DREAM HOUSE
MS MERRITT BUILDS HER DREAM HOUSE
HARBIN INSTITUTE OF TECHNOLOGY
• NAME: 亚姆特 NYAMUTORA TAFADZWA COLLIN
• STUDENT NUMBER: L163330118
• PROJECT TITLE: MS MERRITTS DREAM MANSION.
• MAJOR: CIVIL ENGINEERING.
• SUBJECT: PROJECT MANAGEMENT FOR CONSTRUCTION.
• SUPERVISOR: Dr Tai shuangliang.
DREAM HOUSE MANSION
• Owner: Ms Merrit.
• Project: Dream Mansion.
• Location: Along Lake Anna Virginia New Asgard USA.
• Budget: $399,999 (including design and construction).
• Project delivery system: Design-build.
• INTRODUCTION OF THE CASE.
• A lot of consideration has to be taken into account when dealing with someone’s privately invested residence as they came across a lot of
doubts, misconception and procrastination, they will of course be skeptical about going through with the project. In our case since land in
the North East territory of NewAsgard had already been purchased, the plot being an open fairly flat area by lakeside we had already
achieved the scenic beauty and peacefulness area considerations for our clients given their current situation.
• From this the following factors will be considered during the design building.
Main procedures of the design.
• This will include the procedure to be conducted during the design process.
• Contract confirmation with client
• Plan of what to do after sign the contract with the design build.
• This includes:
• Design
• Construction.
• Design and Construction will mainly deal with basic to advanced construction idea and procedure of works
• Plan and schedule
• It included timing or the duration on which the project will take place with in a period of time.
• Budget, ‘
• will involve the amount of money invested by the client including tax rates
• Schedule
• Is time allocation in order to ensure the course of the project runs smoothly
DISCUSSION.
• Romantic readers may first wish to decide Merritt’s marital future, what should she do?
Merritt, having lived with her mother for the whole durational period since her father passed away would
seem fine at first glance but the joy and comfort that comes with an extended family will most definitely
bring about a sort of joy and comfort that may be missed unintentionally.
Although it remains true that the extra cost will be a little overwhelming for even the both of them but it
might prove beneficial in bringing more than a little happiness in the house.
• Anatomy of a project, Capturing the vision for the build vs no build decision juncture and if it applys to
Ms Merrit’s dream mansion?
In Ms Merritt’s case since above we have already gone with the decision of romantics in support of the
future of her marital life it will have an influence.
In deciding on going through with the marriage she also faces the extra cost challenge, that is the extra
costs which will have to be icured if they would like to be living together at her lake house mansion.
With the extra $100,000 going to be incurred and shared between the new couple a build versus non
build decision juncture will at various points be faced.
On the other hand if we neglect the romantics approach we can also negate the extra cost and also
overlook the possibility of there being a build vs non build decision juncture.
ASSIGNMENT.
• Our first point of action should lie on the apparent choice our client had even before considering the extra cost of living with the extended family.
• This being the choice of using old style traditional historical stlyle of architecture and including a c classic porch to the river in which she can have a
smaller lake side gazebo inclusive in the total price and also within our required territory.
• Her second choice would therefore be tacking use of current technological architecture which will have a large view window taking full advantage
the scenic beauty of the lake house view?
• After deliberation for an extended period of time we came to the conclusion that if our client is to be married a historic style lake house mansion
be inadequate and will prove to have extra unnecessary cost material use wise.
• On the otherhand having an open porch large view window style lake house mansion for just her and her mother might also prove expensive for
Ms Merritss alone.
• Having understood this we came to the conclusion that we can find common ground with our two obligations.
• If the lake house is just for her and her mother we will settle on the historical style mansion lakehouse setup with sudo style lakeside porch gazebo.
• If the lake house is for her and also inclusive of the extended family of the newly wedded the more suitable wide view windowed setup would be
preferable.
1st Choice: For Ms Merritt and her mother only.
Possible Advantages
Lowered cost due to overlooking the more expensive wide view set up
Earlier project completion
Historical preservation
less restrictions have to be dealt with
good management of boundaries
overall project optimization
Possible Shortfalls
overlook the obvious scenic beauty that could have been utilized
wasted space
increased workload since we have included an additional gazebo construction
2nd Choice: For Merritt, her mother and Husband
Possible Advantages
scenic beauty advantage
overall space optimum utilization
project completion relatively early
additional space can be leftover for later construction ideas
general use of modern innovative ideas
Possible Shortfalls
Extra cost to be incurred
Project completion might take time
Unkown design method will be used
1st PROJECT DESCRIPTION AND PROCEDURES
• With a budget of $399,999 which will be conducted under the private sector so the private sector rules and regulations
will apply. It will be a 2 Storey building which will have main bedrooms downstairs and additional guest rooms upstairs
Design Components
i. Patio space to entertain 3 to 5adults
ii. Develop a rustic patio space potentially using reclaimed brick or similar surfacing material Indoor
iii. Possible water feature
iv. Low voltage lighting system
v. Carriage house – integrate a carriage house into the scheme and consider an alternate use in the event the house is not
constructed
vi. Off street parking at the rear of the property
vii. Rear wrap around porch – incorporate a porch with stairs off of the house
viii. Overhead structure(s) – possibly incorporate one or more overhead structures
ix. Consider a space for a gazebo
1st PROJECT SCHEDULE
• Our construction document as stated the project will start early in january 2020 and is supposed to be done by late 2020. It
is also anticipated also that the construction manager is under contract. The house is expected to be finished within the
durational period of about a year.
2nd PROJECT DESCRIPTION AND PROCEDURES
• With a budget of over $599.999 which will be conducted under the private sector so the private sector rules and regulations will apply. It will be a 2
Storey building which will have main master bedrooms and additional guest rooms downstairs having additional bedrooms upstairs for kids.
Design Components
i. Pool Cabana
In the summer, this indoor outdoor room primarily acts as a pool cabana. The massive glass pocket doors are set just feet from the pool, and the
the slightly elevated perch creates a unique relationship to the outside. Open the doors, flip the cushions on the couch and simply sit inside and
and feel like you are outside At the same time, guests and family can float in the pool and look right inside to watch the game on the large flat
screen television while listening to it on outdoor speakers.
ii. Patio space to entertain 6 or 8 adults
iii. Outdoor kitchen with associated seating
iv. Possible water feature
v. Low voltage lighting system
vi. Carriage house – integrate a carriage house into the scheme and consider an alternate use in the event the house is not constructed
vii. Off street parking at the rear of the property
viii. Consider a space for a hammock.
2nd PROJECT SCHEDULE
Our construction document as stated the project will start early in January 2020 and is supposed to be done by late 2020. It is also anticipated also that
the construction manager is under contract. The house is expected to be finished within the durational period of about a year.
SETBACK REQUIREMENTS
• Setback requirements are 100 feet from the lake and 30 feet from the side property lines. For both cases
the same amount of space and boundaries apply exclusive of the gazebo setup. We never ran into any
trouble with the setback requirement as it overlooked the gazebo setup and ample space was in play.
RESTRICTIONS
• The only public services are electricity and phone lines, water will have to come from a domestic well and
sewage is handaled by mechanical aerators with sand filters and also the system should be closely
regulated to prevent and avoid lake pollution.
DESIGN COMPONENTS/ CHALLENGES
• One crucial component to developing the design was the strong desire of the client to salvage a large,
twenty five foot tall and twenty five foot wide Japanese Maple specimen tree. The crux of the problem
was the location of the tree. Keeping the Japanese Maple in its original location meant it was directly in
front of, and therefore blocking, the entrance of the house. Relocating the tree to a more ideal location
would mean eating up a significant portion of the construction budget). Ultimately it was decided that
relocating the tree would be the best aesthetic solution.
• The final design included the relocation of the maple, the construction of a modest boulder wall that
would provide level land for the new maple location, the construction of a new random dimensional
bluestone walk, and additional plant materials to add color and interest. Further architectural
improvements to the front of the house included the addition of a dormer to the existing front porch
roof, removal of the existing railing and support posts and installing two larger more prominent support
columns, upgrading the porch lighting, replacement of the entrance door and, finally, replacing all of the
window trim on the front of the house with larger, more prominent trim work. We also had to address
the steep slope to the east side of the house without disrupting the existing utilities running from the
LESSONS LEARNED
• Since the design of the house was completed and construction commenced prior to any consideration
for the landscape elements, there were limited opportunities to modify the design of the house to
integrate the functional and aesthetic exterior elements. The involvement of a landscape architect is
much more constructive and cost effective when introduced to the project before the building is
complete, even before ground-breaking, in the early concept and planning stage. Landscape architects
can assist clients with understanding the budgetary considerations of the functionally required aspects
the site as well as planning for the more recreational, creative and artistic accompaniments. This client
now forced to allocate approximately $74,000 of their overall house budget to fix problems that could
have been mitigated with some forethought.
REFERENCE
www.google.com
www.forsythpl.org
Zvimwewo zvidata
Project Management for Construction by Dr. Tai shuangliang

More Related Content

What's hot

What's hot (20)

Stage 13 revised design guidelines grand vista release
Stage 13 revised design guidelines grand vista releaseStage 13 revised design guidelines grand vista release
Stage 13 revised design guidelines grand vista release
 
DB CV 27.07.15
DB CV 27.07.15DB CV 27.07.15
DB CV 27.07.15
 
All electric multi-family buildings 3-30-19
All electric multi-family buildings 3-30-19All electric multi-family buildings 3-30-19
All electric multi-family buildings 3-30-19
 
Case study of ralph rapson greenbelt house final
Case study of ralph rapson greenbelt house finalCase study of ralph rapson greenbelt house final
Case study of ralph rapson greenbelt house final
 
E.c.g. company portfolio updated 20200226
E.c.g. company portfolio updated 20200226E.c.g. company portfolio updated 20200226
E.c.g. company portfolio updated 20200226
 
Dockside Green Case-study, Victoria, British Columbia, Canada LEED
Dockside Green Case-study, Victoria, British Columbia, Canada LEEDDockside Green Case-study, Victoria, British Columbia, Canada LEED
Dockside Green Case-study, Victoria, British Columbia, Canada LEED
 
Biju mathew residence
Biju mathew residenceBiju mathew residence
Biju mathew residence
 
Arkwright Work Experience Group Cor3
Arkwright Work Experience Group Cor3Arkwright Work Experience Group Cor3
Arkwright Work Experience Group Cor3
 
Village green release design guidelines
Village green release design guidelinesVillage green release design guidelines
Village green release design guidelines
 
Sustainability in Architecture, Interior Design, Landscape, building
Sustainability in Architecture, Interior Design, Landscape, buildingSustainability in Architecture, Interior Design, Landscape, building
Sustainability in Architecture, Interior Design, Landscape, building
 
Woodlawn project in Ascent magazine
Woodlawn project in Ascent magazineWoodlawn project in Ascent magazine
Woodlawn project in Ascent magazine
 
Don Talend Below-Grade Parking Boosts Low-Rise Housing Design
Don Talend Below-Grade Parking Boosts Low-Rise Housing DesignDon Talend Below-Grade Parking Boosts Low-Rise Housing Design
Don Talend Below-Grade Parking Boosts Low-Rise Housing Design
 
Beyond Zero Carbon Housing - Mark Gillott
Beyond Zero Carbon Housing - Mark GillottBeyond Zero Carbon Housing - Mark Gillott
Beyond Zero Carbon Housing - Mark Gillott
 
BUILD IT article
BUILD IT articleBUILD IT article
BUILD IT article
 
hugh j bitz, architect porfolio brief
hugh j bitz, architect  porfolio briefhugh j bitz, architect  porfolio brief
hugh j bitz, architect porfolio brief
 
Somijas pieredze mājokļu renovācijā
Somijas pieredze mājokļu renovācijāSomijas pieredze mājokļu renovācijā
Somijas pieredze mājokļu renovācijā
 
Architectural Case Study
Architectural Case StudyArchitectural Case Study
Architectural Case Study
 
Sustainable Communities
Sustainable Communities Sustainable Communities
Sustainable Communities
 
MinnePHit House Case Study
MinnePHit House Case StudyMinnePHit House Case Study
MinnePHit House Case Study
 
Build 2 2016_eng_original_singlepage
Build 2 2016_eng_original_singlepageBuild 2 2016_eng_original_singlepage
Build 2 2016_eng_original_singlepage
 

Similar to Dream House

Project Spotlight_PR0415
Project Spotlight_PR0415Project Spotlight_PR0415
Project Spotlight_PR0415
Ingrid Bush
 

Similar to Dream House (20)

Tiny strawbale home.jo annburns.04 23_20
Tiny strawbale home.jo annburns.04 23_20Tiny strawbale home.jo annburns.04 23_20
Tiny strawbale home.jo annburns.04 23_20
 
Case Study : Post Tsunami Housing in Kirinda by Shigeru Ban
Case Study : Post Tsunami Housing in Kirinda by Shigeru BanCase Study : Post Tsunami Housing in Kirinda by Shigeru Ban
Case Study : Post Tsunami Housing in Kirinda by Shigeru Ban
 
N1 presentation1
N1 presentation1N1 presentation1
N1 presentation1
 
Portfolio Shalvi Shamra
Portfolio Shalvi ShamraPortfolio Shalvi Shamra
Portfolio Shalvi Shamra
 
Group 3 final.pptx
Group 3 final.pptxGroup 3 final.pptx
Group 3 final.pptx
 
Resident_-_Issue_11
Resident_-_Issue_11Resident_-_Issue_11
Resident_-_Issue_11
 
NearZero
NearZeroNearZero
NearZero
 
Rochester Homes Complete Brochure
Rochester Homes Complete BrochureRochester Homes Complete Brochure
Rochester Homes Complete Brochure
 
Project Information - Gharkey St House
Project Information - Gharkey St HouseProject Information - Gharkey St House
Project Information - Gharkey St House
 
Desktop study guest house
Desktop study  guest houseDesktop study  guest house
Desktop study guest house
 
Project Spotlight_PR0415
Project Spotlight_PR0415Project Spotlight_PR0415
Project Spotlight_PR0415
 
Rohan Leher2 Brochure - Zricks.com
Rohan Leher2 Brochure - Zricks.comRohan Leher2 Brochure - Zricks.com
Rohan Leher2 Brochure - Zricks.com
 
Customize Modular Homes Fayetteville NC
Customize Modular Homes Fayetteville NCCustomize Modular Homes Fayetteville NC
Customize Modular Homes Fayetteville NC
 
Bajo Tejares Proposal
Bajo Tejares ProposalBajo Tejares Proposal
Bajo Tejares Proposal
 
Bajo Tejares Proposal
Bajo Tejares ProposalBajo Tejares Proposal
Bajo Tejares Proposal
 
We have your piece of heaven
We have your piece of heavenWe have your piece of heaven
We have your piece of heaven
 
We Have Your Piece of Heaven
We Have Your Piece of HeavenWe Have Your Piece of Heaven
We Have Your Piece of Heaven
 
IRJET- Keeping Alive Green Buildings in Today’s Environment
IRJET- Keeping Alive Green Buildings in Today’s EnvironmentIRJET- Keeping Alive Green Buildings in Today’s Environment
IRJET- Keeping Alive Green Buildings in Today’s Environment
 
APEX Airspace.pptx
APEX Airspace.pptxAPEX Airspace.pptx
APEX Airspace.pptx
 
Equis Lake Design Guidelines Brochure
Equis Lake Design Guidelines BrochureEquis Lake Design Guidelines Brochure
Equis Lake Design Guidelines Brochure
 

More from SAIFULLAH MAHMUD (17)

Wind effects on structures
Wind effects on structuresWind effects on structures
Wind effects on structures
 
Wind Analysis of Structure
Wind Analysis of StructureWind Analysis of Structure
Wind Analysis of Structure
 
Coriolis effect
Coriolis effectCoriolis effect
Coriolis effect
 
structural concepts and systems
structural concepts and systemsstructural concepts and systems
structural concepts and systems
 
Shear Forces
Shear ForcesShear Forces
Shear Forces
 
Quebec disaster
Quebec disasterQuebec disaster
Quebec disaster
 
Structural Concept of Trusses
Structural Concept of TrussesStructural Concept of Trusses
Structural Concept of Trusses
 
Bridge Structure
Bridge StructureBridge Structure
Bridge Structure
 
Concept bending l163330114
Concept bending l163330114Concept bending l163330114
Concept bending l163330114
 
Group presentation 101 firefighting
Group presentation 101 firefightingGroup presentation 101 firefighting
Group presentation 101 firefighting
 
Project ppt riverside condo
Project ppt riverside condoProject ppt riverside condo
Project ppt riverside condo
 
The tomorrow company power point by aung thu
The tomorrow company power point by aung thuThe tomorrow company power point by aung thu
The tomorrow company power point by aung thu
 
Evans investment inc
Evans investment incEvans investment inc
Evans investment inc
 
satellite campus
satellite campussatellite campus
satellite campus
 
Bicentennial ibrary
Bicentennial ibrary Bicentennial ibrary
Bicentennial ibrary
 
early morning retirement center
early morning retirement centerearly morning retirement center
early morning retirement center
 
composite member bamboo steel
 composite member bamboo steel composite member bamboo steel
composite member bamboo steel
 

Recently uploaded

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 

Recently uploaded (20)

Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 

Dream House

  • 1. DREAM HOUSE MS MERRITT BUILDS HER DREAM HOUSE
  • 2. HARBIN INSTITUTE OF TECHNOLOGY • NAME: 亚姆特 NYAMUTORA TAFADZWA COLLIN • STUDENT NUMBER: L163330118 • PROJECT TITLE: MS MERRITTS DREAM MANSION. • MAJOR: CIVIL ENGINEERING. • SUBJECT: PROJECT MANAGEMENT FOR CONSTRUCTION. • SUPERVISOR: Dr Tai shuangliang.
  • 3. DREAM HOUSE MANSION • Owner: Ms Merrit. • Project: Dream Mansion. • Location: Along Lake Anna Virginia New Asgard USA. • Budget: $399,999 (including design and construction). • Project delivery system: Design-build.
  • 4. • INTRODUCTION OF THE CASE. • A lot of consideration has to be taken into account when dealing with someone’s privately invested residence as they came across a lot of doubts, misconception and procrastination, they will of course be skeptical about going through with the project. In our case since land in the North East territory of NewAsgard had already been purchased, the plot being an open fairly flat area by lakeside we had already achieved the scenic beauty and peacefulness area considerations for our clients given their current situation. • From this the following factors will be considered during the design building. Main procedures of the design. • This will include the procedure to be conducted during the design process. • Contract confirmation with client • Plan of what to do after sign the contract with the design build. • This includes: • Design • Construction. • Design and Construction will mainly deal with basic to advanced construction idea and procedure of works • Plan and schedule • It included timing or the duration on which the project will take place with in a period of time. • Budget, ‘ • will involve the amount of money invested by the client including tax rates • Schedule • Is time allocation in order to ensure the course of the project runs smoothly
  • 5. DISCUSSION. • Romantic readers may first wish to decide Merritt’s marital future, what should she do? Merritt, having lived with her mother for the whole durational period since her father passed away would seem fine at first glance but the joy and comfort that comes with an extended family will most definitely bring about a sort of joy and comfort that may be missed unintentionally. Although it remains true that the extra cost will be a little overwhelming for even the both of them but it might prove beneficial in bringing more than a little happiness in the house. • Anatomy of a project, Capturing the vision for the build vs no build decision juncture and if it applys to Ms Merrit’s dream mansion? In Ms Merritt’s case since above we have already gone with the decision of romantics in support of the future of her marital life it will have an influence. In deciding on going through with the marriage she also faces the extra cost challenge, that is the extra costs which will have to be icured if they would like to be living together at her lake house mansion. With the extra $100,000 going to be incurred and shared between the new couple a build versus non build decision juncture will at various points be faced. On the other hand if we neglect the romantics approach we can also negate the extra cost and also overlook the possibility of there being a build vs non build decision juncture.
  • 6.
  • 7. ASSIGNMENT. • Our first point of action should lie on the apparent choice our client had even before considering the extra cost of living with the extended family. • This being the choice of using old style traditional historical stlyle of architecture and including a c classic porch to the river in which she can have a smaller lake side gazebo inclusive in the total price and also within our required territory. • Her second choice would therefore be tacking use of current technological architecture which will have a large view window taking full advantage the scenic beauty of the lake house view? • After deliberation for an extended period of time we came to the conclusion that if our client is to be married a historic style lake house mansion be inadequate and will prove to have extra unnecessary cost material use wise. • On the otherhand having an open porch large view window style lake house mansion for just her and her mother might also prove expensive for Ms Merritss alone. • Having understood this we came to the conclusion that we can find common ground with our two obligations. • If the lake house is just for her and her mother we will settle on the historical style mansion lakehouse setup with sudo style lakeside porch gazebo. • If the lake house is for her and also inclusive of the extended family of the newly wedded the more suitable wide view windowed setup would be preferable.
  • 8. 1st Choice: For Ms Merritt and her mother only. Possible Advantages Lowered cost due to overlooking the more expensive wide view set up Earlier project completion Historical preservation less restrictions have to be dealt with good management of boundaries overall project optimization Possible Shortfalls overlook the obvious scenic beauty that could have been utilized wasted space increased workload since we have included an additional gazebo construction
  • 9.
  • 10. 2nd Choice: For Merritt, her mother and Husband Possible Advantages scenic beauty advantage overall space optimum utilization project completion relatively early additional space can be leftover for later construction ideas general use of modern innovative ideas Possible Shortfalls Extra cost to be incurred Project completion might take time Unkown design method will be used
  • 11.
  • 12. 1st PROJECT DESCRIPTION AND PROCEDURES • With a budget of $399,999 which will be conducted under the private sector so the private sector rules and regulations will apply. It will be a 2 Storey building which will have main bedrooms downstairs and additional guest rooms upstairs Design Components i. Patio space to entertain 3 to 5adults ii. Develop a rustic patio space potentially using reclaimed brick or similar surfacing material Indoor iii. Possible water feature iv. Low voltage lighting system v. Carriage house – integrate a carriage house into the scheme and consider an alternate use in the event the house is not constructed vi. Off street parking at the rear of the property vii. Rear wrap around porch – incorporate a porch with stairs off of the house viii. Overhead structure(s) – possibly incorporate one or more overhead structures ix. Consider a space for a gazebo 1st PROJECT SCHEDULE • Our construction document as stated the project will start early in january 2020 and is supposed to be done by late 2020. It is also anticipated also that the construction manager is under contract. The house is expected to be finished within the durational period of about a year.
  • 13. 2nd PROJECT DESCRIPTION AND PROCEDURES • With a budget of over $599.999 which will be conducted under the private sector so the private sector rules and regulations will apply. It will be a 2 Storey building which will have main master bedrooms and additional guest rooms downstairs having additional bedrooms upstairs for kids. Design Components i. Pool Cabana In the summer, this indoor outdoor room primarily acts as a pool cabana. The massive glass pocket doors are set just feet from the pool, and the the slightly elevated perch creates a unique relationship to the outside. Open the doors, flip the cushions on the couch and simply sit inside and and feel like you are outside At the same time, guests and family can float in the pool and look right inside to watch the game on the large flat screen television while listening to it on outdoor speakers. ii. Patio space to entertain 6 or 8 adults iii. Outdoor kitchen with associated seating iv. Possible water feature v. Low voltage lighting system vi. Carriage house – integrate a carriage house into the scheme and consider an alternate use in the event the house is not constructed vii. Off street parking at the rear of the property viii. Consider a space for a hammock. 2nd PROJECT SCHEDULE Our construction document as stated the project will start early in January 2020 and is supposed to be done by late 2020. It is also anticipated also that the construction manager is under contract. The house is expected to be finished within the durational period of about a year.
  • 14. SETBACK REQUIREMENTS • Setback requirements are 100 feet from the lake and 30 feet from the side property lines. For both cases the same amount of space and boundaries apply exclusive of the gazebo setup. We never ran into any trouble with the setback requirement as it overlooked the gazebo setup and ample space was in play. RESTRICTIONS • The only public services are electricity and phone lines, water will have to come from a domestic well and sewage is handaled by mechanical aerators with sand filters and also the system should be closely regulated to prevent and avoid lake pollution.
  • 15. DESIGN COMPONENTS/ CHALLENGES • One crucial component to developing the design was the strong desire of the client to salvage a large, twenty five foot tall and twenty five foot wide Japanese Maple specimen tree. The crux of the problem was the location of the tree. Keeping the Japanese Maple in its original location meant it was directly in front of, and therefore blocking, the entrance of the house. Relocating the tree to a more ideal location would mean eating up a significant portion of the construction budget). Ultimately it was decided that relocating the tree would be the best aesthetic solution. • The final design included the relocation of the maple, the construction of a modest boulder wall that would provide level land for the new maple location, the construction of a new random dimensional bluestone walk, and additional plant materials to add color and interest. Further architectural improvements to the front of the house included the addition of a dormer to the existing front porch roof, removal of the existing railing and support posts and installing two larger more prominent support columns, upgrading the porch lighting, replacement of the entrance door and, finally, replacing all of the window trim on the front of the house with larger, more prominent trim work. We also had to address the steep slope to the east side of the house without disrupting the existing utilities running from the
  • 16. LESSONS LEARNED • Since the design of the house was completed and construction commenced prior to any consideration for the landscape elements, there were limited opportunities to modify the design of the house to integrate the functional and aesthetic exterior elements. The involvement of a landscape architect is much more constructive and cost effective when introduced to the project before the building is complete, even before ground-breaking, in the early concept and planning stage. Landscape architects can assist clients with understanding the budgetary considerations of the functionally required aspects the site as well as planning for the more recreational, creative and artistic accompaniments. This client now forced to allocate approximately $74,000 of their overall house budget to fix problems that could have been mitigated with some forethought.