SlideShare a Scribd company logo
1 of 10
Curriculum Vitae
Sa’edNazeeh
Salem
Civil Engineer.
Date of Birth: 9/8/1977
Address: Nablus
Social Status: married
 Design of Earthquake Resistance Structure
Issued by: Engineering Association-Jerusalem center, and
Earth Sciences & Seismic Engineering Center.
 Disaster Management and Emergency Supports
Issued by: Engineering Association-Jerusalem center, and
Earth Sciences & Seismic Engineering Center.
 Seismic Data Acquisition, Processing & Interpretation
Issued by: Geophysical Service Center Co. in Amman
Mob:00970597592074
Tel: 09-2351523
Email.saedsalem2002@hotmail.com
-CHF from October,2011 up to date in Rammala area.
Work: Projects engineer
Project: Local Government and Infrastructure Program
(LGIP)
Position :
•Supervise daily for the projects to insure that the quality , time and cost within the
plan ,specification and time schedule
 -conduct site visit with beneficiary partner to verify the suitability of proposed
locations, building regulations, infrastructure requirements, availability of
ownership and or proof or land acquisition.
 conduct Environmental Assessment of project site and design to develop control
and mitigation measures
 : assess whether additional design support is necessary and arranges for provision
of support
 review initial design ideas with beneficiary partner to assess viability, to ensure
that design will be compliant with ADA/ABA thresholds and environmental
standards, and to encourage the incorporation of green technologies and local
materials
 Calculate the engineer’s estimates of construction costs for each site
 Submit final designs, estimated costs and a budget narrative, along with the
Environmental Documentation Form and mitigation measures to the USAID
Mission for review and approval .
 Compile tender documents
 Receive contractor proposals;
 Writes detailed investigation and safety and health progress reports
 Review and comment on Contractor’s safety ,risk, security, method of statement
and environmental plans and relevant submittals.
 Manages the Emergency Response Procedures.
Prepare a tender report recommend Contractors which achieve the highest
ratings.
 Manages project safety and health performance
 Assists the Construction Contractor in development of task specific Job Hazard
Analysis
 Quality control, material testing and systematic activity monitoring to ensure
conformance with the project technical specifications and work program;
 Project documentation and reporting procedures;
 Payment certification and disbursements;
 Certification of labor and local materials requirement;
 Construction schedules and project controls;
-Prepare cost budgeting for the projects
- Check designs and tender documents
- Monitor and implement the agreed upon plan and efficiently
organize site facilities in order to meet project deadlines
- Document all stages of the project through measurements and
photos
- prepare progress reports on the project implementation
- review measurement sheets and payment request by contractors
- evaluation contractors bids
- participate in reviewing contractors bids and selectionof best
- controlling the project scope , cost, and quality
-prepare work plans and time schedules for the project
implementing
-U.N.R.W.A (UNITED NATION RELIEF AND WORKS AGENCY
FOR PALESTINE) From Jan , 2006Up to Desember, 2009 in Nablus
Area
Work: supervisor
project: shelter rehabilitation
Position:
-supervisor and assistance on shelter programs
-following up the works in the site
-following up the project as the project planed
- checking up the works in the site as it is in the plans
-Write weekly and monthly reports
-Prepare the documents for shelter rehabilitation projects
-Prepare bill of quantities for some projects
-Prepare the contracts for shelter rehabilitation projects
-Prepare cost budgeting for the projects
-Check designs, specifications and safety regulations
- Check designs and tender documents
- Monitor and implement the agreed upon plan and efficiently
organize site facilities in order to meet project deadlines
 Construction of bedya youth club
 Construction of bedya girls school
 Rehabilitation of masha main entrance
 Rehabilitation of satra main entrance
 Construction of masha primary boys school
 Reconstruction of sinjil main entrance
 Construction of der sudan main entrance
 Rehabiltation of silwad youth club
 Construction of qadora youth club
 Rehabilittion of sinjil boys school
 Construction of qire primary boys school
 Construction of Anata primary boys school
 13)Yasof water net and reservoir
 14)Construction of al Jalazon pedestrian bridge
 15)Rehabilitation of Al Bireh youth association
 16) construction of Saffa water net and construction of internal roads
 17) construction of Nablus sports hall (phase one )
 18) construction of Ras Atie and Da'ba school
 And another similar projects
CHF from Desember,2009 up toOctober.2011 in Rammala area.
Work: Area Engineer
Project: Emergency Job Program (EJP) and( LGIP)
Position :
•Supervise daily for the projects to insure that the quality , time and cost within
the specification and time schedule
 -conduct site visit with beneficiary partner to verify the suitability of proposed
locations, building regulations, infrastructure requirements, availability of
ownership and or proof or land acquisition.
 Review and comment on Contractor’s safety ,risk, security, method of statement
and environmental plans and relevant submittals
 conduct Environmental Assessment of project site and design to develop control
and mitigation measures
 approve beneficiary partner’s project design team. Options include the
Beneficiary partner’s in-house engineering staff or a local design firm.
Outsourcing can be managed and financed by beneficiary partner OR if the Team
assesses that the beneficiary partner has neither the financial nor technical
capability to manage and finance the design process,
 : assess whether additional design support is necessary and arranges for provision
of support
 review initial design ideas with beneficiary partner to assess viability, to ensure
that design will be compliant with ADA/ABA thresholds and environmental
standards, and to encourage the incorporation of green technologies and local
materials
 Calculate the engineer’s estimates of construction costs for each site
 Reviews designs, technical specifications, and bills of quantities and makes any
necessary changes in coordination with the beneficiary partner
 Submit final designs, estimated costs and a budget narrative, along with the
Environmental Documentation Form and mitigation measures to the USAID
Mission for review and approval .
 Compile tender documents
 Check each offer for completeness and adherence to the TOR requirements and
specifications
 evaluate each Construction Tender,
 Prepare a tender report recommend Contractors which achieve the highest ratings.
 Quality control, material testing and systematic activity monitoring to ensure
conformance with the project technical specifications and work program;
 Project documentation and reporting procedures;
 Payment certification and disbursements;
 Certification of labor and local materials requirement;
 Construction schedules and project controls;
 Supervise daily for the projects to insure that the quality , time and cost within
the specification and time schedule
-U.N.R.W.A (UNITEDNATION RELIEF ANDWORKS AGENCYFOR
PALESTINE) From Jan , 2006Up to Desember , 2009 in Nablus Area
Work:
supervisor
project:
shelter rehabilitation
Position:
-supervisor and assistance on shelter programs
-following up daily the works in the site
-following up the project as the project planed
- checking up the works in the site as it is in the plans
-Write weekly and monthly reports
-Prepare the documents for shelter rehabilitation projects
-Prepare bill of quantities for some projects
-Prepare the contracts for shelter rehabilitation projects
-Prepare cost budgeting for the projects
-Check designs, specifications and safety regulations
- Check designs and tender documents
- Monitor and implement the agreed upon plan and efficiently organize site facilities in
order to meet project deadlines
-U.N.R.W.A (UNITED NATION RELIEF AND WORKS AGENCY FOR
PALESTINE) From March, 2001Up to Jan 2006in Nablus Area
Work: construction and maintenance Engineer
project: U.N.R.W.A Establishments in Nablus Area
Position:
- site engineer
- Supervise daily for the projects to insure that the quality , time and cost within the
specification and time schedule
- prepare the assessment for what the UNRWA establishments like schools , health centers
…etc. that need annual maintenance then prepare quantities according for that for annual
maintenance tendering
-following up the works in the site
- Assisting Local community in the camps in preparing contracts documents as stipulated in
the relevant procurement documents; Developing/reviewing and monitoring that the required
scope of work is technically adequate for the required
tasks
-Assisting Local community to have adequate quality control and good filing and reporting
system for the proper and efficient documentation of contracts for all types of infrastructure
projects and services and recording of all lessons learned through the whole process.
-following up the project as the project planed
- checking up the works in the site as it is in the plans
-Write weekly and monthly reports
-Prepare the documents for construction ,upgrade and maintenance projects
-prepare bill of quantities for the projects
-Prepare cost budgeting for the projects
- Check designs and tender documents
- Monitor and implement the agreed upon plan and efficiently organize site facilities in order
to meet project deadlines
- Document all stages of the project through measurements and photos
- prepare progress reports on the project implementation
- review measurement sheets and payment request by contractors
- participate in reviewing contractors bids and selection of best contractor
- controlling the project scope , cost, and quality
-prepare work plans and time schedules for the project implementing
-Yaish Company From January 2000 Up to March 2001 in Nablus
1) Project: Anabta ,quseen and Bal'a water net and reservoir
worke: Site engineer
length: 10 km
Cost: 2000,000 $
Position:
-following up the works in the site
-preparing the materials that the site needs
-following up the project as the project planed
-distributing the labors in the site daily as the works need
-preparing the bill of quantities
- checking up the works in the site as it is in the plans
Jordan Engineers Association – Jerusalem center
COMPUTER
SKILLS Friendly with AutoCAD R14 Program.
Friendly with MS Project and primevera.
Structural Programs such as SAP2000, SAFE, ETABS and BROKEN.
Proficient in EPANET & Water CAD, Computer Programs For Designing
Water Distribution Systems.
Proficient in Microsoft Word, Excel, PowerPoint, Access program For data
analysis Email and Internet.
An-Najah National University
B.SC. In Civil Engineering.
AutoCAD R14 Term at Jordan Engineers Association.
Native Arabic.
A Good Fluency in English Language, Reading, Writing, and Speaking
1- Sonia Massis, Eng, PMP
Senior Projects Manager
Water Resources & Infrastructure Office
USAID West Bank & Gaza
Tel: 03-5198622
Cellphone: 050-528-8613 2-
Email: smassis@usaid.gov
2- Deputy Director for Infrastructure-
LGI Program
E-mail : ajuhari@globalcommunities.ps
Mobile: +972 595 910067
3- Tony Rantissi
Director for Infrastructure-
LGI Program USAID West Bank & Gaza
Tel: 03-5198622
 Jordanian Engineering Association
 Valid Driver License
 Nationality : Palestinian

More Related Content

What's hot

What's hot (20)

CIRRICULUM VITAE - PelisP
CIRRICULUM VITAE - PelisPCIRRICULUM VITAE - PelisP
CIRRICULUM VITAE - PelisP
 
Roberto Guevara-CV
Roberto Guevara-CVRoberto Guevara-CV
Roberto Guevara-CV
 
Resume
ResumeResume
Resume
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CV
 
Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.
 
CV 25-12-15 M.K.Narayana _ Seaport Technology & Engineering
CV 25-12-15 M.K.Narayana _ Seaport Technology & EngineeringCV 25-12-15 M.K.Narayana _ Seaport Technology & Engineering
CV 25-12-15 M.K.Narayana _ Seaport Technology & Engineering
 
Omar Al Nadi CV عمر
Omar Al Nadi CV عمرOmar Al Nadi CV عمر
Omar Al Nadi CV عمر
 
Raman K Gupta ,QC Engr
Raman K Gupta ,QC EngrRaman K Gupta ,QC Engr
Raman K Gupta ,QC Engr
 
Cirriculum vitae pelis2
Cirriculum vitae  pelis2Cirriculum vitae  pelis2
Cirriculum vitae pelis2
 
Appli. for the Const. Mngr
Appli. for the Const. MngrAppli. for the Const. Mngr
Appli. for the Const. Mngr
 
CV of CCEquibal
CV of CCEquibalCV of CCEquibal
CV of CCEquibal
 
shakeel cv 19-2-2015
shakeel cv 19-2-2015shakeel cv 19-2-2015
shakeel cv 19-2-2015
 
CV_Tarun Kumar Behera
CV_Tarun Kumar BeheraCV_Tarun Kumar Behera
CV_Tarun Kumar Behera
 
Nady Boktor Resume
Nady Boktor ResumeNady Boktor Resume
Nady Boktor Resume
 
Curriculum Vitea Neil Herbst
Curriculum Vitea Neil HerbstCurriculum Vitea Neil Herbst
Curriculum Vitea Neil Herbst
 
RMJugueta Resume 01172016
RMJugueta Resume 01172016RMJugueta Resume 01172016
RMJugueta Resume 01172016
 
Updated CV
Updated CVUpdated CV
Updated CV
 
Resume latest
Resume latestResume latest
Resume latest
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
 
Sheraz Mahdi New CV
Sheraz Mahdi New CVSheraz Mahdi New CV
Sheraz Mahdi New CV
 

Viewers also liked

Actividad 7 Problemática carcelaria
Actividad 7 Problemática carcelariaActividad 7 Problemática carcelaria
Actividad 7 Problemática carcelarialauramolinadi
 
Dovile Deksniene resume
Dovile Deksniene resumeDovile Deksniene resume
Dovile Deksniene resumeDovile D
 
Actividad fisica y salud
Actividad fisica y saludActividad fisica y salud
Actividad fisica y saludCamila Duarte
 
Pitch Deck iBAN-Wallet
Pitch Deck iBAN-WalletPitch Deck iBAN-Wallet
Pitch Deck iBAN-WalletLeivy Gonzalez
 
9789584442864.06
9789584442864.069789584442864.06
9789584442864.06victorcam
 
Wawasan multimedia
Wawasan multimediaWawasan multimedia
Wawasan multimediaIndieDesta02
 
Lo que debes saber para ser intercesor ojo
Lo que debes saber para ser intercesor ojoLo que debes saber para ser intercesor ojo
Lo que debes saber para ser intercesor ojoTania Sotillo
 
Actividad fisica y salud
Actividad fisica y saludActividad fisica y salud
Actividad fisica y saludCamila Duarte
 
Maquinas virtuales y plataformas educativas
Maquinas virtuales y plataformas educativas Maquinas virtuales y plataformas educativas
Maquinas virtuales y plataformas educativas Félix Gómez
 
Philip McFadden CV Sept 2016 correct version
Philip McFadden CV Sept 2016 correct versionPhilip McFadden CV Sept 2016 correct version
Philip McFadden CV Sept 2016 correct versionphillip mcfadden
 

Viewers also liked (14)

Actividad 7 Problemática carcelaria
Actividad 7 Problemática carcelariaActividad 7 Problemática carcelaria
Actividad 7 Problemática carcelaria
 
Dovile Deksniene resume
Dovile Deksniene resumeDovile Deksniene resume
Dovile Deksniene resume
 
Actividad fisica y salud
Actividad fisica y saludActividad fisica y salud
Actividad fisica y salud
 
Pitch Deck iBAN-Wallet
Pitch Deck iBAN-WalletPitch Deck iBAN-Wallet
Pitch Deck iBAN-Wallet
 
Proyecto de Expresión Oral
Proyecto de Expresión OralProyecto de Expresión Oral
Proyecto de Expresión Oral
 
9789584442864.06
9789584442864.069789584442864.06
9789584442864.06
 
Tic1
Tic1Tic1
Tic1
 
Wawasan multimedia
Wawasan multimediaWawasan multimedia
Wawasan multimedia
 
FATHIMA
FATHIMAFATHIMA
FATHIMA
 
Lo que debes saber para ser intercesor ojo
Lo que debes saber para ser intercesor ojoLo que debes saber para ser intercesor ojo
Lo que debes saber para ser intercesor ojo
 
Actividad fisica y salud
Actividad fisica y saludActividad fisica y salud
Actividad fisica y salud
 
Maquinas virtuales y plataformas educativas
Maquinas virtuales y plataformas educativas Maquinas virtuales y plataformas educativas
Maquinas virtuales y plataformas educativas
 
NAF
NAFNAF
NAF
 
Philip McFadden CV Sept 2016 correct version
Philip McFadden CV Sept 2016 correct versionPhilip McFadden CV Sept 2016 correct version
Philip McFadden CV Sept 2016 correct version
 

Similar to CV Engineer Sa'ed Salem Projects Local Government Infrastructure

Similar to CV Engineer Sa'ed Salem Projects Local Government Infrastructure (20)

Gerry_Garciano_resume
Gerry_Garciano_resumeGerry_Garciano_resume
Gerry_Garciano_resume
 
Umer CV
Umer CVUmer CV
Umer CV
 
Abo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & DutiesAbo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & Duties
 
Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3
 
Mostafa Ragaee
Mostafa RagaeeMostafa Ragaee
Mostafa Ragaee
 
inayat ur rahman cv 1
inayat ur rahman cv 1inayat ur rahman cv 1
inayat ur rahman cv 1
 
CV (2)
CV (2)CV (2)
CV (2)
 
hidayath cv 2016
hidayath cv 2016hidayath cv 2016
hidayath cv 2016
 
Bill resume
Bill resumeBill resume
Bill resume
 
CV 2018 Series
CV 2018 SeriesCV 2018 Series
CV 2018 Series
 
Surveyor cv
Surveyor cvSurveyor cv
Surveyor cv
 
My Resume
My ResumeMy Resume
My Resume
 
2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص
 
Civil Engineer Updated CV Fernando Villarojo
Civil Engineer Updated CV Fernando VillarojoCivil Engineer Updated CV Fernando Villarojo
Civil Engineer Updated CV Fernando Villarojo
 
Khan.CV
Khan.CVKhan.CV
Khan.CV
 
CV Osama Hamad_Aug 2016
CV Osama Hamad_Aug 2016CV Osama Hamad_Aug 2016
CV Osama Hamad_Aug 2016
 
Vivencio pachoro cv 2016
Vivencio pachoro cv 2016Vivencio pachoro cv 2016
Vivencio pachoro cv 2016
 
CV-Essam Saadeh
CV-Essam SaadehCV-Essam Saadeh
CV-Essam Saadeh
 
Responsibilities as vice president projects at jacobs 1.9.16
Responsibilities as vice president projects at jacobs 1.9.16Responsibilities as vice president projects at jacobs 1.9.16
Responsibilities as vice president projects at jacobs 1.9.16
 
shafaqat cv 1
shafaqat cv 1shafaqat cv 1
shafaqat cv 1
 

CV Engineer Sa'ed Salem Projects Local Government Infrastructure

  • 1. Curriculum Vitae Sa’edNazeeh Salem Civil Engineer. Date of Birth: 9/8/1977 Address: Nablus Social Status: married  Design of Earthquake Resistance Structure Issued by: Engineering Association-Jerusalem center, and Earth Sciences & Seismic Engineering Center.  Disaster Management and Emergency Supports Issued by: Engineering Association-Jerusalem center, and Earth Sciences & Seismic Engineering Center.  Seismic Data Acquisition, Processing & Interpretation Issued by: Geophysical Service Center Co. in Amman Mob:00970597592074 Tel: 09-2351523 Email.saedsalem2002@hotmail.com
  • 2. -CHF from October,2011 up to date in Rammala area. Work: Projects engineer Project: Local Government and Infrastructure Program (LGIP) Position : •Supervise daily for the projects to insure that the quality , time and cost within the plan ,specification and time schedule  -conduct site visit with beneficiary partner to verify the suitability of proposed locations, building regulations, infrastructure requirements, availability of ownership and or proof or land acquisition.  conduct Environmental Assessment of project site and design to develop control and mitigation measures  : assess whether additional design support is necessary and arranges for provision of support  review initial design ideas with beneficiary partner to assess viability, to ensure that design will be compliant with ADA/ABA thresholds and environmental standards, and to encourage the incorporation of green technologies and local materials  Calculate the engineer’s estimates of construction costs for each site  Submit final designs, estimated costs and a budget narrative, along with the Environmental Documentation Form and mitigation measures to the USAID Mission for review and approval .  Compile tender documents  Receive contractor proposals;  Writes detailed investigation and safety and health progress reports  Review and comment on Contractor’s safety ,risk, security, method of statement and environmental plans and relevant submittals.  Manages the Emergency Response Procedures. Prepare a tender report recommend Contractors which achieve the highest ratings.  Manages project safety and health performance  Assists the Construction Contractor in development of task specific Job Hazard Analysis  Quality control, material testing and systematic activity monitoring to ensure conformance with the project technical specifications and work program;  Project documentation and reporting procedures;  Payment certification and disbursements;  Certification of labor and local materials requirement;  Construction schedules and project controls;
  • 3. -Prepare cost budgeting for the projects - Check designs and tender documents - Monitor and implement the agreed upon plan and efficiently organize site facilities in order to meet project deadlines - Document all stages of the project through measurements and photos - prepare progress reports on the project implementation - review measurement sheets and payment request by contractors - evaluation contractors bids - participate in reviewing contractors bids and selectionof best - controlling the project scope , cost, and quality -prepare work plans and time schedules for the project implementing -U.N.R.W.A (UNITED NATION RELIEF AND WORKS AGENCY FOR PALESTINE) From Jan , 2006Up to Desember, 2009 in Nablus Area Work: supervisor project: shelter rehabilitation Position: -supervisor and assistance on shelter programs -following up the works in the site -following up the project as the project planed - checking up the works in the site as it is in the plans -Write weekly and monthly reports -Prepare the documents for shelter rehabilitation projects -Prepare bill of quantities for some projects -Prepare the contracts for shelter rehabilitation projects -Prepare cost budgeting for the projects -Check designs, specifications and safety regulations - Check designs and tender documents - Monitor and implement the agreed upon plan and efficiently organize site facilities in order to meet project deadlines
  • 4.
  • 5.  Construction of bedya youth club  Construction of bedya girls school  Rehabilitation of masha main entrance  Rehabilitation of satra main entrance  Construction of masha primary boys school  Reconstruction of sinjil main entrance  Construction of der sudan main entrance  Rehabiltation of silwad youth club  Construction of qadora youth club  Rehabilittion of sinjil boys school  Construction of qire primary boys school  Construction of Anata primary boys school  13)Yasof water net and reservoir  14)Construction of al Jalazon pedestrian bridge  15)Rehabilitation of Al Bireh youth association  16) construction of Saffa water net and construction of internal roads  17) construction of Nablus sports hall (phase one )  18) construction of Ras Atie and Da'ba school  And another similar projects
  • 6. CHF from Desember,2009 up toOctober.2011 in Rammala area. Work: Area Engineer Project: Emergency Job Program (EJP) and( LGIP) Position : •Supervise daily for the projects to insure that the quality , time and cost within the specification and time schedule  -conduct site visit with beneficiary partner to verify the suitability of proposed locations, building regulations, infrastructure requirements, availability of ownership and or proof or land acquisition.  Review and comment on Contractor’s safety ,risk, security, method of statement and environmental plans and relevant submittals  conduct Environmental Assessment of project site and design to develop control and mitigation measures  approve beneficiary partner’s project design team. Options include the Beneficiary partner’s in-house engineering staff or a local design firm. Outsourcing can be managed and financed by beneficiary partner OR if the Team assesses that the beneficiary partner has neither the financial nor technical capability to manage and finance the design process,  : assess whether additional design support is necessary and arranges for provision of support  review initial design ideas with beneficiary partner to assess viability, to ensure that design will be compliant with ADA/ABA thresholds and environmental standards, and to encourage the incorporation of green technologies and local materials  Calculate the engineer’s estimates of construction costs for each site  Reviews designs, technical specifications, and bills of quantities and makes any necessary changes in coordination with the beneficiary partner  Submit final designs, estimated costs and a budget narrative, along with the Environmental Documentation Form and mitigation measures to the USAID Mission for review and approval .  Compile tender documents  Check each offer for completeness and adherence to the TOR requirements and specifications  evaluate each Construction Tender,  Prepare a tender report recommend Contractors which achieve the highest ratings.  Quality control, material testing and systematic activity monitoring to ensure conformance with the project technical specifications and work program;  Project documentation and reporting procedures;  Payment certification and disbursements;  Certification of labor and local materials requirement;  Construction schedules and project controls;  Supervise daily for the projects to insure that the quality , time and cost within the specification and time schedule
  • 7. -U.N.R.W.A (UNITEDNATION RELIEF ANDWORKS AGENCYFOR PALESTINE) From Jan , 2006Up to Desember , 2009 in Nablus Area Work: supervisor project: shelter rehabilitation Position: -supervisor and assistance on shelter programs -following up daily the works in the site -following up the project as the project planed - checking up the works in the site as it is in the plans -Write weekly and monthly reports -Prepare the documents for shelter rehabilitation projects -Prepare bill of quantities for some projects -Prepare the contracts for shelter rehabilitation projects -Prepare cost budgeting for the projects -Check designs, specifications and safety regulations - Check designs and tender documents - Monitor and implement the agreed upon plan and efficiently organize site facilities in order to meet project deadlines
  • 8. -U.N.R.W.A (UNITED NATION RELIEF AND WORKS AGENCY FOR PALESTINE) From March, 2001Up to Jan 2006in Nablus Area Work: construction and maintenance Engineer project: U.N.R.W.A Establishments in Nablus Area Position: - site engineer - Supervise daily for the projects to insure that the quality , time and cost within the specification and time schedule - prepare the assessment for what the UNRWA establishments like schools , health centers …etc. that need annual maintenance then prepare quantities according for that for annual maintenance tendering -following up the works in the site - Assisting Local community in the camps in preparing contracts documents as stipulated in the relevant procurement documents; Developing/reviewing and monitoring that the required scope of work is technically adequate for the required tasks -Assisting Local community to have adequate quality control and good filing and reporting system for the proper and efficient documentation of contracts for all types of infrastructure projects and services and recording of all lessons learned through the whole process. -following up the project as the project planed - checking up the works in the site as it is in the plans -Write weekly and monthly reports -Prepare the documents for construction ,upgrade and maintenance projects -prepare bill of quantities for the projects -Prepare cost budgeting for the projects - Check designs and tender documents - Monitor and implement the agreed upon plan and efficiently organize site facilities in order to meet project deadlines - Document all stages of the project through measurements and photos - prepare progress reports on the project implementation - review measurement sheets and payment request by contractors - participate in reviewing contractors bids and selection of best contractor - controlling the project scope , cost, and quality -prepare work plans and time schedules for the project implementing -Yaish Company From January 2000 Up to March 2001 in Nablus 1) Project: Anabta ,quseen and Bal'a water net and reservoir worke: Site engineer length: 10 km Cost: 2000,000 $ Position: -following up the works in the site -preparing the materials that the site needs -following up the project as the project planed -distributing the labors in the site daily as the works need -preparing the bill of quantities - checking up the works in the site as it is in the plans
  • 9. Jordan Engineers Association – Jerusalem center COMPUTER SKILLS Friendly with AutoCAD R14 Program. Friendly with MS Project and primevera. Structural Programs such as SAP2000, SAFE, ETABS and BROKEN. Proficient in EPANET & Water CAD, Computer Programs For Designing Water Distribution Systems. Proficient in Microsoft Word, Excel, PowerPoint, Access program For data analysis Email and Internet. An-Najah National University B.SC. In Civil Engineering. AutoCAD R14 Term at Jordan Engineers Association. Native Arabic. A Good Fluency in English Language, Reading, Writing, and Speaking 1- Sonia Massis, Eng, PMP Senior Projects Manager Water Resources & Infrastructure Office USAID West Bank & Gaza Tel: 03-5198622 Cellphone: 050-528-8613 2- Email: smassis@usaid.gov 2- Deputy Director for Infrastructure- LGI Program E-mail : ajuhari@globalcommunities.ps
  • 10. Mobile: +972 595 910067 3- Tony Rantissi Director for Infrastructure- LGI Program USAID West Bank & Gaza Tel: 03-5198622  Jordanian Engineering Association  Valid Driver License  Nationality : Palestinian