1. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
José Alberto Uribe Arias
Telephone: Home: 0057-76187626 / Mobile: 0057-312 4020461. Colombia
e-mail: albertouribemx@yahoo.com.mx
Skype: alberto.uribe34
PERSONAL DATA
Citizenship Identification: 91`422.582 Passport AQ912224
Date of birth: 11-07-1963 Medellin - Colombia
Civil state: Married
Residence: Transversal 154 Nº 17-233, Cañaveral Club House 3, Torre
2, Apto. 203, Floridablanca, Santander - Colombia
Summary
Mr. Uribe has over 20 years of international experience in multi-discipline of Coordination and
General Supervision in the construction of Fertilizer Plants, Oil Platforms, Refineries,
Pump/Compressor stations, Thermoelectric, Hydroelectric, Gas Power Plants, Cement Plants,
Petrochemical Plants & Shutdowns Refineries.
General
Supervises on-site crews in the day-to-day execution of the work in accordance with the
contract drawings, project goals and schedules
Good communications skill and influence with the company, clients and contractors.
Provides Piping Design for Process Plants, actualization of P&IDs
Piping Supervision
Undertakes assigned tasks with respect to:
o Quality,
o Cost optimization,
o On time execution,
o Regulations and procedures,
Coordinates various construction sub-contractors and discipline supervisors in the
execution of piping works as Underground Piping Activities with the next Systems:
Cooling Water System, Oily water sewer, Contaminated rain water sewer, Closed blow
down sewer, Amine blow down sewer, fire water system ( HDPE Thermo set Process
and Key lock System), potable water system and sanitary sewer system.
Supervise the excavations, installation of piping and back filling at Underground Piping
activities.
Knowledge of welding practices and standards.
2. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
verify the availability and adequacy of the materials and drawings
Coordinates various construction sub-contractors and discipline supervisors in the
execution of piping works as Aboveground Piping Activities
Ensures the quantity of the piping work executed by the construction sub-contractors
and monitor the compliance with established schedule
Evaluates the construction piping sub-contractors work capability according to the
programs that have to be implemented and promote corrective action where necessary
Ensures the proper execution of inspection and test in accordance with the field quality
control plan and monitor the adequacy result
Resolves the cases of non-conformity with the support of piping superintendent where
necessary
Provides support to the field engineering works such as field revision of isometric
drawing and Technical Site Instruction (TSI) which are agreed by sub-contractors as
per instruction
Understands and interprets all design, fabrication and erection drawings, and material
specification including other engineering data. In addition, arranges for clarification of
any project drawing or specification which requires additional information for by
construction or subcontractors and ensures applicable project specifications and
standard codes were correctly executed during piping fabrication and erection
Conducts site surveys with sub-contractors engineering group; to propose new routes
and locations for expansion of facilities where interference occurred
Planning
Active member of the project team participating in the construction planning including
failsafe meetings and safe production initiatives.
Developed welding map for fabrication.(marking of joint number and spool number)
Shop fabrication of piping and structures experience
Safety
Ensures the work is performed in a safe manner and accordance the client’s safety
rules and government safety regulations.
Knowledgeable of norms of safety
Ensures that all site activities are performed in environmentally safe and responsible
manner
Conducts weekly HSE assessments and safety walk through, as well as safe and
unsafe auditing.
Construction Completion, Turnover and Commissioning
Organizes the preparation of piping systems for testing based on the test pack limits
specified in the approved test packs
Hydrostatic Tests
Prepares test packages per piping system and test package priority schedule
Attends final walkthrough of completed piping systems and verify clearing of all punch
list prior to mechanical completion
Supports pre-commissioning / commissioning activities, when necessary
Manages technical office for development of As-Built.
Project Management
Monitors the progress with schedules and updating to lead construction engineer
Prepares daily sub-contractor man-hour reports.
Estimates the modification activities including additional works; to assure the
conformance with the installation budget
Attends coordination meetings with client representatives, site manager and project
management team; to assist on all commissioning activities
3. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
Provides daily progress reports in accordance with the Project Managers
Requirements.
EDUCATIONAL AND PROFESSIONAL AFFILIATIONS
Primary: 1971 / 75 School concentration Palmira, Barrancabermeja, Colombia
Technical High school 1976-81 Instituto Tecnico Superior Industrial
Barrancabermeja, Colombia
DIPLOMA: TECHNICAL
Others Estudies, see below
COURSES – TRAININGS
English Beginners Courses MARIELIS LEARNING INSTITUTE Aruba
English Intermediate Courses MARIELIS LEARNING INSTITUTE Aruba
English Intermediate II Courses MARIELIS LEARNING INSTITUTE Aruba
Course: ADVANCE SAFETY AUDIT ABU DHABI GAS LIQUEFACTION COMPANY
LIMITED Das Island
Course: STOP SINCOR DOWNTREAM PROJECT SINCOR- Venezuela
Normas ISO 9000 Visión 2000 FUNDACIÓN UNIVERSIDAD DE ORIENTE. Venezuela
Autocad versión 2000 FUNDACIÓN UNIVERSIDAD DE ORIENTE. Venezuela.
Autocad versión 13 SISTEMAS E INFORMATICA. Bogotá, Colombia
Autocad versión 12 INST. TECN. PASCUAL BRAVO Medellín, Colombia.
Programas Computación Office 2000 CENTRO DE INVESTIGACIÓN. EDUTEC. Costa Rica
4. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
COMPANY, FUNCTION AND MAIN RESPONSIBILITIES.
October 2016 - November 2016 UNION TEMPORAL OBTC Colombia
Piping Coordinator
Ecopetrol Refinery, Barrancabermeja City.
Unit Topping 2100 Plant Shutdown
Type: C
Coordination with staff Piping Supervision and client.
Coordination for fabrication and erection of piping
Ensure that all personnel and all works under control safely.
Ensure good quality and production on time
Piping Fabrication Activities.
Hydro testing activities.
June 2015 - June 2016 INESCO Bolivia
Piping Superintendent.
Samsung Engineering Bolivia.
Ammonia & Urea Fertilizer Project, Bulo Bulo City
Type: EPC
Coordination with staff Piping Supervision and client.
Coordination for fabrication and erection of piping
Ensure that all personnel and all works under control safely.
Ensure good quality and production on time.
Supervision to Subcontractors.
Underground Piping activities.
Installation of piping.
Aboveground piping activities.
Piping Fabrication Activities.
Hydro testing activities.
Precommissioning activities.
January 2015 - April 2015 Santos Cmi Guatemala
Mechanical Supervisor.
Jaguar Energy Guatemala
Escuintla
Type: EPC
Aboveground piping activities.
Piping Fabrication Activities.
Erection piping Activities.
August 2013 - December 2014 Saipem Services Mexico
Piping Supervisor.
PEMEX México
Tula Hidalgo, Refinery Gasolina Limpias Project
Type: EPC
Supervision to Subcontractors. ( TAPIA Company )
Underground Piping activities
Excavations
Installation of piping
Back filling
Aboveground piping activities.
Piping Fabrication Activities.
Hydro testing.
5. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
April 2012 - May 2013 CB&I Colombia.
Piping Supervisor.
REFICAR / ECOPETROL Colombia
Cartagena, Refinery Expansion Project.
Type: EPC
Underground Piping activities
Excavations
Installations of piping HDPE & Thermo set Process. ( 20” HDPE Length=12 Km )
Back filling
Aboveground piping activities.
Piping Fabrication Activities.
Erection piping Activities.
March 2011 - February 2012 INESCO / TECHINT
KAISER / INESCO / TECNICAS REUNIDAS
Piping Superintendent
REPSOL /PETROBAS Bolivia
Gas Plant Margarita /Gas Plant Sabalo
Type: EPC
Coordination with staff Piping Supervision and client.
Coordination for fabrication and erection of piping
Ensure that all personnel and all works under control safely.
Ensure good quality and production on time.
Supervision to Subcontractors.
Underground Piping activities
Excavations
Installation of piping.
Back filling
Aboveground piping activities.
Piping Fabrication Activities.
Hydro testing.
June 2010 - Dec. 2010 Join Venture FT – Wood Group Colombia
Piping Supervisor
BP Colombia. Yopal Colombia
Well Pad Facilities Floreña C6
Type: EPC
Underground Piping activities
Excavations
Installation of piping Carbon Steel.
Verify the engineering in accordance with the drawings of Project and specifications
Supervision for fabrication and erection of piping
Ensure that all personnel and all works under control safely.
Ensure good quality and production on time.
Sep. 2008 - Feb. 2010 Technip France
Piping Supervisor
ADGAS. Abu Dhabi Gas. Abu Dhabi (UAE)
Offshore Associated Gases Project Package 1
Type: EPC
Verify engineering in accordance with the drawings of Project and specifications
Understand and know the scope of work for give support to the Sub-contractor.
6. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
Ensure that all personnel and all works under control safely.
Ensure good quality and production on time.
Underground Piping activities
Excavations
Gas Plant Piping Erection
Sep. 2007 - Sep. 2008 Saipem Contracting Nigeria Limited
Piping Supervisor
Exxon Mobil and Total Company. Nigeria
Offshore Epc2 Project.
Type: EPC
Co-ordination and Supervision for fabrication and erection of piping for Oil platform.
Fabrication of Flets and Subsea umbilical cordon
Fabrication of structure for Oil platform.
Feb 2007 – Apr 2007 Schrader Camargo Ing. Assoc
Piping Supervisor
Smurfit kappa – Yumbo. Colombia
Boiler UR3 Project.
Type: EPC
Co-ordination and Supervision for fabrication and erection of piping small bore
at boiler.
Nov 2006 - Dec 2006 Tecs Ltda.
Piping Supervisor
Ecopetrol refinery – B/bermeja Colombia
Specialist Plant Shutdown
Type: PC
Planning of activities for Shutdown.
Co-ordination and Supervision for Fabrication of Tie-ins.
Supervision for erection of piping and Tie-ins.
Hydrostatic Test.
Jan 2006– Oct 2006 Stork Wescar Aruba N.V.
Piping Supervisor
Valero Refinery Aruba
Crude Plant 6 and 7 Shutdown.
Type: C
Planning of activities for Shutdown.
Co-ordination and Supervision for Fabrication of Tie-ins.
Supervision for erection of piping and Tie-ins.
Hydrostatic Test.
Feb 2005 – Oct 2005 Consortium Inelectra – Schrader Camargo
Piping Supervisor
Ecopetrol Refinery – B/bermeja Colombia
Nafta Plant Shutdown.
Parafine Plant New
Type: EPC
Planning of activities for Shutdown.
Co-ordination and Supervision for Fabrication of Tie-ins.
7. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
Supervision for erection of piping and Tie-ins.
Hydrostatic Test.
Feb. 2004 – Sep. 2004 Tipiel Perú S.A. ( JV Technip/ Dragados )
Piping Supervisor
Repsol YPF. La Pampilla Refinery Peru
Visbreaking Unit.
Merox Unit.
Type: EPC
Co-ordination and Supervision of piping for Erection of new units.
Hydrostatic Test
Pre-commissioning
Nov. 2003 – Dic. 2003 Conduto Ecuador S.A.
Piping Supervisor
Oxy (Occidental Company) Ecuador
Shutdown for Tie-in EPF
Type: C
Planning of activities for Shutdown.
Co-ordination and Supervision for Fabrication of Tie-ins.
Supervision for erection of piping and Tie-ins.
Hydrostatic Test.
Oct. 2003 – Nov. 2003 Harbert International Establishments
Piping Supervisor
Oxy (Occidental Company) Ecuador
Angel Norte
Type: C
Co-ordination and Supervision for Fabrication of Pipeline 8”
Hydrostatic Test.
Jun 2003– Sep. 2003 Servingeseg
Piping Supervisor
Promasa Bogota Colombia
Promasa Plant New
Type: C
Co-ordination and Supervision for Fabrication of piping of food Plant.
Hydrostatic Test.
May. 2002 – Sep. 2002 Consorcio Santos- CMI
Piping Supervisor
OXY (Occidental Company) Ecuador
Eden Yutury
Type: EPC
Co-ordination and Supervision for Fabrication of piping
Erection of piping
Hydrostatic Test.
April. 2001 – Oct. 2001 Simovenza S.A (Sicilmontagi)
Piping Supervisor
Sincor Venezuela
Downstream Project Sincor
Type: C
8. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
Co-ordination and Supervision for Steam tracing installation of visbreaking unit.
Supervision to Sub-contractor
Aug. 2000 – Feb. 2001 Consortium DSD - CGI
Piping Supervisor
Sincor Venezuela
Delayed coker Sincor Plant
Type: C
Co-ordination and Supervision for erection of piping at new Coker Plant.
Installation of pipe supports
Feb. 2000 – May.2000 Consorcio Costa Norte – Trime C.A.
Piping Supervisor
Snamproggeti – Fertinitro Venezuela
Ammoniac and Urea Plant
Type: C
Co-ordination and Supervision for erection of piping at new Plant.
Installation of metallic structure and pipe supports
Sep.1998 – Oct. 1999 Consortium Tamoin - Saret
Technician of Organization and Design
Recope Refinery Costa Rica
Revamping refinery of Limón
Type: EPC
Design of piping
Prefabrication of piping
Co-ordination and Supervision for erection of piping at new Plant.
Hydrostatic Test
Feb. 1998 – May. 1998 CMD. Construcciones y Montajes Distral.
Piping Designer
Termopaipa IV Unit Colombia
New Power Plant
Type: EPC
Design of piping
Prefabrication of piping
Co-ordination and Supervision for erection of piping at new Power Plant.
Hydrostatic Test for piping and Boiler
Jan. 1997 – Jul. 1997 Tipiel S.A.
Piping Designer
Ecopetrol Refinery Colombia
Revamping Toping 2000
Type: EPC
Design of piping for revamping of Topping Plant existing.
Sep.1995 – Dec. 1995 Association TSCT - Tamoin
Piping Supervisor
PetroEcuador Refinery Ecuador
Revamping refinery of Esmeraldas
Type: C
9. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
Co-ordination and Supervision for Fabrication of piping
Erection of piping
Hydrostatic Test.
Mar.1996 – May.1996 Contratista Tito Omar Álvarez
Piping Designer
Ecopetrol Refinery- B/bermeja Colombia
Soda Plant
Type: D
Design of piping for revamping of Soda Plant
Elaboration of specifications for construction and Bidding
Elaboration Take off Material
Oct. 1995 – Dic.1995 T.D.I. Ingenieria Ltda.
Piping Designer
Ecopetrol Refinery- B/bermeja Colombia
U-2900 Plant
Type: D
Design of piping for revamping of U-2900 Plant
Elaboration of specifications for construction and Bidding
Elaboration Take off Material
Aug. 1995 – Oct. 1995 R.A.M. Consorcio de Ingeniería Ltda.
Piping Designer
Ecopetrol Refinery- B/bermeja Colombia
U-2900 Plant
Type: D
Design of piping for revamping of U-2900 Plant
Elaboration of specifications for construction and Bidding
Elaboration Take off Material
Dec.1993 – Dec. 1994 Termotecnica Coindustrial
Piping Supervisor
Ecopetrol Refinery- B/bermeja Colombia
New Catalic Rupture Unit (Cracking Unit)
Type: EPC
Co-ordination and Supervision for Fabrication of piping
Erection of piping, metallic structure ,pipe supports
Hydrostatic Test.
Leader Technical Office
Jun.1992 – Dec. 1992 Consortium HB-Termotecnica
Piping Supervisor
Ecopetrol Refinery- B/bermeja Colombia
Revamping Visbreaking Plant
Type: EPC
Co-ordination and Supervision for Fabrication of piping
Erection of piping, metallic structure , pipe supports
Hydrostatic Test.
Leader Technical Office
Material controller
10. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
11. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
12. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
13. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
14. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
15. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
16. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
17. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
18. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
19. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
20. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
21. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
22. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
23. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
24. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
25. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
26. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
27. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
28. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
29. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
30. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
31. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
32. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
33. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
34. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
35. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
36. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
37. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
38. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
39. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
40. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
41. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
42. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
43. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia
44. José Alberto Uribe Arias
Construction Mechanical Piping Supervisor Oil & Gas, Energy. Colombia