SlideShare a Scribd company logo
1 of 6
DARIO LOPEZ SAN DIEGO
PERSONAL PARTICULARS
Date of Birth March 04, 1964
Addresss 436 Raymundo St.
San Juan
Morong, Rizal
Contact No. +639493145873
E-mail dosandiego@yahoo.com
CARREER OBJECTIVE
To be a part of a dynamic and unrelenting team in its strive for innovation
and excellence in the field of Mechanical Engineering.
WORK EXPERIENCE
Company Name A.D.S San Juan Construction
(General Contractor)
Morong, Rizal
Job Title Project Site Engineer (Mechanical)
Period of Service October 01, 2014 to present
Responsibilities:
 Supervises the mobilization, installation, testing and commissioning of
HVAC, drainage system, sanitary and bathroom fixtures, water supply
pipes and water pumps for housing projects and school buildings.
Company Name SIX CONSTRUCT LTD., UAE
Project Site Cleveland Clinic, Abu Dhabi
Job Title Senior Mechanical Engineer
Period of Service November 07, 2011 to June 30, 2014
Responsibilities:
April 01, 2014 to June 30, 2014 – Four Seasons Hotel - Bahrain
 QA/QC inspector
 Inspection of delivered materials, works done for mechanical
installations as per installation method statements.
 Coordinating with sub-contractors to have the work done as per
approved drawings and specifications.
 Submit inspection request to consultants for final approval of works
done.
 Filing of QA/QC documents for clients information.
March 01, 2013 to March 31, 2014 – Cleveland Clinic Abu Dhabi
 Reviewing and implementing testing and commissioning method
statements of MEP (Air System) works prior to witnessing and
handing-over
 Manage / supervise testing and commissioning team, coordination with
other work trades
 Air balancing for supply and exhaust air ducts, VAVs, ECVs, staircase
pressurization fans, extract fans
 Compiles approved drawings, testing and commissioning
inspection/witness results
November 07, 2011 to February 28, 2013 – Cleveland Clinic Abu Dhabi
Manage / supervise MEP construction department on plant rooms for the
installation of the following:
 Supply and exhaust air handling units, FCUs, VAVs, ECVs,
Fans and Blowers
 Supply and exhaust air ducts
 Chilled water pipes and pumps, heat exchangers
 Heat recovery pipes and pumps
 Thermal heat recovery pipes and pumps
 Domestic and hot water pipes and pumps
 Solar hot water system
Company Name Impregilo-Lidco General Construction Company
Tripoli, Libya
Job Title Mechanical Supervisor (Zliten Project Site)
Period of Service October 10, 2009 – February 28, 2011
Responsibilities:
Supervision of the construction and maintenance of the following project
camp facilities:
 Water tank pump room
 Water supply and drainage system
 Water heaters and split type air conditioning system (single and multi-
evaporators)
 Water softener for kitchen and laundry equipments
 Kitchen and canteen service area equipments
 Washing machines and driers
Company Name Jiangsu Nantong Liu Jian Construction Group
Dubai Branch
(General Contractor)
Job Title Mechanical Engineer (Two Towers, Dubai)
Period of Service July 2008 – April 2009
Responsibilities:
 Prepares shop drawings for mechanical and electrical works for
consultant’s and government’s approval
 Manages the project/work execution for mechanical and electrical
works.
 Provides the progress report which is essential in determining project
date of completion.
 Mechanical works and equipment commissioning.
Company Name SARM Ltd.
(MEP Contractor)
Lagos, Nigeria
Job Title Mechanical Engineer (Diamond Bank)
Period of Service August 2007 – February 2008
Responsibilities:
 Estimates bill of quantities for fire fighting services, drainage system,
swimming pool, borehole, hot and cold water services.
 Attends preliminary, management, and technical meetings.
 Prepares material submittals, shop drawings, material samples for
consultant’s approval.
 Prepares program of works for mechanical services.
 Manages the project/work execution for drainage system, mechanical
works for swimming pools, sanitary wares installation, electrical power
supply to the equipments, fire protection pipes and fire fighting
equipments.
Company Name I. T. B. Nigeria Ltd.
Lagos, Nigeria
(General Contractor)
Job Title Mechanical Engineer (Abugansoro Project Site)
Period of Service August 2006 - July 2007
Responsibilities:
 Estimates bill of quantities for air conditioning, ventilation, plumbing
and fire protection services.
 Supervises the installation of air conditioning and ventilating units,
fire protection pipes and plumbing works.
 Supervises the installation of electrical power supply to the air
conditioning units, motor pumps.
 Prepares material requisition for mechanical services.
Company Name Abdullatif M. Al-Arfaj Trading Corp. (Saudi Aircon)
(MEP/Building Maintenance Contractor)
Al – Hasa, KSA
Job Title A/C Techician (Marina Mall Project Site)
Period of Service March 2004 -February 2006
Job description
Supervised the following activities:
 Retrofitting/cleaning of centralized air conditioning equipments,
cooling towers, chilled water pipes.
 Fabrication of air conditioning duct and ducting accessories.
 Storekeeping of all materials, equipments and tools used in the
installation of centralized air conditioning system.
 Installation of electrical power supply to the air conditioning and
ventilating equipments.
 Installation of air conditioning ducts, air conditioning and ventilating
units, start-up and commissioning.
Company Name A.D.S. San Juan Construction
(General Contractor)
Morong, Rizal
Job Title Mechanical Supervisor
Period of Service March 2001 – February 2004
Responsibilities:
 Supervised the mobilization, purchasing, installation, testing and
commissioning of drainage system, sanitary and bathroom fixtures,
water supply pipes, storage tanks and water pumps.
Company Name Scanaire Systems, Inc.
(Mechanical Contractor)
Cainta, Rizal
Job Title Project Engineer
Period of Service May 1995 – December 2000
Responsibilities:
 Inspection of project site, estimates cost, bill of quantities for
mechanical works such as installation and maintenance of
refrigeration, package type and centralized air conditioning,
ductworks, ventilation, and fire protection.
 Prepared tools, equipments, manpower, and program of works for
project mobilization.
 Prepared list of tools, materials, air conditioning and ventilating units
to be installed.
 Prepared shop drawings, submittals, and turnover reports.
 Installation of electrical power lines, circuit breakers, for the supply of
power to the equipments.
 Attended management and technical meetings at jobsite.
 Supervised all mechanical and electrical works stated at the scope of
works.
 Supervised the trouble shootings, repairs and maintenance of air
conditioning units, and ventilating equipments.
 Supervised the start-up of air conditioning, ventilating equipments, air
balancing on duct outlets, testing and commissioning of equipments.
Company Name R. F. Melendres Construction
(General Contractor)
Pasig City
Job Title Foreman
Period of Service January 1987 – December 1994
Responsibilities:
 Implement mechanical works at the jobsite as instructed by the project
engineer.
 Submit reports of job accomplishment on a daily and weekly basis or as
per instruction of the project engineer.
EDUCATION
University of the East Bachelor of Science in Mechanical
Engineering
Manila, Philippines
SKILLS
 Plumbing
 Driving automobiles
 Computer literate (MS Excel, MS Word)
 Basic Autocad
REFERENCES
Gianpietro Bertoldi
MEP Manager
“VTB Arena Stadium” Site
Codest International – Russia
E-Mail : bertoldi@codest.ru
Tel.: +74997554129
Patrick Gormley
MEP Coordinator
Six Construct
+971506328211

More Related Content

What's hot (20)

Isidro_Calayag Resume 11.20.16
Isidro_Calayag Resume 11.20.16Isidro_Calayag Resume 11.20.16
Isidro_Calayag Resume 11.20.16
 
Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)
Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)
Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)
 
Ahmed.Hassan_CV
Ahmed.Hassan_CVAhmed.Hassan_CV
Ahmed.Hassan_CV
 
CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016
 
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEERResume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
 
MEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANANMEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANAN
 
TED_BEERY_RESUME
TED_BEERY_RESUMETED_BEERY_RESUME
TED_BEERY_RESUME
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume
 
Cv mm
Cv mmCv mm
Cv mm
 
Rozlan Ramli 2015
Rozlan Ramli 2015Rozlan Ramli 2015
Rozlan Ramli 2015
 
Resume (pdf file)
Resume (pdf file)Resume (pdf file)
Resume (pdf file)
 
AStancescu Nov2014
AStancescu Nov2014AStancescu Nov2014
AStancescu Nov2014
 
Mirasol Resume 10-14-14
Mirasol Resume 10-14-14Mirasol Resume 10-14-14
Mirasol Resume 10-14-14
 
Ibrahim Mohamed Ibrahim Issa Resume
Ibrahim Mohamed Ibrahim Issa  ResumeIbrahim Mohamed Ibrahim Issa  Resume
Ibrahim Mohamed Ibrahim Issa Resume
 
Jijo's resume ( qc inspector )doc
Jijo's resume ( qc inspector )docJijo's resume ( qc inspector )doc
Jijo's resume ( qc inspector )doc
 
Mechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire FightingMechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire Fighting
 
jordan updated resume 2015
jordan updated resume 2015jordan updated resume 2015
jordan updated resume 2015
 
Curriculum Vitae of R M Rico
Curriculum Vitae of R M RicoCurriculum Vitae of R M Rico
Curriculum Vitae of R M Rico
 
Cv For Sitemanager
Cv For SitemanagerCv For Sitemanager
Cv For Sitemanager
 
Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16
 

Viewers also liked (12)

Jacob Napier Resume 1
Jacob Napier Resume 1Jacob Napier Resume 1
Jacob Napier Resume 1
 
Resume updated 10-15-16
Resume updated 10-15-16Resume updated 10-15-16
Resume updated 10-15-16
 
ange resume
ange resumeange resume
ange resume
 
AmberBradyResume2016
AmberBradyResume2016AmberBradyResume2016
AmberBradyResume2016
 
Andy Kelly Resume 1
Andy  Kelly Resume 1Andy  Kelly Resume 1
Andy Kelly Resume 1
 
MIKES RESUME 2015w
MIKES RESUME 2015wMIKES RESUME 2015w
MIKES RESUME 2015w
 
Ashtin G Melchor 2016
Ashtin G Melchor 2016Ashtin G Melchor 2016
Ashtin G Melchor 2016
 
Silva_Resume_V1 - 2016
Silva_Resume_V1 - 2016Silva_Resume_V1 - 2016
Silva_Resume_V1 - 2016
 
Zachary K Peterson Jan 2015
Zachary K Peterson Jan 2015Zachary K Peterson Jan 2015
Zachary K Peterson Jan 2015
 
Design Resume 1.3
Design Resume 1.3Design Resume 1.3
Design Resume 1.3
 
TilleyRec
TilleyRecTilleyRec
TilleyRec
 
Pipefitter 11-9-15
Pipefitter 11-9-15Pipefitter 11-9-15
Pipefitter 11-9-15
 

Similar to DARIO LOPEZ SAN DIEGO (20)

Resume 2015 .doc 2
Resume 2015 .doc 2Resume 2015 .doc 2
Resume 2015 .doc 2
 
Totie Laurel CV
Totie Laurel CVTotie Laurel CV
Totie Laurel CV
 
Arun Siby - RESUME
Arun Siby - RESUMEArun Siby - RESUME
Arun Siby - RESUME
 
Kumaresan CV
Kumaresan CVKumaresan CV
Kumaresan CV
 
Ward, George Resume
Ward, George ResumeWard, George Resume
Ward, George Resume
 
jayaprakash
jayaprakashjayaprakash
jayaprakash
 
Rezume ongky
Rezume ongkyRezume ongky
Rezume ongky
 
DEEPES - Copy (2)
DEEPES - Copy (2)DEEPES - Copy (2)
DEEPES - Copy (2)
 
Resume
ResumeResume
Resume
 
randy san andres resume
randy san andres resumerandy san andres resume
randy san andres resume
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
Resume
ResumeResume
Resume
 
afzal c.v
afzal c.vafzal c.v
afzal c.v
 
Ahmed abd elazim c.v
Ahmed abd elazim c.vAhmed abd elazim c.v
Ahmed abd elazim c.v
 
100005_Ibrahim Ahmed Osman El-Sedy
100005_Ibrahim Ahmed Osman El-Sedy100005_Ibrahim Ahmed Osman El-Sedy
100005_Ibrahim Ahmed Osman El-Sedy
 
tamuthu
tamuthutamuthu
tamuthu
 
updated CVlarrybisa
updated CVlarrybisaupdated CVlarrybisa
updated CVlarrybisa
 
Resume
ResumeResume
Resume
 
CV of Mohammed Uzair
CV of Mohammed UzairCV of Mohammed Uzair
CV of Mohammed Uzair
 
Farookh Engr
Farookh EngrFarookh Engr
Farookh Engr
 

DARIO LOPEZ SAN DIEGO

  • 1. DARIO LOPEZ SAN DIEGO PERSONAL PARTICULARS Date of Birth March 04, 1964 Addresss 436 Raymundo St. San Juan Morong, Rizal Contact No. +639493145873 E-mail dosandiego@yahoo.com CARREER OBJECTIVE To be a part of a dynamic and unrelenting team in its strive for innovation and excellence in the field of Mechanical Engineering. WORK EXPERIENCE Company Name A.D.S San Juan Construction (General Contractor) Morong, Rizal Job Title Project Site Engineer (Mechanical) Period of Service October 01, 2014 to present Responsibilities:  Supervises the mobilization, installation, testing and commissioning of HVAC, drainage system, sanitary and bathroom fixtures, water supply pipes and water pumps for housing projects and school buildings. Company Name SIX CONSTRUCT LTD., UAE Project Site Cleveland Clinic, Abu Dhabi Job Title Senior Mechanical Engineer Period of Service November 07, 2011 to June 30, 2014
  • 2. Responsibilities: April 01, 2014 to June 30, 2014 – Four Seasons Hotel - Bahrain  QA/QC inspector  Inspection of delivered materials, works done for mechanical installations as per installation method statements.  Coordinating with sub-contractors to have the work done as per approved drawings and specifications.  Submit inspection request to consultants for final approval of works done.  Filing of QA/QC documents for clients information. March 01, 2013 to March 31, 2014 – Cleveland Clinic Abu Dhabi  Reviewing and implementing testing and commissioning method statements of MEP (Air System) works prior to witnessing and handing-over  Manage / supervise testing and commissioning team, coordination with other work trades  Air balancing for supply and exhaust air ducts, VAVs, ECVs, staircase pressurization fans, extract fans  Compiles approved drawings, testing and commissioning inspection/witness results November 07, 2011 to February 28, 2013 – Cleveland Clinic Abu Dhabi Manage / supervise MEP construction department on plant rooms for the installation of the following:  Supply and exhaust air handling units, FCUs, VAVs, ECVs, Fans and Blowers  Supply and exhaust air ducts  Chilled water pipes and pumps, heat exchangers  Heat recovery pipes and pumps  Thermal heat recovery pipes and pumps  Domestic and hot water pipes and pumps  Solar hot water system Company Name Impregilo-Lidco General Construction Company Tripoli, Libya Job Title Mechanical Supervisor (Zliten Project Site) Period of Service October 10, 2009 – February 28, 2011
  • 3. Responsibilities: Supervision of the construction and maintenance of the following project camp facilities:  Water tank pump room  Water supply and drainage system  Water heaters and split type air conditioning system (single and multi- evaporators)  Water softener for kitchen and laundry equipments  Kitchen and canteen service area equipments  Washing machines and driers Company Name Jiangsu Nantong Liu Jian Construction Group Dubai Branch (General Contractor) Job Title Mechanical Engineer (Two Towers, Dubai) Period of Service July 2008 – April 2009 Responsibilities:  Prepares shop drawings for mechanical and electrical works for consultant’s and government’s approval  Manages the project/work execution for mechanical and electrical works.  Provides the progress report which is essential in determining project date of completion.  Mechanical works and equipment commissioning. Company Name SARM Ltd. (MEP Contractor) Lagos, Nigeria Job Title Mechanical Engineer (Diamond Bank) Period of Service August 2007 – February 2008 Responsibilities:  Estimates bill of quantities for fire fighting services, drainage system, swimming pool, borehole, hot and cold water services.  Attends preliminary, management, and technical meetings.  Prepares material submittals, shop drawings, material samples for consultant’s approval.  Prepares program of works for mechanical services.
  • 4.  Manages the project/work execution for drainage system, mechanical works for swimming pools, sanitary wares installation, electrical power supply to the equipments, fire protection pipes and fire fighting equipments. Company Name I. T. B. Nigeria Ltd. Lagos, Nigeria (General Contractor) Job Title Mechanical Engineer (Abugansoro Project Site) Period of Service August 2006 - July 2007 Responsibilities:  Estimates bill of quantities for air conditioning, ventilation, plumbing and fire protection services.  Supervises the installation of air conditioning and ventilating units, fire protection pipes and plumbing works.  Supervises the installation of electrical power supply to the air conditioning units, motor pumps.  Prepares material requisition for mechanical services. Company Name Abdullatif M. Al-Arfaj Trading Corp. (Saudi Aircon) (MEP/Building Maintenance Contractor) Al – Hasa, KSA Job Title A/C Techician (Marina Mall Project Site) Period of Service March 2004 -February 2006 Job description Supervised the following activities:  Retrofitting/cleaning of centralized air conditioning equipments, cooling towers, chilled water pipes.  Fabrication of air conditioning duct and ducting accessories.  Storekeeping of all materials, equipments and tools used in the installation of centralized air conditioning system.  Installation of electrical power supply to the air conditioning and ventilating equipments.  Installation of air conditioning ducts, air conditioning and ventilating units, start-up and commissioning. Company Name A.D.S. San Juan Construction
  • 5. (General Contractor) Morong, Rizal Job Title Mechanical Supervisor Period of Service March 2001 – February 2004 Responsibilities:  Supervised the mobilization, purchasing, installation, testing and commissioning of drainage system, sanitary and bathroom fixtures, water supply pipes, storage tanks and water pumps. Company Name Scanaire Systems, Inc. (Mechanical Contractor) Cainta, Rizal Job Title Project Engineer Period of Service May 1995 – December 2000 Responsibilities:  Inspection of project site, estimates cost, bill of quantities for mechanical works such as installation and maintenance of refrigeration, package type and centralized air conditioning, ductworks, ventilation, and fire protection.  Prepared tools, equipments, manpower, and program of works for project mobilization.  Prepared list of tools, materials, air conditioning and ventilating units to be installed.  Prepared shop drawings, submittals, and turnover reports.  Installation of electrical power lines, circuit breakers, for the supply of power to the equipments.  Attended management and technical meetings at jobsite.  Supervised all mechanical and electrical works stated at the scope of works.  Supervised the trouble shootings, repairs and maintenance of air conditioning units, and ventilating equipments.  Supervised the start-up of air conditioning, ventilating equipments, air balancing on duct outlets, testing and commissioning of equipments. Company Name R. F. Melendres Construction (General Contractor)
  • 6. Pasig City Job Title Foreman Period of Service January 1987 – December 1994 Responsibilities:  Implement mechanical works at the jobsite as instructed by the project engineer.  Submit reports of job accomplishment on a daily and weekly basis or as per instruction of the project engineer. EDUCATION University of the East Bachelor of Science in Mechanical Engineering Manila, Philippines SKILLS  Plumbing  Driving automobiles  Computer literate (MS Excel, MS Word)  Basic Autocad REFERENCES Gianpietro Bertoldi MEP Manager “VTB Arena Stadium” Site Codest International – Russia E-Mail : bertoldi@codest.ru Tel.: +74997554129 Patrick Gormley MEP Coordinator Six Construct +971506328211