SlideShare a Scribd company logo
1 of 3
Riyadh, Saudi Arab
Mobile: +966 581478780 (K.S.A.)
Email: azhar_niazi@hotmail.com , azhar_niazi@yahoo.com, mazkhan@pbad.sbg.com.sa.
Muhammad Azhar Khan
Key Skills: Quality Management, Construction Management, Project Coordination
Technical Coordination, Sub-contract Administration, Staff Development
Qualification B.Sc. Civil Engineering
Work Experience 16 + years
Driving License Saudi Arabia
Language Skills English, Arabic (Basic), Urdu & Punjabi
Date of Birth 20-08-1970
Marital Status Married
Religion Islam
Work History:
November 2011 – to date
Saudi Binladin Group-PBAD (Riyadh, Saudi Arabia)
Sub-contract Engineer
Responsibilities:
Currently I am working as Sub-contract Engineer with Saudi Binladin Group(SBG) at a mega project (US $
3.75 Billion) i.e. King Abdullah Financial District (KAFD) Project, Riyadh. It is a high rise buildings project.
• Analyze the site requirement received in the form of a Material Supply Requisition along with supporting
documents to issue the Sub-contract
• Send Enquiry Packages to the Sub-contractors to get their Quotations & Preparation of Cost Comparisons
• Make sure the Sub-contractor is pre-qualified with SBG and can be awarded a Sub-contract
• Conduct meetings with the Sub-contractors to finalize the payment terms, completion time and other
contractual clauses
• Co-ordinate and communicate with site management to develop/modify Sub-contract Clauses accordingly
• Finally, develop the Sub-contract in accordance to main Contract, relevant technical specifications &
Standards etc
• Get the final draft of Sub-contract Agreement Signed/Approved by the Concerned Parties
• Maintain the progress record of all work done and update high ups on periodic basis as per their
requirements
Nov 2006 – Mar 2011
Noor Durrani and Associates, Lahore, Pakistan
Resident Engineer
Responsibilities:
Mabarak Centre was a high rise Fast Track building project worth US$ 30 Million (about 70 floors including 3
basements) which included five towers. It was a project of Abu Dhabi Group. Its execution was divided into
packages. Some local Contractors and M/s Bauer International worked as Contractor in the said packages. The
Project Manager’s role was given to M/s Turner. I supervised this prestigious project as Resident Engineer.
• Carried out complete Supervision job along with my team to ensure the required Quality and Progress as per
contractual obligations. I Reviewed and approved all submittals i.e. Construction Schedule, Shop Drawings,
Method Statements, Materials For Construction, Bar Bending Schedules, HSE Plan, QA/QC Plan,
Equipment Fitness Certificates, Staff/Labour Deployment Etc.
Page 1 of 3
• Ensured the proper and smooth supply of construction materials as per project specifications and keeping in
place Contingency Plan to ensure continuity of works
• Ensured quality of all works through proper testing of Concrete, Steel etc, Ground Anchor’s Proof and
Performance Tests, Static Load Tests, PDA Tests and Low Strain Integrity Test as per ASTM
• Prepared reports of tests conducted for submission to the Employer and M/s Turner (The Project Manager)
for their information and record
• Issued Site Observation Notices (SON), Non Conformance Reports (NCRs) when ever work was not
performed as per specification
• Closely monitored the progress of work with respect to the Contractor Construction Schedule and updated
the Employer and M/s Turner along with the Engineer’s Comments
• Highlighted all progress and quality related issues in WEEKLY PROGRESS REVIEW MEETINGS with
M/s Turner/ Client and in other special meetings & also gave proposed solutions accordingly
• Prepared detailed Progress Reports for submission to M/s Turner
• Make sure the keep updated all logs e.g. Submittals’ Log, NCR & SON Log, Site Instructions’ Log,
Accident/Incident Reports’ Log, Drawing Log, Meetings’ Log Etc.
Oct 2004 – Oct 2006
Defence Housing Authority (DHA) Lahore, Pakistan
QC Manager/ Assistant Project Engineer
Responsibilities:
Defence Housing Authority is one of the biggest Real Estate/ Housing authority of Pakistan which is known
for its quality construction and strict following of By Laws.
I worked as Assistant Project Engineer and also I was assigned the additional duty of Quality Control
Engineer to ensure the Quality of Contraction Work supervised by me & my team. During my job I
Supervising various Infra Structure Civil Structural & Architectural Projects such as Sewerage Disposal
Station, Kids Campus, Service Club, Staff Residence Apartments, Parks etc)
As an Assistant Project Engineer my Job included:
• Coordination with Designers to help the Contractor develop Shop Drawings from IFC Drawings and
hence giving approval of Shop Drawings
• Arrangement of Kickoff meetings making sure that all major stake holder participate in the meeting
and later on conducting weekly & Monthly progress review meetings with contractors to discuss
various contractual/financial and quality related issues
• Inspection of all project sites to monitor progress and ensured the conformance to design
specifications and safety or sanitation standard by the Contractors
• Checking and verification of the Contractor’s Interim Payment Certificates.
• Checking and verification of Variation Orders (VOs) submitted by the Contractors
As QC Manager my job included:
• Managing QC Inspectors, Lab Technicians, Site Laboratory Works
• Testing and reviewing for material approval submittals related to fill materials, concrete aggregate,
water, cement, chemical and admixtures, reinforcing bars & mesh & concrete spacers, formworks,
masonary blocks & accessories and plaster materials & accessories, NDT etc. as per the requirement
of project specifications and relevant international standards i.e. ASTM & BS
• Reviewing construction Method Statements for quality control in all kinds of civil, structural &
architectural works using the international standards and project specifications
• Close monitoring of Works to be in conformance to the Standards & Specifications as prescribed in
the Contract Documents. Mainly ASTM & BS standards were followed
• In case of any contractual deviation, raised Site Instructions/Letters & NCRs to the Contractors and
then follow up to get NCR closed by an approved corrective action.
Page 2 of 3
Aug 1999 – Sep 2004
Shahid & Co, Lahore, Pakistan
Civil Engineer
Responsibilities:
I worked as Civil Engineer at different type of Building Projects where I was assigned to manage all the
major Construction activates. Following were some of my job responsibilities.
• Execute the project plan on time using appropriate resources on site.
• Review project reports and designs.
• Develop shop drawings that cover the change requirement of the project.
• Provide technical assistance i.e. interpretation of drawings, recommending construction methods and
equipment, etc. as required. Initiated and maintained extra work estimating and issued change orders.
• Undertook initiatives for risk management and take appropriate steps during execution of project.
• Make all necessary arrangements for site testing to be carried out & Liaison with Consultant’s
representatives. Prepared all Method statements and submitted to Consultant for approval.
• Ensure that Laws & Regulations and Standards are followed without exception.
• Ensure that Site Safety Rules are followed by all resources.
• Manage site equipment and material receiving.
• Monitor the efficient use of materials and equipment.
• Monitor the operations (timely fixing/erection of Form Work and fixing of steel as per Bar Bending
Schedule and, Managed RCC, PCC, brick work, excavation, earth work and other civil works as per project
specifications & schedule Prepared) and also monitored working of staff on the site and daily and weekly
progress reports & updated concerned people.
• Communicated effectively with other subcontractors, architects and consultants.
Educational Background
B.Sc. Civil Engineering
• University of Engineering & Technology Lahore, Pakistan (Sep 94 – July 99). Completed in First Division
• Research Project: Design of Sewage Disposal Station
College & School
• B.Sc. ( Maths A, Maths B & Physics) from Forman Christian (FC) College Lahore, Pakistan (73 %)
• Secondary School Certificate (Metric) from GHS Nawan Jandan Wala, Distt. Bhakkar, Pakistan (82 %)
Computer Proficiency
• MS Office (EXCEL, WORD & PowerPoint)
• ASTA Powerproject (Project Management System)
• Auto Cad
• Can Operate Oracle 6i
• Typing Speed ( > 40 wpm)
Professional Certifications
• Prima Vera (Project Planning & Scheduling)
• ASTA Powerproject (Project Management System)
Professional Affiliations
• Pakistan Engineering Council (PEC)
• Pakistan Engineering Congress
• Saudi Council of Engineers
• Project Management Institute (PMI)
Page 3 of 3

More Related Content

What's hot

RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015Ricky Dasal
 
Abi Ninan Joseph cv 10-01-2016
Abi Ninan Joseph cv  10-01-2016Abi Ninan Joseph cv  10-01-2016
Abi Ninan Joseph cv 10-01-2016Abi Joseph
 
Civil QC Inspector (Aramco Approved)
Civil QC Inspector (Aramco Approved)Civil QC Inspector (Aramco Approved)
Civil QC Inspector (Aramco Approved)Khalid Tamur , PMP®
 
Arfat Resume 15-03-2016
Arfat Resume 15-03-2016Arfat Resume 15-03-2016
Arfat Resume 15-03-2016Arfat Khan
 
Curriculum Vitae lim
Curriculum Vitae limCurriculum Vitae lim
Curriculum Vitae limFilemon Lim
 
Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorandi dipayadnya
 
Yusuf Khan (CV) Up Date
Yusuf Khan (CV) Up DateYusuf Khan (CV) Up Date
Yusuf Khan (CV) Up Dateyusuf khan
 
Raman K Gupta ,QC Engr
Raman K Gupta ,QC EngrRaman K Gupta ,QC Engr
Raman K Gupta ,QC EngrRaman K Gupta
 
CV QAQC Manager Brf - Mngmt app.
CV QAQC Manager Brf - Mngmt app.CV QAQC Manager Brf - Mngmt app.
CV QAQC Manager Brf - Mngmt app.gorg3337
 
ROSARIO LEO G_CV
ROSARIO LEO G_CVROSARIO LEO G_CV
ROSARIO LEO G_CVLeo Rosario
 
WEC CV_2016 09 06
WEC CV_2016 09 06WEC CV_2016 09 06
WEC CV_2016 09 06Wauren Cruz
 

What's hot (20)

RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015
 
Abi Ninan Joseph cv 10-01-2016
Abi Ninan Joseph cv  10-01-2016Abi Ninan Joseph cv  10-01-2016
Abi Ninan Joseph cv 10-01-2016
 
Amir QC
Amir QCAmir QC
Amir QC
 
Civil QC Inspector (Aramco Approved)
Civil QC Inspector (Aramco Approved)Civil QC Inspector (Aramco Approved)
Civil QC Inspector (Aramco Approved)
 
resumelarry
resumelarryresumelarry
resumelarry
 
CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
 
Naim CV
Naim CVNaim CV
Naim CV
 
Engr. Bode CV corrted-Road
Engr. Bode CV corrted-RoadEngr. Bode CV corrted-Road
Engr. Bode CV corrted-Road
 
Arfat Resume 15-03-2016
Arfat Resume 15-03-2016Arfat Resume 15-03-2016
Arfat Resume 15-03-2016
 
Curriculum Vitae lim
Curriculum Vitae limCurriculum Vitae lim
Curriculum Vitae lim
 
Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisor
 
Yusuf Khan (CV) Up Date
Yusuf Khan (CV) Up DateYusuf Khan (CV) Up Date
Yusuf Khan (CV) Up Date
 
Raman K Gupta ,QC Engr
Raman K Gupta ,QC EngrRaman K Gupta ,QC Engr
Raman K Gupta ,QC Engr
 
Site architect cv ammar alsweidan
Site architect cv ammar alsweidan Site architect cv ammar alsweidan
Site architect cv ammar alsweidan
 
Raguram palnichamy jun 2019
Raguram palnichamy jun 2019Raguram palnichamy jun 2019
Raguram palnichamy jun 2019
 
CV QAQC Manager Brf - Mngmt app.
CV QAQC Manager Brf - Mngmt app.CV QAQC Manager Brf - Mngmt app.
CV QAQC Manager Brf - Mngmt app.
 
Vivencio pachoro cv 2016
Vivencio pachoro cv 2016Vivencio pachoro cv 2016
Vivencio pachoro cv 2016
 
ROSARIO LEO G_CV
ROSARIO LEO G_CVROSARIO LEO G_CV
ROSARIO LEO G_CV
 
WEC CV_2016 09 06
WEC CV_2016 09 06WEC CV_2016 09 06
WEC CV_2016 09 06
 
MUHAMMAD ZEESHAN
MUHAMMAD ZEESHANMUHAMMAD ZEESHAN
MUHAMMAD ZEESHAN
 

Viewers also liked

Gicev - FLUOR - DDM
Gicev - FLUOR - DDMGicev - FLUOR - DDM
Gicev - FLUOR - DDMToni Gicev
 
Gicev - MDF Certificates
Gicev - MDF CertificatesGicev - MDF Certificates
Gicev - MDF CertificatesToni Gicev
 
Gicev - Photo Album
Gicev - Photo AlbumGicev - Photo Album
Gicev - Photo AlbumToni Gicev
 
Resume // Faisal Shoaib
Resume // Faisal ShoaibResume // Faisal Shoaib
Resume // Faisal ShoaibFaisal Shoaib
 
Abre e fecha no carnaval
Abre e fecha no carnavalAbre e fecha no carnaval
Abre e fecha no carnavalJamildo Melo
 
Roli i elementeve kimik ne organizmin e njeriut (kimi)
Roli i elementeve kimik ne organizmin e njeriut (kimi)Roli i elementeve kimik ne organizmin e njeriut (kimi)
Roli i elementeve kimik ne organizmin e njeriut (kimi)Izabela Bajrami
 
Vitaminat
Vitaminat Vitaminat
Vitaminat sara7991
 
χριστουγεννιατικές κατασκευές Ε΄2
χριστουγεννιατικές κατασκευές Ε΄2χριστουγεννιατικές κατασκευές Ε΄2
χριστουγεννιατικές κατασκευές Ε΄2Stella-Teddy Damerla
 
Distribuciones
DistribucionesDistribuciones
Distribucionesjesy29
 

Viewers also liked (14)

Gicev - FLUOR - DDM
Gicev - FLUOR - DDMGicev - FLUOR - DDM
Gicev - FLUOR - DDM
 
Gicev - MDF Certificates
Gicev - MDF CertificatesGicev - MDF Certificates
Gicev - MDF Certificates
 
Gicev - Photo Album
Gicev - Photo AlbumGicev - Photo Album
Gicev - Photo Album
 
Resume // Faisal Shoaib
Resume // Faisal ShoaibResume // Faisal Shoaib
Resume // Faisal Shoaib
 
selection
selectionselection
selection
 
LHF Pictorial Brochure 102815
LHF Pictorial Brochure 102815LHF Pictorial Brochure 102815
LHF Pictorial Brochure 102815
 
Abre e fecha no carnaval
Abre e fecha no carnavalAbre e fecha no carnaval
Abre e fecha no carnaval
 
Tailor_16480_MPP
Tailor_16480_MPPTailor_16480_MPP
Tailor_16480_MPP
 
Book yomo
Book yomo Book yomo
Book yomo
 
budget4 - 2
budget4 - 2budget4 - 2
budget4 - 2
 
Roli i elementeve kimik ne organizmin e njeriut (kimi)
Roli i elementeve kimik ne organizmin e njeriut (kimi)Roli i elementeve kimik ne organizmin e njeriut (kimi)
Roli i elementeve kimik ne organizmin e njeriut (kimi)
 
Vitaminat
Vitaminat Vitaminat
Vitaminat
 
χριστουγεννιατικές κατασκευές Ε΄2
χριστουγεννιατικές κατασκευές Ε΄2χριστουγεννιατικές κατασκευές Ε΄2
χριστουγεννιατικές κατασκευές Ε΄2
 
Distribuciones
DistribucionesDistribuciones
Distribuciones
 

Similar to CV_ Azhar. (Civil_ Engr)...

Similar to CV_ Azhar. (Civil_ Engr)... (20)

engr ijaz 1 qc civil engineer I did civil engineering from University peshawar
engr ijaz 1 qc  civil engineer I did civil engineering from University peshawarengr ijaz 1 qc  civil engineer I did civil engineering from University peshawar
engr ijaz 1 qc civil engineer I did civil engineering from University peshawar
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
 
Ghullam murtaza cv (1)
Ghullam murtaza cv (1)Ghullam murtaza cv (1)
Ghullam murtaza cv (1)
 
Umar
UmarUmar
Umar
 
CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)
 
Josefino Waje cv 2
Josefino Waje cv 2Josefino Waje cv 2
Josefino Waje cv 2
 
B_Naik-CV1
B_Naik-CV1B_Naik-CV1
B_Naik-CV1
 
Suheb resume
Suheb resumeSuheb resume
Suheb resume
 
Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.
 
My Fresh Cv.pdf
My Fresh Cv.pdfMy Fresh Cv.pdf
My Fresh Cv.pdf
 
Steven qaqc insp
Steven qaqc inspSteven qaqc insp
Steven qaqc insp
 
CV For QA-QC
CV For QA-QCCV For QA-QC
CV For QA-QC
 
RESUME
RESUMERESUME
RESUME
 
UDATED CV-19032016
UDATED CV-19032016UDATED CV-19032016
UDATED CV-19032016
 
Engr Arif (1)
Engr Arif (1)Engr Arif (1)
Engr Arif (1)
 
Project Engineer
Project EngineerProject Engineer
Project Engineer
 
CURRICULUM_VITAE (1)1
CURRICULUM_VITAE (1)1CURRICULUM_VITAE (1)1
CURRICULUM_VITAE (1)1
 
Royce_Brown Resume-82115
Royce_Brown Resume-82115Royce_Brown Resume-82115
Royce_Brown Resume-82115
 
shahab new cv
shahab new cvshahab new cv
shahab new cv
 
TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015
 

CV_ Azhar. (Civil_ Engr)...

  • 1. Riyadh, Saudi Arab Mobile: +966 581478780 (K.S.A.) Email: azhar_niazi@hotmail.com , azhar_niazi@yahoo.com, mazkhan@pbad.sbg.com.sa. Muhammad Azhar Khan Key Skills: Quality Management, Construction Management, Project Coordination Technical Coordination, Sub-contract Administration, Staff Development Qualification B.Sc. Civil Engineering Work Experience 16 + years Driving License Saudi Arabia Language Skills English, Arabic (Basic), Urdu & Punjabi Date of Birth 20-08-1970 Marital Status Married Religion Islam Work History: November 2011 – to date Saudi Binladin Group-PBAD (Riyadh, Saudi Arabia) Sub-contract Engineer Responsibilities: Currently I am working as Sub-contract Engineer with Saudi Binladin Group(SBG) at a mega project (US $ 3.75 Billion) i.e. King Abdullah Financial District (KAFD) Project, Riyadh. It is a high rise buildings project. • Analyze the site requirement received in the form of a Material Supply Requisition along with supporting documents to issue the Sub-contract • Send Enquiry Packages to the Sub-contractors to get their Quotations & Preparation of Cost Comparisons • Make sure the Sub-contractor is pre-qualified with SBG and can be awarded a Sub-contract • Conduct meetings with the Sub-contractors to finalize the payment terms, completion time and other contractual clauses • Co-ordinate and communicate with site management to develop/modify Sub-contract Clauses accordingly • Finally, develop the Sub-contract in accordance to main Contract, relevant technical specifications & Standards etc • Get the final draft of Sub-contract Agreement Signed/Approved by the Concerned Parties • Maintain the progress record of all work done and update high ups on periodic basis as per their requirements Nov 2006 – Mar 2011 Noor Durrani and Associates, Lahore, Pakistan Resident Engineer Responsibilities: Mabarak Centre was a high rise Fast Track building project worth US$ 30 Million (about 70 floors including 3 basements) which included five towers. It was a project of Abu Dhabi Group. Its execution was divided into packages. Some local Contractors and M/s Bauer International worked as Contractor in the said packages. The Project Manager’s role was given to M/s Turner. I supervised this prestigious project as Resident Engineer. • Carried out complete Supervision job along with my team to ensure the required Quality and Progress as per contractual obligations. I Reviewed and approved all submittals i.e. Construction Schedule, Shop Drawings, Method Statements, Materials For Construction, Bar Bending Schedules, HSE Plan, QA/QC Plan, Equipment Fitness Certificates, Staff/Labour Deployment Etc. Page 1 of 3
  • 2. • Ensured the proper and smooth supply of construction materials as per project specifications and keeping in place Contingency Plan to ensure continuity of works • Ensured quality of all works through proper testing of Concrete, Steel etc, Ground Anchor’s Proof and Performance Tests, Static Load Tests, PDA Tests and Low Strain Integrity Test as per ASTM • Prepared reports of tests conducted for submission to the Employer and M/s Turner (The Project Manager) for their information and record • Issued Site Observation Notices (SON), Non Conformance Reports (NCRs) when ever work was not performed as per specification • Closely monitored the progress of work with respect to the Contractor Construction Schedule and updated the Employer and M/s Turner along with the Engineer’s Comments • Highlighted all progress and quality related issues in WEEKLY PROGRESS REVIEW MEETINGS with M/s Turner/ Client and in other special meetings & also gave proposed solutions accordingly • Prepared detailed Progress Reports for submission to M/s Turner • Make sure the keep updated all logs e.g. Submittals’ Log, NCR & SON Log, Site Instructions’ Log, Accident/Incident Reports’ Log, Drawing Log, Meetings’ Log Etc. Oct 2004 – Oct 2006 Defence Housing Authority (DHA) Lahore, Pakistan QC Manager/ Assistant Project Engineer Responsibilities: Defence Housing Authority is one of the biggest Real Estate/ Housing authority of Pakistan which is known for its quality construction and strict following of By Laws. I worked as Assistant Project Engineer and also I was assigned the additional duty of Quality Control Engineer to ensure the Quality of Contraction Work supervised by me & my team. During my job I Supervising various Infra Structure Civil Structural & Architectural Projects such as Sewerage Disposal Station, Kids Campus, Service Club, Staff Residence Apartments, Parks etc) As an Assistant Project Engineer my Job included: • Coordination with Designers to help the Contractor develop Shop Drawings from IFC Drawings and hence giving approval of Shop Drawings • Arrangement of Kickoff meetings making sure that all major stake holder participate in the meeting and later on conducting weekly & Monthly progress review meetings with contractors to discuss various contractual/financial and quality related issues • Inspection of all project sites to monitor progress and ensured the conformance to design specifications and safety or sanitation standard by the Contractors • Checking and verification of the Contractor’s Interim Payment Certificates. • Checking and verification of Variation Orders (VOs) submitted by the Contractors As QC Manager my job included: • Managing QC Inspectors, Lab Technicians, Site Laboratory Works • Testing and reviewing for material approval submittals related to fill materials, concrete aggregate, water, cement, chemical and admixtures, reinforcing bars & mesh & concrete spacers, formworks, masonary blocks & accessories and plaster materials & accessories, NDT etc. as per the requirement of project specifications and relevant international standards i.e. ASTM & BS • Reviewing construction Method Statements for quality control in all kinds of civil, structural & architectural works using the international standards and project specifications • Close monitoring of Works to be in conformance to the Standards & Specifications as prescribed in the Contract Documents. Mainly ASTM & BS standards were followed • In case of any contractual deviation, raised Site Instructions/Letters & NCRs to the Contractors and then follow up to get NCR closed by an approved corrective action. Page 2 of 3
  • 3. Aug 1999 – Sep 2004 Shahid & Co, Lahore, Pakistan Civil Engineer Responsibilities: I worked as Civil Engineer at different type of Building Projects where I was assigned to manage all the major Construction activates. Following were some of my job responsibilities. • Execute the project plan on time using appropriate resources on site. • Review project reports and designs. • Develop shop drawings that cover the change requirement of the project. • Provide technical assistance i.e. interpretation of drawings, recommending construction methods and equipment, etc. as required. Initiated and maintained extra work estimating and issued change orders. • Undertook initiatives for risk management and take appropriate steps during execution of project. • Make all necessary arrangements for site testing to be carried out & Liaison with Consultant’s representatives. Prepared all Method statements and submitted to Consultant for approval. • Ensure that Laws & Regulations and Standards are followed without exception. • Ensure that Site Safety Rules are followed by all resources. • Manage site equipment and material receiving. • Monitor the efficient use of materials and equipment. • Monitor the operations (timely fixing/erection of Form Work and fixing of steel as per Bar Bending Schedule and, Managed RCC, PCC, brick work, excavation, earth work and other civil works as per project specifications & schedule Prepared) and also monitored working of staff on the site and daily and weekly progress reports & updated concerned people. • Communicated effectively with other subcontractors, architects and consultants. Educational Background B.Sc. Civil Engineering • University of Engineering & Technology Lahore, Pakistan (Sep 94 – July 99). Completed in First Division • Research Project: Design of Sewage Disposal Station College & School • B.Sc. ( Maths A, Maths B & Physics) from Forman Christian (FC) College Lahore, Pakistan (73 %) • Secondary School Certificate (Metric) from GHS Nawan Jandan Wala, Distt. Bhakkar, Pakistan (82 %) Computer Proficiency • MS Office (EXCEL, WORD & PowerPoint) • ASTA Powerproject (Project Management System) • Auto Cad • Can Operate Oracle 6i • Typing Speed ( > 40 wpm) Professional Certifications • Prima Vera (Project Planning & Scheduling) • ASTA Powerproject (Project Management System) Professional Affiliations • Pakistan Engineering Council (PEC) • Pakistan Engineering Congress • Saudi Council of Engineers • Project Management Institute (PMI) Page 3 of 3