SlideShare a Scribd company logo
1 of 5
Download to read offline
Page 1 of 5
Curriculum vitae
MUHAMMAD IQBAL
Proposed position
Quantity Surveyor / Estimator
Present position
Quantity Surveyor / Construction Supervisor
Personal data
Last name Iqbal
First name Muhammad
Year of birth 1982
Nationality Pakistan
With Tebodin since January, 2009
Education
2013 ICBT Dubai
HND (Higher National Diploma in QS) – in progress
2012 Development Institute of science and computer - Dubai
Diploma in Quantity Surveyor
2008 GCT Rasool - Pakistan
Diploma in Land Survey
Key skills and competencies
 Check and certify the Contractor’s claims and preparation of Interim payments certificates.
 Review, check and verify the Variation orders.
 Working on multiple projects at same time.
 Performing risk and value management and cost control.
 Thorough knowledge of Company health, safety, quality and environment procedures.
 Preparing and maintaining the Project Cost Control System for the close-out / final account of project.
 Prepare and maintain the reconciliation for material (received and installed) for the project and cost
control.
 Take-off quantities of project design, variations and any additional work as per drawings.
 Review and verify the penultimate and final account on completion of project.
 Revision of bill of quantity as per the addition / deletion, variation as per change in project scope.
 Assisting in establishing the Client’s requirements and undertaking feasibility studies.
 Attending the meetings with Client and Contractor for any financial issues, proposing solutions as per
standard procedures.
Page 2 of 5
Curriculum vitae
MUHAMMAD IQBAL
Area of expertise
 Value Management
 Cost Control
 Procurement strategy
 Project Management
 Water related schemes
Approvals :
Approved from TRANSCO
Approved from AADC (Al Ain Distribution Company)
Approved from MUSANADA
In-House Trainings :
Certificate for “Information Security” Nov, 2015.
Certificate for “Compliance” June, 2015.
Certificate for “OHSE – Question A Day”
Professional experience
2016 – To Date Tebodin Middle East Ltd.
Q.S on the following MUSANADA Project :
Al Shwaib Residential Complex (186 Villa’s - Civil, Infrastructure & MEP
Works)
Responsibilites and duties
 Reviewing, Finalizing and forwarding the Contractor’s interim payment on
monthly basis.
 Preparing the Cost Report (MUSANADA Format) regularly and forwarding to
Client.
 Maintaining all the record related to Material, Payments, NPC (Notification of
Potential Change) and Variations.
 Updating the RFI’s Log all incoming and outgoing.
 Providing all the updated information to Client as per requirement.
 Arranging weekly Cost meetings with Contractor and Client.
2013 – 2016 Tebodin Middle East Ltd.
Q.S on the following AADC (Al Ain Distribution Company)Project :
A-10864 Framework Consultancy Contract containing different AADC Projects
(A – 6786, A – 10844, A – 11606, A – 11168, A – 10915.1, A – 11150) (HDPE OD-
110 to OD-710mm, D.I DN 300 to 800mm Pipeline Works, House Connection
Works) in Al Ain Region.
Responsibilites and duties
 Evaluate and monitor the shipment documents, RCDR’s and installation of
Page 3 of 5
Curriculum vitae
MUHAMMAD IQBAL
material
 Checking and verifying the interim payments and claims submitted by
Contractor.
 Reviewing and verifying the daily, weekly and monthly progress reports.
 Maintain the record for daily and weekly construction reports to finalize the
Monthly Construction report.
 Revising the bill of quantities for any addition / deletion in the scope.
 Monitor and prepare all the correspondence to Contractor and Client in regards
of any financial issues.
 Maintain a proper record for all financial documents (Payments, RCDR’s,
weekly and Monthly Construction reports, approved drawings) for close-out of
the project.
 Take-off the quantities and prepare the estimated cost for any additional work
assigned by Client.
 Site inspection to confirm the quality and quantity claims by Contractor.
2011 – 2013 Tebodin Middle East Ltd.
Q.S on the following AADC (Al Ain Distribution Company)Project :
Supply and Install New Bulk and domestic Water Connections, Replacement of
Existing Domestic Connections, Electronic Water Meter Installation and Pipelines
Diversion at Different Areas of Al Ain A-6143 (Project Cost AED 40 million
approx.)
Responsibilites and duties
 Estimating the quantities, required for new house connection and existing
connection for sizes (½” to 2”) to install the water meters.
 Attending the progress meetings with Client and Contractor, proposing the
solution for finalizing the actual requirement of material.
 Revision of the BOQ based on the addition / omission in the original scope of
contract.
 Inspection in the factory for the GRP material.
 Maintain the proper record for material delivery and preparing the final
reconciliation of project for close-out.
 Regular co-ordination / meetings with Client and contractor for any disputed
items and proposing the acceptable solutions.
2009 – 2011 Tebodin Middle East Ltd.
Q.S / Site Inspector on the following TRANSCO (Abu Dhabi Transmission &
Despatch Company) Project :
Al Ain Water Transmission Scheme (AWTS) Pipeline from Al Hayer Tanks
Compound to junction A IP 131 Area at Al Ain (Lot P2) and Pipeline from Zakher
Pumping Station To Mezyad (Lot P3) N4381-B (Project Cost AED 1200 million
approx.)
Page 4 of 5
Curriculum vitae
MUHAMMAD IQBAL
Responsibilites and duties
 Evaluation and monitor the QCR’s of work executed, shipment documents,
RCDR ( Recieve Cum damage reports) and material installation.
 Certify the monthly invoices, shipment documents, RCDR’s and material
installation payments.
 Co-ordinate with Client and Contractor related to contractual correspondance,
weekly, monthly financial reports etc.
 Review and verify the authenticity of variation, claims, new item rates with
respect to the contract documents.
 Maintaing up-to-date record of claims, payments and all financial mattars
related to project.
 Daily supervision of all construction works such as Earthwork (Formation,
bedding, surround and backfill) and installation of pipes, fittings and valves.
 Monitiring the site progress, checking the construction of concrete works,
installation of pipes as per approved drawings, method statements, work
procedures and specifications.
 Inspection and confirmation of quantites at each stage of construction at site.
 Store inspections for the quality of material before installation, verification of
any repair / touch up and use of proper material at site.
 Report to senior’s about irregularities in contractor’s work, recommending
solutions and verification of implementation of agreed procedures.
2008 – 2009 M/s. Atiqurrahman Gen. con. Abu Dhabi
Quantity Surveyor / Site Supervisor
Responsibilites and duties
 Responsible for supervision of all civil works of residential buildings which
includes foundation, surveying works, concrete, masonry, plastering,
reinforcement and form works.
 Prepairing daily, weekly and monthly planning and progress reports.
 Prepairing the bill of quantity for material required for the project.
 Preparing the interim payments and claims and following up for approval.
2005 – 2008 M/s. Habib Rafiq Pvt. Ltd.
Quantity Surveyor / Site Supervisor on following project
Defence Housing Scheme Islamabad
Responsibilites and duties
 Review and check field notes, land and property corner search, staking lines.
 Survey land to determine the property lines, elevation, grades, benchmarks,
boundaries etc.
 Plots and drafts topographic information and stakes right-of-way limits, locate
as –built items for plans.
 Construction of underground utilities i.e sewer lines, sub surface drainage lines
and portable water lines from DN 100 to 450mm and prepairing the interim
payments accordingly.
Page 5 of 5
Curriculum vitae
MUHAMMAD IQBAL
 Construction of utilitiy ducts for different services.
2004 – 2005 M/s. Rahman Brothers Ltd, Pakistan.
Quantity Surveyor / Site Supervisor on following project
Main GT Road, Length 62 KM.
Responsibilites and duties
 Responsible for execution of road works i.e earth works, sub grade, sub base
and laying asphalt and preparing the interim payments accordingly.
 Construction of parking area using kerb stones and tiles.
 Directly involed in construction and operational activities at site.
 Preparing daily, weekly and monthly construction reports.
 Construction of different types of utilities i.e sewerage system, portable water.
Languages
Speaking Reading Writing
Arabic 3 3 3
English 2 2 2
Scale: 1. mother tongue | 2. Good | 3. working knowledge
Membership of professional bodies
 ACAC (American Council for Accredited Certificates)

More Related Content

What's hot (20)

Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3
 
sounder
soundersounder
sounder
 
RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015
 
CV-Sounder
CV-SounderCV-Sounder
CV-Sounder
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
Sanjeewa_CV updated on 23.02.2016
Sanjeewa_CV  updated on 23.02.2016Sanjeewa_CV  updated on 23.02.2016
Sanjeewa_CV updated on 23.02.2016
 
Hamdi.62016.PDF
Hamdi.62016.PDFHamdi.62016.PDF
Hamdi.62016.PDF
 
inayat ur rahman cv 1
inayat ur rahman cv 1inayat ur rahman cv 1
inayat ur rahman cv 1
 
Sanjeewa_CV updated on 16.05.2014
Sanjeewa_CV  updated on 16.05.2014Sanjeewa_CV  updated on 16.05.2014
Sanjeewa_CV updated on 16.05.2014
 
my cv 2
my cv 2my cv 2
my cv 2
 
My Resume
My ResumeMy Resume
My Resume
 
C.V,,,,,,
C.V,,,,,,C.V,,,,,,
C.V,,,,,,
 
Amr. 2015....
Amr. 2015....Amr. 2015....
Amr. 2015....
 
Manoj Kumar_ Resume.DOC
Manoj Kumar_ Resume.DOCManoj Kumar_ Resume.DOC
Manoj Kumar_ Resume.DOC
 
Mechanical Engg_CV
Mechanical Engg_CVMechanical Engg_CV
Mechanical Engg_CV
 
Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016
 
majdi C.V
majdi C.Vmajdi C.V
majdi C.V
 
Project Controls CV (Mohamed Kamal)
Project Controls CV (Mohamed Kamal)Project Controls CV (Mohamed Kamal)
Project Controls CV (Mohamed Kamal)
 
UPDATE CV 2015
UPDATE CV 2015UPDATE CV 2015
UPDATE CV 2015
 
Waseem Al-Ezz Resume
Waseem Al-Ezz ResumeWaseem Al-Ezz Resume
Waseem Al-Ezz Resume
 

Similar to CV_Muhammad Iqbal

Similar to CV_Muhammad Iqbal (20)

CV Shehzad SQS
CV Shehzad SQSCV Shehzad SQS
CV Shehzad SQS
 
CV Senior Quantity Surveyor(CIVIL)
CV Senior Quantity Surveyor(CIVIL)CV Senior Quantity Surveyor(CIVIL)
CV Senior Quantity Surveyor(CIVIL)
 
Furrukh Shahzad CV Quantity Surveyor
Furrukh Shahzad CV Quantity SurveyorFurrukh Shahzad CV Quantity Surveyor
Furrukh Shahzad CV Quantity Surveyor
 
Zuher Mirza CV
Zuher Mirza CVZuher Mirza CV
Zuher Mirza CV
 
Rafeek's CV
Rafeek's CV Rafeek's CV
Rafeek's CV
 
CV waqar Azeem QS
CV waqar Azeem QSCV waqar Azeem QS
CV waqar Azeem QS
 
CV-Atif_Ashraf-4
CV-Atif_Ashraf-4CV-Atif_Ashraf-4
CV-Atif_Ashraf-4
 
Ramanathan CV
Ramanathan CVRamanathan CV
Ramanathan CV
 
Rahim a m
Rahim a mRahim a m
Rahim a m
 
Jefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdf
Jefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdfJefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdf
Jefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdf
 
CV QS AKHTAR RASUL
CV QS AKHTAR RASULCV QS AKHTAR RASUL
CV QS AKHTAR RASUL
 
CV_Saifullah Khalid-
CV_Saifullah Khalid-CV_Saifullah Khalid-
CV_Saifullah Khalid-
 
Babar Sohail Khan (1)
Babar Sohail Khan (1)Babar Sohail Khan (1)
Babar Sohail Khan (1)
 
Mohamed khamis
Mohamed khamisMohamed khamis
Mohamed khamis
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
SYED NAHAR's RESUME
SYED NAHAR's RESUMESYED NAHAR's RESUME
SYED NAHAR's RESUME
 
1. Usman Ali CV Project Engineer Electrical.pdf
1. Usman Ali CV Project Engineer Electrical.pdf1. Usman Ali CV Project Engineer Electrical.pdf
1. Usman Ali CV Project Engineer Electrical.pdf
 
CV Shreenivash Chandra
CV Shreenivash ChandraCV Shreenivash Chandra
CV Shreenivash Chandra
 
QUANTITY SURVEYOR (MUHAMMAD AZEEM) UPDATED 1-22-2017
QUANTITY SURVEYOR  (MUHAMMAD AZEEM) UPDATED 1-22-2017QUANTITY SURVEYOR  (MUHAMMAD AZEEM) UPDATED 1-22-2017
QUANTITY SURVEYOR (MUHAMMAD AZEEM) UPDATED 1-22-2017
 
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
 

CV_Muhammad Iqbal

  • 1. Page 1 of 5 Curriculum vitae MUHAMMAD IQBAL Proposed position Quantity Surveyor / Estimator Present position Quantity Surveyor / Construction Supervisor Personal data Last name Iqbal First name Muhammad Year of birth 1982 Nationality Pakistan With Tebodin since January, 2009 Education 2013 ICBT Dubai HND (Higher National Diploma in QS) – in progress 2012 Development Institute of science and computer - Dubai Diploma in Quantity Surveyor 2008 GCT Rasool - Pakistan Diploma in Land Survey Key skills and competencies  Check and certify the Contractor’s claims and preparation of Interim payments certificates.  Review, check and verify the Variation orders.  Working on multiple projects at same time.  Performing risk and value management and cost control.  Thorough knowledge of Company health, safety, quality and environment procedures.  Preparing and maintaining the Project Cost Control System for the close-out / final account of project.  Prepare and maintain the reconciliation for material (received and installed) for the project and cost control.  Take-off quantities of project design, variations and any additional work as per drawings.  Review and verify the penultimate and final account on completion of project.  Revision of bill of quantity as per the addition / deletion, variation as per change in project scope.  Assisting in establishing the Client’s requirements and undertaking feasibility studies.  Attending the meetings with Client and Contractor for any financial issues, proposing solutions as per standard procedures.
  • 2. Page 2 of 5 Curriculum vitae MUHAMMAD IQBAL Area of expertise  Value Management  Cost Control  Procurement strategy  Project Management  Water related schemes Approvals : Approved from TRANSCO Approved from AADC (Al Ain Distribution Company) Approved from MUSANADA In-House Trainings : Certificate for “Information Security” Nov, 2015. Certificate for “Compliance” June, 2015. Certificate for “OHSE – Question A Day” Professional experience 2016 – To Date Tebodin Middle East Ltd. Q.S on the following MUSANADA Project : Al Shwaib Residential Complex (186 Villa’s - Civil, Infrastructure & MEP Works) Responsibilites and duties  Reviewing, Finalizing and forwarding the Contractor’s interim payment on monthly basis.  Preparing the Cost Report (MUSANADA Format) regularly and forwarding to Client.  Maintaining all the record related to Material, Payments, NPC (Notification of Potential Change) and Variations.  Updating the RFI’s Log all incoming and outgoing.  Providing all the updated information to Client as per requirement.  Arranging weekly Cost meetings with Contractor and Client. 2013 – 2016 Tebodin Middle East Ltd. Q.S on the following AADC (Al Ain Distribution Company)Project : A-10864 Framework Consultancy Contract containing different AADC Projects (A – 6786, A – 10844, A – 11606, A – 11168, A – 10915.1, A – 11150) (HDPE OD- 110 to OD-710mm, D.I DN 300 to 800mm Pipeline Works, House Connection Works) in Al Ain Region. Responsibilites and duties  Evaluate and monitor the shipment documents, RCDR’s and installation of
  • 3. Page 3 of 5 Curriculum vitae MUHAMMAD IQBAL material  Checking and verifying the interim payments and claims submitted by Contractor.  Reviewing and verifying the daily, weekly and monthly progress reports.  Maintain the record for daily and weekly construction reports to finalize the Monthly Construction report.  Revising the bill of quantities for any addition / deletion in the scope.  Monitor and prepare all the correspondence to Contractor and Client in regards of any financial issues.  Maintain a proper record for all financial documents (Payments, RCDR’s, weekly and Monthly Construction reports, approved drawings) for close-out of the project.  Take-off the quantities and prepare the estimated cost for any additional work assigned by Client.  Site inspection to confirm the quality and quantity claims by Contractor. 2011 – 2013 Tebodin Middle East Ltd. Q.S on the following AADC (Al Ain Distribution Company)Project : Supply and Install New Bulk and domestic Water Connections, Replacement of Existing Domestic Connections, Electronic Water Meter Installation and Pipelines Diversion at Different Areas of Al Ain A-6143 (Project Cost AED 40 million approx.) Responsibilites and duties  Estimating the quantities, required for new house connection and existing connection for sizes (½” to 2”) to install the water meters.  Attending the progress meetings with Client and Contractor, proposing the solution for finalizing the actual requirement of material.  Revision of the BOQ based on the addition / omission in the original scope of contract.  Inspection in the factory for the GRP material.  Maintain the proper record for material delivery and preparing the final reconciliation of project for close-out.  Regular co-ordination / meetings with Client and contractor for any disputed items and proposing the acceptable solutions. 2009 – 2011 Tebodin Middle East Ltd. Q.S / Site Inspector on the following TRANSCO (Abu Dhabi Transmission & Despatch Company) Project : Al Ain Water Transmission Scheme (AWTS) Pipeline from Al Hayer Tanks Compound to junction A IP 131 Area at Al Ain (Lot P2) and Pipeline from Zakher Pumping Station To Mezyad (Lot P3) N4381-B (Project Cost AED 1200 million approx.)
  • 4. Page 4 of 5 Curriculum vitae MUHAMMAD IQBAL Responsibilites and duties  Evaluation and monitor the QCR’s of work executed, shipment documents, RCDR ( Recieve Cum damage reports) and material installation.  Certify the monthly invoices, shipment documents, RCDR’s and material installation payments.  Co-ordinate with Client and Contractor related to contractual correspondance, weekly, monthly financial reports etc.  Review and verify the authenticity of variation, claims, new item rates with respect to the contract documents.  Maintaing up-to-date record of claims, payments and all financial mattars related to project.  Daily supervision of all construction works such as Earthwork (Formation, bedding, surround and backfill) and installation of pipes, fittings and valves.  Monitiring the site progress, checking the construction of concrete works, installation of pipes as per approved drawings, method statements, work procedures and specifications.  Inspection and confirmation of quantites at each stage of construction at site.  Store inspections for the quality of material before installation, verification of any repair / touch up and use of proper material at site.  Report to senior’s about irregularities in contractor’s work, recommending solutions and verification of implementation of agreed procedures. 2008 – 2009 M/s. Atiqurrahman Gen. con. Abu Dhabi Quantity Surveyor / Site Supervisor Responsibilites and duties  Responsible for supervision of all civil works of residential buildings which includes foundation, surveying works, concrete, masonry, plastering, reinforcement and form works.  Prepairing daily, weekly and monthly planning and progress reports.  Prepairing the bill of quantity for material required for the project.  Preparing the interim payments and claims and following up for approval. 2005 – 2008 M/s. Habib Rafiq Pvt. Ltd. Quantity Surveyor / Site Supervisor on following project Defence Housing Scheme Islamabad Responsibilites and duties  Review and check field notes, land and property corner search, staking lines.  Survey land to determine the property lines, elevation, grades, benchmarks, boundaries etc.  Plots and drafts topographic information and stakes right-of-way limits, locate as –built items for plans.  Construction of underground utilities i.e sewer lines, sub surface drainage lines and portable water lines from DN 100 to 450mm and prepairing the interim payments accordingly.
  • 5. Page 5 of 5 Curriculum vitae MUHAMMAD IQBAL  Construction of utilitiy ducts for different services. 2004 – 2005 M/s. Rahman Brothers Ltd, Pakistan. Quantity Surveyor / Site Supervisor on following project Main GT Road, Length 62 KM. Responsibilites and duties  Responsible for execution of road works i.e earth works, sub grade, sub base and laying asphalt and preparing the interim payments accordingly.  Construction of parking area using kerb stones and tiles.  Directly involed in construction and operational activities at site.  Preparing daily, weekly and monthly construction reports.  Construction of different types of utilities i.e sewerage system, portable water. Languages Speaking Reading Writing Arabic 3 3 3 English 2 2 2 Scale: 1. mother tongue | 2. Good | 3. working knowledge Membership of professional bodies  ACAC (American Council for Accredited Certificates)