1. C.V
NAME : MAJDI ABU ALI
DATE OF BIRTH : 1960 TULKAREM
NATIONALITY : JORDANIAN
MARITAL STATUS : MARRIED
MOBILE NUMBER : +996502015784 / Saudi Arabia
GRADUATION DATE : DAMASCUS /1988
Email address : abuali.majdi@yahoo.com
EXPERIENCES : holding BSc.in Civil engineering degree from Damascus faculty of
civil engineering and more than 26 years of experience within the civil construction,
infrastructure and industry in Saudi Arabia. Fully bilingual in Arabic and English
languages.
Specialties: construction large scale projects, top level management, leading multi
discipline teams.
1- May. 2014 up Date Saudi Tumpane
Responsibilities:-
Project Manager : For Tabuk water treatment plant (204 million S.R ) including
budget issue , procurement plan issue , manpower and equip. plan , time sch.
,review and issue design and shop drawing for approval and controlling of site
work progress to be matching the approved project time sch. , issue daily and
weekly reports and monthly meeting attendance with the owner .
2-Nov.2012 up to May. 2014 Arabian Consulting Engineering Services
Responsibilities: -
Resident Engineer (project manager ) : for LULU Hyper market in Riyadh khurais
road (64 million S.R) including recommendations,advice,reviewing and approval
for all project electromecanical,civil and architectural design drawings,the
relevant shop drawings ,materials,suppliers,subcontractors& project works to
ensure that works are constructed in accordance with the contract documents &time
sch. In addition to review contract proposed quality control and safety plan up
to testing, commissioning and final handing over stage.
3- Apr. 2009 - July 2012 Bin Laden Group (PBAD) – Riyadh
Responsibilities: -
Project Manager: From Apr.2009 up to Jan.2010 for all (KAFD) project excavation
works & parcel manager for high-rise building (parcel 209/ 350 million s.r) in
the same project.Schedule and coordinate all design and construction
processes, including the selection, hiring, and oversight of specialty
trade contractors. Prepare, review, revise, and monitor budgets. Ensure
that projects done on time and within budget by coordinating and
supervising the construction process from the development stage through
final construction stage. Review, approve, and prioritize work and approve
all expenditures. Provide innovative ideas. Identify and encourage
opportunities for “value added” enhancements and identify how to address
construction needs that are not being properly satisfied. Ensure that all
commitments of work are completed as agreed. Determine the optimal way to
get trade organization, work procedure on the site based on the
coordination with the project team. Preparation and supervision of sub-
contractors contracts. Representative for the company in all site meetings
2. with the construction management and the owner. Supervision and
coordination with the ElectroMechanical sub-contractors works on site.
Sign all handing over forms and request for inspection. Approval signature
on all payment forms.
Project Manager: From Jan. 2010 up to Feb. 2011 for concrete underground
utilities tunnel with pretension cover slab (169 million s.r)for King Abdulla
financial district project (KAFD) cut and cover system.
Deputy Project Manager: From Feb.2011 up to Aug. 2011 for the extension of
king fahd national library in Riyadh (KFNL / 350 million s.r) turnkey
project including all civil, arch. And infrastructure works (sewage network,
potable water network, data cables, lighting poles, elect. sewage manholes,
valve chambers etc.….).Oversee the delivery and use of materials,
tools, and equipments, workers productivity and the quality of
construction. Ensure the safety of workers, facilities and the
construction site. Coordinate regular safety meetings and training
for safe work practices. Enforce safety regulations. Evaluate work
and provide feedback on progress, quantity, quality & safety.
Initiate requests for, and help secure, additional resources when
necessary to meet project dead line and supervise all aspects of
construction.
Project manager: From Aug.2011 up to July 2012 for Saudi Arabian monetary agency
expansion project (SAMA 455 million s.r) turnkey project including all P.M
responsibilities ensuring that execution of the project will be as per it's time
sch.Schedule and coordinate all design and construction processes,
including the selection, hiring, and oversight of specialty trade
contractors. Prepare, review, revise, and monitor budgets. Ensure that
projects get done on time and within budget by coordinating and
supervising the construction process from the development stage through
final construction. Review, approve and prioritize work and approve all
expenditures. Provide innovative ideas. Identify and encourage
opportunities for “value added” enhancements and identify how to address
construction needs that are not being properly satisfied. Ensure that all
commitments of work are completed as agreed and following up procurements,
project IPC and all subcontractors’ payments certificates.
4-Nov.2004 - Mar. 2009 ARABIAN BEMCO – Riyadh
Responsibilities: -
Site manager: for bowaib & salbukh water treatment plants expansion project (140
million s.r) up to final handing over including management for all engineering
requirements, as built draw issues, following up progress sche. And supervising
all civil works such as cooling tower , clarifiers, gravity sand filters,R.O
building, pressure pumps, main water tank valve chambers , allinfrastructure and
underground utilities and GRPchemical dosing lines,rejected water& UPVCpiping,
roads, walkways auxiliary compact substations, high and low voltage cables&all
relationship, submittals ,weekly meetings with the consultant & owner (ministry
of water and electricity), following up, coordinating with procurement
department, report to any resource shortage and ensuring quality control .
3. Construction manager:for turbine air inlet cooling system (TAICS) project in
PP9(9th. power plant) Riyadh area including all steel structure,civil,finishing
activities, all infrastructures such as( water lines network, sewage lines
network, fiber optic , high voltage , low voltage , substations and auxiliary
compact substations, air filter houses), Lead and manage the site team in
their daily work, Ensure that all supervision activities under the
responsibility of the site team are being carried out by the site team
members, and if needed, to report any resource shortage, disciplinary
problem, quality breaches, accidents and other irregularities to the
project responsible person, Conduct all works application according to
shop drawings and details. Revision of B.O.Q and cost control. Implement
work policy for all job activities and trade organization, work procedure
on the site based on the coordination with the project manager.
Preparation and supervisions for the sub-contractors contracts.
Representative for the company in all site meetings with the construction
management and the owner.Supervision and coordination with the Electro -
Mechanical sub-contractors works on site. Sign on all handing over forms
and request for inspection. Approval signature on all payment forms
schedule the project in logical steps and budget time, obtain all necessary
permits and materials approval, shop drawing and As Built drawing issues review
and monitor up to final handing over.
5-Jan. 2003 – Nov. 2004 al- ROMAYYSA Con. Est. – Riyadh
Responsibilities: -
Project Manager: for residential palace in mohammadia residential quarter
(turnkey). Define and clarify project scope, develop the project plan, develop
project schedule and policies and procedures to support the achievement of the
project objectives.
Consultant: for prince sultan office renovation project in ma'ther quarter.
review and approve all Civil, architectural and MEP design drawings and the
relevant shop drawings, materials, suppliers, subcontractors & execution of
project works to ensure that works are constructed in accordance with the
contract documents, time schedule &project quality .
6-Sep. 2000 – Oct. 2002 Electro industries – Riyadh
Responsibilities: -
Proj.Manager: for the company steel struc. Factory expansion proj. (Turnkey) in
2nd. Industrialpark.
Proj.Manager: for outside net work extension (STC) including all civil & telecom
activities.
7-Nov. 1997 – Jul. 2000 C.C.C – Yanbu royal commission
Responsibilities: -
Site civil eng.: For petrochemical yanpet ethylen expansion project including all
civil construction, Pre-engineered steel building, all underground utilities and
electromech. facilities (GRP & galv. pipes, sewage line network and chemical
steel tanks and vessel erection up to final handing over. lead and manage the
site team in daily work, ensure that all supervision activities under the
responsibility of the site team are being carried out by the site team members
and if needed to report any resources shortage, accidents and other
4. irregularities to the project responsible person. implement all safety procedures
according to the approved safety plan, conduct site field inspection to ensure
the construction quality meets plans and specifications, review and maintain
drawings, track & review all submittals and forward to consultant for approval ,
attend and report at weekly progress meetings, manage and track project punch
list and reporting to the site manager .
7-Jun. 1994 -sep. 1997al- NajemCont.Est.–Yabu royal commission
Responsibilities: -
Vice construction manager: for 64 residential villas (turnkey) for SAMREF Company
including shop drawing issue and approval, supervision, materials approval
,materials procurement follow up, managing financial responsibilities, revise and
monitor budgets ensure that the project get done on time and within the budget by
coordinating and supervising the construction process from development stage up
to final construction ,help secure and additional resources when necessary to
meet project deadline , payment certificates up to handing over stage.
8-Jan. 1992 – 1993 Ben Jaralla Cont. Est. – Abha
Responsibilities: -
Site civil eng.: For al- bohaira resort center including surveying
responsibilities & civil works for commercial center, mosque & proj.
Administration building.Schedule and coordinate all design and construction
processes, including the selection, hiring, and oversight of specialty
trade contractors. Prepare, review, revise, and monitor budgets. Organize
and direct all activities of materials testing and track project punch
list and reporting to the site manager
9-1991 – 1992 al – Jarbou Est. – Yanbu royal commission
Responsibilities: -
Construction manager: for flood control channel project in yanbu.
Schedule and coordinate all design and construction processes, including
the selection, hiring, and oversight of specialty trade contractors.
Prepare, review, revise, and monitor budgets. Ensure that project gets
done on time and within budget by coordinating and supervising the
construction process from the development stage through final
construction. Review, approve, and prioritize work and approve all
expenditures. Provide innovative ideas. Identify and encourage
opportunities for “value added” enhancements and identify how to address
construction needs that are not being properly satisfied. Ensure that all
commitments of work are completed as agreed.
10-Jun. 1988 – 1991 al – Jarbou Est. Yanbu royal commission
Responsibilities: -
Site civil eng.: For flood control channel 37k.m with embankments & blast rock
riprap covering all internal channel faces, all earthworks, leveling, grading in
order to protect royal commission area against flood.
King Khalid international airport industrial and maintenance complex earthwork
hardscaping and landscaping