrument cables like core, pair, triad Shield and unshielded cables.
• To ensure the quality of the filed instruments, cables, junction box, tubing and piping in
accordance to client contract specifications
• To perform the inspection & calibration of field instruments and preparation of calibration
certificates as per the client specifications/standards.
• To undertake installation and pre commissioning inspection activities for the filed
instruments and panels inside Control Room (like DCS, ESD, PLC, SCADA, UPS,
Marshalling Panel, Interposing Panel and F&G system). Functional tests of panels.
• Inspect and test electrical parts, assembled accessories prior to installation in plant for
conformance to specifications, based from established Company Inspection and Test Plan
and quality standards.
• Inspect wire harnesses, control panels, electrical jig boards, to assure the completeness of
assembly and quality as per international standards and codes and conformance to blue
prints production, illustration, engineering drawings and specifications.
• Inspect and monitor the installation of cable, cable tray distribution control panel per
approved drawings and ITP.
• Verify construction drawings, specifications and installation procedures of electrical
equipments based from NEC, NEMA and NFPA.
• Witness cable termination for medium and low voltage power to switch gear, MCC,
MV/LV electrical motors.
• Verify, check and inspect the installed or laid out RGS conduits and to ensure that the
materials are all protected against corrosion and maintain its normal condition.
• Test certify, install, repair and inspect installations and participate develop complex
instrument that measures and records changes in industrial environment per approved
testing and work procedures.
• Considerable contribution for construction testing, pre-commissioning, commissioning and
start of activities to achieve safe & successful goal without a lost time injury through whole
the project.
• Familiar with the international industry codes and standard related to intrinsically safe
system and electrical system for instrumentation such as, ANSI, IEEE 518, IEEE 1100, IEC
60529, NEMA 250, NEMA VE-1, NEMA VE-2, NFPA-70/NEC and UL 94.
• Coordinate with the Clients for the final acceptance of the plant hand over.
• 100MVA/50MVA, 25MVA, 5MVA Transformer Installation Inspection.
• Electrical equipment such as CT, PT, SF6 CB, ISO, LA & CRP panels Installation
Inspection.
4) Company Profile:
M/s AREVA T&D INDIA LIMITED. Noida, India.
The Areva is now become a Alstom, Areva is one of leading Electrical contracting company and it
providing the most advanced electrical infrastructure, solutions to meet world electricity demand
with an increased demand for energy worldwide. Areva transmission & distribution dedicated
teams combine their skills to deliver customer-valued solutions to build smarter, more stable, more
efficient and environmentally friendly electricity worldwide.
And this company working in this field since 125 years. The Areva Company has been
Engaged in the construction of GIS & AIS substations. As I joined this company as follows.
Designation : Electrical Site Engineer
Company : M/s Areva T&D India Ltd
Projects/Site:-
(I) : 220/33/11 KV GIS Substation, AIIMS (DTL), New Delhi.
(II) : 132/11KV AIS Substation, Bhalai Steel Plant, Chhattisgarh.
Client/Developer : Indian Government. (DTL/BSP)
Duration : 10-05-2008 to 28-06- 2011. (3 Years)
Reason for the Post leaving : QC post opportunity, Department Transfer (Construction to QC)
Responsibility and Duties at projects site:-
• After receiving of work order planning & scheduling of work for Execution.
• Reviewing and preparation of shop drawings complete with Electrical Design,
Coordination drawings, material submittals and Approvals.
• Monitoring and scheduling of manpower and material consumption to avoid wastages.
• To ensure performance of the work in strict accordance with the drawings and specification.
• Erection testing and commissioning of AIS Substation 11KV,66KV,132KV& 220KV.
• Erection testing and commissioning of GIS Substation 66KV.
• Erection testing and commissioning of GIS Substation 220KV.
• Erection testing and commissioning of power & distribution transformers, LT & HT panels,
control panels.
• Ensuring of HT & LT power and control cable laying, testing & commissioning as per IFC.
• Erection and Testing of LT and HT Panels.
• Erection, testing & commissioning substation electrical equipments such as CT, PT, CB,
ISO, LA. CRP panels.
• Erection testing and commissioning of earthlings system for power plant.
• Ensuring the work of HT & LT panel, control panel as per approved control scheme.
• Complete the project according to drawing and client requirement.
• Responsible for planning & tracking of site work.
• Implementation of health and safety measures as per approved HSE.
• Billing and Invoicing and measurement.
• Reconciliation of material & man power after project executed.
• Attend the inspection of electrical system installation RFI raised by contractors.
• Witness for testing & commissioning of electrical system as per approved ITP & associated
Check List based on International Standard,
• Daily site surveillance for ongoing activities at site as per standard requirements.
• Review & approve vendor submitted drawings, material submittal, and method statement.
• Review status of measuring and Test Equipment prior to use at site.
• Review of vendor’s sub contractor’s material submittal, Factory Acceptance Test reports for
acceptance conforming to project specifications, IE rule & other applicable international
standards.
• Rectification closing of punch list issued by client representative as per project standards.
• Inspection of electrical installations & coordinating with client representative for inspection.
• Carry out of testing & commissioning of electrical system as per client approved ITP &
associated Check List based on International Standard, Codes.
• Inspection & daily monitoring & site surveillance on daily basis to avoid major NCR from
authority & approval agency.
• Review status of measuring and Test Equipment prior to use at site.
• Submitting of factory test reports to client for their acceptance.
• Monitoring and scheduling of manpower and material consumption to avoid wastages.
• Plan work in co-ordination with civil construction programme.
• Preparation of running and final bills as per work completed at projects and submission to
clients.
• To Plan, Erection and commissioning of wiring, HT and LT works like transformer,
panels DG sets etc
• Preparation of quantity variation sheet and get it certified from clients & consultants. With
respect to tender documents.
• Inspection of electrical installations & coordinating with client representative for inspection.
• Ensure work in accordance with GFC drawings and specification approved project quality
plan and ITP’s.
• Project detail study of all related drawings, specifications, BOQ's, estimates etc provided by
the architects/consultants; submit tender.
• Visit factory inspection for major equipments like transformer, HT & LT panels, DG sets,
cables and pumps etc. prior to dispatch at site.
• Generate client Requests for Inspection (RFI) where required proving sufficient notice for
Hold, Witness and Inspection points. After the receiving RFI from sub contractor.
• Issued punch list to sub contractors for works not carried as per project standards. And same
has been getting it corrected from them prior to raise RFI to clients.
• Record and document (QC ) any and all deviations from the Project quality program and
Company Integrated Management system(IMS)
• Provide support and advice to the construction personnel for execution of Grounding,
Lightning arrester, Panels installation, etc. in relation to the Project Quality Program and
ITP’s but not limit to applicable standards.
• Witness and verify Continuity, Merger, HI-POT and Component testing for Medium
Voltage & Low Voltage equipment.
• Co-ordination of Electrical system, HVAC system, Fire fighting system, plumbing system
for execution of project in accordance approved Electrical /Mechanical /Plumbing GFC
drawings in Architectural projects.
• Manage the MEP Contractors daily construction activities, schedule and progress.
• Suggestion to Prepare the as build drawing for all Vendors.
• Guidance to co-worker for installation, commissioning on load final Testing.
• 22/11 KV HT panels, all parts installation inspection.
• 66KV GIS substation installation Inspection.
• 220KV GIS substation installation Inspection.
• 132KV AIS all equipment (Transformer,CT,PT,Isolator,LA,SF6 circuit breaker) installation
Inspection.
• 2MVA DG sets with Synchronizing panels.
• 3000KVA /2000KVA/1500KVA DG sets.
• 5MVA / 22/11 KV power transformers -10 Nos.
• 50MVA/66/11KV Power Transformer-4 Nos.
• 100MVA/66/33/11KV Power Transformer-3 Nos.
• 100MVA/220/66/33KV Power Transformer-2 Nos.
• 2 MVA distribution transformers -7 nos.
• 22 KV HT panels/11KV Grid Panel/11KV HT panel.
• 2000KVA 11 KV DG sets with Synchronizing Panels -10Nos.
• 132 KW fire main pumps,-2 Nos.
• Battery bank installation/battery charger/DC distribution panel system.
• ACDB Panel Installation Inspection.
4) Company Profile:-
M/s TRISHUL CORPORATE SERVICES PVT.LTD. Chennai, India.
This company provides manpower for Site Project Services & Operation Maintenance
Services, Engineering Services. Mechanical & Electrical Maintenance Service. The TCSPL
having maintenance, management and consultancy projects of various leading firm. Provide
service for Indian reputed companies such as Larsen And Toubro Limited (Coimbatore),
Nuclear Power Plant (Koodankulam), Areva Limited (Delhi), Chettinad Cements and Zuari
Cements. I joined this company as O& M engineer for ensuring of smooth functioning of
system consisting LT &HT panels, HT DG set, LT DG set, VCB, ACB, 11 KV substations etc.
Designation : Operation & Maintenance Engineer
Company : M/s Trishul Corporate Services Pvt Ltd
Projects/Site : 66/11kv Air Insulated Substation Delhi Airport
Main MRSS Substation.
Client/Developer : Areva T&D India Ltd/ GMR Airport New Delhi
Duration : 01-06-2007 to 05-05- 2008. (1 Year)
Responsibility and Duties at site:-
• Review of approve vendor submitted drawings, material submittal.
• Planning, work allocation and work execution.
• Study the project IFC drawings & project specification prior to start Maintenance works.
• Preparation of work schedule, weekly schedule and monthly schedule for preventive
maintenance.
• Studying and analyzing the Engineering drawings and explaining to Subordinates.
• Maintenance management practices, Spares following, Sap order creations and inventory
schemes.
• Analysis of Breakdowns and implementing corrective actions and improving MTBF and
MTTR hours.
• Evaluation of Electrical maintenance and reduction in maintenance cost.
• Preparing essential spare parts list for critical machines and maintaining spares.
• Participation in new equipments installation & servicing along with vendors.
• Knowledge of attending preventive maintenance, Breakdown maintenance and other
activities.
• Responsible for the Electrical Utility maintenance.
• Prepare preventive maintenance schedule & implement. Brief summary of Experience
• Ensuring cleaning of all electrical equipments.
• Involved in testing, Pre commissioning and Start up Activities.
• Proper arrangement & control of material for execution at appropriate time.
• Execute the job on the basis of quality and safety involved in it.
• Directed and coordinated the Maintenance of electrical equipment – Provided expert
technical support to field engineers, technicians and customer staff
• Monitoring Site Activities in Accordance with the Project Specifications, Industry
Standards and Guidelines.
• Preparation of as-build drawing due to deviation in projects scope.
• Preparation of SLD ,GA and schematic drawing of MCC, PCC,
• Assembling of various types of switchgears
• Preparation of bill of material with the help of GA, SLD & schematic drawing.
• In PCC assembling of circuit breakers from range 630A -3200A of company L&T, GE.
Switch disconnected units from range 32A-630A. moulded case circuit breakers from range
32A-800A.MCCB’s ,
• In MCC assembling of circuit breakers ,Wiring of DOL starter
• Inspection and Testing of panel’s modular.
• After inquiry received form client send quotations of electrical works.
• Once work awarded form client, plan to mobilize the material and manpower.
• Receive maintenance work request through SAP and conduct site visit for manpower
resources /estimation/tools & spare parts availability.
• Prepare job plan for major activity and conduct meetings with respective departments
• Ensure the history record for equipment is updated for ESD/STR
• Daily condition monitoring and physical inspection of electrical equipment as per schedule.
• Meetings with reliability and planning department in case of ESD/STA to manage
manpower man-hours and required tools/testing equipment and other appliances.
• Manage the documentation after completion of work.
• Daily preventive maintenance activities as per SAP system.
• To check and review control circuit diagram as per final revision & troubleshoot of accrued
problem in Substation as well as in Control Room.
• Planning of Emergency Shutdown Activities.
• Get manage the condition monitoring of emergency diesel generators.
• Check physically and vissioually the temperature/oil level/selicagel color/bucherz relay of
TRANSFORMERS as per maintenance planning procedure.
• Inspection of new arrival of electrical equipments in warehouse with manufactured catalog.
• To get check nominated MOTORS body temp/bearing sound/greasing nipples/cooling
fans/covers of driving and non driving ends as per SAP procedure.
• All activities report send to head of department through SAP after work completion.
COMPUTER AND TECHNICAL SKILLS
● Languages Known : MS Office( MS-Word, Excel, Power Point Etc ), C, C++, Proficient in
MS Windows Operating System.
● Area of Interest : Utilization of Electric Power, Electrical Power Systems, Electrical
Machine.
STRENGHTS
● I am consistent, hard-working and dynamic person. I believe myself to be highly self motivated and
That keeps me always on my toes. I am also very passionate about my field and the possibilities of it.
I am a good team member and always keep everybody focused on the task.
PERSONAL DETAILS
Father’s name :- Ziaur Rahman
Mother’s name :- Mehnaaz Begum
Date of birth : - 10-03-1986
Sex :- Male
Marital status :- Married.
Nationality :- Indian.
Languages :- English, Urdu, Hindi
Permanent Address :- Vill: Khatatoli Post: Dhanpatganj
Via: Sontha, P.S : Routha
Dist : Purnia
State: Bihar
Pin : 855115
Passport Detail :- Passport no. J6698780
Country . India
Date of Birth. 10/03/1986
Date of issue. 15/04/2011
Date of Expiry. 14/04/2021
File no. DLHA05710910
Driving License :- Valid Indian Driving license.
Place: New Delhi Sharib Reza
Date:

More Related Content

What's hot

2.annexure mep projects executed
2.annexure mep projects executed2.annexure mep projects executed
2.annexure mep projects executedArun Das
 
2.annexure mep
2.annexure mep2.annexure mep
2.annexure mepArun Das
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume Arun Das
 
Banesh Pai _ MEP Engineer
Banesh Pai _ MEP EngineerBanesh Pai _ MEP Engineer
Banesh Pai _ MEP EngineerBaneshwar Pai
 
Mech_Eng. CV updated
Mech_Eng. CV updatedMech_Eng. CV updated
Mech_Eng. CV updatedMOHAMED ILYAS
 
MEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMERMEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMERHabeeb Omer
 
Resume mep latest
Resume mep latestResume mep latest
Resume mep latestArun Das
 
Saeed Fadl CV
Saeed Fadl CVSaeed Fadl CV
Saeed Fadl CVsaeed981
 
Edwin b 1.baldelovar resume
Edwin b 1.baldelovar resumeEdwin b 1.baldelovar resume
Edwin b 1.baldelovar resumeEdwin Baldelovar
 
SYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEERSYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEERjaved hazari
 
Andrew_Wellbelove's_CV_July_2016_ doc_a1
Andrew_Wellbelove's_CV_July_2016_ doc_a1Andrew_Wellbelove's_CV_July_2016_ doc_a1
Andrew_Wellbelove's_CV_July_2016_ doc_a1andrew wellbelove
 

What's hot (18)

2.annexure mep projects executed
2.annexure mep projects executed2.annexure mep projects executed
2.annexure mep projects executed
 
2.annexure mep
2.annexure mep2.annexure mep
2.annexure mep
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume
 
Banesh Pai _ MEP Engineer
Banesh Pai _ MEP EngineerBanesh Pai _ MEP Engineer
Banesh Pai _ MEP Engineer
 
Irfan - Elec Engr
Irfan - Elec EngrIrfan - Elec Engr
Irfan - Elec Engr
 
Mech_Eng. CV updated
Mech_Eng. CV updatedMech_Eng. CV updated
Mech_Eng. CV updated
 
ckreddycv (1)
ckreddycv (1)ckreddycv (1)
ckreddycv (1)
 
Tauseef_CV PP_Rev2
Tauseef_CV PP_Rev2Tauseef_CV PP_Rev2
Tauseef_CV PP_Rev2
 
MEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMERMEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMER
 
Resume mep latest
Resume mep latestResume mep latest
Resume mep latest
 
Saeed Fadl CV
Saeed Fadl CVSaeed Fadl CV
Saeed Fadl CV
 
E&I inspector cv
E&I inspector cvE&I inspector cv
E&I inspector cv
 
Jayabalan cv
Jayabalan  cvJayabalan  cv
Jayabalan cv
 
Edwin b 1.baldelovar resume
Edwin b 1.baldelovar resumeEdwin b 1.baldelovar resume
Edwin b 1.baldelovar resume
 
Tabrez
TabrezTabrez
Tabrez
 
SYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEERSYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEER
 
Andrew_Wellbelove's_CV_July_2016_ doc_a1
Andrew_Wellbelove's_CV_July_2016_ doc_a1Andrew_Wellbelove's_CV_July_2016_ doc_a1
Andrew_Wellbelove's_CV_July_2016_ doc_a1
 
MATHAVAN LATEST CV ON AUG 2015
MATHAVAN LATEST CV ON AUG 2015MATHAVAN LATEST CV ON AUG 2015
MATHAVAN LATEST CV ON AUG 2015
 

Viewers also liked

Tanya Galvanizers a noted name in the hot dip galvanizing
Tanya Galvanizers a noted name in the hot dip galvanizingTanya Galvanizers a noted name in the hot dip galvanizing
Tanya Galvanizers a noted name in the hot dip galvanizingTanya/Prashant Galvanizers
 
G. R. Engineers Company Profile
G. R. Engineers Company ProfileG. R. Engineers Company Profile
G. R. Engineers Company ProfileMaxpromotion
 
Beisit electric - cable gland
Beisit electric - cable glandBeisit electric - cable gland
Beisit electric - cable glandJacky Ding
 
CGC COMPANY PROFILE
CGC COMPANY PROFILECGC COMPANY PROFILE
CGC COMPANY PROFILEadonissidh
 
Tqm in telecom
Tqm in telecomTqm in telecom
Tqm in telecomJinto Cv
 
IEEE 848 Standard Procedure For The Determination Of Tthe Ampacity Derating o...
IEEE 848 Standard Procedure For The Determination Of Tthe Ampacity Derating o...IEEE 848 Standard Procedure For The Determination Of Tthe Ampacity Derating o...
IEEE 848 Standard Procedure For The Determination Of Tthe Ampacity Derating o...Thorne & Derrick International
 
Delta Telecom O&m presentation
Delta Telecom O&m presentationDelta Telecom O&m presentation
Delta Telecom O&m presentationengramjadislam78
 
Improving efficiency in a water distribution system
Improving efficiency in a water distribution systemImproving efficiency in a water distribution system
Improving efficiency in a water distribution systemBrian Gongol
 
O&M Doc for Telecom Sites
O&M Doc  for Telecom Sites       O&M Doc  for Telecom Sites
O&M Doc for Telecom Sites Muhmmad Javed
 
Prepare electrical supplies 2
Prepare electrical supplies 2Prepare electrical supplies 2
Prepare electrical supplies 2tessil23
 
Proconsultores Telecommunication Presentation
Proconsultores Telecommunication PresentationProconsultores Telecommunication Presentation
Proconsultores Telecommunication Presentationguest080219
 
Electrical Assurance Presentation 2010
Electrical Assurance Presentation 2010Electrical Assurance Presentation 2010
Electrical Assurance Presentation 2010mseaborn
 
Electrical Power Distribution System (ArnabNandi_WBSEDCL)
Electrical Power Distribution System (ArnabNandi_WBSEDCL)Electrical Power Distribution System (ArnabNandi_WBSEDCL)
Electrical Power Distribution System (ArnabNandi_WBSEDCL)Arnab Nandi
 
Why you should conduct electrical preventive maintenance
Why you should conduct electrical preventive maintenanceWhy you should conduct electrical preventive maintenance
Why you should conduct electrical preventive maintenanceHeather Jarmusz
 
Power cables
Power cablesPower cables
Power cablescollege
 

Viewers also liked (20)

Electricproducts
ElectricproductsElectricproducts
Electricproducts
 
Evaluación final
Evaluación finalEvaluación final
Evaluación final
 
Tanya Galvanizers a noted name in the hot dip galvanizing
Tanya Galvanizers a noted name in the hot dip galvanizingTanya Galvanizers a noted name in the hot dip galvanizing
Tanya Galvanizers a noted name in the hot dip galvanizing
 
Unity Overview
Unity OverviewUnity Overview
Unity Overview
 
G. R. Engineers Company Profile
G. R. Engineers Company ProfileG. R. Engineers Company Profile
G. R. Engineers Company Profile
 
Beisit electric - cable gland
Beisit electric - cable glandBeisit electric - cable gland
Beisit electric - cable gland
 
CGC COMPANY PROFILE
CGC COMPANY PROFILECGC COMPANY PROFILE
CGC COMPANY PROFILE
 
Tqm in telecom
Tqm in telecomTqm in telecom
Tqm in telecom
 
IEEE 848 Standard Procedure For The Determination Of Tthe Ampacity Derating o...
IEEE 848 Standard Procedure For The Determination Of Tthe Ampacity Derating o...IEEE 848 Standard Procedure For The Determination Of Tthe Ampacity Derating o...
IEEE 848 Standard Procedure For The Determination Of Tthe Ampacity Derating o...
 
Delta Telecom O&m presentation
Delta Telecom O&m presentationDelta Telecom O&m presentation
Delta Telecom O&m presentation
 
Improving efficiency in a water distribution system
Improving efficiency in a water distribution systemImproving efficiency in a water distribution system
Improving efficiency in a water distribution system
 
O&M Doc for Telecom Sites
O&M Doc  for Telecom Sites       O&M Doc  for Telecom Sites
O&M Doc for Telecom Sites
 
Prepare electrical supplies 2
Prepare electrical supplies 2Prepare electrical supplies 2
Prepare electrical supplies 2
 
Proconsultores Telecommunication Presentation
Proconsultores Telecommunication PresentationProconsultores Telecommunication Presentation
Proconsultores Telecommunication Presentation
 
Electrical Assurance Presentation 2010
Electrical Assurance Presentation 2010Electrical Assurance Presentation 2010
Electrical Assurance Presentation 2010
 
Electrical Power Distribution System (ArnabNandi_WBSEDCL)
Electrical Power Distribution System (ArnabNandi_WBSEDCL)Electrical Power Distribution System (ArnabNandi_WBSEDCL)
Electrical Power Distribution System (ArnabNandi_WBSEDCL)
 
Why you should conduct electrical preventive maintenance
Why you should conduct electrical preventive maintenanceWhy you should conduct electrical preventive maintenance
Why you should conduct electrical preventive maintenance
 
Choosing Electrical Panels
Choosing Electrical PanelsChoosing Electrical Panels
Choosing Electrical Panels
 
Eat 105 Chapter 3
Eat 105  Chapter 3Eat 105  Chapter 3
Eat 105 Chapter 3
 
Power cables
Power cablesPower cables
Power cables
 

Similar to 1. Sharib Reza(CV)

Similar to 1. Sharib Reza(CV) (20)

RESUME-Sijin
RESUME-SijinRESUME-Sijin
RESUME-Sijin
 
mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineer
 
CV-Ulysses Bustillo
CV-Ulysses BustilloCV-Ulysses Bustillo
CV-Ulysses Bustillo
 
JAI RESUME
JAI RESUMEJAI RESUME
JAI RESUME
 
Tabrez
TabrezTabrez
Tabrez
 
CV of Tahir Mahmood
CV of Tahir MahmoodCV of Tahir Mahmood
CV of Tahir Mahmood
 
saif.resume dxb
saif.resume dxbsaif.resume dxb
saif.resume dxb
 
Samuel resume cv
Samuel resume cvSamuel resume cv
Samuel resume cv
 
Hussein Ahmad Salem-CV
Hussein Ahmad Salem-CVHussein Ahmad Salem-CV
Hussein Ahmad Salem-CV
 
Anish's CV
Anish's CV Anish's CV
Anish's CV
 
Saeed Fadl CV
Saeed Fadl CVSaeed Fadl CV
Saeed Fadl CV
 
Khalid -cv_electrical_engineer (1)
Khalid  -cv_electrical_engineer (1)Khalid  -cv_electrical_engineer (1)
Khalid -cv_electrical_engineer (1)
 
SHAMSHAD QAQC RESUME
SHAMSHAD QAQC RESUMESHAMSHAD QAQC RESUME
SHAMSHAD QAQC RESUME
 
Electrical QA QC Engineer
Electrical QA QC EngineerElectrical QA QC Engineer
Electrical QA QC Engineer
 
2.annexure mep
2.annexure mep2.annexure mep
2.annexure mep
 
Fady samir cv
Fady samir cvFady samir cv
Fady samir cv
 
asif cv aijade new 2014 December
asif cv aijade new 2014 Decemberasif cv aijade new 2014 December
asif cv aijade new 2014 December
 
CV
CVCV
CV
 
Derar CM
Derar CMDerar CM
Derar CM
 
YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG
 

1. Sharib Reza(CV)

  • 1. CURRICULUM-VITAE Sharib Reza H.No. : 7 A Tyagi Vihar Nangloi, New Delhi-110041 Mob : +91-9650283141 (Mumbai) E mail Id: sharib1986@rediffmail.com E mail Id: sharibreza1986@gmail.com PROFILE: - Electrical QC Inspector / Electrical Engineer :- Installation, Testing and Commissioning of Air Insulated Substations, Gas Insulated Substations. Town Development (Building & Housing) Electrical Project & Kaust Research Park Infrastructure Electrical Project. CAREER OBJECTIVE ●I look forward to a career, which would help me hone my creative, and problem solving skills and to work in a competitive and challenging environment part of motivated to be a Team. TECHNICAL QUALIFICATIONS EDUCATIONAL BOARD/UNIVERSITY SCHOOL/COLLEG YEAR AGG. 3YEAR DIPLOMA ELECTRICAL ENGINEERING BOARD OF TECHNICAL EDUCATION DELHI C.R.R.I.T NEW DELHI JUNE-2007 62.89 % HSSC (XII) A M U ALIGARH SENIOR SECONDARY SCHOOL ALIGARH JUNE- 2004 70.75 % HC( X) BIHAR BOARD NATIONAL HIGH SCHOOL KISHANGANJ JUNE- 2001 58.91 % Approved QC Certificate & Special Training Certificates ● Saudi Armco Approved Electrical QC Inspector. ● 6 Week Training in Electrical Engineering field from Northern Railway Shed Shakurbasti New Delhi, July-2006. ● 1 Month Electrical Quality Training in old Delhi railway Substation in SSC/ACC/DLI, Delhi June 2008. 09.6-Years, Experience & Specialization. ●Electrical(QA/QC) Engineering having 9.6 years of Experience in Project Management, Quality Assurance/ Quality Control, Installation and testing /commission of electrical system of various EPC projects. Extensive work experience in various fields like Erection, Testing and Commissioning of AIS substation and GIS substation in 11kv, 33kv, 66kv, 132kv, 220kv.Thuwal Town Development (Building & Housing) Electrical Project & Kaust Research Park Infrastructure Electrical Project . Familiar with International standards and codes like (NEC, IEC, IEEE, BS, ANSI, NEMA, ISA, NFPA-70), fully familiar with Saudi Aramco Standard & Alstom Standard.
  • 2. Summary of Responsibilities & Duties for Electrical Construction Project Technical:- • Review of drawings, material submittal, and method of statement. • Review of project documents in accordance with approved matrix. • Follow and maintain Company standards of Quality in accordance with Company Quality System requirements. • Checking/ Planning / Implementing/ Controlling / Handling Info / Instructions / Interpersonal Relationship/Orally informing /Investigating. • Monitoring and scheduling of manpower and material consumption to avoid wastages. • Preparation of ITP, checklist, Testing and commissioning forms and procedures. • Monitoring status of measuring and Test Equipment used at site. • Routine area surveillance of Electrical/instrumentation Installation activities. • To ensure performance of the work in strict accordance with the drawings and specification. • Ensure that Quality Management System implemented as per ISO9001: 2008, Applicable codes, standard and project specifications. • Review of vendor’s Material submittal, Factory Acceptance Test reports for acceptance. • Inspection of site project work (Above ground//Below ground) as per NEMA STD, NEC code and approved project quality plan. • Adhere to safe working methods & report to the resident engineer for any accidents on site. • Co-ordinate and co-operate with Engineer & site Foreman for all the Installation activities. • Erection, Testing and Commissioning of 11KV, 33KV, 132KV, 220KV AIS Substation. • Erection, Testing and Commissioning of 220KV &66KV Gas Insulated Substation. • Erection, Testing and Commissioning of Power Transformer &Distribution Transformers. • Installation, Testing and Commissioning of LT panels, HT panels and Control panels. • LT cable, MV cable & HT cable Laying (both in Trenches and Cable Tray). • Process the joint measurement forms and maintain the records of their status. • Providing technical inputs for methodologies of construction. • Preparation of punch list for electrical system, fire alarm system works. • Familiar with International standards and codes like (NEC, IEC, IEEE, BS, ANSI, NEMA, ISA, NEMA 250, NEMA VE-1, NEMA VE-2, NFPA-70). Management:- • Managing various Erection works, giving quality and safety as prime importance. • Management of sub-contractors at site. • Material Management, Scheduling of all activities. • Resource mobilization and resource sharing among various teams at site. • Quality work and timely completion/ Quality assurance and documentation. • Review meetings & team management/Prepare and maintain Inspection records. • Prepare & Maintain the all inspection records of QA/QC documents. • Contractors billings certification & quantity survey. • Client Handling and Contractor Management. Client Relationships:- • Dealings with Client for various issues coming at site, Billing and Invoicing. • Attending customer complaints, compliance to customer requirement. • Invoicing Settlements, Billing Settlements and Client Handling for Quality works. • Coordinating with Saudi Aramco PMT, and coordinating with client inspection representative. • Coordination and ensuring presence of clients representatives PMT, PID and Proponent for Electrical system & fire alarm system for pre-commissioning stage. Safety Responsibilities:-
  • 3. • Should know the Hazardous area in applicable of Construction/Safety as prime importance. • Facility Maintenance projects and the necessary precautions to be taken. • Take reasonable care of own health and safety and that of others in the workplace. 1) Company Profile:- M/s AL-OBAYAN CONTRACTING EST. Khobar, Saudi Arabia. Al-Obayan is one of the leading contracting company around the Saudi Arabia. Al-Obayan Contracting Company is fully Saudi owned. Providing services for all phases of a project, and specialize in residential, commercial buildings, office buildings, hospitals, schools and Infrastructure. Designation : Electrical QC Inspector Company : AL-Obayan Contracting Est. Project/Site : HAW_GOSP-2(Switchyard) Client/Developer : Saudi Aramco. Duration : 23 October -2016 To 12 December-2016 (2 months) Responsibility and Duties at projects site:- • Surveillance of ongoing site activities & guiding electrical team at site as per approved project specification, IFC drawings, ITP & check list. • To ensure performance of the work in strict accordance with the drawings and specification. • To inspect and record the construction works carried out by contractor on site and resolve the site generated quarries by co-ordinating with the Engineer. • Co-ordination with construction team for execution of electrical system. In accordance with project specification and as per approved IFC layouts. • Coordinating with Saudi Aramco PMT, other discipline QC Supervisors, Inspectors and Construction Engineers to make sure that activity carried out as per sequence and approved plan to avoid reworks, delay or rejection at job site. • Inspection for the Electrical & Instrumentation Duct Bank installation, Cable trenches prior to cable pulling and after cable pulling to release for the next activities. Also inspection of cable tray installation on the main pipe rack, including substation & main control building. Inspection for the instrumentation and paging system cables pulling / installation underground and above ground cable installation and Fiber Optic Cable installation. • Maintain a detailed diary of the day’s work activities, issues, work approved or rejected, hours of operation, labour and equipment used etc, and sign at the end of each day. • Responsible for preparation of RFI with reference to approved ITP & check list which made in accordance NEC & other international standard. • Responsible to raise RFI to client representative for final acceptance, once satisfied during internal inspection at site. • Supporting hand to internal quality personnel for preparation of RFI with reference to ITP & check list.
  • 4. 2) Company Profile:- M/s AL-MUHAIDIB CONTRACTING CO. LTD. Jeddah, Kingdom of Saudi Arabia. This is one of the leading contracting company around the Saudi Arabia and abroad. Al-Muhaidib Contracting Company was established in 1398 (H), 1977 (G) and is fully Saudi owned. Providing services for all phases of a project, and specialize in Oil & Gas and Infrastructure, which, alongside General Construction, constitute of company core business. Since its inception, Al-Muhaidib Contracting Company has been engaged in the construction of residential and commercial buildings, office buildings, hospitals, schools, sewer lines, water lines, wastewater treatment plants, water purification and desalination plants. As I joined this company as follows. Designation : Electrical QC Inspector Company : AL-Muhaidib Contracting Co. Ltd. Project/Site (I) : "Thuwal Town Development Electrical Project, Phase-1 Substation Works, MDP panel, Power Panel, Lighting Panel Building Lighting, Lightning System, Grounding system, Medical Clinic all Electrical works, Grand Mosque all Electrical Works, all seven school Electrical works at Thuwal Jeddah,Saudi Arabia (II) : Kaust Research Park Infrastructure Project Zone-01,02&03. Construction of Satellite substation-04, Satellite substation-05 Alternate Exchange Building, all RMU for zone-01,02,03. at King Abdullah University of Technology, Thuwal, Kaust, Jeddah, Saudi Arabia. Client/Developer : Saudi Aramco Company. Duration : 10 July -2013 To 12 September-2015( 2.5 years) Responsibility and Duties at projects site:- • Supervision, monitoring and inspection of total construction activities carried out by contractor on site on behalf of employer in accordance with specification, approved drawings and method statements. • Inspection for the installation of all kinds of field mounted instruments and electrical equipments, MCC panels, switch gears, power/control panels, lighting panels, annunciation panels, transformer protection panels and interposing panels, RMU, Package substation. • Responsible for the installation of (J.B’s) Junction Boxes, Local Control panels, Primary and Secondary cable tray, PVC/RGS/PVC coated RGS conduit installation, instrument impulse piping / tubing installation, conduits sealing and fiber damming as per standard and procedure.
  • 5. • Inspection for the installation of Grounding grid cable, Grounding Electrodes, Ground wells, Ground Bus bar in the field and Building connection to the equipment as per the international standard NEC and approved Project drawing & specification. • Inspection for the Electrical & Instrumentation Duct Bank installation, Cable trenches prior to cable pulling and after cable pulling to release for the next activities. Also inspection of cable tray installation on the main pipe rack, including substation & main control building. Inspection for the instrumentation and paging system cables pulling / installation underground and above ground cable installation and Fiber Optic Cable installation. • To ensure performance of the work in strict accordance with the drawings and specification. • To inspect and record the construction works carried out by contractor on site and resolve the site generated quarries by co-ordinating with the Engineer. • Co-ordination with construction team for execution of electrical system. In accordance with project specification and as per approved IFC layouts. • Be fair and firm in dealings with the contractor. Consider the alternatives and consequences carefully before making decisions. • Write inspection reports, Worksheets, (NCR) Non-compliance Reports and makes Log book entry on the inspection finding and maintain inspection records. • Coordinate with the laboratory technician and arrange for sampling and testing of satisfactorily completed work and quality assurance testing of suspect materials. • Maintain a detailed diary of the day’s work activities, issues, work approved or rejected, hours of operation, labour and equipment used etc, and sign at the end of each day. • Responsible for preparation of RFI with reference to approved ITP & check list which made in accordance NEC & other international standard. • Responsible to raise RFI to client representative for final acceptance, once satisfied during internal inspection at site. • Supporting hand to internal quality personnel for preparation of RFI with reference to ITP & check list. • Check temperature, compaction, joints and surface of asphalt. • Check all form works, reinforcement etc before concrete pouring. • Surveillance of ongoing site activities & guiding electrical team at site as per approved project specification, IFC drawings, ITP & check list. • Coordination with construction team, internal QC & pre commissioning coordinator for the closure of punch list items & EIL items as per approved drawing, project specifications, ITP & check list. • Responsible for the implementation of ISO 9001, QMS requirement, Project Quality Plan and Schedule “Q” Quality Management System of Saudi Aramco which include Material, installation, testing and pre-commissioning of electrical system. • Preparation of Inspection & Test Plan (ITP) and associated Check List based on International Standard, Code, Saudi Aramco Project and Engineering Practices. • Inspection of ongoing installation and site surveillance on daily basis & Supervision and Inspection of all construction activities carried out by contractor on site. • Coordinating with Saudi Aramco PMT, other discipline QC Supervisors, Inspectors and Construction Engineers to make sure that activity carried out as per sequence and approved plan to avoid reworks, delay or rejection at job site. • Responsible to make sure that Documentation and Records are maintained as per Schedule “Q” requirement of Saudi Aramco and as per ISO 9001: 2008 QMS requirement. • Surveillance of ongoing activities at site on daily basis to make sure that all the activities performed at site based on approved specification, latest drawing, ITP, Method statement, and work executed as per approved project Quality plan.
  • 6. • Inspection of electrical installations at site like Grounding/cad welding, Duct Bank , RGS/EMT conduits, Raceway, Cable Ladder, Cable pulling for HV/LV cables, HV/LV cable jointing and termination, Power transformer, HV/LV switchgear, Lighting System/Lighting pole. • Generate client Requests for Inspection (RFI) where required proving sufficient notice for Hold, Witness and Inspection points. After the receiving RFI from sub contractor. • Issue of internal log book entry / NCR to construction team for not executing work as per IFC drawings, Project spec and quality requirement. • Preparation of weekly schedule for inspection and coordinating with client inspection representative. • Review of Supplier/Manufacturer Technical submittals and coordinating with supplier/manufacturer representative for compliance requirement (FAT reports) based on Project specification. • Responsible for preparation of punch list in line with ITP requirements and to close the same. • Monitoring and maintaining the QA/QC records and reports as per ISO 9001:2008 QMS requirement. • Preparation of Final as built drawing for scheme changes as per Client requirement, single line diagram, cable schedules, cable route lay out drawings Equipment laid out drawings. • Preparation of Quality Plan, Work Procedure for all Electrical activities including but not limited to (a) Procedure for Storage, Handling and Preservation.( b) Procedure for Material receiving.( c) Procedure for Electrical installation at job site as per Saudi Aramco Schedule Q requirement. • Responsible for response to client Inspector logbook entries and pass to construction team to rectify the same as per requirement. • Responsible joint inspection with Saudi Aramco Inspection Department at job site. • Attending the weekly meeting with Saudi Aramco to resolve all the non conformity exist at site and to discuss all the issue related to Quality requirement at job site. • Responsible to check the calibration certificate validity of measurement equipment like earth tester, insulation resistance tester etc. prior to take into use. • Responsible to assist to quality supervise & quality managers for preparing the ITP & check list as per site requirement in accordance with standard. • Coordination with construction team, PID & proponent for the closure of punch list items & EIL items as per approved drawing, project specifications, ITP & check list. • Coordination and ensuring presence of clients representatives for fire alarm control system & electrical system pre-commissioning stage. • To inspect and record the construction works carried out by contractor on site and resolve the site generated quarries by co-ordinating with the Resident Engineer. • Coordinate with the laboratory technician and arrange for sampling and testing of satisfactorily completed work and quality assurance testing of suspect materials. • Maintain a detailed diary of the day’s work activities, issues, work approved or rejected, hours of operation, labour and equipment used etc, and sign at the end of each day. • Drafting site instructions for any required variations from, or additions to, the contract documents. • Report questionable methods of operations by the contractor to the Engineer. • Maintaining records of site resources, daily progress of work, inspections, construction and workshop drawings, method statements and ITPs (Inspector Testing Plans). Making special notes and document the contract activities that may lead to claims.
  • 7. • Supervision and Inspection of `additional works’ and `out of scope works’ carried out by contractor. • Responsible for the preparation of Punch list for the activities carried out by the construction group. 3) Company Profile: M/s ALSTOM T&D INDIA LIMITED. Noida, India. Alstom, is one of leading Electrical contracting company and it providing the most advanced electrical grid solutions to meet world electricity demand with an increased demand for energy worldwide. Alstom Grid’s dedicated teams combine their skills to deliver customer-valued solutions to build smarter, more stable, more efficient and environmentally friendly electricity grids worldwide. And this company working in this field in Iinda, since 07 years. The Alstom Company has been Engaged in the construction sector – Power, Transport, Substations, Grid, Switchgears for air- insulated substations (AIS) or gas-insulated substations (GIS), Instrument transformers, circuit breakers, disconnectors, power transformers, and substation automation solutions. Alstom Grid offers services to optimize the Power grid including, Energy Management Systems (EMS), Distribution Management Systems (DMS), Market Management Systems (MMS). As I joined this company as follows. Designation : Electrical QC Engineer Company : M/s Alstom T&D India Ltd Projects/Site:- (I) 66/11KV GIS substation, Adani South Port Mundra Gujarat. (II) 220/66/33KV AIS substation, Getco Lunawada Gujarat. Client/Developer : Adani Port Gujrat / Getco Gujarat Duration : 01-07- 2011 TO 30-06-2013 (2.1 Years) Reason for leaving : Abroad opportunity. Responsibility and Duties at projects site:- • To monitor the construction process to ensure all quality requirements by performing all the in-process stage inspection activities during the fabrication, installation, final testing of the product/ process are met in accordance to the Organization procedures, contract requirements and relevant international Codes/ Standards of practice. • Follow and maintain Company standards of Quality in accordance with Company Quality System requirements. • To check, inspect and test incoming raw materials/ instruments to ensure that they meet project contract specification/ contract requirements. • To perform the in-process inspection as per QC procedures and Inspection and Test plan (ITP).
  • 8. • Erection, testing & commissioning substation electrical equipments such as CT, PT, CB, ISO, LA and CRP panels Inspection. • 66KV GIS substation such as Line bay, Transformer bay, Bus Coupler bay &VT bay Installation Inspection. • Routine area surveillance of instrumentation/electrical erection activities. • Inspection & Witnessing according to Project specification and QCP & ITP. • Erection testing and commissioning of Power & Distribution Transformers Inspection. • Erection testing and commissioning of LT & HT panels, Control panels Inspection. • Monitoring the work activities of Sub-contractors and ensuring that work has done as per the IFC drawing and standard. • Review and comment on quality control program developed by construction, contractors ( like electrical/Instrument Calibration Procedure, Loop folder prior to preparation, High and Medium voltage cable splicing, Hi-Pot testing, Cable Pulling, Pressure test Procedure) for approval. • Perform material receiving inspection for all Electrical and Instrumentation materials (including skids) delivered to the site. • Perform depth design review to verify conformance to company engineering standards and specification on project in the construction stage. • Write inspection reports, Worksheets, (NCR) Non-compliance Reports and makes Log book entry on the inspection finding and maintain inspection records. • Performance other miscellaneous related duties as directed by the QA/QC Manager. • Maintain the all inspection records of QA/QC documents. • Responsible for the implementation, monitoring and documentation of the quality plane to ensure its effectiveness. Also turnover of quality documents & records to client such record Construction Inspection Record Book, Project Completion System, including all test reports and related all documents. • Inspection for the installation of all kinds of field mounted instruments and electrical equipments, MCC panels, switch gears, power/control panels, lighting panels, annunciation panels, transformer protection panels and interposing panels. • Also familiar with latest Calibration & Calibration Certificates, all test and measuring instruments/electrical are in operational & calibrated condition, which will be utilized. • Also responsible for checking , verifying and reviewing the construction drawings covering specification, IFC, P& ID, other attachments prior to installation. • Responsible for the installation of (J.B’s) Junction Boxes, Local Control panels, Primary and Secondary cable tray, A/G & U/G conduit installation, instrument impulse piping / tubing installation, conduits sealing and fiber damming as per standard and procedure.
  • 9. • Responsible for the preparation of Punch list for the activities carried out by the construction group. • Plan, scheduled, co-ordinate and provide work direction to contractor inspectors. • Inviting to Client for Witness Inspection/ Test as per the Approved ITP. • Inspection for the Electrical & Instrumentation Duct Bank installation, Cable trenches prior to cable pulling and after cable pulling to release for the next activities. Also inspection of cable tray installation on the main pipe rack, including substation & main control building. Inspection for the instrumentation and paging system cables pulling / installation underground and above ground cable installation. • Inspection for the installation of Grounding grid cable, Grounding Electrodes, Ground wells, Ground Bus bar in the field and Building connection to the equipment as per the international standard NEC and approved Project drawing & specification. • Also Coordinates with Clients PID (Project Inspection Department) for Project Inspection and stage wise activities for witness or Hold Points. • Preparing and reviewing QCP, ITP and Inspection check list for procurement and construction according to Project quality plan (PQP). • To coordinate with Client/ Consultant for the verification of process inspection for varies QC activities and signing off all QC documents. • To follow and ensure the proper filling system (in accordance to the Organization procedure) with full traceability for retrieving the document. • To perform the quality control activities while installation and pre commissioning of High, Medium & Low voltage switch gears, protective relays and Motor Control Centers. • To undertake verification of Cable Laying (both in Trenches and Cable Tray). • To undertake functional Tests of all electrical equipment including MCC, Transformers, Relay Panels, CT, PTs and UPS. • To undertake inspection during installation and pre commissioning of Cathodic Protection • To read Electrical drawings, Termination drawing and Cable Schedules. • To undertake installation and Pre commissioning inspection of Power and Distribution transformers, High, Medium & Low voltage panel boards. • To undertake inspection of cable Trays and Cable laying installation for various types of instrument cables like core, pair, triad Shield and unshielded cables. • To ensure the quality of the filed instruments, cables, junction box, tubing and piping in accordance to client contract specifications • To perform the inspection & calibration of field instruments and preparation of calibration certificates as per the client specifications/standards. • To undertake installation and pre commissioning inspection activities for the filed instruments and panels inside Control Room (like DCS, ESD, PLC, SCADA, UPS, Marshalling Panel, Interposing Panel and F&G system). Functional tests of panels. • Inspect and test electrical parts, assembled accessories prior to installation in plant for conformance to specifications, based from established Company Inspection and Test Plan and quality standards.
  • 10. • Inspect wire harnesses, control panels, electrical jig boards, to assure the completeness of assembly and quality as per international standards and codes and conformance to blue prints production, illustration, engineering drawings and specifications. • Inspect and monitor the installation of cable, cable tray distribution control panel per approved drawings and ITP. • Verify construction drawings, specifications and installation procedures of electrical equipments based from NEC, NEMA and NFPA. • Witness cable termination for medium and low voltage power to switch gear, MCC, MV/LV electrical motors. • Verify, check and inspect the installed or laid out RGS conduits and to ensure that the materials are all protected against corrosion and maintain its normal condition. • Test certify, install, repair and inspect installations and participate develop complex instrument that measures and records changes in industrial environment per approved testing and work procedures. • Considerable contribution for construction testing, pre-commissioning, commissioning and start of activities to achieve safe & successful goal without a lost time injury through whole the project. • Familiar with the international industry codes and standard related to intrinsically safe system and electrical system for instrumentation such as, ANSI, IEEE 518, IEEE 1100, IEC 60529, NEMA 250, NEMA VE-1, NEMA VE-2, NFPA-70/NEC and UL 94. • Coordinate with the Clients for the final acceptance of the plant hand over. • 100MVA/50MVA, 25MVA, 5MVA Transformer Installation Inspection. • Electrical equipment such as CT, PT, SF6 CB, ISO, LA & CRP panels Installation Inspection. 4) Company Profile: M/s AREVA T&D INDIA LIMITED. Noida, India. The Areva is now become a Alstom, Areva is one of leading Electrical contracting company and it providing the most advanced electrical infrastructure, solutions to meet world electricity demand with an increased demand for energy worldwide. Areva transmission & distribution dedicated teams combine their skills to deliver customer-valued solutions to build smarter, more stable, more efficient and environmentally friendly electricity worldwide. And this company working in this field since 125 years. The Areva Company has been Engaged in the construction of GIS & AIS substations. As I joined this company as follows. Designation : Electrical Site Engineer Company : M/s Areva T&D India Ltd Projects/Site:- (I) : 220/33/11 KV GIS Substation, AIIMS (DTL), New Delhi. (II) : 132/11KV AIS Substation, Bhalai Steel Plant, Chhattisgarh.
  • 11. Client/Developer : Indian Government. (DTL/BSP) Duration : 10-05-2008 to 28-06- 2011. (3 Years) Reason for the Post leaving : QC post opportunity, Department Transfer (Construction to QC) Responsibility and Duties at projects site:- • After receiving of work order planning & scheduling of work for Execution. • Reviewing and preparation of shop drawings complete with Electrical Design, Coordination drawings, material submittals and Approvals. • Monitoring and scheduling of manpower and material consumption to avoid wastages. • To ensure performance of the work in strict accordance with the drawings and specification. • Erection testing and commissioning of AIS Substation 11KV,66KV,132KV& 220KV. • Erection testing and commissioning of GIS Substation 66KV. • Erection testing and commissioning of GIS Substation 220KV. • Erection testing and commissioning of power & distribution transformers, LT & HT panels, control panels. • Ensuring of HT & LT power and control cable laying, testing & commissioning as per IFC. • Erection and Testing of LT and HT Panels. • Erection, testing & commissioning substation electrical equipments such as CT, PT, CB, ISO, LA. CRP panels. • Erection testing and commissioning of earthlings system for power plant. • Ensuring the work of HT & LT panel, control panel as per approved control scheme. • Complete the project according to drawing and client requirement. • Responsible for planning & tracking of site work. • Implementation of health and safety measures as per approved HSE. • Billing and Invoicing and measurement. • Reconciliation of material & man power after project executed. • Attend the inspection of electrical system installation RFI raised by contractors. • Witness for testing & commissioning of electrical system as per approved ITP & associated Check List based on International Standard, • Daily site surveillance for ongoing activities at site as per standard requirements. • Review & approve vendor submitted drawings, material submittal, and method statement. • Review status of measuring and Test Equipment prior to use at site. • Review of vendor’s sub contractor’s material submittal, Factory Acceptance Test reports for acceptance conforming to project specifications, IE rule & other applicable international standards. • Rectification closing of punch list issued by client representative as per project standards. • Inspection of electrical installations & coordinating with client representative for inspection. • Carry out of testing & commissioning of electrical system as per client approved ITP & associated Check List based on International Standard, Codes. • Inspection & daily monitoring & site surveillance on daily basis to avoid major NCR from authority & approval agency. • Review status of measuring and Test Equipment prior to use at site. • Submitting of factory test reports to client for their acceptance.
  • 12. • Monitoring and scheduling of manpower and material consumption to avoid wastages. • Plan work in co-ordination with civil construction programme. • Preparation of running and final bills as per work completed at projects and submission to clients. • To Plan, Erection and commissioning of wiring, HT and LT works like transformer, panels DG sets etc • Preparation of quantity variation sheet and get it certified from clients & consultants. With respect to tender documents. • Inspection of electrical installations & coordinating with client representative for inspection. • Ensure work in accordance with GFC drawings and specification approved project quality plan and ITP’s. • Project detail study of all related drawings, specifications, BOQ's, estimates etc provided by the architects/consultants; submit tender. • Visit factory inspection for major equipments like transformer, HT & LT panels, DG sets, cables and pumps etc. prior to dispatch at site. • Generate client Requests for Inspection (RFI) where required proving sufficient notice for Hold, Witness and Inspection points. After the receiving RFI from sub contractor. • Issued punch list to sub contractors for works not carried as per project standards. And same has been getting it corrected from them prior to raise RFI to clients. • Record and document (QC ) any and all deviations from the Project quality program and Company Integrated Management system(IMS) • Provide support and advice to the construction personnel for execution of Grounding, Lightning arrester, Panels installation, etc. in relation to the Project Quality Program and ITP’s but not limit to applicable standards. • Witness and verify Continuity, Merger, HI-POT and Component testing for Medium Voltage & Low Voltage equipment. • Co-ordination of Electrical system, HVAC system, Fire fighting system, plumbing system for execution of project in accordance approved Electrical /Mechanical /Plumbing GFC drawings in Architectural projects. • Manage the MEP Contractors daily construction activities, schedule and progress. • Suggestion to Prepare the as build drawing for all Vendors. • Guidance to co-worker for installation, commissioning on load final Testing. • 22/11 KV HT panels, all parts installation inspection. • 66KV GIS substation installation Inspection. • 220KV GIS substation installation Inspection. • 132KV AIS all equipment (Transformer,CT,PT,Isolator,LA,SF6 circuit breaker) installation Inspection. • 2MVA DG sets with Synchronizing panels. • 3000KVA /2000KVA/1500KVA DG sets. • 5MVA / 22/11 KV power transformers -10 Nos. • 50MVA/66/11KV Power Transformer-4 Nos. • 100MVA/66/33/11KV Power Transformer-3 Nos. • 100MVA/220/66/33KV Power Transformer-2 Nos. • 2 MVA distribution transformers -7 nos. • 22 KV HT panels/11KV Grid Panel/11KV HT panel. • 2000KVA 11 KV DG sets with Synchronizing Panels -10Nos.
  • 13. • 132 KW fire main pumps,-2 Nos. • Battery bank installation/battery charger/DC distribution panel system. • ACDB Panel Installation Inspection. 4) Company Profile:- M/s TRISHUL CORPORATE SERVICES PVT.LTD. Chennai, India. This company provides manpower for Site Project Services & Operation Maintenance Services, Engineering Services. Mechanical & Electrical Maintenance Service. The TCSPL having maintenance, management and consultancy projects of various leading firm. Provide service for Indian reputed companies such as Larsen And Toubro Limited (Coimbatore), Nuclear Power Plant (Koodankulam), Areva Limited (Delhi), Chettinad Cements and Zuari Cements. I joined this company as O& M engineer for ensuring of smooth functioning of system consisting LT &HT panels, HT DG set, LT DG set, VCB, ACB, 11 KV substations etc. Designation : Operation & Maintenance Engineer Company : M/s Trishul Corporate Services Pvt Ltd Projects/Site : 66/11kv Air Insulated Substation Delhi Airport Main MRSS Substation. Client/Developer : Areva T&D India Ltd/ GMR Airport New Delhi Duration : 01-06-2007 to 05-05- 2008. (1 Year) Responsibility and Duties at site:- • Review of approve vendor submitted drawings, material submittal. • Planning, work allocation and work execution. • Study the project IFC drawings & project specification prior to start Maintenance works. • Preparation of work schedule, weekly schedule and monthly schedule for preventive maintenance. • Studying and analyzing the Engineering drawings and explaining to Subordinates. • Maintenance management practices, Spares following, Sap order creations and inventory schemes. • Analysis of Breakdowns and implementing corrective actions and improving MTBF and MTTR hours. • Evaluation of Electrical maintenance and reduction in maintenance cost. • Preparing essential spare parts list for critical machines and maintaining spares. • Participation in new equipments installation & servicing along with vendors. • Knowledge of attending preventive maintenance, Breakdown maintenance and other activities. • Responsible for the Electrical Utility maintenance. • Prepare preventive maintenance schedule & implement. Brief summary of Experience • Ensuring cleaning of all electrical equipments. • Involved in testing, Pre commissioning and Start up Activities. • Proper arrangement & control of material for execution at appropriate time. • Execute the job on the basis of quality and safety involved in it.
  • 14. • Directed and coordinated the Maintenance of electrical equipment – Provided expert technical support to field engineers, technicians and customer staff • Monitoring Site Activities in Accordance with the Project Specifications, Industry Standards and Guidelines. • Preparation of as-build drawing due to deviation in projects scope. • Preparation of SLD ,GA and schematic drawing of MCC, PCC, • Assembling of various types of switchgears • Preparation of bill of material with the help of GA, SLD & schematic drawing. • In PCC assembling of circuit breakers from range 630A -3200A of company L&T, GE. Switch disconnected units from range 32A-630A. moulded case circuit breakers from range 32A-800A.MCCB’s , • In MCC assembling of circuit breakers ,Wiring of DOL starter • Inspection and Testing of panel’s modular. • After inquiry received form client send quotations of electrical works. • Once work awarded form client, plan to mobilize the material and manpower. • Receive maintenance work request through SAP and conduct site visit for manpower resources /estimation/tools & spare parts availability. • Prepare job plan for major activity and conduct meetings with respective departments • Ensure the history record for equipment is updated for ESD/STR • Daily condition monitoring and physical inspection of electrical equipment as per schedule. • Meetings with reliability and planning department in case of ESD/STA to manage manpower man-hours and required tools/testing equipment and other appliances. • Manage the documentation after completion of work. • Daily preventive maintenance activities as per SAP system. • To check and review control circuit diagram as per final revision & troubleshoot of accrued problem in Substation as well as in Control Room. • Planning of Emergency Shutdown Activities. • Get manage the condition monitoring of emergency diesel generators. • Check physically and vissioually the temperature/oil level/selicagel color/bucherz relay of TRANSFORMERS as per maintenance planning procedure. • Inspection of new arrival of electrical equipments in warehouse with manufactured catalog. • To get check nominated MOTORS body temp/bearing sound/greasing nipples/cooling fans/covers of driving and non driving ends as per SAP procedure. • All activities report send to head of department through SAP after work completion.
  • 15. COMPUTER AND TECHNICAL SKILLS ● Languages Known : MS Office( MS-Word, Excel, Power Point Etc ), C, C++, Proficient in MS Windows Operating System. ● Area of Interest : Utilization of Electric Power, Electrical Power Systems, Electrical Machine. STRENGHTS ● I am consistent, hard-working and dynamic person. I believe myself to be highly self motivated and That keeps me always on my toes. I am also very passionate about my field and the possibilities of it. I am a good team member and always keep everybody focused on the task. PERSONAL DETAILS Father’s name :- Ziaur Rahman Mother’s name :- Mehnaaz Begum Date of birth : - 10-03-1986 Sex :- Male Marital status :- Married. Nationality :- Indian. Languages :- English, Urdu, Hindi Permanent Address :- Vill: Khatatoli Post: Dhanpatganj Via: Sontha, P.S : Routha Dist : Purnia State: Bihar Pin : 855115 Passport Detail :- Passport no. J6698780 Country . India Date of Birth. 10/03/1986 Date of issue. 15/04/2011 Date of Expiry. 14/04/2021 File no. DLHA05710910 Driving License :- Valid Indian Driving license. Place: New Delhi Sharib Reza Date: