SlideShare a Scribd company logo
1 of 9
Download to read offline
Curriculum Vitae
Of
Neil Herbst
Personal Details
Last Name : Herbst
First Name : Neil
Identity number : 8704065111089
Nationality : South African
First Language : Afrikaans
Other Languages : English
Gender : Male
Health : Excellent
Contact number : 0825709255
0725785595
E-mail Address : nherbst7@gmail.com
Postal Address : 36 Narsing Road
Brackenhurst
Alberton
1448
Formal Qualifications
Tertiary Qualification
Tertiary Institution : University of Johannesburg
Degree : BEng Civil Engineering
Duration of Studies : 2006 – 2009
Secondary School Qualifications
High School Attended : Hoërskool Dinamika
Highest Standard passed : Grade 12
Year Matriculated : 2005
General Comment : Did very well and got 5 distinctions and 4 B’s
Subjects
Afrikaans – First Language HG : B
English – Second Language HG : B
Mathematics HG : A
Physical Science HG : A
Economics HG : A
Accounting HG : A
Technical Drawings HG : A
Mercantile Law SG : B
Functional Physical Science SG : B
Professional Overview
Neil is an enthusiastic, highly motivated and hardworking individual who has a clear
understanding of the role and responsibilities associated with being a civil engineer. Having the
ability to provide support for multiple concurrent priorities, Neil is able to establish, maintain
and develop effective working relationships with clients, work crews and work colleagues. He
possesses a broad range of technical, personal effectiveness and leadership skills and uses
rigorous logic and methods to come up with effective solutions to difficult problems. As
someone who is comfortable with and able to effectively cope with change, he has a long track
record of making best use of any available resources and techniques.
Career History
Aveng Rail
Civil Engineer January 2010 to Present
Responsible for working closely with the client, construction and project managers on various rail
construction projects in South Africa and Australia by monitoring and updating progress, critical path
analysis, provision of technical input to the project as and when required and undertaking quality
measurements and analysing them.
Key Projects Undertaken
Assmang Black Rock Mine Operation, Construction of new Private Railway Siding Line and Area
Lighting, South Africa – Aveng Rail (R27 million - including Subcontractor)
Construction Manager – April 2015 to Present
Key Responsibilities
 Planning and organising of works
 Co-ordination with client, EPCM and other contractors
 Managing subcontractor
 Coordinating with the suppliers and dealers for materials
 Procurement of material and plant resources on site
 Undertaking monthly payment certificates
 Setting out project works in accordance with specifications and drawings
 Sign off and maintaining traceability of flush butt and alumniothermic welds
 Analysing survey, track geometry, qualification and production test weld reports
 Provide technical assistance to supervisory staff
 Quality measurements and data presentation
 Compiling of quality documents/file - MDR
 Compiling of punch list items
 Handover inspections with client
 Preparing weekly schedule update
 Preparing monthly client required reports
Assmang Khumani Mine, Perway Maintenance of Private Siding, South Africa – Aveng Rail (R10 million)
Contracts Manager – November 2013 to September 2015
Key Responsibilities
 Planning and organizing of works
 Co-ordination with client and other contractors
 Coordinating with the suppliers and dealers for materials
 Procurement of material and plant resources on site
 Undertaking monthly payment certificates
 Conduction site inspections to determine the maintenance work load
Kalagadi Manganese Mines, Construction and Electrification of a New Railway Line, South Africa –
Aveng Rail (R134 million - including Subcontractors)
Site Engineer – November 2013 to March 2015
Key Responsibilities
 Planning of specific tasks with project manager
 Setting out project works in accordance with specifications and drawings
 Sign off and maintaining traceability of flush butt and alumniothermic welds
 Technical understanding of de-stressing and surfacing of plain line and crossovers
 Analysing survey, track geometry, qualification and production test weld reports
 Provide technical assistance to supervisory staff
 Quality measurements and data presentation
 Surveying and establish reference points and elevations to guide construction
 Compiling of quality documents/file - MDR
 Compiling of punch list items
 Handover inspections with client
Kudumane Mining Resources, Construction of Railway Line, South Africa – Aveng Rail (R53 million)
Site Engineer – November 2013 to December 2014
Key Responsibilities
 Planning of specific tasks with project manager
 Setting out project works in accordance with specifications and drawings
 Sign off and maintaining traceability of flush butt and alumniothermic welds
 Technical understanding of de-stressing and surfacing of plain line and crossovers
 Analysing survey, track geometry, qualification and production test weld reports
 Provide technical assistance to supervisory staff
 Quality measurements and data presentation
 Surveying and establish reference points and elevations to guide construction
 Compiling of quality documents/file - MDR
 Compiling of punch list items
 Handover inspections with client
Fortescure Metal Group T155 Rail Expansion Project and Solomon Spur, Australia (Fly In Fly Out) -
McConnell Dowell – Aveng Rail Joint Venture (Aus$150 million or R1,425 billion)
Site Engineer – February 2012 to October 2013
The FMG T155 Rail Expansion Project involved the construction of 140km new railway line which links
the Solomon mine with FMG’s mainline, a total of 120km of duplicated rail of the mainline and the
installation of 84 turnouts from Port Hedland to Christmas Creek mine and Solomon mine. It also
included the installation of numerous level crossings of which two of them were crossing through
national highways and constructing the railway over a rail over rail bridge (BHP) and three other
bridges. Working on the FMG T155 Rail Expansion Project involved moving to any of FMG’s eight rail
construction camps at any given time depending on where the work front was.
Key Responsibilities
Neil worked closely with the Construction manager, Quality manager and Project engineers. He was
responsible for the following but not limited to:
 Planning of specific tasks with construction manager
 Setting out project works in accordance with specifications and drawings
 Sign off and maintaining traceability of flush butt and alumniothermic welds
 Technical understanding of de-stressing and surfacing of plain line and crossovers
 Analysing survey, track geometry, qualification and production test weld reports
 Provide technical assistance to supervisory staff
 Quality measurements and data presentation
o Geismar Amber trolley - Track geometry measurements
o Pandrol Verse – Stress Free Temperature (SFT) measurements
 Sign off of Field Inspection Checklists
 Sign off of Inspection Test Plans
 Compiling of quality documents/file - MDR
 Compiling of punch list items
 Handover inspections with client
Assmang Khumani Mine, Construction of Stackers and Reclaimers, South Africa – Aveng Rail (R12.5
million or Aus$1.5 million)
Junior Contracts Manager – July 2011 to February 2012
Key Responsibilities
 Planning and organizing of works
 Co-ordination with client and other contractors
 Surveying and establish reference points and elevations to guide construction
 Coordinating with the suppliers and dealers for materials
 Procurement of material and plant resources on site
 Quality measurements and data presentation
 Analysing survey, track geometry, qualification and production test weld reports
 Preparing weekly and monthly client required reports
 Undertaking monthly payment certificates
 Handover inspections with client
 Compiling of quality documents/file – MDR
Kumba Sishen South Kolomela Mine, South Africa – Aveng Rail (R90 million)
Site Engineer – January 2010 to July 2011
Key Responsibilities
 Planning and organizing specific works with the project manager
 Surveying and establish reference points and elevations to guide construction
 Recording of the flash butt and Alumniothermic weld data
 Quality measurements and data presentation
 Assisting Quality manager
 Compiling of quality documents/file – MDR
 Understanding of installing Overhead Track Equipment or Overhead Contact Distribution Systems
 Marking out of chainage, benchmarks
Coega Industrial Development Zone Project, South Africa (R160 million)
Under Graduate Engineer – November 2008 to February 2009
Aveng Grinaker-LTA
Engineering Training Facility and Pre-Cast Yard, South Africa
Under Graduate Engineer – January 2008 to February 2008
Publications
Kruger, D., Herbst, N., Bester, J. 2015. The Effect of Polymer Emulsion Addition on the Setting Time,
Crack Formation and Strength of Cementitious Patch Repair Mortars. Advanced Materials Research Vol.
1129: 86-93
Professional Presentations
Kruger, D., & Herbst, N. 2015. The Effect of Polymer Emulsion Addition on the Setting Time, Crack
Formation and Strength of Cementitious Patch Repair Mortars. Paper presented at the 15th
International Congress on Polymers in Concrete, Singapore.
Short Courses
 Legal Liability – Mines Health and Safety Act – May 2015
 Construction Regulations 2014 Update – March 2015
 Hazard Identification and Risk Assessment (HIRA) Training – September 2014
 Effective Construction Contract Management & Administration – November 2011
 Construction Contract Law Essentials – March 2011
Outstanding Achievements
 Grade 12 of the year
 Dux Scholar grade 12
 Dux Scholar grade 11
 Prefect Grade 12
 Invited to a luncheon for first-year students who excelled in the first semester examinations which
have an average above 75%
 Golden Key International Honour Society member in 2008
Sports Achievements
 Central Gauteng colours in Athletics
 Central Gauteng colours in Cross Country
 Part of the University of Johannesburg Cross Country team at South African Universities meeting for
three years running.
Leadership
School Prefect 2004 – 2005
Academic Committee 2004 – 2005
Other Interests
 Running
 Mountain biking
Referees
Mr. A Kretzmann
Executive Manager, Exco – Aveng Rail
Tel: +27118986800 (South Africa)
Mr. B Scellingerhout
Contracts Manager – Aveng Rail
Tel: +27825656904 (South Africa)
Mr. B le Roux
Contracts Manager – Aveng Rail
Tel: +27824521319 (South Africa)
Mr. C Crowley
Quality Manager – Parsons Brinkerhoff
Tel: +61434378896 (Australia)
Mr. A Wragg
Senior Project Engineer – McConnell Dowell Constructors
Tel: +61428103346 (Australia)
Mr. D Kruger
Lecturer at the University of Johannesburg
Tel: +27836251518 (South Africa)

More Related Content

What's hot (19)

EPLopez RESUME
EPLopez RESUMEEPLopez RESUME
EPLopez RESUME
 
LinkedIn_RS_Cv_20150417_v2
LinkedIn_RS_Cv_20150417_v2LinkedIn_RS_Cv_20150417_v2
LinkedIn_RS_Cv_20150417_v2
 
Chris Rainey Resume 2016
Chris Rainey Resume 2016Chris Rainey Resume 2016
Chris Rainey Resume 2016
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
 
Edumac Resume part 3333333
Edumac Resume part 3333333Edumac Resume part 3333333
Edumac Resume part 3333333
 
RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015
 
Kal resume
Kal resumeKal resume
Kal resume
 
ronald coventry cv n5
ronald coventry cv n5ronald coventry cv n5
ronald coventry cv n5
 
Troy Ens Resume
Troy Ens ResumeTroy Ens Resume
Troy Ens Resume
 
Manimaran
ManimaranManimaran
Manimaran
 
Peter L. Cabbab.
Peter L. Cabbab.Peter L. Cabbab.
Peter L. Cabbab.
 
edwin cv for QA-QC Engineer
edwin cv for QA-QC Engineeredwin cv for QA-QC Engineer
edwin cv for QA-QC Engineer
 
res-16
res-16res-16
res-16
 
Shoaib Resume
Shoaib ResumeShoaib Resume
Shoaib Resume
 
QA QC CIVIL
QA QC CIVILQA QC CIVIL
QA QC CIVIL
 
Ghullam murtaza cv (1)
Ghullam murtaza cv (1)Ghullam murtaza cv (1)
Ghullam murtaza cv (1)
 
Resume 9-9-15
Resume 9-9-15Resume 9-9-15
Resume 9-9-15
 
Roberto Guevara-CV
Roberto Guevara-CVRoberto Guevara-CV
Roberto Guevara-CV
 
inayat ur rahman cv 1
inayat ur rahman cv 1inayat ur rahman cv 1
inayat ur rahman cv 1
 

Similar to Curriculum Vitea Neil Herbst

Similar to Curriculum Vitea Neil Herbst (20)

Abdul Halim Sadikun - Resume 2016 (1)
Abdul Halim Sadikun - Resume 2016 (1)Abdul Halim Sadikun - Resume 2016 (1)
Abdul Halim Sadikun - Resume 2016 (1)
 
Johns resume
Johns resumeJohns resume
Johns resume
 
Rajandran Thaiman CV(2015)
Rajandran Thaiman CV(2015)Rajandran Thaiman CV(2015)
Rajandran Thaiman CV(2015)
 
CV - Florin Tuluc 2
CV - Florin Tuluc 2CV - Florin Tuluc 2
CV - Florin Tuluc 2
 
Dale Crowe Resume 2016
Dale Crowe Resume 2016Dale Crowe Resume 2016
Dale Crowe Resume 2016
 
CV 2016.doc
CV 2016.docCV 2016.doc
CV 2016.doc
 
Resume 2016 - Product Scheduler
Resume 2016 - Product SchedulerResume 2016 - Product Scheduler
Resume 2016 - Product Scheduler
 
EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015
 
Cv
CvCv
Cv
 
CV
CVCV
CV
 
Beakal Likassa - Resume
Beakal Likassa - ResumeBeakal Likassa - Resume
Beakal Likassa - Resume
 
Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016
 
Resume 2015updated doc
Resume 2015updated docResume 2015updated doc
Resume 2015updated doc
 
CV Darlington
CV DarlingtonCV Darlington
CV Darlington
 
Curriculum Vitae of R M Rico
Curriculum Vitae of R M RicoCurriculum Vitae of R M Rico
Curriculum Vitae of R M Rico
 
Ardie cv
Ardie cvArdie cv
Ardie cv
 
Ged Langan _ CAREER DETAILS_2014 updated Jan 2015
Ged Langan _ CAREER DETAILS_2014 updated Jan 2015Ged Langan _ CAREER DETAILS_2014 updated Jan 2015
Ged Langan _ CAREER DETAILS_2014 updated Jan 2015
 
my resume sankar 3
my resume sankar 3my resume sankar 3
my resume sankar 3
 
Lourrain cv (2) updated Jan 2016
Lourrain cv (2) updated Jan 2016Lourrain cv (2) updated Jan 2016
Lourrain cv (2) updated Jan 2016
 
JULIOS CV-T
JULIOS CV-TJULIOS CV-T
JULIOS CV-T
 

Curriculum Vitea Neil Herbst

  • 2. Personal Details Last Name : Herbst First Name : Neil Identity number : 8704065111089 Nationality : South African First Language : Afrikaans Other Languages : English Gender : Male Health : Excellent Contact number : 0825709255 0725785595 E-mail Address : nherbst7@gmail.com Postal Address : 36 Narsing Road Brackenhurst Alberton 1448
  • 3. Formal Qualifications Tertiary Qualification Tertiary Institution : University of Johannesburg Degree : BEng Civil Engineering Duration of Studies : 2006 – 2009 Secondary School Qualifications High School Attended : Hoërskool Dinamika Highest Standard passed : Grade 12 Year Matriculated : 2005 General Comment : Did very well and got 5 distinctions and 4 B’s Subjects Afrikaans – First Language HG : B English – Second Language HG : B Mathematics HG : A Physical Science HG : A Economics HG : A Accounting HG : A Technical Drawings HG : A Mercantile Law SG : B Functional Physical Science SG : B
  • 4. Professional Overview Neil is an enthusiastic, highly motivated and hardworking individual who has a clear understanding of the role and responsibilities associated with being a civil engineer. Having the ability to provide support for multiple concurrent priorities, Neil is able to establish, maintain and develop effective working relationships with clients, work crews and work colleagues. He possesses a broad range of technical, personal effectiveness and leadership skills and uses rigorous logic and methods to come up with effective solutions to difficult problems. As someone who is comfortable with and able to effectively cope with change, he has a long track record of making best use of any available resources and techniques. Career History Aveng Rail Civil Engineer January 2010 to Present Responsible for working closely with the client, construction and project managers on various rail construction projects in South Africa and Australia by monitoring and updating progress, critical path analysis, provision of technical input to the project as and when required and undertaking quality measurements and analysing them. Key Projects Undertaken Assmang Black Rock Mine Operation, Construction of new Private Railway Siding Line and Area Lighting, South Africa – Aveng Rail (R27 million - including Subcontractor) Construction Manager – April 2015 to Present Key Responsibilities  Planning and organising of works  Co-ordination with client, EPCM and other contractors  Managing subcontractor  Coordinating with the suppliers and dealers for materials  Procurement of material and plant resources on site  Undertaking monthly payment certificates  Setting out project works in accordance with specifications and drawings  Sign off and maintaining traceability of flush butt and alumniothermic welds  Analysing survey, track geometry, qualification and production test weld reports  Provide technical assistance to supervisory staff  Quality measurements and data presentation  Compiling of quality documents/file - MDR  Compiling of punch list items  Handover inspections with client  Preparing weekly schedule update  Preparing monthly client required reports
  • 5. Assmang Khumani Mine, Perway Maintenance of Private Siding, South Africa – Aveng Rail (R10 million) Contracts Manager – November 2013 to September 2015 Key Responsibilities  Planning and organizing of works  Co-ordination with client and other contractors  Coordinating with the suppliers and dealers for materials  Procurement of material and plant resources on site  Undertaking monthly payment certificates  Conduction site inspections to determine the maintenance work load Kalagadi Manganese Mines, Construction and Electrification of a New Railway Line, South Africa – Aveng Rail (R134 million - including Subcontractors) Site Engineer – November 2013 to March 2015 Key Responsibilities  Planning of specific tasks with project manager  Setting out project works in accordance with specifications and drawings  Sign off and maintaining traceability of flush butt and alumniothermic welds  Technical understanding of de-stressing and surfacing of plain line and crossovers  Analysing survey, track geometry, qualification and production test weld reports  Provide technical assistance to supervisory staff  Quality measurements and data presentation  Surveying and establish reference points and elevations to guide construction  Compiling of quality documents/file - MDR  Compiling of punch list items  Handover inspections with client Kudumane Mining Resources, Construction of Railway Line, South Africa – Aveng Rail (R53 million) Site Engineer – November 2013 to December 2014 Key Responsibilities  Planning of specific tasks with project manager  Setting out project works in accordance with specifications and drawings  Sign off and maintaining traceability of flush butt and alumniothermic welds  Technical understanding of de-stressing and surfacing of plain line and crossovers  Analysing survey, track geometry, qualification and production test weld reports  Provide technical assistance to supervisory staff  Quality measurements and data presentation  Surveying and establish reference points and elevations to guide construction  Compiling of quality documents/file - MDR  Compiling of punch list items
  • 6.  Handover inspections with client Fortescure Metal Group T155 Rail Expansion Project and Solomon Spur, Australia (Fly In Fly Out) - McConnell Dowell – Aveng Rail Joint Venture (Aus$150 million or R1,425 billion) Site Engineer – February 2012 to October 2013 The FMG T155 Rail Expansion Project involved the construction of 140km new railway line which links the Solomon mine with FMG’s mainline, a total of 120km of duplicated rail of the mainline and the installation of 84 turnouts from Port Hedland to Christmas Creek mine and Solomon mine. It also included the installation of numerous level crossings of which two of them were crossing through national highways and constructing the railway over a rail over rail bridge (BHP) and three other bridges. Working on the FMG T155 Rail Expansion Project involved moving to any of FMG’s eight rail construction camps at any given time depending on where the work front was. Key Responsibilities Neil worked closely with the Construction manager, Quality manager and Project engineers. He was responsible for the following but not limited to:  Planning of specific tasks with construction manager  Setting out project works in accordance with specifications and drawings  Sign off and maintaining traceability of flush butt and alumniothermic welds  Technical understanding of de-stressing and surfacing of plain line and crossovers  Analysing survey, track geometry, qualification and production test weld reports  Provide technical assistance to supervisory staff  Quality measurements and data presentation o Geismar Amber trolley - Track geometry measurements o Pandrol Verse – Stress Free Temperature (SFT) measurements  Sign off of Field Inspection Checklists  Sign off of Inspection Test Plans  Compiling of quality documents/file - MDR  Compiling of punch list items  Handover inspections with client Assmang Khumani Mine, Construction of Stackers and Reclaimers, South Africa – Aveng Rail (R12.5 million or Aus$1.5 million) Junior Contracts Manager – July 2011 to February 2012 Key Responsibilities  Planning and organizing of works  Co-ordination with client and other contractors  Surveying and establish reference points and elevations to guide construction  Coordinating with the suppliers and dealers for materials  Procurement of material and plant resources on site  Quality measurements and data presentation  Analysing survey, track geometry, qualification and production test weld reports  Preparing weekly and monthly client required reports
  • 7.  Undertaking monthly payment certificates  Handover inspections with client  Compiling of quality documents/file – MDR Kumba Sishen South Kolomela Mine, South Africa – Aveng Rail (R90 million) Site Engineer – January 2010 to July 2011 Key Responsibilities  Planning and organizing specific works with the project manager  Surveying and establish reference points and elevations to guide construction  Recording of the flash butt and Alumniothermic weld data  Quality measurements and data presentation  Assisting Quality manager  Compiling of quality documents/file – MDR  Understanding of installing Overhead Track Equipment or Overhead Contact Distribution Systems  Marking out of chainage, benchmarks Coega Industrial Development Zone Project, South Africa (R160 million) Under Graduate Engineer – November 2008 to February 2009 Aveng Grinaker-LTA Engineering Training Facility and Pre-Cast Yard, South Africa Under Graduate Engineer – January 2008 to February 2008
  • 8. Publications Kruger, D., Herbst, N., Bester, J. 2015. The Effect of Polymer Emulsion Addition on the Setting Time, Crack Formation and Strength of Cementitious Patch Repair Mortars. Advanced Materials Research Vol. 1129: 86-93 Professional Presentations Kruger, D., & Herbst, N. 2015. The Effect of Polymer Emulsion Addition on the Setting Time, Crack Formation and Strength of Cementitious Patch Repair Mortars. Paper presented at the 15th International Congress on Polymers in Concrete, Singapore. Short Courses  Legal Liability – Mines Health and Safety Act – May 2015  Construction Regulations 2014 Update – March 2015  Hazard Identification and Risk Assessment (HIRA) Training – September 2014  Effective Construction Contract Management & Administration – November 2011  Construction Contract Law Essentials – March 2011 Outstanding Achievements  Grade 12 of the year  Dux Scholar grade 12  Dux Scholar grade 11  Prefect Grade 12  Invited to a luncheon for first-year students who excelled in the first semester examinations which have an average above 75%  Golden Key International Honour Society member in 2008 Sports Achievements  Central Gauteng colours in Athletics  Central Gauteng colours in Cross Country  Part of the University of Johannesburg Cross Country team at South African Universities meeting for three years running. Leadership School Prefect 2004 – 2005 Academic Committee 2004 – 2005 Other Interests  Running  Mountain biking
  • 9. Referees Mr. A Kretzmann Executive Manager, Exco – Aveng Rail Tel: +27118986800 (South Africa) Mr. B Scellingerhout Contracts Manager – Aveng Rail Tel: +27825656904 (South Africa) Mr. B le Roux Contracts Manager – Aveng Rail Tel: +27824521319 (South Africa) Mr. C Crowley Quality Manager – Parsons Brinkerhoff Tel: +61434378896 (Australia) Mr. A Wragg Senior Project Engineer – McConnell Dowell Constructors Tel: +61428103346 (Australia) Mr. D Kruger Lecturer at the University of Johannesburg Tel: +27836251518 (South Africa)