SlideShare a Scribd company logo
1 of 13
Curriculum Vitae 
Malik Muhammad Nadeem 
Mob : 0092 333 5830764 & 0092 306 8173011 
E-mail : nadeemawanm@yahoo.com & awannadeem45@gmail.com 
Skype id : malik.nadeem713 
Summary of Experience: 
Total Exp. construction field-12 years 
(Middle East,Gulf,UAE)Const.Civil/Land Survey 
Experience-6 years 
Pakistan&Afghanistan-Const.civil/LandSurvey 
Presently working For – 
Company : National Logistic CELL 
Metro Bus Services (RWP-ISB) Project 
Pakistan. 
Position: Senior Land Surveyor/Supervisor 
PROFESSIONAL OBJECTIVE 
Seeking a good Prospect as a Civil/ Land Surveyor Engineer in a growth oriented organization 
where my professional skills can be utilized and enhanced while contributing substantially to 
my organization through dedication, hard work and sincerity. 
Strengths: 
Good interpersonal leadership skills, Adaptability, Passion for growth, Result oriented, 
Committed to excellence, Positive Attitude, Knowledge of Construction activities and well 
experience in handling advanced types of survey equipments for all types of engineering 
works and related processing software’s. 
Educational Background: Survey Engineering Education & Training from(PMDC) Survey 
Collage Pakistan.(Second Class 2003).
Additional Qualification: 
BSC, Computer Courses, Safety Courses 
Capabilities: 
· Good ability to read, interpret and implement construction drawings. 
· Experience in drafting sectional drawing, detailing and developing conceptual drawings, 
Engineering measurements, and Calculations etc. 
· Ability to communicate effectively with the knowledge of management and influencing 
skills, multilingual languages. 
· Poses good skills in managing and monitoring end to end implementation and execution 
of construction activities to ensure compliance with the contract documents. 
· Ability to control labour force and to prioritize multiple tasks and to get the work done 
efficiently. 
· Ample experience in working under extreme climatic conditions and able to work 
independently with minimal supervision to meet targets. 
Extensive Survey experience in technical and field management in 
· Infrastructure, Building constructional Survey, Oil & Gas field, Water Intake. 
· Roads, Railways, Pipe lines, Transmissions Line Alignment Survey 
· Town Planning and Cadastral survey. Water Treatment Plant, Wadi protection. 
Main Clients 
· (ADM) Abu Dhabi Municipality (UAE) 
· Ministry of President’s Affair (UAE) 
· Emirates Aluminum(EMAL) (UAE) 
· Sadara LLC (IRAQ) 
· Governorate Investment commission (IRAQ) 
· (USACE) Us Army Corps of Engineering (AFGHANISTAN) 
· WSP International, (NHA) National Highway Authority Pakistan 
· ( PPL) Pakistan Petroleum Limited 
· W & R Directorate Pakistan Army 
· Rawalpindi Development Authority (PAKISTAN) 
EMPLOYMENT RECORD: 
Experience in Middle East, UAE, Gulf
Client : Sadara llc, Governorate Investment commission Iraq 
Company : MEC (Makiya Engineering Consultancy) 
Position : Senior Land Surveyor (Site Inspector) 
Reporting to : Sr.Site engineers, Resident Engineer 
From : May-04, 2013 To April-16, 2014 
Major Responsibilities carried as a Senior Land surveyor/Site Inspector 
Responsibilities: 
· Mainly to check and ensure the plot limits and Setting Out and Levels carried out for 
various construction activities, at various stages of structure and supervise as per 
design, drawings and specifications provided to the contractors. 
Supervise the contractors work such as. 
· Topography of the area and levels before and after execution for contouring and earth 
work calculation and calculating taking actual quantity executed in site. 
· Transferring DMD Levels and Control Points to the Site location, and confirming the same 
by connecting to other Govt authorized control datum. 
· Checking Setting out and level works done for road, buildings, foundations, plastering, 
Block works, Excavation, shuttering, Scaffolding, Curb Fixing, Water proofing, Movement 
Joint fixing, Grid lines, Dowels, structure’s Vertical and Horizontal elements, Vibro 
Compaction, Landscaping, chiller and sewerage lines etc. as per design and drawing. 
· Monitoring and inspecting the construction activities to ensure compliance with contract 
and design specifications and drawings. 
· Monitoring all Health, Safety and Environment activities are fully implemented and 
properly followed and identify risks expected and involved during site visit and reporting 
the same to Safety Manager for immediate action. 
· Identifying innovative ways to improve – Quality and Progress of the work as per existing 
site condition. 
· Follow up and Co-ordinate with the contractor and work, review submittals and shop 
drawings for material take off and identifying, resolving design issues and providing 
technical support if any required .And providing side measurements, progress report and 
site details for updating, planning and meeting.
· Follow up and implementing QA/QC procedures and identifying the related issues by 
monitoring the site activities and reporting the same to QA/QC department, Site 
Engineers etc. 
· Reviewing of all Construction- Concrete body plans, Architectural drawings etc to clarify if 
any missing or conflicting detail and its rectifications and ensure the job is performed in 
the approved manner. 
· Coordination between the Project Management and clients and attending meeting, 
preparing daily, weekly, monthly, progress reports. 
· Attending Technical and progress meeting with the Contractors, Sub Contractors. 
Project undertaken : 
(PPP) Presidential palace project Abu Dhabi 
Client : Ministry Of President’s Affairs 
Company : Ghantoot Group 
Position : Senior Civil Surveyor 
From : 08- Sep, 2010 To April-23, 2013 
Total : 2 Years & 8 Months 
Responsibilities: 
· Transferring DMD Levels and Control Points to the site Locations, Planning and 
conducting Horizontal and Vertical Controls, Transfer Penetration Points, fixing of Plot 
limits, property boundaries, grid pillars, center lines and alignment for tower cranes, 
Setting Out of Piles, Cutoff Levels, Vertical and horizontal curves, fixing of 
embedment plates, bolts, dowels, nibs, for the steel and concrete structure . Setting 
out of all vertical and horizontal elements of sub and super structure of the building. 
· Maintaining the project records for the Levels, Control Points, s built for the Various 
structural elements, Survey instruments and its calibrations etc to enable setting out 
works are carried out to the required level of accuracy. 
· Site execution and arrangements and Co-Ordination with the Foreman’s Engineers, 
QA/QC, Consultants and getting inspected and approvals for survey inspections for 
various activities before concrete pour. 
· Reviewing of all Construction – Concrete body plans, Architectural drawings etc to 
clarify if any missing or conflicting details and raise RFI, CVI etc to solve the issues
and ensure and provide the correct, approved details and drawings to the 
Construction team and ensure job is performed in smooth and approved manner. 
· Providing feed back to the planning dept. in order to prepare a weekly / monthly 
programmed. 
· Monitoring all Health, Safety and Environment activities are fully implemented and 
properly followed and identify risks expected and involved during execution and 
reporting the same to the Safety Manager for immediate action. And providing tool 
box talks to the operatives, related to Safety issues while executing the work. 
· Providing support to the construction crew – Engineers, Construction Manager by 
monitoring and Supervising of Block works, Plastering, Excavation, Shuttering , 
Scaffolding, Curb fixing, Water Proofing, Movement joints fixing, daily progress report, 
quantity measurements Etc. 
· Carrying Out inspections of structural, Architectural, Interior works prior to the 
inspection of Consultants and ensuring works carried out as per Specification, 
drawings and confirms to contract requirements. And coordinating for consultants 
final inspections. 
· Supervise the Site Surveyors team and Co- ordination with Chief Surveyor and 
organizing the daily Survey work routine. 
· CO – ordination with Client & Consultant. 
Project undertaken: 
CCB & RCB Project Abu Dhabi 
Shopping Maal, Building, Roads, Villas 
Client : ADM (Abu Dhabi Municipality) 
Company : Target Engineering LLC 
Position : Senior Land Surveyor 
From : Mar-22, 2009 To Aug-24, 2010 
Total : 1 year & 5 Months 
Responsibilities: 
· Conducting reconnaissance survey and transferring the precise MSL Levels and Co- 
Ordinates from survey of Govt. authorized control points (datum) to the nearest site 
locations and confirming the same by connecting to other datum.
· Responsible for construction of different items like Building, roads and other cutting 
and filling works, such as clearing and grubbing, as per the approved drawings. 
· Maintain the road layers thickness and width as per design specification, 
Responsible for reconciliation of quantity as per the site execution. 
· Setting Out for feature other new underground utilities. 
· To keep full records for variation and claims for news item, preparation of periodic 
execution updates, maintaining good co-ordination with client and consultant. 
· Establishing main Control Points and Bench Marks at a distance of 5Km apart by 
GPS system and running a close traverse line in between maintaining the great 
accuracy. 
· Transferring all stored data from the Total Station to PC which is in NEZ/ENZ format 
to plot in Auto Cad to generate new base drawings. 
· Coordination with the cad- draftsman for the preparation of detailed drawings of 
existing roads with all required data’s for planning and design proposed road. 
· Maintaining the project records for the Levels, Control points, as built for various 
structural elements, Survey Instruments and its calibrations etc enable setting out 
works are carried out to the required level of accuracy. 
· Planning and conducting Horizontal and Vertical Controls, Transfer penetration 
points, fixing of plot limits, property boundaries, grid pillars, center lines and 
alignment for tower cranes, setting Out of piles, cutoff levels, verticals and horizontal 
curves, fixing of embedment plates, bolts, dowels, nibs, for the steel and concrete 
structures. Setting Out of all vertical and horizontal elements of sub and super 
structure of the buildings. 
· Reviewing or all Construction –concrete body plans, Architectural drawings etc to 
clarify if any missing or conflicting details and raise RFI,CVI etc to solve the issues 
and ensure and provide the correct , approved detail and drawings to the 
construction survey team and ensure job is performed in smooth and approved 
manner. 
· Providing feed back to the planning dept in order to prepare a weekly/monthly 
programmed. 
· Monitoring all Health, Safety and Environment activities are fully implemented and 
properly followed and identify risks expected and involved during execution and 
reporting the same to the Safety Manager for immediate action. 
· Monitoring and Supervising of Block works, Plastering, shuttering, Scaffolding, Curb 
Fixing, Water proofing, Movement joint fixing, daily progress report, Quantity 
measurements etc. 
· Co- ordination with Foreman’s Engineers, and QA/QC.
· Carrying out inspections of Structural, Architectural, and interior works prior to the 
inspection of Consultants and ensuring works carried out as per Specification, 
drawings and confirms to contract requirements. And coordinating for consulting for 
the final inspections. 
Project undertaken: EMAL 
Emirates Aluminum Project Abu Dhabi Taweela 
(ARS)Anode Roding Shop Building 
Client : Emirates Aluminum 
Company : Target Engineering LLC 
Position : Land surveyor 
From : May-05, 2008 To March-21, 2009 
Total : 11 Months 
Responsibilities: 
· Transferring the Levels and Co-Ordinates from survey of Govt authorized control 
points (datum) to the nearest Site locations and confirming the same by connecting 
to other datum. 
· Establishing main Control Points and Bench Marks at a distance of 5 Km apart by 
GPS System and running a close traverse line in between maintaining the great 
accuracy. 
· Responsible for construction of different items like cutting and filling works, such as 
clearing and grubbing, as per the approved drawing and technical specification. 
· Setting Out Building corner, plot limit, Grid Pillars, Center lines for tower cranes. 
Setting Out of Piles, cutoff levels, Concrete Foundations, fixing of embedment plates, 
dowels, nibs, for all the steel and concrete structures. Setting Out of all Vertical and 
Horizontal elements of sub and super structure of the building. 
· Horizontal & Vertical Alignment and leveling for (ARS) Anode Roding Shop building, 
fixing anchor bolt on foundations for all kind civil & mechanical works. 
· Taking NSL(Natural Surface Levels) for calculation cutting & filling. 
· Pre marking for aero plan, Layout on the ground (1* 1 Meter) symbol of plus & 
painting in two colors black and white. 
· Measurement on site height clearance for crossing heavy equipments.
· Site execution and arrangement and Co-Ordination with the Foreman’s, Engineers, 
QA/QC, Consultant and getting inspected and approvals for survey for various 
activities before concrete pour. 
· Every morning safety tool meeting and follow instruction about health environment 
safety. 
· Co-ordination with Survey party chief and organizing the daily survey work routine. 
Experience in Afghanistan 
Road Project National Highway 
Jalalabad, Torkhom, Kabul Road 
Client : WSP International, Sweden, (NHA) Pakistan 
Company : (FWO) Frontier Works Organization 
Position : Land Surveyor 
From : Feb-28, 2006 To Mar-26, 2008 
Total : 2 Years & 1 Month 
RESPONSIBILITIES: 
· Conducting reconnaissance survey and transferring the precise MSL Levels and Co- 
Ordinates from survey of Afghanistan and Other Govt. authorized control Points 
(datum) to the nearest site locations and confirming the same by connecting to other 
datum. Establishing main Control Points and Bench Marks at a distance of each 5Km 
apart by GPS system and running a close traverse line in between maintaining the 
great accuracy. 
· Maintain the road layers thickness and widths as per design specification, 
Responsible for reconciliation of quantities as per the site execution. 
· Setting Out of feature duct box, culverts for road crossing other new underground 
utilities. 
· Responsible for construction of different items like roads and other filling works, such 
as clearing and grubbing, embankment, sub grade, rock cutting and construction of 
culverts as per the approved drawing and technical specification.
· Conducting DTM survey by using Total Station and collecting detail along the 
proposed alignment including Longitudinal and Cross section of intercepting Roads 
and other above ground all utilities. 
· Calculate the Toe points and fixing on the ground for backfilling road layers as per 
approved design specification. Taking road cross section for calculation cutting & 
filling. 
· Setting Out of the C/L alignment of proposed road, horizontal and Vertical curves with 
H.I.P and P.V.I and establishing peg levels at edges, centers and marking the 
locations of bridges , Culverts and other road elements etc. 
· Site execution and arrangements and Co-ordination with the Foreman’s, Engineers, 
QA/AC, Consultants and getting inspected and approvals for survey inspections for 
various activities before concrete pour. 
· Monitoring all Health, Safety and Environment activities are fully implemented and 
properly followed and identify risks expected. 
· Co-ordination with Survey Party Chief and organizing the daily survey work routine. 
· Supervise and control the junior surveyor team. 
Project Undertaken: 
Barracks, Steel Building, Internal Roads, Project Kabul. 
Client : (USACE) Us Army Corps of Engineering 
Company : (VICC) Venco Imtaz Construction Company 
Position : Surveyor 
From : June-11, 2005 To Feb-22, 2006 
Total : 8 Months 
Responsibilities: 
· Conducting reconnaissance survey and transferring the precise MSL Levels and Co- 
Ordinates from Govt. authorized control points (datum) to the nearest site location 
and confirming the same by connecting to other datum. 
· Setting Out of all Vertical and Horizontal elements of sub and super structure of the 
building, Fixing the Plots limits, Property Boundaries, Grid Pillars, Center lines for 
Road, Setting Out of Horizontals curves, Fixing of Embedment plates, Bolts, Dowels, 
Nibs, for the steel and concrete structure. 
· Maintaining the project records for the levels, Control points, as built for various 
structural elements. Marking for foundations, floor slab, walkways, levels before 
concrete. Marking for Block works. 
· Setting out for Electrical, Mechanical elements and other Underground utilities.
· Responsible for all Civil work , de mining, removal of high density rubbish filled site, 
de-grubbing, site development, perimeter walls, asphalt and gravel roads, and all 
related survey work. 
· Site execution and arrangements and Co-ordination with the Foreman’s, Engineers, 
QA/QC. 
· Monitoring all Health Safety and Environments activities are fully implemented and 
properly followed and identify risks expected. 
Topographic survey Qalat Afghanistan 
Client : (UNOPS) United Nations Office for Project Services 
Company : Venco Imtiaz Construction Company 
Responsibilities: 
· Survey by using Total Station and collecting topographical details along the roads 
including Longitudinal and cross section of roads. 
· Topographic survey for new qalat city project. 
Experience in Pakistan 
pipelines project Oil & GAS FIELD Blochistan 
Client : (PPL) Pakistan Petroleum Limited 
Company : Petrocon (PVT) LTD 
Position : Land Surveyor 
From : March-26, 2004 To May-28, 2005 
Total : 01 Year & 02 Months 
Responsibilities: 
· Conducting reconnaissance survey and transferring the precise MSL Levels and Co- 
Ordinates from Survey of Pakistan and Other Govt. authorized points (datum) to the 
nearest site locations and conforming the same by connecting to other datum. 
· Establishing main Control Points and Bench Marks at a distance of each 5Km apart 
by GPS System and running a close traverse line in between maintaining the great 
accuracy. 
· Setting Out all kind of pipelines, Setting Out gas well point. 
· Traversing, Topographic survey, setting out, Staking, Flow line, route marking, free 
hand sketch along with pipeline 30 meter corridor for feature other new design. 
· As built survey for new construction oil and gas well pads. 
· Detailed Survey for existing pipe lines, and modifying new design and routs for oil and 
gas pipe lines.
· Monitoring all Health, Safety and Environment activities are fully implemented and 
properly followed and identify risks expected. 
Project Undertaken: 
Housing Scheme Islamabad 
Defense Housing Authority Phase 2 Rawat 
Buildings, Roads, Earthworks, Water tanks, Tube Wells, Water Treatment Plants, Pumping 
Stations, Pipe Lines, Under Ground Cables. 
Client : W & R Directorate Pakistan Army 
Company : HRL (Habib Rafiiq Pvt Ltd) 
Position : Junior surveyor 
From : Jan-11, 2003 To Mar-17, 2004 
Total : 01 Year & 03 Months 
Responsibilities: 
· Conducting Reconnaissance survey and transferring the precise MSL Levels and Co- 
Ordinates from survey of Pakistan and Other Govt. authorized control points (datum) 
to the nearest site locations and confirming the same by connecting to other datum. 
· Establishing main control points and Bench marks at a distance of each 5Km apart 
by GPS System and running a close traverse line between maintaining the accuracy. 
· Setting Out of the C/L alignment of proposed road, Curves, and establishing peg 
levels at edges, and marking the locations of culverts, levels for cutting and filling 
areas, and other road elements etc. 
· Setting Out Buildings, Water tanks, Water Treatment plants, Pumping stations, 
Street Lights Poles, pipe lines, tube wells, and all kind of the underground and above 
ground all utilities. 
· Responsible for construction of different items like roads, building, earthworks, 
concrete levels, as per the approved drawing and technical specification. 
· Shifting Bench Mark Elevation with Auto level. 
· Monitoring all Health, Safety and Environment activities are fully implemented and 
properly followed and identify risks expected. 
COMPUTER SKILLS
Knowledge and Proficiency in using various computer applications as AUTO cad, Google 
KMZ files, Ms Office, Ms Excel, Internet, etc. 
INSTRUMENTS USED 
· GPS 
Gamin* GPS MAP-276, Garmin Eertex-C, GPS 76-S 
· TOTAL STATION 
SOKIA*, LEICA*, NIKON*, TOPCON, PENTEX*. 
· THEODOLITE: WILD (TO, T2) CAMPASS, OPTICAL PLUMMET. 
· LEVELS INSTRUMENT: DIGITAL LEVEL, AUTO LEVELS. 
PERSONAL PROFILE: 
Name in full : Malik Muhammad Nadeem 
Date of Birth : 20 December 1979 
Passport No : AR 9453182 
Nationality : Pakistani 
Marital Status : Married 
Religion : Islam 
Language Proficiency : English, Arabic, Urdu, Hindi, Punjabi 
Hobbies : Sports, Snooker 
Permanent Address : S/O MALIK AFSAR AWAN HOUSE NO J-251 POST 
OFFICE BOX - 49060 NEAR HOSPITAL KHEWRA 
JHELUM PAKISTAN
I here by declare that the information and the facts stated here in above are true and correct 
to the best of my knowledge and belief.

More Related Content

What's hot

Sajid CV BE Civil 2007
Sajid CV BE Civil 2007Sajid CV BE Civil 2007
Sajid CV BE Civil 2007sajid hasan
 
Land Surveyor Updated CV
Land Surveyor Updated CVLand Surveyor Updated CV
Land Surveyor Updated CVIbrar Hussain
 
civil engineer Cv
civil engineer Cvcivil engineer Cv
civil engineer CvRinu Chacko
 
ihsan CV - structural design engineer
ihsan CV - structural design engineerihsan CV - structural design engineer
ihsan CV - structural design engineerihsan ullah
 
Civil Engineer CV
Civil Engineer CVCivil Engineer CV
Civil Engineer CVAfzal Khan
 
Rameez - Site Engineer - CV
Rameez - Site Engineer - CVRameez - Site Engineer - CV
Rameez - Site Engineer - CVRameez K
 
Civil Site Engineer (2)
Civil Site Engineer (2)Civil Site Engineer (2)
Civil Site Engineer (2)ahmed elazazy
 
Resume - Structural Engineer - Prasad D Kulkarni
Resume - Structural Engineer - Prasad D KulkarniResume - Structural Engineer - Prasad D Kulkarni
Resume - Structural Engineer - Prasad D KulkarniPrasad Kulkarni
 
Vipin mv civil engineer cv and coverletter
Vipin mv civil engineer cv and coverletterVipin mv civil engineer cv and coverletter
Vipin mv civil engineer cv and coverlettervipin m.v
 
CV for AutoCAD Draftsman ( civil & Arch.)
CV for AutoCAD Draftsman ( civil & Arch.)CV for AutoCAD Draftsman ( civil & Arch.)
CV for AutoCAD Draftsman ( civil & Arch.)Murshid Alam
 
Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)RAJA KUMAR .R
 
Cv of civil structural design engineer
Cv of civil structural design engineerCv of civil structural design engineer
Cv of civil structural design engineersajeer abdulrazak
 

What's hot (20)

Sajid CV BE Civil 2007
Sajid CV BE Civil 2007Sajid CV BE Civil 2007
Sajid CV BE Civil 2007
 
Land Surveyor Updated CV
Land Surveyor Updated CVLand Surveyor Updated CV
Land Surveyor Updated CV
 
civil engineer Cv
civil engineer Cvcivil engineer Cv
civil engineer Cv
 
RAJESH RAMU CV
RAJESH RAMU CVRAJESH RAMU CV
RAJESH RAMU CV
 
ihsan CV - structural design engineer
ihsan CV - structural design engineerihsan CV - structural design engineer
ihsan CV - structural design engineer
 
CV Site Engineer Civil
CV Site Engineer CivilCV Site Engineer Civil
CV Site Engineer Civil
 
Civil Engineer - CV
Civil Engineer - CVCivil Engineer - CV
Civil Engineer - CV
 
CV CIVIL ENGINEER
CV CIVIL ENGINEERCV CIVIL ENGINEER
CV CIVIL ENGINEER
 
Civil Engineer CV
Civil Engineer CVCivil Engineer CV
Civil Engineer CV
 
Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)
 
Rameez - Site Engineer - CV
Rameez - Site Engineer - CVRameez - Site Engineer - CV
Rameez - Site Engineer - CV
 
Civil Site Engineer (2)
Civil Site Engineer (2)Civil Site Engineer (2)
Civil Site Engineer (2)
 
Civil engineer
Civil engineerCivil engineer
Civil engineer
 
Resume - Structural Engineer - Prasad D Kulkarni
Resume - Structural Engineer - Prasad D KulkarniResume - Structural Engineer - Prasad D Kulkarni
Resume - Structural Engineer - Prasad D Kulkarni
 
Resume-Land Surveyor
Resume-Land SurveyorResume-Land Surveyor
Resume-Land Surveyor
 
Quantity Surveyor CV
Quantity Surveyor CVQuantity Surveyor CV
Quantity Surveyor CV
 
Vipin mv civil engineer cv and coverletter
Vipin mv civil engineer cv and coverletterVipin mv civil engineer cv and coverletter
Vipin mv civil engineer cv and coverletter
 
CV for AutoCAD Draftsman ( civil & Arch.)
CV for AutoCAD Draftsman ( civil & Arch.)CV for AutoCAD Draftsman ( civil & Arch.)
CV for AutoCAD Draftsman ( civil & Arch.)
 
Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)
 
Cv of civil structural design engineer
Cv of civil structural design engineerCv of civil structural design engineer
Cv of civil structural design engineer
 

Similar to Surveyor cv

Similar to Surveyor cv (20)

Sheraz Mahdi New CV
Sheraz Mahdi New CVSheraz Mahdi New CV
Sheraz Mahdi New CV
 
Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3
 
Naveed Asif C.V Updated
Naveed Asif C.V UpdatedNaveed Asif C.V Updated
Naveed Asif C.V Updated
 
Cv civil engineer ahmed mansour
Cv civil engineer ahmed mansourCv civil engineer ahmed mansour
Cv civil engineer ahmed mansour
 
cv civil ahmed mansour
cv civil ahmed mansourcv civil ahmed mansour
cv civil ahmed mansour
 
Cv civil ahmed mansour
Cv civil ahmed mansourCv civil ahmed mansour
Cv civil ahmed mansour
 
Sami resume new
Sami resume newSami resume new
Sami resume new
 
shafaqat cv 1
shafaqat cv 1shafaqat cv 1
shafaqat cv 1
 
Site civil engineer fiazuddin
Site civil engineer fiazuddinSite civil engineer fiazuddin
Site civil engineer fiazuddin
 
Santhan CV-2016
Santhan CV-2016Santhan CV-2016
Santhan CV-2016
 
CV - NAZEER AHMED -Oversees
CV - NAZEER AHMED -OverseesCV - NAZEER AHMED -Oversees
CV - NAZEER AHMED -Oversees
 
Rahim a m
Rahim a mRahim a m
Rahim a m
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
 
Babar Sohail Khan (1)
Babar Sohail Khan (1)Babar Sohail Khan (1)
Babar Sohail Khan (1)
 
jafar cv
jafar cvjafar cv
jafar cv
 
engr ijaz 1 qc civil engineer I did civil engineering from University peshawar
engr ijaz 1 qc  civil engineer I did civil engineering from University peshawarengr ijaz 1 qc  civil engineer I did civil engineering from University peshawar
engr ijaz 1 qc civil engineer I did civil engineering from University peshawar
 
SASI NEW RESUME
SASI NEW RESUMESASI NEW RESUME
SASI NEW RESUME
 
CV of KP Tomy
CV of KP TomyCV of KP Tomy
CV of KP Tomy
 
inayat ur rahman cv 1
inayat ur rahman cv 1inayat ur rahman cv 1
inayat ur rahman cv 1
 
Shafaqat Hussain
Shafaqat Hussain Shafaqat Hussain
Shafaqat Hussain
 

Surveyor cv

  • 1. Curriculum Vitae Malik Muhammad Nadeem Mob : 0092 333 5830764 & 0092 306 8173011 E-mail : nadeemawanm@yahoo.com & awannadeem45@gmail.com Skype id : malik.nadeem713 Summary of Experience: Total Exp. construction field-12 years (Middle East,Gulf,UAE)Const.Civil/Land Survey Experience-6 years Pakistan&Afghanistan-Const.civil/LandSurvey Presently working For – Company : National Logistic CELL Metro Bus Services (RWP-ISB) Project Pakistan. Position: Senior Land Surveyor/Supervisor PROFESSIONAL OBJECTIVE Seeking a good Prospect as a Civil/ Land Surveyor Engineer in a growth oriented organization where my professional skills can be utilized and enhanced while contributing substantially to my organization through dedication, hard work and sincerity. Strengths: Good interpersonal leadership skills, Adaptability, Passion for growth, Result oriented, Committed to excellence, Positive Attitude, Knowledge of Construction activities and well experience in handling advanced types of survey equipments for all types of engineering works and related processing software’s. Educational Background: Survey Engineering Education & Training from(PMDC) Survey Collage Pakistan.(Second Class 2003).
  • 2. Additional Qualification: BSC, Computer Courses, Safety Courses Capabilities: · Good ability to read, interpret and implement construction drawings. · Experience in drafting sectional drawing, detailing and developing conceptual drawings, Engineering measurements, and Calculations etc. · Ability to communicate effectively with the knowledge of management and influencing skills, multilingual languages. · Poses good skills in managing and monitoring end to end implementation and execution of construction activities to ensure compliance with the contract documents. · Ability to control labour force and to prioritize multiple tasks and to get the work done efficiently. · Ample experience in working under extreme climatic conditions and able to work independently with minimal supervision to meet targets. Extensive Survey experience in technical and field management in · Infrastructure, Building constructional Survey, Oil & Gas field, Water Intake. · Roads, Railways, Pipe lines, Transmissions Line Alignment Survey · Town Planning and Cadastral survey. Water Treatment Plant, Wadi protection. Main Clients · (ADM) Abu Dhabi Municipality (UAE) · Ministry of President’s Affair (UAE) · Emirates Aluminum(EMAL) (UAE) · Sadara LLC (IRAQ) · Governorate Investment commission (IRAQ) · (USACE) Us Army Corps of Engineering (AFGHANISTAN) · WSP International, (NHA) National Highway Authority Pakistan · ( PPL) Pakistan Petroleum Limited · W & R Directorate Pakistan Army · Rawalpindi Development Authority (PAKISTAN) EMPLOYMENT RECORD: Experience in Middle East, UAE, Gulf
  • 3. Client : Sadara llc, Governorate Investment commission Iraq Company : MEC (Makiya Engineering Consultancy) Position : Senior Land Surveyor (Site Inspector) Reporting to : Sr.Site engineers, Resident Engineer From : May-04, 2013 To April-16, 2014 Major Responsibilities carried as a Senior Land surveyor/Site Inspector Responsibilities: · Mainly to check and ensure the plot limits and Setting Out and Levels carried out for various construction activities, at various stages of structure and supervise as per design, drawings and specifications provided to the contractors. Supervise the contractors work such as. · Topography of the area and levels before and after execution for contouring and earth work calculation and calculating taking actual quantity executed in site. · Transferring DMD Levels and Control Points to the Site location, and confirming the same by connecting to other Govt authorized control datum. · Checking Setting out and level works done for road, buildings, foundations, plastering, Block works, Excavation, shuttering, Scaffolding, Curb Fixing, Water proofing, Movement Joint fixing, Grid lines, Dowels, structure’s Vertical and Horizontal elements, Vibro Compaction, Landscaping, chiller and sewerage lines etc. as per design and drawing. · Monitoring and inspecting the construction activities to ensure compliance with contract and design specifications and drawings. · Monitoring all Health, Safety and Environment activities are fully implemented and properly followed and identify risks expected and involved during site visit and reporting the same to Safety Manager for immediate action. · Identifying innovative ways to improve – Quality and Progress of the work as per existing site condition. · Follow up and Co-ordinate with the contractor and work, review submittals and shop drawings for material take off and identifying, resolving design issues and providing technical support if any required .And providing side measurements, progress report and site details for updating, planning and meeting.
  • 4. · Follow up and implementing QA/QC procedures and identifying the related issues by monitoring the site activities and reporting the same to QA/QC department, Site Engineers etc. · Reviewing of all Construction- Concrete body plans, Architectural drawings etc to clarify if any missing or conflicting detail and its rectifications and ensure the job is performed in the approved manner. · Coordination between the Project Management and clients and attending meeting, preparing daily, weekly, monthly, progress reports. · Attending Technical and progress meeting with the Contractors, Sub Contractors. Project undertaken : (PPP) Presidential palace project Abu Dhabi Client : Ministry Of President’s Affairs Company : Ghantoot Group Position : Senior Civil Surveyor From : 08- Sep, 2010 To April-23, 2013 Total : 2 Years & 8 Months Responsibilities: · Transferring DMD Levels and Control Points to the site Locations, Planning and conducting Horizontal and Vertical Controls, Transfer Penetration Points, fixing of Plot limits, property boundaries, grid pillars, center lines and alignment for tower cranes, Setting Out of Piles, Cutoff Levels, Vertical and horizontal curves, fixing of embedment plates, bolts, dowels, nibs, for the steel and concrete structure . Setting out of all vertical and horizontal elements of sub and super structure of the building. · Maintaining the project records for the Levels, Control Points, s built for the Various structural elements, Survey instruments and its calibrations etc to enable setting out works are carried out to the required level of accuracy. · Site execution and arrangements and Co-Ordination with the Foreman’s Engineers, QA/QC, Consultants and getting inspected and approvals for survey inspections for various activities before concrete pour. · Reviewing of all Construction – Concrete body plans, Architectural drawings etc to clarify if any missing or conflicting details and raise RFI, CVI etc to solve the issues
  • 5. and ensure and provide the correct, approved details and drawings to the Construction team and ensure job is performed in smooth and approved manner. · Providing feed back to the planning dept. in order to prepare a weekly / monthly programmed. · Monitoring all Health, Safety and Environment activities are fully implemented and properly followed and identify risks expected and involved during execution and reporting the same to the Safety Manager for immediate action. And providing tool box talks to the operatives, related to Safety issues while executing the work. · Providing support to the construction crew – Engineers, Construction Manager by monitoring and Supervising of Block works, Plastering, Excavation, Shuttering , Scaffolding, Curb fixing, Water Proofing, Movement joints fixing, daily progress report, quantity measurements Etc. · Carrying Out inspections of structural, Architectural, Interior works prior to the inspection of Consultants and ensuring works carried out as per Specification, drawings and confirms to contract requirements. And coordinating for consultants final inspections. · Supervise the Site Surveyors team and Co- ordination with Chief Surveyor and organizing the daily Survey work routine. · CO – ordination with Client & Consultant. Project undertaken: CCB & RCB Project Abu Dhabi Shopping Maal, Building, Roads, Villas Client : ADM (Abu Dhabi Municipality) Company : Target Engineering LLC Position : Senior Land Surveyor From : Mar-22, 2009 To Aug-24, 2010 Total : 1 year & 5 Months Responsibilities: · Conducting reconnaissance survey and transferring the precise MSL Levels and Co- Ordinates from survey of Govt. authorized control points (datum) to the nearest site locations and confirming the same by connecting to other datum.
  • 6. · Responsible for construction of different items like Building, roads and other cutting and filling works, such as clearing and grubbing, as per the approved drawings. · Maintain the road layers thickness and width as per design specification, Responsible for reconciliation of quantity as per the site execution. · Setting Out for feature other new underground utilities. · To keep full records for variation and claims for news item, preparation of periodic execution updates, maintaining good co-ordination with client and consultant. · Establishing main Control Points and Bench Marks at a distance of 5Km apart by GPS system and running a close traverse line in between maintaining the great accuracy. · Transferring all stored data from the Total Station to PC which is in NEZ/ENZ format to plot in Auto Cad to generate new base drawings. · Coordination with the cad- draftsman for the preparation of detailed drawings of existing roads with all required data’s for planning and design proposed road. · Maintaining the project records for the Levels, Control points, as built for various structural elements, Survey Instruments and its calibrations etc enable setting out works are carried out to the required level of accuracy. · Planning and conducting Horizontal and Vertical Controls, Transfer penetration points, fixing of plot limits, property boundaries, grid pillars, center lines and alignment for tower cranes, setting Out of piles, cutoff levels, verticals and horizontal curves, fixing of embedment plates, bolts, dowels, nibs, for the steel and concrete structures. Setting Out of all vertical and horizontal elements of sub and super structure of the buildings. · Reviewing or all Construction –concrete body plans, Architectural drawings etc to clarify if any missing or conflicting details and raise RFI,CVI etc to solve the issues and ensure and provide the correct , approved detail and drawings to the construction survey team and ensure job is performed in smooth and approved manner. · Providing feed back to the planning dept in order to prepare a weekly/monthly programmed. · Monitoring all Health, Safety and Environment activities are fully implemented and properly followed and identify risks expected and involved during execution and reporting the same to the Safety Manager for immediate action. · Monitoring and Supervising of Block works, Plastering, shuttering, Scaffolding, Curb Fixing, Water proofing, Movement joint fixing, daily progress report, Quantity measurements etc. · Co- ordination with Foreman’s Engineers, and QA/QC.
  • 7. · Carrying out inspections of Structural, Architectural, and interior works prior to the inspection of Consultants and ensuring works carried out as per Specification, drawings and confirms to contract requirements. And coordinating for consulting for the final inspections. Project undertaken: EMAL Emirates Aluminum Project Abu Dhabi Taweela (ARS)Anode Roding Shop Building Client : Emirates Aluminum Company : Target Engineering LLC Position : Land surveyor From : May-05, 2008 To March-21, 2009 Total : 11 Months Responsibilities: · Transferring the Levels and Co-Ordinates from survey of Govt authorized control points (datum) to the nearest Site locations and confirming the same by connecting to other datum. · Establishing main Control Points and Bench Marks at a distance of 5 Km apart by GPS System and running a close traverse line in between maintaining the great accuracy. · Responsible for construction of different items like cutting and filling works, such as clearing and grubbing, as per the approved drawing and technical specification. · Setting Out Building corner, plot limit, Grid Pillars, Center lines for tower cranes. Setting Out of Piles, cutoff levels, Concrete Foundations, fixing of embedment plates, dowels, nibs, for all the steel and concrete structures. Setting Out of all Vertical and Horizontal elements of sub and super structure of the building. · Horizontal & Vertical Alignment and leveling for (ARS) Anode Roding Shop building, fixing anchor bolt on foundations for all kind civil & mechanical works. · Taking NSL(Natural Surface Levels) for calculation cutting & filling. · Pre marking for aero plan, Layout on the ground (1* 1 Meter) symbol of plus & painting in two colors black and white. · Measurement on site height clearance for crossing heavy equipments.
  • 8. · Site execution and arrangement and Co-Ordination with the Foreman’s, Engineers, QA/QC, Consultant and getting inspected and approvals for survey for various activities before concrete pour. · Every morning safety tool meeting and follow instruction about health environment safety. · Co-ordination with Survey party chief and organizing the daily survey work routine. Experience in Afghanistan Road Project National Highway Jalalabad, Torkhom, Kabul Road Client : WSP International, Sweden, (NHA) Pakistan Company : (FWO) Frontier Works Organization Position : Land Surveyor From : Feb-28, 2006 To Mar-26, 2008 Total : 2 Years & 1 Month RESPONSIBILITIES: · Conducting reconnaissance survey and transferring the precise MSL Levels and Co- Ordinates from survey of Afghanistan and Other Govt. authorized control Points (datum) to the nearest site locations and confirming the same by connecting to other datum. Establishing main Control Points and Bench Marks at a distance of each 5Km apart by GPS system and running a close traverse line in between maintaining the great accuracy. · Maintain the road layers thickness and widths as per design specification, Responsible for reconciliation of quantities as per the site execution. · Setting Out of feature duct box, culverts for road crossing other new underground utilities. · Responsible for construction of different items like roads and other filling works, such as clearing and grubbing, embankment, sub grade, rock cutting and construction of culverts as per the approved drawing and technical specification.
  • 9. · Conducting DTM survey by using Total Station and collecting detail along the proposed alignment including Longitudinal and Cross section of intercepting Roads and other above ground all utilities. · Calculate the Toe points and fixing on the ground for backfilling road layers as per approved design specification. Taking road cross section for calculation cutting & filling. · Setting Out of the C/L alignment of proposed road, horizontal and Vertical curves with H.I.P and P.V.I and establishing peg levels at edges, centers and marking the locations of bridges , Culverts and other road elements etc. · Site execution and arrangements and Co-ordination with the Foreman’s, Engineers, QA/AC, Consultants and getting inspected and approvals for survey inspections for various activities before concrete pour. · Monitoring all Health, Safety and Environment activities are fully implemented and properly followed and identify risks expected. · Co-ordination with Survey Party Chief and organizing the daily survey work routine. · Supervise and control the junior surveyor team. Project Undertaken: Barracks, Steel Building, Internal Roads, Project Kabul. Client : (USACE) Us Army Corps of Engineering Company : (VICC) Venco Imtaz Construction Company Position : Surveyor From : June-11, 2005 To Feb-22, 2006 Total : 8 Months Responsibilities: · Conducting reconnaissance survey and transferring the precise MSL Levels and Co- Ordinates from Govt. authorized control points (datum) to the nearest site location and confirming the same by connecting to other datum. · Setting Out of all Vertical and Horizontal elements of sub and super structure of the building, Fixing the Plots limits, Property Boundaries, Grid Pillars, Center lines for Road, Setting Out of Horizontals curves, Fixing of Embedment plates, Bolts, Dowels, Nibs, for the steel and concrete structure. · Maintaining the project records for the levels, Control points, as built for various structural elements. Marking for foundations, floor slab, walkways, levels before concrete. Marking for Block works. · Setting out for Electrical, Mechanical elements and other Underground utilities.
  • 10. · Responsible for all Civil work , de mining, removal of high density rubbish filled site, de-grubbing, site development, perimeter walls, asphalt and gravel roads, and all related survey work. · Site execution and arrangements and Co-ordination with the Foreman’s, Engineers, QA/QC. · Monitoring all Health Safety and Environments activities are fully implemented and properly followed and identify risks expected. Topographic survey Qalat Afghanistan Client : (UNOPS) United Nations Office for Project Services Company : Venco Imtiaz Construction Company Responsibilities: · Survey by using Total Station and collecting topographical details along the roads including Longitudinal and cross section of roads. · Topographic survey for new qalat city project. Experience in Pakistan pipelines project Oil & GAS FIELD Blochistan Client : (PPL) Pakistan Petroleum Limited Company : Petrocon (PVT) LTD Position : Land Surveyor From : March-26, 2004 To May-28, 2005 Total : 01 Year & 02 Months Responsibilities: · Conducting reconnaissance survey and transferring the precise MSL Levels and Co- Ordinates from Survey of Pakistan and Other Govt. authorized points (datum) to the nearest site locations and conforming the same by connecting to other datum. · Establishing main Control Points and Bench Marks at a distance of each 5Km apart by GPS System and running a close traverse line in between maintaining the great accuracy. · Setting Out all kind of pipelines, Setting Out gas well point. · Traversing, Topographic survey, setting out, Staking, Flow line, route marking, free hand sketch along with pipeline 30 meter corridor for feature other new design. · As built survey for new construction oil and gas well pads. · Detailed Survey for existing pipe lines, and modifying new design and routs for oil and gas pipe lines.
  • 11. · Monitoring all Health, Safety and Environment activities are fully implemented and properly followed and identify risks expected. Project Undertaken: Housing Scheme Islamabad Defense Housing Authority Phase 2 Rawat Buildings, Roads, Earthworks, Water tanks, Tube Wells, Water Treatment Plants, Pumping Stations, Pipe Lines, Under Ground Cables. Client : W & R Directorate Pakistan Army Company : HRL (Habib Rafiiq Pvt Ltd) Position : Junior surveyor From : Jan-11, 2003 To Mar-17, 2004 Total : 01 Year & 03 Months Responsibilities: · Conducting Reconnaissance survey and transferring the precise MSL Levels and Co- Ordinates from survey of Pakistan and Other Govt. authorized control points (datum) to the nearest site locations and confirming the same by connecting to other datum. · Establishing main control points and Bench marks at a distance of each 5Km apart by GPS System and running a close traverse line between maintaining the accuracy. · Setting Out of the C/L alignment of proposed road, Curves, and establishing peg levels at edges, and marking the locations of culverts, levels for cutting and filling areas, and other road elements etc. · Setting Out Buildings, Water tanks, Water Treatment plants, Pumping stations, Street Lights Poles, pipe lines, tube wells, and all kind of the underground and above ground all utilities. · Responsible for construction of different items like roads, building, earthworks, concrete levels, as per the approved drawing and technical specification. · Shifting Bench Mark Elevation with Auto level. · Monitoring all Health, Safety and Environment activities are fully implemented and properly followed and identify risks expected. COMPUTER SKILLS
  • 12. Knowledge and Proficiency in using various computer applications as AUTO cad, Google KMZ files, Ms Office, Ms Excel, Internet, etc. INSTRUMENTS USED · GPS Gamin* GPS MAP-276, Garmin Eertex-C, GPS 76-S · TOTAL STATION SOKIA*, LEICA*, NIKON*, TOPCON, PENTEX*. · THEODOLITE: WILD (TO, T2) CAMPASS, OPTICAL PLUMMET. · LEVELS INSTRUMENT: DIGITAL LEVEL, AUTO LEVELS. PERSONAL PROFILE: Name in full : Malik Muhammad Nadeem Date of Birth : 20 December 1979 Passport No : AR 9453182 Nationality : Pakistani Marital Status : Married Religion : Islam Language Proficiency : English, Arabic, Urdu, Hindi, Punjabi Hobbies : Sports, Snooker Permanent Address : S/O MALIK AFSAR AWAN HOUSE NO J-251 POST OFFICE BOX - 49060 NEAR HOSPITAL KHEWRA JHELUM PAKISTAN
  • 13. I here by declare that the information and the facts stated here in above are true and correct to the best of my knowledge and belief.