We have spent some time
figuring out the essence of
the Leca brand and have
found that “Together we
buildforthefuture”isquite
a good summation. It con­
tains at least two elements
that we find important.
Together, because we in­
clude you – our partner/customer/allied – in
the process. Many day to day challenges are
solved in close co-operation between us as
producers and you as designers or builders.
This kind of co-operation is essential for us
to develop further. Together we find the best
solutions.
	 The future, because everything changes.
Changeisfastanditisimperativetoparticipate
in what is happening. In building ­methods,
technology, economic aspects and environ­
mental issues – to have mentioned some of the
major changes. And those who do not think
ahead, will not be a part of the future.
	 We hope that the magazine you are
holding in your hands right now visualizes the
Leca approach to modern building.
	 Our solutions are in line with modern
demands, for instance sound and thermal
insulation and low maintenance. Leca walls
contributed to sound comfort in a Portuguese
school and living comfort for people and
horses in Polish farm houses.
	 Regarding environmental demands like
water cleaning and energy saving: We pres­
ent a passive house with Leca blocks, and the
best Czech drinking water ever (cleaned with
the environmental Leca product, Filtralite).
	 And regarding fast, efficient and cost
saving building methods: Leca aggregates
save weight and thereby costs and work in a
Polish bridge and a Scottish landmark. It adds
flexibility to house building in Finland and
climate resistance on the rough west coast of
Norway.
	 And in addition, or maybe a curiosity,
Leca products challenges Danish artists in cre­
ating exciting sculptures.
	 We hope you will find the magazine
useful and inspiring.
Torben Dyrberg
Managing Director
Leca International
TOGETHER
WE BUILD FOR
THE FUTURE
BUILD
is a magazine published
by Leca International
Editorial work: TANKEN BAK
www.tankenbak.no
Design: Munch design
Editor-in-chief: Torben Dyrberg
Editor: Morten Müller,
communication manager, Leca Norway
Front page:
Gamesa headquarters in Pamplona, Spain
Photo: Rubén P. Bescos
THE FASTEST
ISOLATED ROOF
FINLAND  Roofs of Leca® aggregates is the easiest and best solution
for isolated roofs on apartment blocks. In the new area Jätkäsaari in
Helsinki there are many roofs insulated with Leca® aggregates.
Leca® is a registered trademark owned by Saint-Gobain
3
The 220 apartments under construc-
tion in Saunalahti in Finland will have
a ventilated structural Leca aggregate
roof.
	 Southwest of Espoo the contrac-
tor Lujatalo Oy is building two resi-
dential blocks with close to 220 apart-
ments. The two blocks are curved and
three floors high. The developer is
the Housing Foundation and Espoon
Asunnot.
	 The apartment blocks have a
hybrid roof for good isolation and
technical installation. There is a base
of up to 200 mm EPS insulation that
is topped with between 800 and
1000 mm Leca aggregate.
	 “The buildings have a centralized
ventilation system and conduits lead
from the ceiling down the stairways.
The roof has a great deal of technol-
ogy which is placed within the Leca
aggregate layer,” says site foreman Ari
Mohell from the contractor ­Lujatalo
Oy.
Filled with tech
The structural engineer for the pro-
ject, Taija Karjalainen from Sweco
Structural Engineering Oy, says the
thickness of the aggregate varies
with how much the building services
and technical installations require.
	 “There is practically always tech-
nology within low-pitched residential
roofs where use of insulation plates
is difficult. Managing moisture is
always important in construction.
The airing through the Leca aggre-
gate and the roof ventilators ensure
the proper removal of moisture from
the structure,” says Karjalainen.
Common solution
The ease of application and good
thermal insulation has made Leca
aggregate a common solution for
apartment blocks.
	 “It is the clearest and least prob-
lematic solution. Placing technology
in the aggregate is easy and it is also
easytoforminclinationsthatwilllead
to roof drains. As a ventilated roof
structure, a lightweight aggregate
is also operational reliable because
moisture can escape,” says worksite
manager Heikki Määttänen from the
roof constructor Kerabit Oy.
	 The Leca aggregate is lifted to
the roof with a tower crane, and
distributing approximately 500 m2
takes only a few hours. On the same
day a concrete layer about four centi­
metres is spread and honed as a base
for waterproofing.
Leca® is a registered trademark owned by Saint-Gobain
4
Developer Asuntosäätiö
Main contractor  Lujatalo Oy
Roofing contractor  Kerabit Oy
Architectural designer Arkkitehdit
Hannunkari & Mäkipaja Oy
Structural engineering Sweco
Rakennetekniikka Oy
Leca products  Leca aggregate KS 420K
Leca facts
Competent professionals quickly cast and knead the thin concrete
slab that will become a base for the final waterproofing.
A filter cloth is laid on top of the correctly applied height of
lightweight aggregate and concrete is pumped up onto the roof from
a pump vehicle.
Leca® is a registered trademark owned by Saint-Gobain
5
Facility  Helix project
Location  Falkirk, Scotland
Application  2000 m3
Contractor  R J McLeod (Contractors)
Limited
Landscape architects and engineers 
Ironside Farrar
Leca products  Leca aggregates
Leca facts
The 30-metre high horse heads rise above
the landscape. To reduce fill weight Leca
aggregates were used on the Helix project to
secure and maintain the existing fresh water
trunk main. (Photo: Martin McCarthy)
Leca® is a registered trademark owned by Saint-Gobain
6
The Helix project in Falkirk has transformed a tired and lifeless environment
into a most expansive and attractive community location. The entire site is
linked by 27 kilometres of shared access pathways linking 16 communities,
much of which has LED lighting, main access ways and a canal tunnel under
the major M9 motorway.
	 Leca aggregates have played a key role below the surface of this project
enabling construction access and land raising directly over a Scottish Water
36" fresh water trunk main and a 500 mm pumped rising main. Its specifica-
tion has avoided enormous additional costs that would have arisen from the
rerouting of Scottish Water’s assets.
30 metres high
Rising high above this futuristic community landscape are The ­Kelpies, two
fabulous 30-metres high, stainless steel sculptures of equine heads reflect-
ing the significant role the heavy horse played in Scotland’s successful era of
heavy industry and now dominate the skyline illustrating the typically equine
quality of strength and power.
	 This beautiful sculpture has been brought dramatically to life by incredi-
ble engineering knowledge and superb construction skills.
	 The overall landscape architecture for Helix was conceived by landscape
architects and engineers Ironside Farrar of Edinburgh.
	 David McCandless, graduate geo-environmental engineer, explains why
Leca aggregates were required: “Putting both the raised hard and soft land-
scape works associated with the Kelpies over the mains would have placed
unacceptable weight on the pipework so we looked for a lightweight product
to substitute the traditional earth fill and Leca aggregates fitted the bill. By
replacing up to 1250 mm of additional fill with Leca aggregates we reduced
the increased load substantially and were able to demonstrate that the land
raising could occur without undue risk.”
Resolved weight problem
This resolved the weight problem at Helix to the satisfaction of both Ironside
Farrar’s engineering team and Scottish Water’s asset manager.
	 Civil engineering contractor R J McLeod (Contractors) Limited carried out
the excavation and refill project and Spencer Carnie, project manager, super-
vised the work on site. He says:
	 “We removed the existing fill to a depth of a metre to expose the top of
the water main. Then we back filled and raised the levels with 2000 m³ of Leca
aggregates which was delivered close to the working site allowing us to place
it quickly and easily with tracked shovels. Leca aggregates worked very well for
us with no problems at all.”
CREATING A
STABLE GROUND
UK  Constructing the Helix project directly above Scottish Water Mains
pipes created a challenge. Leca® aggregates made it possible without
rerouting the mains pipework.
7
Reducing cost
by half
The new bridge over the Odra river in
Szczecin in Poland was a huge invest-
ment. Linking the city with the Gryfia
Business Park on the islands Ostrów
Brdowski and Gryfia, the bridge was
completed last year.
	 Before the bridge was com-
pleted the connection between the
islands and the city was by ferry. The
ferries had high maintenance costs
and a lot of problems, which led to
decreased investments in the area.
Poor soil
The construction was done in two
stages. Stage 1 involved building the
almost 200-metre long steel bridge
across the river. In the second stage
an access road and connection with
existing roads were constructed.
	 The poor non-bearing soil struc-
tures in the deeper layers of the
ground posed a risk for uneven struc-
ture settlements. To avoid the risk it
was decided to reduce the tension on
the embankment by using expanded
clay.
Double mattress
A mattress was made from Leca
­KERAMZYT – an aggregate that is
four times lighter than the soil at the
site.The Leca aggregate was wrapped
in geotextile fabric to form a mat-
tress. On top of this mattress a new
mattress formed from geonet and
crushed aggregate was placed before
it was topped with surface structure.
	 The solution reduced the ten-
sion below the road structure con-
siderably. The aggregate was used
to reduce tension, while the crushed
aggregate evenly distributed the
forces from the traffic.
	 The construction of the bridge
was completed by Mars Most
Brdowski and was co-funded by the
European Union with resources from
the regional development fund.
POLAND  Using Leca® KERAMZYT in the construction of an access road
to a new bridge in Szczecin in Poland, cut cost in half.
Facility  Brdowski Bridge and the road
connection to Ostrów and Gryfia islands.
Location  Szczecin, Poland
Investor  Mars Most Brdowski
Contractor  PRO Nowograd
Leca products  Leca KERAMZYT
8/10–20 R
Leca facts
Leca® is a registered trademark owned by Saint-Gobain
8
The ground was non-loadbearing. A mattress of geotextile fabric and
Leca KERAMZYT was created before a new mattress with crushed
aggregate was put on top to distribute pressure from traffic.
The Brdowski bridge created the first road connection to the islands
in Szczecin, making the area more attractive to investors.
Leca® is a registered trademark owned by Saint-Gobain
9
10
Leca® is a registered trademark owned by Saint-Gobain
A better
soundscape
for students
PORTUGAL  The use of Leca® Soundcomfort
blocks in the renovation of a school
in Lisbon, created better acoustics and
an aesthetic appeal.
11
Project  Braacamp Freire School
Location  Lisbon, Portugal
Architect  Cristina Verissimo and
Diogo Burnay Architects
Leca products  Soundcomfort blocks
and Leca aggregate
Leca facts
In the hallway in Braacamp Freire
School in Lisbon, Portugal, the
unique Leca Soundcomfort blocks
were used to create better acoustics
and an exciting look. The school was
both renovated and enlarged during
the project.
Containment
The Leca Soundcomfort blocks were
used to contain sound between the
hallway and the adjacent auditorium.
Soundcomfort blocks became essen-
tial because they brought an acous-
tic comfort and increased acoustic
absorption.
	 According to the architect
behind the project, CristinaVerissimo
and Diogo Burnay Architects, the
blocks were chosen because of their
simplicity and robustness. Another
important factor was that the block
harmonised with the existing design
and interior of the school.
Tight budget
Theprojectwasonatightbudget.The
surface of the Soundcomfort blocks
meant that the need for renders and
facade finishing was eliminated from
most of the building. Excluding ren-
ders on the surface helped bring the
project within a feasible budget.
	 An aesthetic value was added to
the project with the blocks’ grooved
surface. In some parts of the build-
ing the walls were painted in bright
colours.
	 Expanded clay aggregate was
also used in the floor fillings of the
school.
Soundcomfort blocks were used to create
better sound and acoustics when renovating
Braacamp Freire School in Lisbon, Portugal.
Bright colours and the surface of the
Soundcomfort blocks harmonised well with
the already existing design of the school.
Leca® is a registered trademark owned by Saint-Gobain
12
Supporting Scotland’s
tramways
UK  To provide access to Scotland’s home of Rugby, Murrayfield Stadium,
Leca® lightweight aggregates were just the ticket.
Leca® is a registered trademark owned by Saint-Gobain
13
To create a stable and high raised
tramway system in Edinburgh, the
Murrayfield tram stop was built on
Leca lightweight aggregate.
	 Challenges involving an already
existing Network Rail line and build-
ingsmadeLecalightweightaggregate
the best solution for the new Edin-
burgh tramway system. The station
at the famous Murrayfield Stadium,
home of Scottish Rugby, was made
possible thanks to the properties of
Leca aggregates.
Overburden
The existing ground level made it
challenging to raise the seven-metre
high structure. Traditional fill would
create an excessive burden on the
ground and threaten the stability of
the existing Network Rail line.
	 “One of our main issues was to
get such a large earthworks struc-
ture founded on the underlying soft
ground conditions without signif-
icant ground improvement being
undertaken. The lightweight attrib-
utes of the Leca aggregates satisfied
these criteria, significantly lowering
bearing/settlement at formation
compared to traditional fills. It also
interacted with the Tensar elements
of the structure without difficulty,”
says Tristan Morgan, geotechnical
engineer at Parsons Brinkerhoff.
14,000 m3
The light weight of Leca aggregates
was the perfect match for the chal-
lenge.
	 “Faced with the complications
at the Murrayfield site, especially
the potential expense of excavating
unsuitable ground, Leca aggregates
have proved exactly the right
choice of material for this technical
project. Access to the platform site
was difficult but Leca aggregates
are a versatile and easy material
to handle,” says Andrew Henry,
construction manager at Graham
Construction.
	 More than 14,000 m3 of Leca
aggregates were required for the
Murrayfield tram stop. The aggregate
was shipped directly to the nearby
Port of Leith and trucked to the site
with large capacity delivery vehicles.
Facility  Murrayfield tram stop
Location  Edinburgh, UK
Application  14,000 m3
Consulting engineer  Parsons Brinkerhoff
Leca products used 
Leca lightweight aggregate
Leca facts
Leca® is a registered trademark owned by Saint-Gobain
14
Bearing and stability concerns made Leca aggregates to be the
perfect material for infill when constructing the Murrayfield tram
stop in Edinburgh.
The new Edinburgh tram system was completed in 2014 and quickly
gained an annual number of rides at about 5 million passengers.
Faced with the complications
of the Murrayfield site, Leca
aggregates proved to be exactly
the right choice of material for
this technical project.
Leca® is a registered trademark owned by Saint-Gobain
15
The contractor Basso-Kivitalo is
building a 140 apartment complex in
­Pellaslaakso, Espoo, in Finland. Con-
sisting of five three-floor deck access
blocks, the 5400 square metre com-
plex is the biggest in Finland.
	 “If apartment buyers were asked
if they would like a stone masonry
building or a precast concrete house,
they would consider a stone masonry
building to be a much better choice,”
says development director Jukka Leht-
onen of Basso Building Systems Oy.
More flexible
Previous experience with an apart-
ment project in Sipoo taught the
construction company that using
Leca blocks is no more expensive
than using elements. Several of the
company’s previous apartment pro-
jects have shown that Leca blocks are
a cost-competitive building material.
	 “Elements have to be designed
completely ready before orders, due
to wiring installations. Leca Sandwich
blocks are immediately available. And
they are much more flexible than ele-
ments in terms of their design and
implementation,” says Lehtonen.
	 In the construction of apart-
ment blocks the benefits of the flex-
ibility of block construction are even
greater than when building single
family houses. In big projects it is
easier to fit in various work stages to
proceed flexibly in different buildings
and floors when using blocks.
Stronger blocks
In previous apartment blocks Basso
Building Systems Oy has used Leca
shuttering blocks in the lowest parts
of the construction. Due to stronger
Sandwich blocks, that is no longer
necessary.
FINLAND  Finland’s largest apartment block project in Espoo is built with
Leca® Sandwich blocks. The 140 apartment project has so far been a success.
	 “Thanks to the stronger Leca
Sandwich blocks, the construction
is even simpler, since all floors are
laid down in the same way. In Pellas-
laakso, Espoo, shuttering blocks have
only been used in a few specific loca-
tions. A house built from Leca Sand-
wich blocks can also be rendered
almost at the same time, whilst,
with concrete blocks, one must wait
longer for the concrete to dry,” Leht-
onen says.
Leca sandwich block masonry is progressing
rapidly, thanks to an experienced group of
masons.
Five three-floor buildings, with a total of 140
apartments, will be built from Leca Sandwich
blocks in the area.
In order to ensure the smooth running of
the work, the cleanliness of the worksite and
logistics management are essential.
A cost-effective
solution for Apartments
Leca® is a registered trademark owned by Saint-Gobain
16
Facility  Apartment blocks
Location  Espoo, Finland
Developer Nuorisosäätiö
Main contractor 
Basso Building Systems Oy
Architect 
Arkkitehtitoimisto Antti Heikkilä Oy
Leca products  Leca Lex Foundation
blocks, Leca Design Sandwich Blocks,
Leca EasyLex, Leca shuttering blocks,
Leca Sandwich shuttering blocks
Leca facts
Leca® is a registered trademark owned by Saint-Gobain
17
Innovative
high floors
SPAIN  The circular shape of the Gamesa headquarters was
perfect for the innovative floor solution using Leca®.
18
Photo:RubénP.Bescos
19
Leca® is a registered trademark owned by Saint-Gobain
Building a circular structure repre-
sents a challenge for prefabricated
concrete elements. A new and inno-
vative solution was needed to build
the new headquarters for Gamesa in
Pamplona in Spain.
	 Using slabs of prestressed Leca
in various forms, the floor could be
built with the shape the architect
imagined.
Revolution
The innovative floor solution was
developedbyAriblockViguetasNavar-
ras together with Viguetas Navarras
S. L. and the Centre for Development
of Industrial Technology (CDTI) to
build floors in high buildings.
	 Leca prestressed slabs are a rev-
olution in construction. The market
has adopted the floor slabs as a
standard solution that is both safe,
strong and of high quality.
	 Gamesa’s headquarters are five
floors high and 11,000 m2 in size.
The contractor VDR and Gamesa
chose to use the Leca prestressed
slabs also because they improve
the soundproofing, well above the
requirements of CTE, between floors.
It is also calculated that the high
coefficient of thermal insulation will
result in a significant energy saving
in the building.
Quick installation
As with all Leca products the slabs
provide an unbeatable prefabricated
fire protection, complying with the
REI 180 standard.
	 Another advantage of using the
prestressed Leca slabs is their quick
installation. In total 8000 m2 of slabs
were used in the Gamesa building.
The speed of installation was 500 m2
a day, which makes it an attractive
product for a wide range of uses.
Leca® is a registered trademark owned by Saint-Gobain
20
The Gamesa headquarters is a spectacular
building in Pamplona.
An innovative solution for building floors
was used to adapt the floors to the buildings
circular shape.
Using prestressed Leca slabs in the floor
construction gave the contractor a floor that
has good insulation, excellent soundproofing
and is fire resistant.
The headquarter have 8000 m2 of office
space. The use of the prestressed Leca slabs
meant that 500 m2 could be built in a day.
Facility  Gamesa headquarters
Location  Pamplona, Spain
Client Gamesa
Contractor  Consortium of VDR and
VIGUETAS NAVARRAS
Architect  Antonio and Juan Luis
Irigaray Vaillo
Leca products  Prestressed slabs Leca
that used Leca MF
Leca facts
Leca® is a registered trademark owned by Saint-Gobain
21
Five years ago Katarzyna decided to
build her new agritourism business
in Leca blocks. The reason was she
wanted something that was easy to
maintain.
	 “I wanted a comfortable house
for my guests and my animal friends
to be warm in the winter and cool in
the summer. That is why I use blocks
of expanded clay,” tells Katarzyna.
	 Her agritourism business is
located to the village of Bierzwnik in
the West Pomeranian area of Poland.
The house was built in 2011 and has a
floor area of 600 m2. The house and
stable constructions are made from
light Leca blocks and built across a
ground floor.
Hospitable house
Her guests appreciate the climate
inside the house. She says the house
is wonderful.
	 “In the summer the guests ask
if the rooms are air conditioned be­
cause they are so pleasingly cool. In
winter the house is easy to warm up,
you can feel the warmth after only 20
minutes,” Katarzyna says.
	 She knew about expanded clay
before she started planning her agri-
tourism business. When she was told
it also could be used for blocks, she
wanted to use it.
	 “Two factors influenced my deci-
sion. Firstly, expanded clay is a natu-
ral material. Secondly, an experiment
showed that expanded clay blocks
was the first of construction mate-
rial to dry up after being immersed in
water,” she explains.
Low cost heating
Due to the good insulation character-
istics of the blocks, the heating of the
house is easy.
	 “The cost of heating my house
with an area of 600 m2 is compara-
ble to heating a 300 m2 house,” says
Katarzyna.
	 She says that she will recom-
mend blocks of expanded clay to
others.
	 “The fact that I also build sta-
bles for my beloved animals should
be a sufficient recommendation,”
she remarks.
POLAND  When establishing an agritourism business in Bierzwnik in
Poland, Katarzyna chose Leca® blocks because they are natural, save
energy and are easy to build with.
Facility  Agritourism / horses stables
Location  Bierzwnik, Poland
Leca products  Leca Blok 24
Leca facts
Cool in
the summer,
warm in
the winter
Leca® is a registered trademark owned by Saint-Gobain
22
The guest house is built in Leca blocks. In the winter it is warm, and in
the summer it is cool and comfortable.
The horses also got new stables built in Leca blocks. “I want my
animal friends to be warm and dry in the winter and cool in the
summer,” says Katarzyna, the owner of the agritourism site.
The fact that expanded clay is a natural building material was
important when Katarzyna chose Leca blocks.
Leca® is a registered trademark owned by Saint-Gobain
23
These bright young minds have dis-
covered a way to put Leca aggregates
at the heart of stylish design in an
urban environment, by finding new
ways to maximise the benefits of
this versatile building material. Leca
aggregates are now officially cool –
LeCool, in fact.
Making Leca LeCool
Aarhus School of Architecture encour-
aged its students to experiment with
materials and fabrication methods,
in order to challenge preconceptions
and uncover new possibilities for
architects to consider in their designs
for buildings and urban spaces.
	 The students looked to new
technologies to transform Leca
aggregates into a swooping, curving
design, from a small prototype model
to a full-sized exhibition piece.
	 After using 3D modelling soft-
ware to determine the shape, the stu-
dents turned their design into reality
using robotic hotwire to cut through
polystyrene blocks to create a mould.
The end result was an extremely crea-
tive and exciting Leca sculpture.
	 The finished design is named
LeCool and was exhibited at the
Milan Design Week to demonstrate
how digital fabrication technologies,
such as robotic hotwire cutting and
CNC milling, can be used to produce
dynamic shapes using Leca aggre-
gates. This is a brave new world for
urban design.
Endless exciting possibilities
“It opens up exciting opportunities
and new ways to work with shapes –
you can form the material into pretty
much any shape, so the design
DENMARK  Inspired architecture students have placed Leca® at the
cutting edge of urban design by discovering this versatile and surprisingly
stylish material.
A design for urban life
potential is massive,” says Niels
Martin Larsen, associate professor at
Aarhus School of Architecture.
	 This creative project opens up
a world of possibilities for using
Leca aggregates. For example, Leca’s
ability to allow water to permeate
through it makes it worth consider-
ing for an urban roof garden or park
setting with raised flower beds in
exciting forms.
	 With such a versatile, durable,
and environmentally friendly mate-
rial, the only limit is the architect’s
imagination.
	 Look out for Leca products
appearing in exciting urban design
projects all over the world.
Leca® is a registered trademark owned by Saint-Gobain
24
The sculpture LeCool  was first made at a
small scale and then scaled up to fit the
exhibition space.
Students using robotic cutting technology
created the curved sculpture in foam before
it was cast in Leca. The sculpture was
exhibited at the Milan Design Week in April.
Facility  Unit F, Aarhus School of
Architecture, Denmark
Developers  Second- and third-year
bachelor students Sara Strandby Braae,
Niklas Søndermølle Frandsen, Martin
Waltersdorph Nielsen, and Mathias
Waldersdorff Bugge
Leca products  Leca aggregates
Leca facts
Leca® is a registered trademark owned by Saint-Gobain
25
The expansion of the water treat-
ment plant is expected to provide
sufficient capacity for the population
in the area until 2050. Construction
work started in 2014, and is expected
to be finished in 2018.
	 “The construction site is at
times very busy, and the deadlines
are tough. But it is also a very inter-
esting site to be working on,” says
Srdjan Mijatovic, foreman for the
masons in the company Waldeland
& Varhaug AS Murerfirma.
	 Leca Isoblokk has been used to
isolate technical areas from the huge
water basins that will be filtering the
water. Between the old plant and the
expansion there is also a huge Leca
Isoblokk wall.
Isolation wall
The new treatment plant has a lot
of concrete walls and constructions.
In many places the half Sandwich
block, Leca Fasadeblokk, is used both
to increase the insulation properties
of the wall and get a more attractive
facade.
	 “The walls are so high we need
to do them in several rounds to pre-
NORWAY  The IVAR Langevatn water treatment plant supplies 320,000
people with fresh water. When expanding the plant, Leca® Isoblokk plays an
important role.
vent them from seeping. As a final
treatment, the walls will be plastered
with fibre coatings,” says ­Mijatovic.
	 The total cost for the expansion
of the water treatment plant is esti-
mated at around 120 million euros.
That will give the population of the
region of Stavanger and Sandnes,
the petrol capitol of Norway, a better,
cleaner, and clearer water supply
over the next several decades.
A Better
Facade
Leca® is a registered trademark owned by Saint-Gobain
26
Facility  IVAR Langevatn water
treatment plant
Location  Ålgård, Norway
Developer  IVAR recycling and water
treatment
Contractor  Kruse Smith Entreprenør AS
Masonry work  Valdeland & Varhaug AS
Murerfirma
Leca products  Leca Isoblokk 30,
Leca Fasadeblokk
Weber products  Weber Fibre Coatings,
Weber ready-mixed mortar M5
Leca facts
The huge water treatment plant in Ålgård
south of Stavanger will be partly isolated by
Leca Fasadeblokk.
The 120-million-euro expansion of the water
treatment plant south of Ålgård will secure
320,000 people with a supply of fresh water
for the next several decades.
Srdjan Mijatovic (left) of the company
Waldeland & Varhaug AS Murerfirma will be
working at the construction site on and off
for several years.
Leca® is a registered trademark owned by Saint-Gobain
27
On top of that, the water treatment
plant now delivers the best drinking
water they have ever produced.
	 After a year of scientific pilot
testing at a small scale, the decision
was made to change from sand to
Filtralite. Six months after putting
the new water filters into production,
regional manager Ladislav Rainiš at
Bedřichov Water is impressed.
	 “We have clearly seen the
advantages of Filtralite, and we are
now replacing the sand filters in the
remaining basins with Filtralite,” he
says.
	 The pilot test confirmed what
other water works have reported:
energy saved, increased output, and
improved water quality. Bedřichov
Water supplies about 100,000 people
with fresh water in Liberec in the
Czech Republic.
A modern product
Filtralite is a modern product, devel-
oped for water filtering purposes.
It works on a slightly different prin-
ciple to sand filters. Filtralite can be
characterized as small hard pieces of
open sponge, full of internal pores. As
the water passes through the filter,
the particles are trapped in the Fil-
tralite pouches.
	 “The result is more than four
times longer filtering intervals,
which means that 75 percent less
energy is needed when flushing the
filter. Filtralite also leads to the plant
doubling its output,” says profes-
sor Petr Dolejš at Brno University of
Technology.
	 He says that most water works
could benefit from the reduced
energy costs when using Filtralite.
Two layers
The Filtralite used in the plant con-
sists of two layers, a so-called “Mono-
Multi” solution. The layers are of dif-
ferent size and density. After flushing
CZECH REPUBLIC  By replacing traditional sand filters with Filtralite®,
the Bedřichov Water Treatment plant in the Czech Republic reduced
energy costs by 75 percent, and doubled capacity.
the filter, the layers falls back into
place and are not mixed together.
	 “After changing to Filtralite we
have seen an improvement in the
general performance. The amount of
particles leaving the filters have been
greatly reduced, and the numbers of
particles evading has been improved
by a factor of ten,” explains professor
Dolejš.
The best and most
affordable water
Facility  Bedřichov Water Treatment Plant
Client  The North Bohemian Water
Company
Leca products  Filtralite in different sizes
and densities
Leca facts
Leca® is a registered trademark owned by Saint-Gobain
28
Filtralite
•	 Made of expanded clay
•	 Can be used for both conventional and biological filtration of
effluent and potable water, including desalination
•	 Available in variable sizes (0.5–20 mm) and densities (320–
900 kg/m3)
•	 Longer filter runs between backwashes (up to 800 %) and
higher filtration velocity (up to 20 m/h)
•	 Return on investment in 1–3 years (product lifetime > 25 years)
•	 Installed in more than 200 water treatments plants in over 40
countries since introduced in 1994
Facts
“We have clearly seen the many advantages of Filtralite,” says regional
manager Ladislav Rainiš of the North Bohemian Water Company after
introducing Filtralite in the Bedřichov Water Treatment Plant.
The Bedřichov Water Treatment Plant has reduced energy costs and
increased production. On top of this, the plant is delivering its best
water ever.
Leca® is a registered trademark owned by Saint-Gobain
29
The weather on the west coast of Norway is tough, and
demands more from building materials than most places.
The closer you get to the salt water, the more the materi-
als must endure.
	 “The facade of the houses around here are sanded
down by the sea, wind, and salt in the air. Choosing a
tough and durable material like Leca and a thick coating
means we do not have to use as much time on mainte-
nance as the neighbours,” says house owner Ketil Jensen.
	 The ground floor was cast in concrete. The family
of four lived on the ground floor while the first floor was
built on top of them in Leca.
	 “Using Leca was an easy decision. The Sandwich
block gives us a wall that is ready insulated. We try to use
materials that are easy to wash and maintain. The pur-
pose of the porch is to enjoy the view, not work on the
house,” he says.
FIGHTING THE
ELEMENTS
NORWAY  Almost hanging on the edge of a cliff, the
family house in Western Norway needs to withstand a
tough climate and wet weather.
30
Facility  Family house
Location  Askøy, Norway
Contractor Private
Leca products  Leca Isoblokk 35
Leca facts
31
Leca® is a registered trademark owned by Saint-Gobain
Easier floors
with Leca®
A complete renovation of an apart-
ment building in Helsinki, Finland,
required all structures and technical
installations, with the exception of
the frames and facades, to be dis-
mantled.
Sound and fire
The goal of the project was to reno-
vate the apartment building in Hel-
sinki, Finland, from the 1950s up to
modern standards when it came
to sound, heat, and fire prevention.
The building also needed a general
upgrade on the building installation.
	 “A decision was made to replace
the old fillings of the intermediate
floors with Leca aggregates, both for
sound and fire technical reasons. The
useof Lecaaggregateseasilyachieves
both requirements,” says Valtteri
Vaarsalo, chief structural designer
from Sweco Asiantuntijapalvelut Oy.
Easy to apply
The apartment building is five storeys
tall. As an alternative to Leca aggre-
gates hard wool was considered, but
the cutting and installation of the
wool would be more demanding.
	 “Leca aggregates were selected
as the new floor filler material partly
because it is easy to apply by blowing
it in place,” says foreman Ari Antti-
lainen from Fira Oy.
	 To prevent dust from spreading,
the aggregate is sprayed with small
amounts of water as it is blown
between the inverted beams in
the floor. Most of the moisture
evaporates in the blowing process
or soon afterwards. To make sure the
humidity is within acceptable levels,
wireless humidity sensors were
installed during the process.
	 “Through a cloud service, the
readings from the sensors can also be
utilised by the client and the supervi-
sors,” says Anttilainen.
	 According to Vaarsalo, the meas-
urement data from the humidity
sensors have provided safe read-
ings immediately from the very first
­measurements.
	 “The blowing of lightweight Leca
aggregates only takes one working
day, which is an advantage in regard
to the operational schedule of the
entire worksite,” says Antillainen.
FINLAND  The light weight, fire-resistant properties, and easy usage of
Leca® aggregates made them the best choice when replacing the fillings in
intermediate floors in a renovation project.
The apartment buildings were dismantled,
save for the facade and frames, before they
were rebuilt to modern standards.
“Leca aggregates were selected partly
because they are easy to apply through
blowing,” says foreman Ari Anttilainen, of
Fira Oy.
Leca aggregates were blown directly from
ground level when filling the intermediate
floors.
Location  Helsinki, Finland
Developer  Mutual Pension Insurance
Company Ilmarinen
Contractor  Fira Oy
Leca contractor  Anpe Oy
Structural engineering Sweco
Asiantuntijapalvelut Oy
Leca products  Leca aggregates
4–20 mm
Leca facts
Leca® is a registered trademark owned by Saint-Gobain
32
Leca® is a registered trademark owned by Saint-Gobain
33
The Eika sports centre is an expansion
of the old student recreation centre
at the GG-hallen, some 30 kilometres
south of Oslo in Norway. Opening
in November, it gives the 5,000 stu-
dents a new and better sports centre.
	 “The new centre partly incor-
porates and is built around the old
sports centre. Because of a very short
construction period, we decided to
use Leca Lettveggsblokker on almost
all the inner walls,” says Marius
Aamodt, foreman with Veidekke
Entreprenør AS.
Quick mounting
The Leca Lettveggsblokk is especially
well suited to the project. Because of
progress at the site the inner walls
had to be set up before the roof was
in place. That meant that the inner
walls were exposed to changing
weather and had to withstand a lot.
	 “Becausethewallswereexposed
to the changing weather in Norway,
we had to use a material that could
withstand a period basically out-
doors. The only building material
that is not harmed in those condi-
tions is Leca blocks,” says Aamodt.
	 One special thing about the
blocks is that they are not fixed with
a cement-based mortar or glue. The
installation is done with the special
Stone Fix glue, a polyurethane-based
foam glue.
	 “Using the glue we can mount
the walls very quickly and with very
good results.The glue fixes the blocks
in a very short time, and means we
can mount higher walls than with a
cement based product,” says Kristian
Aamodt of Veidekke.
Tougher walls
Another feature of the Leca walls is
Quick
internal
walls
that they are tougher than inner walls
made with plaster. In a sports facility
that is important, and ensures the
walls will demand less maintenance.
	 “Especially in the wet areas like
showers and wardrobes the Leca
block is the best choice. The walls are
very robust, even when assembled
with the glue. We can very quickly
start putting finishing renders on the
wall”, says Aamodt.
	 Due to the large areas that
needed to be covered, the render was
applied to the wall with a spray. The
sprayable render means a lot more
square metres can be covered in a
day.
NORWAY  The students at the Norwegian University of Life
Sciences will soon enjoy a new sports centre. The inner walls are
made with Leca®.
Leca® is a registered trademark owned by Saint-Gobain
34
Facility  Eika sports centre
Location  Ås, Norway
Developer  Studentsamskipnaden i Ås,
SiÅS
Contractor  Veidekke Entreprenør AS
Leca products  Leca Lettvegg 118,
Leca Basicblokk
Weber products  Weber render, Weber
Stone Fix, Weber wet area system
Leca facts
Eika sports centre outside Oslo is a huge expansion of the existing
centre. Almost all the inner walls are built with Leca Lettveggsblokk.
Hege Anker-Jensen from Leca inspects firewalls built with Leca
Basicblock. Almost all the inner walls of the sports centre are
constructed with Leca Lettveggsblokk (top).
Leca’s technical personnel has been an important advisor in the
project. Here the foreman Marius Aamodt, mason Truls Eliassen and
Kristian Aamodt discuss the result with Jan Øyvind Christensen and
Hege Anker-Jensen from Leca (bottom).
Leca® is a registered trademark owned by Saint-Gobain
35
Reducing energy Costs
Matti Heikkilä is a construction entre-
preneur and the managing director
of Projektimestarit Oy. He was deter-
mined that he wanted to build the
new houses to a low-energy stand-
ard. Previous experiences lead him to
choose Leca Sandwich blocks.
	 “In 2003, I built our first single
family house from Leca Term Sand-
wich blocks. I was very pleased with
the solution at the time, and after
having lived in a wooden house in
between, I definitely wanted to build
a new Leca block house, where I could
take advantage of the success of the
previous block house,” Matti Heikkilä
says.
Saves energy
When the lead-ins and connections
are properly done, blockhouses
becomeveryairtight.Thisisanimpor-
tant feature because airtightness is a
central part of energy efficiency.
	 “Due to their mass, blocks
possess good thermal and sound
insulation properties compared
with wooden buildings,” says head
designer Veikko Ahonen from Ark-
kitehtuuritoimisto Ahonen Veikko
Oy.
	 He considered the advantages
of building in Leca before he decided
to use Leca Sandwich blocks for the
family houses.
	 “It is quick to construct the
large masonry units. The frame of
the building, the heat insulation,
and outer shell, with the exception
of surfacing, rise at the same time.
Leca blocks are easy to work with
and are flexible building units for
many forms. Leca blocks are highly
suitable for constructions on sloped
locations, because the entire facade,
from the basement wall upwards,
can be made from the same mate-
rial,” says Ahonen.
FINLAND  A Finnish family built two low-energy houses with Leca® Design
Sandwich blocks. It is their second house built with Leca®.
Soundproofed
The house is built on a slope in a
suburb of Helsinki. Leca Sandwich
blocks meant they could effectively
take advantage of the difficult slope.
	 “I like stone houses, because
they do not click and clack and one
can ensure that everyone can enjoy
their own desired peace.”
	 The house also features audio
and video systems and smart house
technology, all of which can be con-
trolled via smartphones or tablets.
Leca® is a registered trademark owned by Saint-Gobain
36
Client  Matti Heikkilä
Frame contractor  Aja Rakennus Oy
Architect  Arkkitehuuritoimisto Ahonen
Veikko Oy
Structural engineering Insinööritoimisto
Pietiläinen & Gabrielsson Oy
Leca products  Leca sandwich block
LTH-420, Kahi separating wall block, Leca
shuttering blocks (in swimming pools)
Leca facts
Large windows and skylights make the
houses bright. The mass of the stone house
evens out temperature fluctuations and
saves energy.
Matti Heikkilä (right) was determined he
wanted a low-energy house built with Leca
Sandwich block.
The houses are set in a slope and close
together. The swimming pools are made
with Leca shuttering blocks.
Leca® is a registered trademark owned by Saint-Gobain
37
The new highway in the inland of
Norway is 9.3 km long, including a
1.7 km long tunnel that bypasses the
small town of Gran. Approaching the
opening day, the construction site is
busy.
	 Using Leca in the ground within
road construction is a well-known
and tested method. The Leca aggre-
gates are put in the construction of
the road to insulate from frost and
prevent settlement.
Anti-frost
“More than 20,000 cubic metres
of Leca aggregates are used in the
tunnel. Above that there is a layer
of coarse rocks and more fine stone
masses. On top there is, of course,
asphalt,” says construction manager
Ole Helge Steinsrud of NCC.
	 Leca aggregates are often also
used to avoid settlement where the
ground is unstable, such as when
constructing roads or buildings in
areas with clay.
	 The light weight of Leca aggre-
gates is a huge advantage in many
situations. On two roundabouts built
on top of culverts there will be huge
flower and plant beds. To reduce the
weight of the beds, Leca aggregate is
filled to a level prior to capping with
a top layer of soil.
Easy to lay
Installing hundreds of cubic metres
withinabusycarriagewayundergoing
construction work is a challenge. The
solution was blowing the aggregates
in place through a series of hoses.
	 “It is very easy to lay out the Leca
aggregates by blowing them in place
like this. Using a typical machine such
as a tracked excavator or blade would
not be possible because of the bulk-
heads between the different plant
beds,” says foreman Bjørn Løvseth
with NCC.
Keeping it light
NORWAY  More than 21,000 m3 of Leca® aggregates have been used in
the construction of a new motorway in inland Norway.
Leca® is a registered trademark owned by Saint-Gobain
38
Facility  Highway 4
Location  Gran, Norway
Developer  Norwegian Public Roads
Administration
Contractor NCC
Leca products  Leca aggregates
Leca facts
To reduce the weight of the roundabout on
Highway 4 in Norway, the developer chose
Leca aggregates as filling for the plant beds.
The aggregates were blown in place through
a series of hoses.
Blowing the Leca aggregates in place is
easy and effective. Using hoses with a large
diameter the operator has good control and
can direct the aggregate in to position.
Leca® is a registered trademark owned by Saint-Gobain
39
Leca International A/S
Robert Jacobsens Vej 62 A
2300 Copenhagen S
Denmark
A Saint-Gobain brand
NORWAY
Brobekkveien 84
Alnabru, 0582 Oslo
DENMARK
Randersvej 75
8940 Randers SV
GERMANY
Rahdener Str. 1
21769 Lamstedt
PORTUGAL
Tojeira, Apartado 16
3240-908 Avelar
SPAIN
Ctra. C-17, km. 2
08110 Montcada i Reixac
Barcelona
UNITED KINGDOM
Regus House, Herons Way
Chester Business Park
Chester, CH4 9QR
FINLAND
Strömberginkuja 2
00380 Helsinki
SWEDEN
Norra Malmvägen 76
191 62 Sollentuna
LATVIA
Daugavgrīvas iela 83
LV1007 Riga
LITHUANIA
Menulio 7
LT04326 Vilnius
ESTONIA
Peterburi tee 75
Tallinn 11415
POLAND
Krasickiego 9
83-140 Gniew

More Related Content

What's hot

Coatleven en
Coatleven   enCoatleven   en
Coatleven enlibnam
 
Dingle dell-en
Dingle dell-enDingle dell-en
Dingle dell-enlibnam
 
BM Assignment 1A
BM Assignment 1A BM Assignment 1A
BM Assignment 1A Sharon Chow
 
urban design Makoko digital version
urban design Makoko digital versionurban design Makoko digital version
urban design Makoko digital versionIsmaila Aro
 
Marinetek floating
Marinetek floatingMarinetek floating
Marinetek floatingSOLVED
 
Marinetek energy efficiency
Marinetek energy efficiencyMarinetek energy efficiency
Marinetek energy efficiencySOLVED
 
Aquaterra System
Aquaterra SystemAquaterra System
Aquaterra Systembchamilt
 
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban AreasCase Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban AreasSustainable Performance Institute
 
Historic Jail Roof Replacement
Historic Jail Roof ReplacementHistoric Jail Roof Replacement
Historic Jail Roof ReplacementFairfax County
 
Warmhouse photographic site diary
Warmhouse photographic site diaryWarmhouse photographic site diary
Warmhouse photographic site diaryICE Architects Ltd.
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
 
A 1 Concrete Leveling Facilities Management Expo 2008
A 1 Concrete Leveling Facilities Management Expo 2008A 1 Concrete Leveling Facilities Management Expo 2008
A 1 Concrete Leveling Facilities Management Expo 2008Peter Easton
 
First Half of 2019 LEED Schools: Leading the Green Schools Movement
First Half of 2019 LEED Schools: Leading the Green Schools Movement First Half of 2019 LEED Schools: Leading the Green Schools Movement
First Half of 2019 LEED Schools: Leading the Green Schools Movement USGBC
 
Class of 2017: LEED-certified Schools Make an Impact
Class of 2017: LEED-certified Schools Make an ImpactClass of 2017: LEED-certified Schools Make an Impact
Class of 2017: LEED-certified Schools Make an ImpactUSGBC
 

What's hot (20)

Coatleven en
Coatleven   enCoatleven   en
Coatleven en
 
Dingle dell-en
Dingle dell-enDingle dell-en
Dingle dell-en
 
BM Assignment 1A
BM Assignment 1A BM Assignment 1A
BM Assignment 1A
 
urban design Makoko digital version
urban design Makoko digital versionurban design Makoko digital version
urban design Makoko digital version
 
ULX Jan Feb 2010
ULX Jan Feb 2010ULX Jan Feb 2010
ULX Jan Feb 2010
 
Simmons Nov 2014
Simmons Nov 2014Simmons Nov 2014
Simmons Nov 2014
 
Marinetek floating
Marinetek floatingMarinetek floating
Marinetek floating
 
ULX August 09
ULX August 09ULX August 09
ULX August 09
 
Marinetek energy efficiency
Marinetek energy efficiencyMarinetek energy efficiency
Marinetek energy efficiency
 
Aquaterra System
Aquaterra SystemAquaterra System
Aquaterra System
 
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban AreasCase Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
 
Beautiful brewery models design flexibility
Beautiful brewery models design flexibilityBeautiful brewery models design flexibility
Beautiful brewery models design flexibility
 
Historic Jail Roof Replacement
Historic Jail Roof ReplacementHistoric Jail Roof Replacement
Historic Jail Roof Replacement
 
Warmhouse photographic site diary
Warmhouse photographic site diaryWarmhouse photographic site diary
Warmhouse photographic site diary
 
Alpha
AlphaAlpha
Alpha
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Madison Park Project Plans (Most Recent, All Documents, 1/12/17)
Madison Park Project Plans (Most Recent, All Documents, 1/12/17)Madison Park Project Plans (Most Recent, All Documents, 1/12/17)
Madison Park Project Plans (Most Recent, All Documents, 1/12/17)
 
A 1 Concrete Leveling Facilities Management Expo 2008
A 1 Concrete Leveling Facilities Management Expo 2008A 1 Concrete Leveling Facilities Management Expo 2008
A 1 Concrete Leveling Facilities Management Expo 2008
 
First Half of 2019 LEED Schools: Leading the Green Schools Movement
First Half of 2019 LEED Schools: Leading the Green Schools Movement First Half of 2019 LEED Schools: Leading the Green Schools Movement
First Half of 2019 LEED Schools: Leading the Green Schools Movement
 
Class of 2017: LEED-certified Schools Make an Impact
Class of 2017: LEED-certified Schools Make an ImpactClass of 2017: LEED-certified Schools Make an Impact
Class of 2017: LEED-certified Schools Make an Impact
 

Similar to Build 2 2016_eng_original_singlepage

Build 01 leca_magazine_2016-01_english original
Build 01 leca_magazine_2016-01_english originalBuild 01 leca_magazine_2016-01_english original
Build 01 leca_magazine_2016-01_english originalLeca2018
 
Maxit Leca on Linked In
Maxit Leca on Linked InMaxit Leca on Linked In
Maxit Leca on Linked InLMWoods
 
Don Talend Below-Grade Parking Boosts Low-Rise Housing Design
Don Talend Below-Grade Parking Boosts Low-Rise Housing DesignDon Talend Below-Grade Parking Boosts Low-Rise Housing Design
Don Talend Below-Grade Parking Boosts Low-Rise Housing DesignDon Talend
 
art gallery case study
art gallery case studyart gallery case study
art gallery case studyAmanKhan319
 
Exeed Litecrete Brochure Final Web
Exeed Litecrete Brochure Final WebExeed Litecrete Brochure Final Web
Exeed Litecrete Brochure Final WebFaris Alwan
 
green concrete
green concretegreen concrete
green concreteAtul Ingle
 
report grace spelling
report grace spellingreport grace spelling
report grace spellingAstha Lama
 
Viking_Grace_ENG_web
Viking_Grace_ENG_webViking_Grace_ENG_web
Viking_Grace_ENG_webMarko Mannila
 
Doug Johnson - RIBA 2030 Climate Challenge
Doug Johnson - RIBA 2030 Climate ChallengeDoug Johnson - RIBA 2030 Climate Challenge
Doug Johnson - RIBA 2030 Climate ChallengeIES VE
 
Convegni 2013/ Marco Amosso, Lombardini22 - Ristritturazione In Brera
Convegni 2013/ Marco Amosso, Lombardini22 - Ristritturazione In BreraConvegni 2013/ Marco Amosso, Lombardini22 - Ristritturazione In Brera
Convegni 2013/ Marco Amosso, Lombardini22 - Ristritturazione In BreraViessmann Italia
 
IAED 342-Research Presentation
IAED 342-Research PresentationIAED 342-Research Presentation
IAED 342-Research PresentationSerra's Art Studio
 
Whitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyWhitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyAndrew White
 
Cool Roofing and Building enveloping
Cool Roofing and Building envelopingCool Roofing and Building enveloping
Cool Roofing and Building envelopingArnav Mathur
 

Similar to Build 2 2016_eng_original_singlepage (20)

Build 01 leca_magazine_2016-01_english original
Build 01 leca_magazine_2016-01_english originalBuild 01 leca_magazine_2016-01_english original
Build 01 leca_magazine_2016-01_english original
 
Maxit Leca on Linked In
Maxit Leca on Linked InMaxit Leca on Linked In
Maxit Leca on Linked In
 
Don Talend Below-Grade Parking Boosts Low-Rise Housing Design
Don Talend Below-Grade Parking Boosts Low-Rise Housing DesignDon Talend Below-Grade Parking Boosts Low-Rise Housing Design
Don Talend Below-Grade Parking Boosts Low-Rise Housing Design
 
Woodlawn project in Ascent magazine
Woodlawn project in Ascent magazineWoodlawn project in Ascent magazine
Woodlawn project in Ascent magazine
 
art gallery case study
art gallery case studyart gallery case study
art gallery case study
 
Exeed Litecrete Brochure Final Web
Exeed Litecrete Brochure Final WebExeed Litecrete Brochure Final Web
Exeed Litecrete Brochure Final Web
 
green concrete
green concretegreen concrete
green concrete
 
report grace spelling
report grace spellingreport grace spelling
report grace spelling
 
Illumination of the Jacques Cartier Bridge
Illumination of the Jacques Cartier BridgeIllumination of the Jacques Cartier Bridge
Illumination of the Jacques Cartier Bridge
 
Bentley Case Study
Bentley Case StudyBentley Case Study
Bentley Case Study
 
Dairy Plant Modivas KP Project LQ
Dairy Plant Modivas KP Project LQDairy Plant Modivas KP Project LQ
Dairy Plant Modivas KP Project LQ
 
Viking_Grace_ENG_web
Viking_Grace_ENG_webViking_Grace_ENG_web
Viking_Grace_ENG_web
 
Doug Johnson - RIBA 2030 Climate Challenge
Doug Johnson - RIBA 2030 Climate ChallengeDoug Johnson - RIBA 2030 Climate Challenge
Doug Johnson - RIBA 2030 Climate Challenge
 
Superior Brochure
Superior BrochureSuperior Brochure
Superior Brochure
 
Convegni 2013/ Marco Amosso, Lombardini22 - Ristritturazione In Brera
Convegni 2013/ Marco Amosso, Lombardini22 - Ristritturazione In BreraConvegni 2013/ Marco Amosso, Lombardini22 - Ristritturazione In Brera
Convegni 2013/ Marco Amosso, Lombardini22 - Ristritturazione In Brera
 
TSI Wales Linkdin
TSI Wales LinkdinTSI Wales Linkdin
TSI Wales Linkdin
 
IAED 342-Research Presentation
IAED 342-Research PresentationIAED 342-Research Presentation
IAED 342-Research Presentation
 
Whitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyWhitescape Civil Engineering Case Study
Whitescape Civil Engineering Case Study
 
hugh j bitz, architect porfolio brief
hugh j bitz, architect  porfolio briefhugh j bitz, architect  porfolio brief
hugh j bitz, architect porfolio brief
 
Cool Roofing and Building enveloping
Cool Roofing and Building envelopingCool Roofing and Building enveloping
Cool Roofing and Building enveloping
 

Recently uploaded

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 

Recently uploaded (20)

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 

Build 2 2016_eng_original_singlepage

  • 1. BUILDA MAGAZINE FROM LECA® No.2–2016 A quicker roof → 02 Building Leca® on the edge → 30 Innovative floor solution → 18 Making the ground stable → 06
  • 2. We have spent some time figuring out the essence of the Leca brand and have found that “Together we buildforthefuture”isquite a good summation. It con­ tains at least two elements that we find important. Together, because we in­ clude you – our partner/customer/allied – in the process. Many day to day challenges are solved in close co-operation between us as producers and you as designers or builders. This kind of co-operation is essential for us to develop further. Together we find the best solutions. The future, because everything changes. Changeisfastanditisimperativetoparticipate in what is happening. In building ­methods, technology, economic aspects and environ­ mental issues – to have mentioned some of the major changes. And those who do not think ahead, will not be a part of the future. We hope that the magazine you are holding in your hands right now visualizes the Leca approach to modern building. Our solutions are in line with modern demands, for instance sound and thermal insulation and low maintenance. Leca walls contributed to sound comfort in a Portuguese school and living comfort for people and horses in Polish farm houses. Regarding environmental demands like water cleaning and energy saving: We pres­ ent a passive house with Leca blocks, and the best Czech drinking water ever (cleaned with the environmental Leca product, Filtralite). And regarding fast, efficient and cost saving building methods: Leca aggregates save weight and thereby costs and work in a Polish bridge and a Scottish landmark. It adds flexibility to house building in Finland and climate resistance on the rough west coast of Norway. And in addition, or maybe a curiosity, Leca products challenges Danish artists in cre­ ating exciting sculptures. We hope you will find the magazine useful and inspiring. Torben Dyrberg Managing Director Leca International TOGETHER WE BUILD FOR THE FUTURE BUILD is a magazine published by Leca International Editorial work: TANKEN BAK www.tankenbak.no Design: Munch design Editor-in-chief: Torben Dyrberg Editor: Morten Müller, communication manager, Leca Norway Front page: Gamesa headquarters in Pamplona, Spain Photo: Rubén P. Bescos
  • 3. THE FASTEST ISOLATED ROOF FINLAND  Roofs of Leca® aggregates is the easiest and best solution for isolated roofs on apartment blocks. In the new area Jätkäsaari in Helsinki there are many roofs insulated with Leca® aggregates. Leca® is a registered trademark owned by Saint-Gobain 3
  • 4. The 220 apartments under construc- tion in Saunalahti in Finland will have a ventilated structural Leca aggregate roof. Southwest of Espoo the contrac- tor Lujatalo Oy is building two resi- dential blocks with close to 220 apart- ments. The two blocks are curved and three floors high. The developer is the Housing Foundation and Espoon Asunnot. The apartment blocks have a hybrid roof for good isolation and technical installation. There is a base of up to 200 mm EPS insulation that is topped with between 800 and 1000 mm Leca aggregate. “The buildings have a centralized ventilation system and conduits lead from the ceiling down the stairways. The roof has a great deal of technol- ogy which is placed within the Leca aggregate layer,” says site foreman Ari Mohell from the contractor ­Lujatalo Oy. Filled with tech The structural engineer for the pro- ject, Taija Karjalainen from Sweco Structural Engineering Oy, says the thickness of the aggregate varies with how much the building services and technical installations require. “There is practically always tech- nology within low-pitched residential roofs where use of insulation plates is difficult. Managing moisture is always important in construction. The airing through the Leca aggre- gate and the roof ventilators ensure the proper removal of moisture from the structure,” says Karjalainen. Common solution The ease of application and good thermal insulation has made Leca aggregate a common solution for apartment blocks. “It is the clearest and least prob- lematic solution. Placing technology in the aggregate is easy and it is also easytoforminclinationsthatwilllead to roof drains. As a ventilated roof structure, a lightweight aggregate is also operational reliable because moisture can escape,” says worksite manager Heikki Määttänen from the roof constructor Kerabit Oy. The Leca aggregate is lifted to the roof with a tower crane, and distributing approximately 500 m2 takes only a few hours. On the same day a concrete layer about four centi­ metres is spread and honed as a base for waterproofing. Leca® is a registered trademark owned by Saint-Gobain 4
  • 5. Developer Asuntosäätiö Main contractor  Lujatalo Oy Roofing contractor  Kerabit Oy Architectural designer Arkkitehdit Hannunkari & Mäkipaja Oy Structural engineering Sweco Rakennetekniikka Oy Leca products  Leca aggregate KS 420K Leca facts Competent professionals quickly cast and knead the thin concrete slab that will become a base for the final waterproofing. A filter cloth is laid on top of the correctly applied height of lightweight aggregate and concrete is pumped up onto the roof from a pump vehicle. Leca® is a registered trademark owned by Saint-Gobain 5
  • 6. Facility  Helix project Location  Falkirk, Scotland Application  2000 m3 Contractor  R J McLeod (Contractors) Limited Landscape architects and engineers  Ironside Farrar Leca products  Leca aggregates Leca facts The 30-metre high horse heads rise above the landscape. To reduce fill weight Leca aggregates were used on the Helix project to secure and maintain the existing fresh water trunk main. (Photo: Martin McCarthy) Leca® is a registered trademark owned by Saint-Gobain 6
  • 7. The Helix project in Falkirk has transformed a tired and lifeless environment into a most expansive and attractive community location. The entire site is linked by 27 kilometres of shared access pathways linking 16 communities, much of which has LED lighting, main access ways and a canal tunnel under the major M9 motorway. Leca aggregates have played a key role below the surface of this project enabling construction access and land raising directly over a Scottish Water 36" fresh water trunk main and a 500 mm pumped rising main. Its specifica- tion has avoided enormous additional costs that would have arisen from the rerouting of Scottish Water’s assets. 30 metres high Rising high above this futuristic community landscape are The ­Kelpies, two fabulous 30-metres high, stainless steel sculptures of equine heads reflect- ing the significant role the heavy horse played in Scotland’s successful era of heavy industry and now dominate the skyline illustrating the typically equine quality of strength and power. This beautiful sculpture has been brought dramatically to life by incredi- ble engineering knowledge and superb construction skills. The overall landscape architecture for Helix was conceived by landscape architects and engineers Ironside Farrar of Edinburgh. David McCandless, graduate geo-environmental engineer, explains why Leca aggregates were required: “Putting both the raised hard and soft land- scape works associated with the Kelpies over the mains would have placed unacceptable weight on the pipework so we looked for a lightweight product to substitute the traditional earth fill and Leca aggregates fitted the bill. By replacing up to 1250 mm of additional fill with Leca aggregates we reduced the increased load substantially and were able to demonstrate that the land raising could occur without undue risk.” Resolved weight problem This resolved the weight problem at Helix to the satisfaction of both Ironside Farrar’s engineering team and Scottish Water’s asset manager. Civil engineering contractor R J McLeod (Contractors) Limited carried out the excavation and refill project and Spencer Carnie, project manager, super- vised the work on site. He says: “We removed the existing fill to a depth of a metre to expose the top of the water main. Then we back filled and raised the levels with 2000 m³ of Leca aggregates which was delivered close to the working site allowing us to place it quickly and easily with tracked shovels. Leca aggregates worked very well for us with no problems at all.” CREATING A STABLE GROUND UK  Constructing the Helix project directly above Scottish Water Mains pipes created a challenge. Leca® aggregates made it possible without rerouting the mains pipework. 7
  • 8. Reducing cost by half The new bridge over the Odra river in Szczecin in Poland was a huge invest- ment. Linking the city with the Gryfia Business Park on the islands Ostrów Brdowski and Gryfia, the bridge was completed last year. Before the bridge was com- pleted the connection between the islands and the city was by ferry. The ferries had high maintenance costs and a lot of problems, which led to decreased investments in the area. Poor soil The construction was done in two stages. Stage 1 involved building the almost 200-metre long steel bridge across the river. In the second stage an access road and connection with existing roads were constructed. The poor non-bearing soil struc- tures in the deeper layers of the ground posed a risk for uneven struc- ture settlements. To avoid the risk it was decided to reduce the tension on the embankment by using expanded clay. Double mattress A mattress was made from Leca ­KERAMZYT – an aggregate that is four times lighter than the soil at the site.The Leca aggregate was wrapped in geotextile fabric to form a mat- tress. On top of this mattress a new mattress formed from geonet and crushed aggregate was placed before it was topped with surface structure. The solution reduced the ten- sion below the road structure con- siderably. The aggregate was used to reduce tension, while the crushed aggregate evenly distributed the forces from the traffic. The construction of the bridge was completed by Mars Most Brdowski and was co-funded by the European Union with resources from the regional development fund. POLAND  Using Leca® KERAMZYT in the construction of an access road to a new bridge in Szczecin in Poland, cut cost in half. Facility  Brdowski Bridge and the road connection to Ostrów and Gryfia islands. Location  Szczecin, Poland Investor  Mars Most Brdowski Contractor  PRO Nowograd Leca products  Leca KERAMZYT 8/10–20 R Leca facts Leca® is a registered trademark owned by Saint-Gobain 8
  • 9. The ground was non-loadbearing. A mattress of geotextile fabric and Leca KERAMZYT was created before a new mattress with crushed aggregate was put on top to distribute pressure from traffic. The Brdowski bridge created the first road connection to the islands in Szczecin, making the area more attractive to investors. Leca® is a registered trademark owned by Saint-Gobain 9
  • 10. 10 Leca® is a registered trademark owned by Saint-Gobain
  • 11. A better soundscape for students PORTUGAL  The use of Leca® Soundcomfort blocks in the renovation of a school in Lisbon, created better acoustics and an aesthetic appeal. 11
  • 12. Project  Braacamp Freire School Location  Lisbon, Portugal Architect  Cristina Verissimo and Diogo Burnay Architects Leca products  Soundcomfort blocks and Leca aggregate Leca facts In the hallway in Braacamp Freire School in Lisbon, Portugal, the unique Leca Soundcomfort blocks were used to create better acoustics and an exciting look. The school was both renovated and enlarged during the project. Containment The Leca Soundcomfort blocks were used to contain sound between the hallway and the adjacent auditorium. Soundcomfort blocks became essen- tial because they brought an acous- tic comfort and increased acoustic absorption. According to the architect behind the project, CristinaVerissimo and Diogo Burnay Architects, the blocks were chosen because of their simplicity and robustness. Another important factor was that the block harmonised with the existing design and interior of the school. Tight budget Theprojectwasonatightbudget.The surface of the Soundcomfort blocks meant that the need for renders and facade finishing was eliminated from most of the building. Excluding ren- ders on the surface helped bring the project within a feasible budget. An aesthetic value was added to the project with the blocks’ grooved surface. In some parts of the build- ing the walls were painted in bright colours. Expanded clay aggregate was also used in the floor fillings of the school. Soundcomfort blocks were used to create better sound and acoustics when renovating Braacamp Freire School in Lisbon, Portugal. Bright colours and the surface of the Soundcomfort blocks harmonised well with the already existing design of the school. Leca® is a registered trademark owned by Saint-Gobain 12
  • 13. Supporting Scotland’s tramways UK  To provide access to Scotland’s home of Rugby, Murrayfield Stadium, Leca® lightweight aggregates were just the ticket. Leca® is a registered trademark owned by Saint-Gobain 13
  • 14. To create a stable and high raised tramway system in Edinburgh, the Murrayfield tram stop was built on Leca lightweight aggregate. Challenges involving an already existing Network Rail line and build- ingsmadeLecalightweightaggregate the best solution for the new Edin- burgh tramway system. The station at the famous Murrayfield Stadium, home of Scottish Rugby, was made possible thanks to the properties of Leca aggregates. Overburden The existing ground level made it challenging to raise the seven-metre high structure. Traditional fill would create an excessive burden on the ground and threaten the stability of the existing Network Rail line. “One of our main issues was to get such a large earthworks struc- ture founded on the underlying soft ground conditions without signif- icant ground improvement being undertaken. The lightweight attrib- utes of the Leca aggregates satisfied these criteria, significantly lowering bearing/settlement at formation compared to traditional fills. It also interacted with the Tensar elements of the structure without difficulty,” says Tristan Morgan, geotechnical engineer at Parsons Brinkerhoff. 14,000 m3 The light weight of Leca aggregates was the perfect match for the chal- lenge. “Faced with the complications at the Murrayfield site, especially the potential expense of excavating unsuitable ground, Leca aggregates have proved exactly the right choice of material for this technical project. Access to the platform site was difficult but Leca aggregates are a versatile and easy material to handle,” says Andrew Henry, construction manager at Graham Construction. More than 14,000 m3 of Leca aggregates were required for the Murrayfield tram stop. The aggregate was shipped directly to the nearby Port of Leith and trucked to the site with large capacity delivery vehicles. Facility  Murrayfield tram stop Location  Edinburgh, UK Application  14,000 m3 Consulting engineer  Parsons Brinkerhoff Leca products used  Leca lightweight aggregate Leca facts Leca® is a registered trademark owned by Saint-Gobain 14
  • 15. Bearing and stability concerns made Leca aggregates to be the perfect material for infill when constructing the Murrayfield tram stop in Edinburgh. The new Edinburgh tram system was completed in 2014 and quickly gained an annual number of rides at about 5 million passengers. Faced with the complications of the Murrayfield site, Leca aggregates proved to be exactly the right choice of material for this technical project. Leca® is a registered trademark owned by Saint-Gobain 15
  • 16. The contractor Basso-Kivitalo is building a 140 apartment complex in ­Pellaslaakso, Espoo, in Finland. Con- sisting of five three-floor deck access blocks, the 5400 square metre com- plex is the biggest in Finland. “If apartment buyers were asked if they would like a stone masonry building or a precast concrete house, they would consider a stone masonry building to be a much better choice,” says development director Jukka Leht- onen of Basso Building Systems Oy. More flexible Previous experience with an apart- ment project in Sipoo taught the construction company that using Leca blocks is no more expensive than using elements. Several of the company’s previous apartment pro- jects have shown that Leca blocks are a cost-competitive building material. “Elements have to be designed completely ready before orders, due to wiring installations. Leca Sandwich blocks are immediately available. And they are much more flexible than ele- ments in terms of their design and implementation,” says Lehtonen. In the construction of apart- ment blocks the benefits of the flex- ibility of block construction are even greater than when building single family houses. In big projects it is easier to fit in various work stages to proceed flexibly in different buildings and floors when using blocks. Stronger blocks In previous apartment blocks Basso Building Systems Oy has used Leca shuttering blocks in the lowest parts of the construction. Due to stronger Sandwich blocks, that is no longer necessary. FINLAND  Finland’s largest apartment block project in Espoo is built with Leca® Sandwich blocks. The 140 apartment project has so far been a success. “Thanks to the stronger Leca Sandwich blocks, the construction is even simpler, since all floors are laid down in the same way. In Pellas- laakso, Espoo, shuttering blocks have only been used in a few specific loca- tions. A house built from Leca Sand- wich blocks can also be rendered almost at the same time, whilst, with concrete blocks, one must wait longer for the concrete to dry,” Leht- onen says. Leca sandwich block masonry is progressing rapidly, thanks to an experienced group of masons. Five three-floor buildings, with a total of 140 apartments, will be built from Leca Sandwich blocks in the area. In order to ensure the smooth running of the work, the cleanliness of the worksite and logistics management are essential. A cost-effective solution for Apartments Leca® is a registered trademark owned by Saint-Gobain 16
  • 17. Facility  Apartment blocks Location  Espoo, Finland Developer Nuorisosäätiö Main contractor  Basso Building Systems Oy Architect  Arkkitehtitoimisto Antti Heikkilä Oy Leca products  Leca Lex Foundation blocks, Leca Design Sandwich Blocks, Leca EasyLex, Leca shuttering blocks, Leca Sandwich shuttering blocks Leca facts Leca® is a registered trademark owned by Saint-Gobain 17
  • 18. Innovative high floors SPAIN  The circular shape of the Gamesa headquarters was perfect for the innovative floor solution using Leca®. 18
  • 19. Photo:RubénP.Bescos 19 Leca® is a registered trademark owned by Saint-Gobain
  • 20. Building a circular structure repre- sents a challenge for prefabricated concrete elements. A new and inno- vative solution was needed to build the new headquarters for Gamesa in Pamplona in Spain. Using slabs of prestressed Leca in various forms, the floor could be built with the shape the architect imagined. Revolution The innovative floor solution was developedbyAriblockViguetasNavar- ras together with Viguetas Navarras S. L. and the Centre for Development of Industrial Technology (CDTI) to build floors in high buildings. Leca prestressed slabs are a rev- olution in construction. The market has adopted the floor slabs as a standard solution that is both safe, strong and of high quality. Gamesa’s headquarters are five floors high and 11,000 m2 in size. The contractor VDR and Gamesa chose to use the Leca prestressed slabs also because they improve the soundproofing, well above the requirements of CTE, between floors. It is also calculated that the high coefficient of thermal insulation will result in a significant energy saving in the building. Quick installation As with all Leca products the slabs provide an unbeatable prefabricated fire protection, complying with the REI 180 standard. Another advantage of using the prestressed Leca slabs is their quick installation. In total 8000 m2 of slabs were used in the Gamesa building. The speed of installation was 500 m2 a day, which makes it an attractive product for a wide range of uses. Leca® is a registered trademark owned by Saint-Gobain 20
  • 21. The Gamesa headquarters is a spectacular building in Pamplona. An innovative solution for building floors was used to adapt the floors to the buildings circular shape. Using prestressed Leca slabs in the floor construction gave the contractor a floor that has good insulation, excellent soundproofing and is fire resistant. The headquarter have 8000 m2 of office space. The use of the prestressed Leca slabs meant that 500 m2 could be built in a day. Facility  Gamesa headquarters Location  Pamplona, Spain Client Gamesa Contractor  Consortium of VDR and VIGUETAS NAVARRAS Architect  Antonio and Juan Luis Irigaray Vaillo Leca products  Prestressed slabs Leca that used Leca MF Leca facts Leca® is a registered trademark owned by Saint-Gobain 21
  • 22. Five years ago Katarzyna decided to build her new agritourism business in Leca blocks. The reason was she wanted something that was easy to maintain. “I wanted a comfortable house for my guests and my animal friends to be warm in the winter and cool in the summer. That is why I use blocks of expanded clay,” tells Katarzyna. Her agritourism business is located to the village of Bierzwnik in the West Pomeranian area of Poland. The house was built in 2011 and has a floor area of 600 m2. The house and stable constructions are made from light Leca blocks and built across a ground floor. Hospitable house Her guests appreciate the climate inside the house. She says the house is wonderful. “In the summer the guests ask if the rooms are air conditioned be­ cause they are so pleasingly cool. In winter the house is easy to warm up, you can feel the warmth after only 20 minutes,” Katarzyna says. She knew about expanded clay before she started planning her agri- tourism business. When she was told it also could be used for blocks, she wanted to use it. “Two factors influenced my deci- sion. Firstly, expanded clay is a natu- ral material. Secondly, an experiment showed that expanded clay blocks was the first of construction mate- rial to dry up after being immersed in water,” she explains. Low cost heating Due to the good insulation character- istics of the blocks, the heating of the house is easy. “The cost of heating my house with an area of 600 m2 is compara- ble to heating a 300 m2 house,” says Katarzyna. She says that she will recom- mend blocks of expanded clay to others. “The fact that I also build sta- bles for my beloved animals should be a sufficient recommendation,” she remarks. POLAND  When establishing an agritourism business in Bierzwnik in Poland, Katarzyna chose Leca® blocks because they are natural, save energy and are easy to build with. Facility  Agritourism / horses stables Location  Bierzwnik, Poland Leca products  Leca Blok 24 Leca facts Cool in the summer, warm in the winter Leca® is a registered trademark owned by Saint-Gobain 22
  • 23. The guest house is built in Leca blocks. In the winter it is warm, and in the summer it is cool and comfortable. The horses also got new stables built in Leca blocks. “I want my animal friends to be warm and dry in the winter and cool in the summer,” says Katarzyna, the owner of the agritourism site. The fact that expanded clay is a natural building material was important when Katarzyna chose Leca blocks. Leca® is a registered trademark owned by Saint-Gobain 23
  • 24. These bright young minds have dis- covered a way to put Leca aggregates at the heart of stylish design in an urban environment, by finding new ways to maximise the benefits of this versatile building material. Leca aggregates are now officially cool – LeCool, in fact. Making Leca LeCool Aarhus School of Architecture encour- aged its students to experiment with materials and fabrication methods, in order to challenge preconceptions and uncover new possibilities for architects to consider in their designs for buildings and urban spaces. The students looked to new technologies to transform Leca aggregates into a swooping, curving design, from a small prototype model to a full-sized exhibition piece. After using 3D modelling soft- ware to determine the shape, the stu- dents turned their design into reality using robotic hotwire to cut through polystyrene blocks to create a mould. The end result was an extremely crea- tive and exciting Leca sculpture. The finished design is named LeCool and was exhibited at the Milan Design Week to demonstrate how digital fabrication technologies, such as robotic hotwire cutting and CNC milling, can be used to produce dynamic shapes using Leca aggre- gates. This is a brave new world for urban design. Endless exciting possibilities “It opens up exciting opportunities and new ways to work with shapes – you can form the material into pretty much any shape, so the design DENMARK  Inspired architecture students have placed Leca® at the cutting edge of urban design by discovering this versatile and surprisingly stylish material. A design for urban life potential is massive,” says Niels Martin Larsen, associate professor at Aarhus School of Architecture. This creative project opens up a world of possibilities for using Leca aggregates. For example, Leca’s ability to allow water to permeate through it makes it worth consider- ing for an urban roof garden or park setting with raised flower beds in exciting forms. With such a versatile, durable, and environmentally friendly mate- rial, the only limit is the architect’s imagination. Look out for Leca products appearing in exciting urban design projects all over the world. Leca® is a registered trademark owned by Saint-Gobain 24
  • 25. The sculpture LeCool  was first made at a small scale and then scaled up to fit the exhibition space. Students using robotic cutting technology created the curved sculpture in foam before it was cast in Leca. The sculpture was exhibited at the Milan Design Week in April. Facility  Unit F, Aarhus School of Architecture, Denmark Developers  Second- and third-year bachelor students Sara Strandby Braae, Niklas Søndermølle Frandsen, Martin Waltersdorph Nielsen, and Mathias Waldersdorff Bugge Leca products  Leca aggregates Leca facts Leca® is a registered trademark owned by Saint-Gobain 25
  • 26. The expansion of the water treat- ment plant is expected to provide sufficient capacity for the population in the area until 2050. Construction work started in 2014, and is expected to be finished in 2018. “The construction site is at times very busy, and the deadlines are tough. But it is also a very inter- esting site to be working on,” says Srdjan Mijatovic, foreman for the masons in the company Waldeland & Varhaug AS Murerfirma. Leca Isoblokk has been used to isolate technical areas from the huge water basins that will be filtering the water. Between the old plant and the expansion there is also a huge Leca Isoblokk wall. Isolation wall The new treatment plant has a lot of concrete walls and constructions. In many places the half Sandwich block, Leca Fasadeblokk, is used both to increase the insulation properties of the wall and get a more attractive facade. “The walls are so high we need to do them in several rounds to pre- NORWAY  The IVAR Langevatn water treatment plant supplies 320,000 people with fresh water. When expanding the plant, Leca® Isoblokk plays an important role. vent them from seeping. As a final treatment, the walls will be plastered with fibre coatings,” says ­Mijatovic. The total cost for the expansion of the water treatment plant is esti- mated at around 120 million euros. That will give the population of the region of Stavanger and Sandnes, the petrol capitol of Norway, a better, cleaner, and clearer water supply over the next several decades. A Better Facade Leca® is a registered trademark owned by Saint-Gobain 26
  • 27. Facility  IVAR Langevatn water treatment plant Location  Ålgård, Norway Developer  IVAR recycling and water treatment Contractor  Kruse Smith Entreprenør AS Masonry work  Valdeland & Varhaug AS Murerfirma Leca products  Leca Isoblokk 30, Leca Fasadeblokk Weber products  Weber Fibre Coatings, Weber ready-mixed mortar M5 Leca facts The huge water treatment plant in Ålgård south of Stavanger will be partly isolated by Leca Fasadeblokk. The 120-million-euro expansion of the water treatment plant south of Ålgård will secure 320,000 people with a supply of fresh water for the next several decades. Srdjan Mijatovic (left) of the company Waldeland & Varhaug AS Murerfirma will be working at the construction site on and off for several years. Leca® is a registered trademark owned by Saint-Gobain 27
  • 28. On top of that, the water treatment plant now delivers the best drinking water they have ever produced. After a year of scientific pilot testing at a small scale, the decision was made to change from sand to Filtralite. Six months after putting the new water filters into production, regional manager Ladislav Rainiš at Bedřichov Water is impressed. “We have clearly seen the advantages of Filtralite, and we are now replacing the sand filters in the remaining basins with Filtralite,” he says. The pilot test confirmed what other water works have reported: energy saved, increased output, and improved water quality. Bedřichov Water supplies about 100,000 people with fresh water in Liberec in the Czech Republic. A modern product Filtralite is a modern product, devel- oped for water filtering purposes. It works on a slightly different prin- ciple to sand filters. Filtralite can be characterized as small hard pieces of open sponge, full of internal pores. As the water passes through the filter, the particles are trapped in the Fil- tralite pouches. “The result is more than four times longer filtering intervals, which means that 75 percent less energy is needed when flushing the filter. Filtralite also leads to the plant doubling its output,” says profes- sor Petr Dolejš at Brno University of Technology. He says that most water works could benefit from the reduced energy costs when using Filtralite. Two layers The Filtralite used in the plant con- sists of two layers, a so-called “Mono- Multi” solution. The layers are of dif- ferent size and density. After flushing CZECH REPUBLIC  By replacing traditional sand filters with Filtralite®, the Bedřichov Water Treatment plant in the Czech Republic reduced energy costs by 75 percent, and doubled capacity. the filter, the layers falls back into place and are not mixed together. “After changing to Filtralite we have seen an improvement in the general performance. The amount of particles leaving the filters have been greatly reduced, and the numbers of particles evading has been improved by a factor of ten,” explains professor Dolejš. The best and most affordable water Facility  Bedřichov Water Treatment Plant Client  The North Bohemian Water Company Leca products  Filtralite in different sizes and densities Leca facts Leca® is a registered trademark owned by Saint-Gobain 28
  • 29. Filtralite • Made of expanded clay • Can be used for both conventional and biological filtration of effluent and potable water, including desalination • Available in variable sizes (0.5–20 mm) and densities (320– 900 kg/m3) • Longer filter runs between backwashes (up to 800 %) and higher filtration velocity (up to 20 m/h) • Return on investment in 1–3 years (product lifetime > 25 years) • Installed in more than 200 water treatments plants in over 40 countries since introduced in 1994 Facts “We have clearly seen the many advantages of Filtralite,” says regional manager Ladislav Rainiš of the North Bohemian Water Company after introducing Filtralite in the Bedřichov Water Treatment Plant. The Bedřichov Water Treatment Plant has reduced energy costs and increased production. On top of this, the plant is delivering its best water ever. Leca® is a registered trademark owned by Saint-Gobain 29
  • 30. The weather on the west coast of Norway is tough, and demands more from building materials than most places. The closer you get to the salt water, the more the materi- als must endure. “The facade of the houses around here are sanded down by the sea, wind, and salt in the air. Choosing a tough and durable material like Leca and a thick coating means we do not have to use as much time on mainte- nance as the neighbours,” says house owner Ketil Jensen. The ground floor was cast in concrete. The family of four lived on the ground floor while the first floor was built on top of them in Leca. “Using Leca was an easy decision. The Sandwich block gives us a wall that is ready insulated. We try to use materials that are easy to wash and maintain. The pur- pose of the porch is to enjoy the view, not work on the house,” he says. FIGHTING THE ELEMENTS NORWAY  Almost hanging on the edge of a cliff, the family house in Western Norway needs to withstand a tough climate and wet weather. 30
  • 31. Facility  Family house Location  Askøy, Norway Contractor Private Leca products  Leca Isoblokk 35 Leca facts 31 Leca® is a registered trademark owned by Saint-Gobain
  • 32. Easier floors with Leca® A complete renovation of an apart- ment building in Helsinki, Finland, required all structures and technical installations, with the exception of the frames and facades, to be dis- mantled. Sound and fire The goal of the project was to reno- vate the apartment building in Hel- sinki, Finland, from the 1950s up to modern standards when it came to sound, heat, and fire prevention. The building also needed a general upgrade on the building installation. “A decision was made to replace the old fillings of the intermediate floors with Leca aggregates, both for sound and fire technical reasons. The useof Lecaaggregateseasilyachieves both requirements,” says Valtteri Vaarsalo, chief structural designer from Sweco Asiantuntijapalvelut Oy. Easy to apply The apartment building is five storeys tall. As an alternative to Leca aggre- gates hard wool was considered, but the cutting and installation of the wool would be more demanding. “Leca aggregates were selected as the new floor filler material partly because it is easy to apply by blowing it in place,” says foreman Ari Antti- lainen from Fira Oy. To prevent dust from spreading, the aggregate is sprayed with small amounts of water as it is blown between the inverted beams in the floor. Most of the moisture evaporates in the blowing process or soon afterwards. To make sure the humidity is within acceptable levels, wireless humidity sensors were installed during the process. “Through a cloud service, the readings from the sensors can also be utilised by the client and the supervi- sors,” says Anttilainen. According to Vaarsalo, the meas- urement data from the humidity sensors have provided safe read- ings immediately from the very first ­measurements. “The blowing of lightweight Leca aggregates only takes one working day, which is an advantage in regard to the operational schedule of the entire worksite,” says Antillainen. FINLAND  The light weight, fire-resistant properties, and easy usage of Leca® aggregates made them the best choice when replacing the fillings in intermediate floors in a renovation project. The apartment buildings were dismantled, save for the facade and frames, before they were rebuilt to modern standards. “Leca aggregates were selected partly because they are easy to apply through blowing,” says foreman Ari Anttilainen, of Fira Oy. Leca aggregates were blown directly from ground level when filling the intermediate floors. Location  Helsinki, Finland Developer  Mutual Pension Insurance Company Ilmarinen Contractor  Fira Oy Leca contractor  Anpe Oy Structural engineering Sweco Asiantuntijapalvelut Oy Leca products  Leca aggregates 4–20 mm Leca facts Leca® is a registered trademark owned by Saint-Gobain 32
  • 33. Leca® is a registered trademark owned by Saint-Gobain 33
  • 34. The Eika sports centre is an expansion of the old student recreation centre at the GG-hallen, some 30 kilometres south of Oslo in Norway. Opening in November, it gives the 5,000 stu- dents a new and better sports centre. “The new centre partly incor- porates and is built around the old sports centre. Because of a very short construction period, we decided to use Leca Lettveggsblokker on almost all the inner walls,” says Marius Aamodt, foreman with Veidekke Entreprenør AS. Quick mounting The Leca Lettveggsblokk is especially well suited to the project. Because of progress at the site the inner walls had to be set up before the roof was in place. That meant that the inner walls were exposed to changing weather and had to withstand a lot. “Becausethewallswereexposed to the changing weather in Norway, we had to use a material that could withstand a period basically out- doors. The only building material that is not harmed in those condi- tions is Leca blocks,” says Aamodt. One special thing about the blocks is that they are not fixed with a cement-based mortar or glue. The installation is done with the special Stone Fix glue, a polyurethane-based foam glue. “Using the glue we can mount the walls very quickly and with very good results.The glue fixes the blocks in a very short time, and means we can mount higher walls than with a cement based product,” says Kristian Aamodt of Veidekke. Tougher walls Another feature of the Leca walls is Quick internal walls that they are tougher than inner walls made with plaster. In a sports facility that is important, and ensures the walls will demand less maintenance. “Especially in the wet areas like showers and wardrobes the Leca block is the best choice. The walls are very robust, even when assembled with the glue. We can very quickly start putting finishing renders on the wall”, says Aamodt. Due to the large areas that needed to be covered, the render was applied to the wall with a spray. The sprayable render means a lot more square metres can be covered in a day. NORWAY  The students at the Norwegian University of Life Sciences will soon enjoy a new sports centre. The inner walls are made with Leca®. Leca® is a registered trademark owned by Saint-Gobain 34
  • 35. Facility  Eika sports centre Location  Ås, Norway Developer  Studentsamskipnaden i Ås, SiÅS Contractor  Veidekke Entreprenør AS Leca products  Leca Lettvegg 118, Leca Basicblokk Weber products  Weber render, Weber Stone Fix, Weber wet area system Leca facts Eika sports centre outside Oslo is a huge expansion of the existing centre. Almost all the inner walls are built with Leca Lettveggsblokk. Hege Anker-Jensen from Leca inspects firewalls built with Leca Basicblock. Almost all the inner walls of the sports centre are constructed with Leca Lettveggsblokk (top). Leca’s technical personnel has been an important advisor in the project. Here the foreman Marius Aamodt, mason Truls Eliassen and Kristian Aamodt discuss the result with Jan Øyvind Christensen and Hege Anker-Jensen from Leca (bottom). Leca® is a registered trademark owned by Saint-Gobain 35
  • 36. Reducing energy Costs Matti Heikkilä is a construction entre- preneur and the managing director of Projektimestarit Oy. He was deter- mined that he wanted to build the new houses to a low-energy stand- ard. Previous experiences lead him to choose Leca Sandwich blocks. “In 2003, I built our first single family house from Leca Term Sand- wich blocks. I was very pleased with the solution at the time, and after having lived in a wooden house in between, I definitely wanted to build a new Leca block house, where I could take advantage of the success of the previous block house,” Matti Heikkilä says. Saves energy When the lead-ins and connections are properly done, blockhouses becomeveryairtight.Thisisanimpor- tant feature because airtightness is a central part of energy efficiency. “Due to their mass, blocks possess good thermal and sound insulation properties compared with wooden buildings,” says head designer Veikko Ahonen from Ark- kitehtuuritoimisto Ahonen Veikko Oy. He considered the advantages of building in Leca before he decided to use Leca Sandwich blocks for the family houses. “It is quick to construct the large masonry units. The frame of the building, the heat insulation, and outer shell, with the exception of surfacing, rise at the same time. Leca blocks are easy to work with and are flexible building units for many forms. Leca blocks are highly suitable for constructions on sloped locations, because the entire facade, from the basement wall upwards, can be made from the same mate- rial,” says Ahonen. FINLAND  A Finnish family built two low-energy houses with Leca® Design Sandwich blocks. It is their second house built with Leca®. Soundproofed The house is built on a slope in a suburb of Helsinki. Leca Sandwich blocks meant they could effectively take advantage of the difficult slope. “I like stone houses, because they do not click and clack and one can ensure that everyone can enjoy their own desired peace.” The house also features audio and video systems and smart house technology, all of which can be con- trolled via smartphones or tablets. Leca® is a registered trademark owned by Saint-Gobain 36
  • 37. Client  Matti Heikkilä Frame contractor  Aja Rakennus Oy Architect  Arkkitehuuritoimisto Ahonen Veikko Oy Structural engineering Insinööritoimisto Pietiläinen & Gabrielsson Oy Leca products  Leca sandwich block LTH-420, Kahi separating wall block, Leca shuttering blocks (in swimming pools) Leca facts Large windows and skylights make the houses bright. The mass of the stone house evens out temperature fluctuations and saves energy. Matti Heikkilä (right) was determined he wanted a low-energy house built with Leca Sandwich block. The houses are set in a slope and close together. The swimming pools are made with Leca shuttering blocks. Leca® is a registered trademark owned by Saint-Gobain 37
  • 38. The new highway in the inland of Norway is 9.3 km long, including a 1.7 km long tunnel that bypasses the small town of Gran. Approaching the opening day, the construction site is busy. Using Leca in the ground within road construction is a well-known and tested method. The Leca aggre- gates are put in the construction of the road to insulate from frost and prevent settlement. Anti-frost “More than 20,000 cubic metres of Leca aggregates are used in the tunnel. Above that there is a layer of coarse rocks and more fine stone masses. On top there is, of course, asphalt,” says construction manager Ole Helge Steinsrud of NCC. Leca aggregates are often also used to avoid settlement where the ground is unstable, such as when constructing roads or buildings in areas with clay. The light weight of Leca aggre- gates is a huge advantage in many situations. On two roundabouts built on top of culverts there will be huge flower and plant beds. To reduce the weight of the beds, Leca aggregate is filled to a level prior to capping with a top layer of soil. Easy to lay Installing hundreds of cubic metres withinabusycarriagewayundergoing construction work is a challenge. The solution was blowing the aggregates in place through a series of hoses. “It is very easy to lay out the Leca aggregates by blowing them in place like this. Using a typical machine such as a tracked excavator or blade would not be possible because of the bulk- heads between the different plant beds,” says foreman Bjørn Løvseth with NCC. Keeping it light NORWAY  More than 21,000 m3 of Leca® aggregates have been used in the construction of a new motorway in inland Norway. Leca® is a registered trademark owned by Saint-Gobain 38
  • 39. Facility  Highway 4 Location  Gran, Norway Developer  Norwegian Public Roads Administration Contractor NCC Leca products  Leca aggregates Leca facts To reduce the weight of the roundabout on Highway 4 in Norway, the developer chose Leca aggregates as filling for the plant beds. The aggregates were blown in place through a series of hoses. Blowing the Leca aggregates in place is easy and effective. Using hoses with a large diameter the operator has good control and can direct the aggregate in to position. Leca® is a registered trademark owned by Saint-Gobain 39
  • 40. Leca International A/S Robert Jacobsens Vej 62 A 2300 Copenhagen S Denmark A Saint-Gobain brand NORWAY Brobekkveien 84 Alnabru, 0582 Oslo DENMARK Randersvej 75 8940 Randers SV GERMANY Rahdener Str. 1 21769 Lamstedt PORTUGAL Tojeira, Apartado 16 3240-908 Avelar SPAIN Ctra. C-17, km. 2 08110 Montcada i Reixac Barcelona UNITED KINGDOM Regus House, Herons Way Chester Business Park Chester, CH4 9QR FINLAND Strömberginkuja 2 00380 Helsinki SWEDEN Norra Malmvägen 76 191 62 Sollentuna LATVIA Daugavgrīvas iela 83 LV1007 Riga LITHUANIA Menulio 7 LT04326 Vilnius ESTONIA Peterburi tee 75 Tallinn 11415 POLAND Krasickiego 9 83-140 Gniew