 To pursue a career in a globally competitive environment and to work on
challenging assignments that provide better career prospects, job
satisfaction and steady paced professional growth thereby contributing
maximum to the organization.
Employment History
 19 years of Professional Experience in Construction Industry with
experience in Industrial building, Tower, Tunnel, Power plant, underground
metro projects, Pipe Lines projects, Road & Infrastructure projects.
 I am a creative, outgoing individual with an exceptionally positive
personality, whom possesses great abilities in successfully executing and
completing given tasks. Also, I am extremely idealistic and possess the ability
to handle unexpected situations with minute difficulty.
Experience
1 Employer: Jainco Buildcon Limited, Shalimar Bagh, New Delhi
Position :- Project Engineer
Job Responsibility:- Proving and Laying of Sewerage Line in Mahaveer
enclave F & D Block, New Delhi and water pipeline laying of 1200mm
dia.
Duration:- Feb. 2016 to Till Date
2 Employer : AL RAJHI CONSTRUCTION L.L.C IN UAE
Position : - Construction Manager
Project is awarded to Al Rajhi Construction LLC. Project consists of
Infrastructure Development including Earthworks, 80 km of arterial
ConstruCtion manager
abdul lathif mohamed fareezan
roads and 270 km of internal neighborhood roads & Parking, Sewerage,
Storm water, Potable water, Irrigation, Telephone, Electrical and Street
lighting works
The Value of Project : AED 700 million
Client : MUSANADA
Project Management : PARSONS
Consultant : MOTT MACDONALD
Duration:- January 2015 to November 2015
RESPONSIBILITIES
 Reviews project plans and proposals, then works with management
to develop project objectives. Identifies project responsibilities by
determining the phases and elements of the project.
 Reviews contractor bids; interviews and assigns personnel to specific
phases and elements of the project. Through project coordination
meetings and other forms of communication, oversees and
coordinates the technical aspects of the project.
 Prepares status reports and regularly monitors budgets, contractors
and schedules. Allocates project resources appropriately; approves
expenditures; employee contractor contracts. Keeps an accurate
record and electronic data base of all elements of the projects.
 Presents procedures, rules and regulations to those involved in the
project; maintains a safe, clean and productive environment through
enforcing procedures. Maintains project integrity and reputation
through compliance with state and federal regulations.
 Determines project specifications by studying product design,
customer requirements, and performance standards; completing
technical studies; preparing cost estimates.
 Confirms product performance by designing and conducting tests.
 Determines project schedule by studying project planand
specifications; calculating time requirements; sequencing project
elements.
 Maintains project schedule by monitoring project progress;
coordinating activities; resolving problems.
 Controls project plan by reviewing design, specifications, and plan and
schedule changes; recommending actions.
 Controls project costs by approving expenditures; administering
contractor contracts.
 Prepares project status reports by collecting, analyzing, and
summarizing information and trends; recommending actions.
 Maintains safe and clean working environment by enforcing
procedures, rules, and regulations.
3. Employer: Ghantoot Gulf Contracting Dubai, UAE
Position : - ConstructionManager,/ Acting Project Manager.
Duration :- November 2009 to December 2014
Project No1.:- CW/512C
Project Name:- supply, installation, testing & commissioning of
fibre cement / glass reinforced plastic/glass reinforced
epoxy water transmission pipeline and associated works
from Jabel Ali habab road to al Ain road and Al Barsha
parallel road in Emirate of Dubai of 60 km water pipe
line.
Responsibilities:Installation,Commissioning,testing,ShutDown,NDRCworkof
1200mmdia PipelineforM/S DEWAProjects.
ValueOfProject:-AED300Millionin34months
Client:- DubaiElectricityandWaterAuthority(DEWA)
Project No2.:- CW/308D
Project Name:- supply, installation, testing & commissioning of
fibre cement / glass reinforced plastic/glass reinforced
epoxy water transmission pipeline and associated works
from Jabel Ali Habab road ( Al Qudra Bridge) to al Lusalli
.Sewerage line, installation, testing and commissioning
also.
Responsibilities:Installation,Commissioning,testing,ShutDown,NDRCworkof
1200mmdia PipelineforM/S DEWAProjects.6kmssewerage
lineinstallationwithmanholemaking,testingand
commissioningalso.
ValueOfProject:-AED160Millionin2months35kmwaterpipeline.
Consultant: - NipponJogesuido Sekkei. Co Ltd (Japan)
Client: - DubaiElectricityand Water Authority (DEWA)
4. Employer:- Imperial Trading &Contracting Co. W.L.L, QATAR
Position;- Construction Manager
Duration:- November 2008 to October 2009
ValueofProjectDone & Duration:- 150 Million QatarRiyal,in 36 months.
Job Responsibility Construction of 38 Villas Project near Qatar
University West Bay New Doha
Consultant :- ATCO
Client :- DAR ASLAM GROUP
5. Employer: - Arabian Construction Company (ACC) UAE.
Position:- Senior Project Engineer.
Duration:- October 2007 to October 2008.
ValueofProject Done&Duration: -100 MillionU.SDollar,in36months.
JobResponsibility:-Construction of QUIDFA Power Plant. Fujairah
F2Project.
Consultant:- ALSTOM Power LTD Switzerland
Client:- Fujairah Asia Power Limited.
6 Employer :- Continental Engineering Corporation(Taiwan)
Position :- Station Incharge –INA Metro Station .
Duration :- October 2006 to September 2007.
ValueOf Project Done &Duration: -28 MillionUS Dollar ,in36 months.
Jobresponsibility:- Construction of INA Metro Station by Top to Down
Method. i.e making diaphram wall ,Top slab,
Concourse slab, & Base slab etc & Utility diversion.
Client:- Delhi Metro Rail Corporation
7. Employer : - Senbo Engineering Ltd. New Delhi (INDIA).
Position :-Sr. Engineer.
Duration :- April 2005 to September 2006.
ValueOfProject:- Done &Duration150MillionU.A.E.Dhs.,in 24months.
Job responsibility Construction of Box type tunnel of
underground Metro Of DMRC and road diversion and
underground utility And road making from
Barakhamba road to Tilak Bridge and making
Diaphragm wall and guide wall by top to Down
method, and utility diversion of 2400 mm dia AC Pipe
and 1200 mm Dia AC Pipe.
Client:- Delhi Metro Rail Corporation (DMRC)
8. Employer:- Joint Venture Companies KSHI (Kumagai Japanese
Company) Skanska(Swedish company)HCC (Indian Company)
Itochu (Japanese company) Delhi metro Rail corporation MC1A
Project.
Position :- Sr. Project Engineer.
Duration :- April 2003 to March 2005.
ValueOfProject Done &Duration: - 2BillionU.s.Dollars, in48months.
Consultant:- Mounsel
Client: Delhi Metro Rail Corporation (DMRC)
JOB DESCRIPTION
Rock Excavation and soil excavation, wall decking RCP,
SLP, Rock bolts, shot Crete, concrete and ground
anchor. Ancillary Building works ,Diversion of
underground utility, storm water sewer line, water
line, Misc planning, Blinding ,concreting of base slab
wall roof slab and execution of site work as per drawing
and casting with L&T. Doka system. Handling site
independently. Road making from Delhi university to
VidhanSabha, Pipe line laying 600 mm Dia AC Pipe and
making manhole.
9 . Employer:- M/S Ahluwalia contracts (India) Ltd March
1998to Feb 2003
Position:- Project Engineer.
Duration:- March 1998 to Feb 2003.
Value ofProject Done &Duration:- 0. 5BillionU.s. Dollars, in60 months.
JOB DESCRIPTION:-
Hindustan computer Ltd, H.O. Building in NoidaSec.3,
construction. Rectification and Renovation of 5 Star
Shangrilla hotel. New Delhi -110001.
10. Employer :- M/S Nagarjuna Construction Co Ltd, Karnatka (INDIA)
Position : - Assistant Engineer Civil.
Duration :- March 1996 to Feb 1998.
ValueOf Project Done &Duration: - 0. 3 BillionU.s. Dollars, in36months.
Job Responsibility: - Construction of multi-storied building of
Karnataka Housing Board Project in Bangalore.
RESPONSIBILITIES:
 Centering and shuttering works with L&T. Doka system layout and
leveling work. All finishing works.
 Water proofing works/cracks works.
 Piling works.
 Road Work.
 Underground metro project by top to down and cut and
cover method.
 Utility diversion.
 Strom water and sewerage pipeline laying and
maintenance of 2400mm, 1200mm dia.
 Pipe rack foundation and steel structure installation,
Fabrication and pipe laying.
 By open-cut method Installation commissioning, testing,
Inter connection, shutdown, NDRC works of 1200mm
Dia Water Pipe line for M/S. DEWA.
OVER ALL DUTIES & RESPONSIBILITIES:
 Reports directly to Projects Manager Operations
Manager / General Manager.
 Prepare contracts and negotiate revisions, changes and
additions to contractual agreements with architects,
consultants, clients, suppliers and subcontractors.
 Attends Projects Coordination & Progress Meetings.
 Ensure that all materials to be used in the project,
conform to the
 Required standards & contract specifications.
 Monitor all projects progress and inform Site Engineers
for all revisions and deviation orders
 Coordinates with the Client’s Project Engineer/Project
Manager in all related to execution of the contract.
 Suppliers and subcontractors.
 Informs suppliers provide the necessary operation and
maintenance manuals ahead of time to avoid delay in
project handover.
 Prepare Cost Control for Purchase Orders Material
Procurement and bill of material of site control an
reference(with estimator)
 Sending Quotation Request to vendors with the help of his
Secretary (at least three in every materials for comparison)
to get actual
prevailing prices in the market.
 Duly review all safety reports and CQC comments for
possible follow up action.
 Assigned competent personnel in special phase of
construction.
 Abide any construction related job as instructed by the
Projects manager.
 Set an example to all his subordinates with regards to
construction quality and site safety aspects.
 Conduct monthly coordination meetings with company’s Site
Engineers, safety Engineers, QC Engineers for correct and
applicable construction Techniques and to apply it with
finesse.
 Ensure the Client’s contract requirements are met. Issue
Purchase Orders early for all long lead materials (Package
Substation, HVAC Equipment, Crane, Hydraulic lifts Air
Compressors, etc.) so that delivery will not effect the target
Completion date.
 Authorize to sign all submittals, payment claims &
correspondences and make on the spot decision for any
project requirements and resolution with contracting
Officer’s Representative (COR).
Academic Qualification
B E in (Civil) Bangalore University in Feb. 1996.
Additional Qualification
Project Management Professional (P.M.P) Course, Dubai, U.A.E.
Sr. Project Engineer / Construction manager Approved by Road & Transport
Authority (RTA) Government of Dubai, U.A.E.
IT Skill
 Packages MS office.
 Auto cad
 Internet
I do hereby declare that above particulars, which I furnished, are true and
correct to best of my knowledge.
Your faithfully
Engr. Rama Shankar Trivedi
jainco

More Related Content

What's hot (20)

A resume FRES (1)
A resume FRES (1)A resume FRES (1)
A resume FRES (1)
 
Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CV
 
MCV
MCVMCV
MCV
 
Rozlan Ramli 2015
Rozlan Ramli 2015Rozlan Ramli 2015
Rozlan Ramli 2015
 
RANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CLRANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CL
 
Civil QC Inspector (Aramco Approved)
Civil QC Inspector (Aramco Approved)Civil QC Inspector (Aramco Approved)
Civil QC Inspector (Aramco Approved)
 
CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Md._Habibur_Rahman_CV
Md._Habibur_Rahman_CVMd._Habibur_Rahman_CV
Md._Habibur_Rahman_CV
 
Resume-1- Ashraf Khan (1)
Resume-1- Ashraf Khan (1)Resume-1- Ashraf Khan (1)
Resume-1- Ashraf Khan (1)
 
CV PM-KJH
CV PM-KJHCV PM-KJH
CV PM-KJH
 
Civil finishing engineer(2)
Civil finishing engineer(2)Civil finishing engineer(2)
Civil finishing engineer(2)
 
V.BASKAR CV
V.BASKAR CVV.BASKAR CV
V.BASKAR CV
 
Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15
 
CV
CVCV
CV
 
CV of Engr. Habibullah_1.5 DEC 2014
CV  of Engr. Habibullah_1.5 DEC 2014CV  of Engr. Habibullah_1.5 DEC 2014
CV of Engr. Habibullah_1.5 DEC 2014
 
Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3
 
Yusuf Khan (CV) Up Date
Yusuf Khan (CV) Up DateYusuf Khan (CV) Up Date
Yusuf Khan (CV) Up Date
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-New
 
cv for Project Engineer
cv for Project Engineercv for Project Engineer
cv for Project Engineer
 

Similar to jainco (20)

AL SARABI CV
AL SARABI CVAL SARABI CV
AL SARABI CV
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Ganesan resume
Ganesan resumeGanesan resume
Ganesan resume
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
KWKCV16
KWKCV16KWKCV16
KWKCV16
 
ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
mathy 2015
mathy 2015mathy 2015
mathy 2015
 
My Resume.1
My Resume.1My Resume.1
My Resume.1
 
Manickam - CV
Manickam - CVManickam - CV
Manickam - CV
 
Rafeek's CV
Rafeek's CV Rafeek's CV
Rafeek's CV
 
kkbiodata 1.6.15
kkbiodata 1.6.15kkbiodata 1.6.15
kkbiodata 1.6.15
 
JAMES -CV -
JAMES -CV -JAMES -CV -
JAMES -CV -
 
Ajay Resume
Ajay Resume Ajay Resume
Ajay Resume
 
CV1
CV1CV1
CV1
 
cv of suresh latest (4) (1)
cv of suresh latest (4) (1)cv of suresh latest (4) (1)
cv of suresh latest (4) (1)
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2
 
CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)
 
CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)
 

jainco

  • 1. Objective Rama Shankar Trivedi Email: rstrivedi_civileng@yaho o.com Cell: + 91 9971423300 +91 9971081909 PERSONAL INFO: Date of Birth : 14/10/1968 Sex : Male Marital Status : Married Nationality : Indian Languages Known : English, Hindi.  To pursue a career in a globally competitive environment and to work on challenging assignments that provide better career prospects, job satisfaction and steady paced professional growth thereby contributing maximum to the organization. Employment History  19 years of Professional Experience in Construction Industry with experience in Industrial building, Tower, Tunnel, Power plant, underground metro projects, Pipe Lines projects, Road & Infrastructure projects.  I am a creative, outgoing individual with an exceptionally positive personality, whom possesses great abilities in successfully executing and completing given tasks. Also, I am extremely idealistic and possess the ability to handle unexpected situations with minute difficulty. Experience 1 Employer: Jainco Buildcon Limited, Shalimar Bagh, New Delhi Position :- Project Engineer Job Responsibility:- Proving and Laying of Sewerage Line in Mahaveer enclave F & D Block, New Delhi and water pipeline laying of 1200mm dia. Duration:- Feb. 2016 to Till Date 2 Employer : AL RAJHI CONSTRUCTION L.L.C IN UAE Position : - Construction Manager Project is awarded to Al Rajhi Construction LLC. Project consists of Infrastructure Development including Earthworks, 80 km of arterial ConstruCtion manager abdul lathif mohamed fareezan
  • 2. roads and 270 km of internal neighborhood roads & Parking, Sewerage, Storm water, Potable water, Irrigation, Telephone, Electrical and Street lighting works The Value of Project : AED 700 million Client : MUSANADA Project Management : PARSONS Consultant : MOTT MACDONALD Duration:- January 2015 to November 2015 RESPONSIBILITIES  Reviews project plans and proposals, then works with management to develop project objectives. Identifies project responsibilities by determining the phases and elements of the project.  Reviews contractor bids; interviews and assigns personnel to specific phases and elements of the project. Through project coordination meetings and other forms of communication, oversees and coordinates the technical aspects of the project.  Prepares status reports and regularly monitors budgets, contractors and schedules. Allocates project resources appropriately; approves expenditures; employee contractor contracts. Keeps an accurate record and electronic data base of all elements of the projects.  Presents procedures, rules and regulations to those involved in the project; maintains a safe, clean and productive environment through enforcing procedures. Maintains project integrity and reputation through compliance with state and federal regulations.  Determines project specifications by studying product design, customer requirements, and performance standards; completing technical studies; preparing cost estimates.  Confirms product performance by designing and conducting tests.  Determines project schedule by studying project planand specifications; calculating time requirements; sequencing project elements.  Maintains project schedule by monitoring project progress; coordinating activities; resolving problems.  Controls project plan by reviewing design, specifications, and plan and schedule changes; recommending actions.  Controls project costs by approving expenditures; administering contractor contracts.
  • 3.  Prepares project status reports by collecting, analyzing, and summarizing information and trends; recommending actions.  Maintains safe and clean working environment by enforcing procedures, rules, and regulations. 3. Employer: Ghantoot Gulf Contracting Dubai, UAE Position : - ConstructionManager,/ Acting Project Manager. Duration :- November 2009 to December 2014 Project No1.:- CW/512C Project Name:- supply, installation, testing & commissioning of fibre cement / glass reinforced plastic/glass reinforced epoxy water transmission pipeline and associated works from Jabel Ali habab road to al Ain road and Al Barsha parallel road in Emirate of Dubai of 60 km water pipe line. Responsibilities:Installation,Commissioning,testing,ShutDown,NDRCworkof 1200mmdia PipelineforM/S DEWAProjects. ValueOfProject:-AED300Millionin34months Client:- DubaiElectricityandWaterAuthority(DEWA) Project No2.:- CW/308D Project Name:- supply, installation, testing & commissioning of fibre cement / glass reinforced plastic/glass reinforced epoxy water transmission pipeline and associated works from Jabel Ali Habab road ( Al Qudra Bridge) to al Lusalli .Sewerage line, installation, testing and commissioning also. Responsibilities:Installation,Commissioning,testing,ShutDown,NDRCworkof 1200mmdia PipelineforM/S DEWAProjects.6kmssewerage lineinstallationwithmanholemaking,testingand commissioningalso. ValueOfProject:-AED160Millionin2months35kmwaterpipeline. Consultant: - NipponJogesuido Sekkei. Co Ltd (Japan) Client: - DubaiElectricityand Water Authority (DEWA)
  • 4. 4. Employer:- Imperial Trading &Contracting Co. W.L.L, QATAR Position;- Construction Manager Duration:- November 2008 to October 2009 ValueofProjectDone & Duration:- 150 Million QatarRiyal,in 36 months. Job Responsibility Construction of 38 Villas Project near Qatar University West Bay New Doha Consultant :- ATCO Client :- DAR ASLAM GROUP 5. Employer: - Arabian Construction Company (ACC) UAE. Position:- Senior Project Engineer. Duration:- October 2007 to October 2008. ValueofProject Done&Duration: -100 MillionU.SDollar,in36months. JobResponsibility:-Construction of QUIDFA Power Plant. Fujairah F2Project. Consultant:- ALSTOM Power LTD Switzerland Client:- Fujairah Asia Power Limited. 6 Employer :- Continental Engineering Corporation(Taiwan) Position :- Station Incharge –INA Metro Station . Duration :- October 2006 to September 2007. ValueOf Project Done &Duration: -28 MillionUS Dollar ,in36 months. Jobresponsibility:- Construction of INA Metro Station by Top to Down Method. i.e making diaphram wall ,Top slab, Concourse slab, & Base slab etc & Utility diversion. Client:- Delhi Metro Rail Corporation 7. Employer : - Senbo Engineering Ltd. New Delhi (INDIA). Position :-Sr. Engineer. Duration :- April 2005 to September 2006. ValueOfProject:- Done &Duration150MillionU.A.E.Dhs.,in 24months. Job responsibility Construction of Box type tunnel of underground Metro Of DMRC and road diversion and underground utility And road making from Barakhamba road to Tilak Bridge and making Diaphragm wall and guide wall by top to Down method, and utility diversion of 2400 mm dia AC Pipe and 1200 mm Dia AC Pipe.
  • 5. Client:- Delhi Metro Rail Corporation (DMRC) 8. Employer:- Joint Venture Companies KSHI (Kumagai Japanese Company) Skanska(Swedish company)HCC (Indian Company) Itochu (Japanese company) Delhi metro Rail corporation MC1A Project. Position :- Sr. Project Engineer. Duration :- April 2003 to March 2005. ValueOfProject Done &Duration: - 2BillionU.s.Dollars, in48months. Consultant:- Mounsel Client: Delhi Metro Rail Corporation (DMRC) JOB DESCRIPTION Rock Excavation and soil excavation, wall decking RCP, SLP, Rock bolts, shot Crete, concrete and ground anchor. Ancillary Building works ,Diversion of underground utility, storm water sewer line, water line, Misc planning, Blinding ,concreting of base slab wall roof slab and execution of site work as per drawing and casting with L&T. Doka system. Handling site independently. Road making from Delhi university to VidhanSabha, Pipe line laying 600 mm Dia AC Pipe and making manhole. 9 . Employer:- M/S Ahluwalia contracts (India) Ltd March 1998to Feb 2003 Position:- Project Engineer. Duration:- March 1998 to Feb 2003. Value ofProject Done &Duration:- 0. 5BillionU.s. Dollars, in60 months. JOB DESCRIPTION:- Hindustan computer Ltd, H.O. Building in NoidaSec.3, construction. Rectification and Renovation of 5 Star Shangrilla hotel. New Delhi -110001. 10. Employer :- M/S Nagarjuna Construction Co Ltd, Karnatka (INDIA) Position : - Assistant Engineer Civil. Duration :- March 1996 to Feb 1998. ValueOf Project Done &Duration: - 0. 3 BillionU.s. Dollars, in36months. Job Responsibility: - Construction of multi-storied building of Karnataka Housing Board Project in Bangalore. RESPONSIBILITIES:  Centering and shuttering works with L&T. Doka system layout and leveling work. All finishing works.
  • 6.  Water proofing works/cracks works.  Piling works.  Road Work.  Underground metro project by top to down and cut and cover method.  Utility diversion.  Strom water and sewerage pipeline laying and maintenance of 2400mm, 1200mm dia.  Pipe rack foundation and steel structure installation, Fabrication and pipe laying.  By open-cut method Installation commissioning, testing, Inter connection, shutdown, NDRC works of 1200mm Dia Water Pipe line for M/S. DEWA. OVER ALL DUTIES & RESPONSIBILITIES:  Reports directly to Projects Manager Operations Manager / General Manager.  Prepare contracts and negotiate revisions, changes and additions to contractual agreements with architects, consultants, clients, suppliers and subcontractors.  Attends Projects Coordination & Progress Meetings.  Ensure that all materials to be used in the project, conform to the  Required standards & contract specifications.  Monitor all projects progress and inform Site Engineers for all revisions and deviation orders  Coordinates with the Client’s Project Engineer/Project Manager in all related to execution of the contract.  Suppliers and subcontractors.  Informs suppliers provide the necessary operation and maintenance manuals ahead of time to avoid delay in project handover.  Prepare Cost Control for Purchase Orders Material Procurement and bill of material of site control an reference(with estimator)  Sending Quotation Request to vendors with the help of his Secretary (at least three in every materials for comparison) to get actual prevailing prices in the market.  Duly review all safety reports and CQC comments for possible follow up action.  Assigned competent personnel in special phase of construction.
  • 7.  Abide any construction related job as instructed by the Projects manager.  Set an example to all his subordinates with regards to construction quality and site safety aspects.  Conduct monthly coordination meetings with company’s Site Engineers, safety Engineers, QC Engineers for correct and applicable construction Techniques and to apply it with finesse.  Ensure the Client’s contract requirements are met. Issue Purchase Orders early for all long lead materials (Package Substation, HVAC Equipment, Crane, Hydraulic lifts Air Compressors, etc.) so that delivery will not effect the target Completion date.  Authorize to sign all submittals, payment claims & correspondences and make on the spot decision for any project requirements and resolution with contracting Officer’s Representative (COR). Academic Qualification B E in (Civil) Bangalore University in Feb. 1996. Additional Qualification Project Management Professional (P.M.P) Course, Dubai, U.A.E. Sr. Project Engineer / Construction manager Approved by Road & Transport Authority (RTA) Government of Dubai, U.A.E. IT Skill  Packages MS office.  Auto cad  Internet I do hereby declare that above particulars, which I furnished, are true and correct to best of my knowledge. Your faithfully Engr. Rama Shankar Trivedi