SlideShare a Scribd company logo
1 of 7
Sitio Kinawa, Sto. Rosario E-mail: ggarciano1016@gmail.com
Matag-ob, Leyte Mobile No. +966559501532
Gerry I. Garciano
OBJECTIVES: To enhance my skills and knowledge thru mechanical trade and operations in constructions and oil &
gas industry set-up procedure and challenge the position assign by the management.
EXPERIENCE:
Present: Project: NKY Architects & Engineers is a Turkish Consultancy firm and working for big scale project since
1980. It has projects in Turkey, North Iraq and kingdom of Saudi Arabia. Nky's new project in KSA is
KAP2 (King Abdullah Project second Phase). It is a well-known and prestigious project in Middle East
Region. The client is MOI (Ministry of Interior), KAP2 is geographically distributed all over the
Kingdom of Saudi Arabia and there will be sites in different cities. The project types are generally
building and infrastructure. There are training camps, governmental offices, residential areas and
school buildings in the projects.
May 27, 2015 - Present NKY Architects and Engineers KSA, Riyadh
Senior Mechanical Engineer – Site Consultant
 Supervise and control the activities on site assuring compliance with drawings and Specs.
 Assure that the contractor and Junior engineers are using the correct version of drawings & specs.
 Maintain surveillance of all project activities and if necessary initiates corrective action in conjunction with the
Area Manager to meet project quality requirements.
 Supervise and coordinate the technical interfaces or clarifications between the different disciplines.
 Recommend solution to problems "technical or constructional" and define the means of applying them.
 Evaluate the contractors performance, proposes and ways for improvement.
 Provide technical support for the junior engineers.
 Assure that Junior engineers and supervisors follow their assigned tasks and responsibilities.
 Define work plans ahead and distribute jobs to engineers and supervisors on site.
 Collect project site activities and information and furnish the Area Manager with necessary information.
 Initiate progress and status report.
 Insure compliance of contractor to tech. SPECS and quality requirements.
 Assure compliance with the required safety & health requirements.
Previous: Project: Maskan Arabia Co. - Construction and developing real estate industry.
The project is leading in building design, planning and development consulting services of public and
private residential building, scope of work involves urban management, infrastructure funding,
coordination policy and supervision.
October 15, 12 – October 30, 14 NP - Architecture & Engineering Consultants KSA, Riyadh
Mechanical Engineer – Site Consultant
 Review of shop drawings, materials, mock-up & request as submitted by contractor which is plan for the project.
 Inspect and monitor the project site progress and ensure that the work is according to the design, specification,
schedule and safety.
 Attend testing and commissioning of project elements.
 Check and approve mechanical drawings and shop drawings in compliance and accordance to the standard
codes.
 Prepared detailed Design / Technical drawings by using AutoCAD 2D & 3D modeling application.
1 | P a g e
 Coordinate with other disciplines such as Architectural, Civil Structural, and Electrical.
 Organize, draft and coordinate technical documents.
 Check the materials, manpower and equipment as according to plan.
 Report all variation and the delay on site.
 Manage the site activities by ensuring that the contractor follow the entire quality control requirement.
 Coordinate with all project parties to ensure the requirements are incorporated in the project.
 Verify the progress of work at site in coordination with the consultant team at site.
 Conduct technical meeting with the consultant and contractor to ensure the approvals are on track.
 Verify all approval of materials and shop drawings in addition to suppliers and sub-contractor’s approval.
Project: U.S NAVAL STATION, Guantanamo Bay, Cuba
The project is the leader in consulting, HVAC/Plumbing design, operation and maintenance,
engineering and construction of processing and infrastructure of all public facilities situated at U.S.
Naval Station area, scope of work involves supply and installation of labor, materials, tools of trade and
engineering supervision.
May 25, 11 – May 02, 12 Burns & Roe and DCK North America, LLC Guantanamo, Cuba
Mechanical Engineer II
 Participates in the site surveys and field measurements.
 Prepares mechanical designs with minimum supervision that require calculations (Elite and McQuay program)
and coordination with other disciplines.
 Coordinates with the client to resolve any scope-related issues that shall be conforms on IMC, SMACNA and
ASHRAE.
 Checks cost estimates and material take-offs prepared by the planner and estimator(s). If required, also
prepares these documents personally using RS Means cost estimating system.
 Prepared detailed Design / Technical (35% - 100%) drawings by using AutoCAD 2D & 3D modeling application.
 Checks product data submittals and material requisitions prepared by the planner and estimator(s). If required,
Also prepares these documents personally.
 Coordinates with other discipline, vendors, subcontractors and Purchasing Department during estimate
preparation.
 Prepares product data and submittals transmittals in conjunction with the design and UFGS for client approval.
 Assist in the training of subordinate planner and estimators.
 Prepares material requisitions for purchase.
 Provides technical assistance to shop personnel during the project construction phase.
 Keeps abreast of engineering design practices and estimating techniques.
Feb. 09, 11- May 16, 11 Exploration Drilling Corp. (EDCO) Cebu City
Safety Officer / Management Trainee
 Personally responsible for own safety and conducting one’s self to the standards of Policies and Procedures
 Promote and promulgate safety program
 Apply safety policies and practices in rig operations and act as a role model to other crew members in all safety
matters
 Conduct and record Tool Box Talks for the rig crew and achieve the participation and contribution of crew
members
 Conduct safety inspections of rig equipment.
 Ensure that all activities are conducted using safe working practices and using the designated Personal
Protection Equipment (PPE).
 Facilitate in checking the safety gears of the Rig members before going to their respective workplace
 Make accident/incident report.
 Attend meeting together with Supervisor at TVI office.
 Check accuracy of DDSR data everyday and file them.
2 | P a g e
A J o in t V e n t u re o f B u r n s a n d R o e a n d d c k n o r th a m e r ic a , L L C
 Make Hole Summary and Chargeable Materials Summary for each operational Rig (cut-off period: 1st
-15th
day
and 16th
-30th
/31st
day of the month / deadline: 1st
day after cut-off).
 Report/scan DDSRs to Cebu office every morning; send signed DDSRs to Cebu office weekly.
 Supervision/Monitoring of concerns for each operational Rig with regards to manpower, additives/materials,
tools and equipments.
 Conduct Hole Survey (on call).
 Assists Admin or Warehouseman when needed.
Project: ROYAL COMMISSION for JUBAIL and YANBU. Construction, Modification/Renovation and Maintenance
The project is the maintenance of all public facilities situated at Royal Commission area consisting of
Schools, Mosques, Recreation Centers, Swimming Polls, Public Parks, Public Toilets, and Beaches,
scope of work involves supply and installation of labor, materials, tools of trade and engineering
supervision of rehabilitation H.V.A.C and Plumbing. Also includes civil and electrical works.
Jan. 23, 08- Nov. 02, 10 Globe Marine Services Co. Al-Sinaiyah, Yanbu, KSA
Mechanical Engineer II
 Prepared budgeted cost for estimated materials, labor and services required in the project.
 Prepared Technical Reports regarding maintenance, Modification, Designing and Renovation of public facilities
of mechanical works.
 Prepared mechanical work design with calculation proposed (Elite and McQuay program) for construction and
rehabilitation.
 Prepared the bill of materials and bill of quantity with estimated cost.
 Involve in project cost planning and checks practical solution for cost savings.
 Responsible in monitoring facilities which were mechanically unsafe and constitute hazardous to safety and
health.
 Prepare the review and checking of planned and specifications.
 Prepared detailed technical drawings by using AutoCAD 2D & 3D modeling application.
 Conducted plan-in-hand inspection of proposed project.
 Conducted initial acceptance inspection for newly constructed facility/buildings by Royal Commission
Construction Department.
 Project coordinator including thorough monitoring of project development and site requirements.
 Inspecting work on the site to ensure compliance with the drawings and specifications.
Aug. 16, 06-Jan. 15, 08 San Miguel Foods Inc. (B-MEG) Tacloban City
Operations Assistant
 Prepared daily production activities with updated mixing guide.
 Performed Daily Production Report which will be submitted to Cebu Office.
 Performed System Application Program (SAP) - Materials Management System and Production Planning.
 Responsible in preparing SAP - Materials Requirement Plan.
 Performed SAP – Goods Receipt, Goods Issue and Summary of Transfer Materials.
 Performed SAP – Valuation Debit / Credit Materials and Stock Status Reports.
 Prepared Warehouse Entry Slip with updated materials receipt.
 Prepared Transfer Documents of Finished Goods in process and Raw Materials to Partnership.
 Performed and updated P.O. Raw Materials and Accessories and updates P.O. Balances.
 Performed Production Efficiency and Weekly Highlights Report.
 Performed Re-processing Feeds and Raw Materials & Slow & Non-moving Materials Movements.
 Responsible in preparing maintenance Production Controls (PC) and Micro & Vitamins Usage Monitoring.
 Updated and performed Weekly/Month inventory of Raw Materials and Good in Process Materials.
 Performed Payment Request Memo of SMC Shipping and Lighterage Corporation.
 Performed other related duties and responsibilities that may be assigned by superior.
Project: SHANGRI-LA’S MACTAN ISLAND HOTEL & RESORT INC. Renovation (Lobby, Atrium & Shang wing)
3 | P a g e
The project consist of 9th
floor hotel building composed of 361 rooms, work involved in supply and in
installation of labor, materials, tools of trade and engineering supervision of rehabilitation of 361 units
Fan coil units (FCU) air-conditioning units. Also includes electrical installations.
Feb. 06, 06-Aug 07, 06 Kalayaan Engineerig Company, Inc. Mandaue City
Office Engineer
 Prepared budget cost and estimated of materials, labor and services required in the project.
 Prepared and evaluated progress and final payments in connection with the contract.
 Prepared projects of monthly cost report.
 Involves in project cost planning and checks practical solution for valued engineering and cost savings.
 Assess cost effects when changes occur and agreed on variation with contractor/suppliers
 Prepared statements of final account upon completion of contract.
 Prepared detailed estimates, quantity take-off and costing for bidding purposes and project implementation.
 Reviewed the contract for adherent to stipulate and reviewed the specifications for implementation.
 Project coordinator including thorough monitoring of project development and site requirements.
 Closely coordinated and finalized the detailed of the contractor technically including timetable with the
supplier/trade contractor/sub-contractor.
 Coordinated with the project-in-charge as to nature and quantity take-off of all change/variation orders and/or
revisions and all additional works between tender/construction and as-built Plan for final quantifications.
 Reviewed the sub-contractors final Bill of Quantity (BOQ) for high low price during clarification seasons.
 Monitored and inspected of materials delivered on the site as per approved submittals by the consultant prior for
the installation at the site.
 Inspecting work on the site to ensure compliance with the drawings and specifications.
 Prepares progress billing.
April 27, 04-Jan. 23, 06 Suncrest Foods Inc. Valenzuela City
Maintenance Engineer
 Gathered all materials for the daily activities scheduled of maintenance process.
 Prepared manpower priority schedule activity by process method.
 Trouble shooting, checking-up, dismantling, assembles of machine parts and repair installation of mechanical
equipment related to production process.
 Performed corrective, preventive and breakdown maintenance.
 Responsible in coordinating with production supervisor of equipment scheduled for shutdown.
 Responsible in mechanical layout and technical drawing using AutoCAD 2D & 3D of spare parts of
equipment/machine.
 Fabrication design and modification of machine by using AutoCAD 2D & 3D modeling application.
 Performed other related duties and responsibilities as may be assigned by superior.
 Directly reporting to the maintenance supervisor.
Project: CV-1 and CV-2 INTEL GATEWAY CAVITE, Renovation and Installation of Machine
(Retrofit, and Ball-Attach Area.)
The project consist of 3rd
floor building, work involved in supply and installation of labor, materials, tools
of trade and engineering supervision of rehabilitation and relocation of electronic equipment units,
Chilled Water pipe- line, Air-conditioning units and structural foundation
Jan. 05, 02-April 16, 04 Roblett International Construction Corp. Mandaluyong City
Mechanical Engineer
 Gathers all personal protection before entering the job site.
 Preparation of materials for the daily activities schedule.
 Project coordinator including thorough monitoring of project development and site requirements.
 Responsible in material tracker’s of incoming and out-going for the Retrofit and Bull Attach project.
 Responsible in production monitoring and manpower controlled in both mechanical tasks.
4 | P a g e
 Installation and Erection of Chilled Water pipeline, Ducting, Structural Foundation and Sprinkler line.
 Prepared reviewed and checking of planned and specifications.
 Installation of Air Handling Units (AHU) and Fan Coil Units (FCU).
 Take-off and Hook-off both structural and mechanical drawing.
 Responsible in encoding the production and daily activities reports.
 Performed other related tasks or responsibilities as may be assigned by superintendent.
 Directly reporting to the mechanical superintendent.
January 24, 01-Dec. 15, 01 Innodata Mandaue Inc. Mandaue City
Quality Assurance
 Gathered all documents for daily audit schedule.
 Responsible in auditing the quality of the documents and finding the natural errors of the texts from final
process.
 Sees to it that all audited documents must get the batting average of 99.9% were secured for endorsement to
client.
 Performed other responsibilities in a quality assurance department that may be assigned by team manager of
Q.A. Department.
COMPLETION:
DOLE Regional Office No. IX – ZAMPEN OSHNET INC. Zamboanga City
February 28, 2011 – March 04, 2011
 Basic Occupational Safety and Health Training Course
Oilwell Drilling Technology Development Center Inc. Mandaue City, Cebu
November 08, 2010 – December 04, 2010
 Basic Training Program for Drilling Personnel
 Introduction to Basic Oilwell Drilling Technology
 IADC Rigpass Orientation and Basic Safety Awareness (Including Slinger and Bankman
Safety Measure)
 IADC Rig Pass ID
 Orientation on the Prevention of Marine Pollution by Oil pursuant to MARPOL
 Introduction to Hydrogen Sulfide (H2S) / SCBA
 First Aid at Oil and Gas Drilling Rig
 Official Transcript of Records
Technical Education and Skills Development Authority (TESDA) Lahug, Cebu
December 27, 2010
 CAV (R-VII) No. 00061 - Certificate of Trainings / Diploma and Transcript of Records
ABESAMIS Construction and Drilling Corporation Mandaue City, Cebu
November 22, 2010 – December 21, 2010
 On – The – Job Training functions of ROUSTABOUT
National Maritime Polytechnic (NMP) Tacloban City, Leyte
January 10 - 21, 2011
 Basic Safety Training (BST)
 Gender Sensitivity Training for Seafarers (GSTS)
 Prevention of Alcohol and Drug Abuse in the Maritime Sector (PADAMS)
 STD/HIV/AIDS Prevention in the Maritime Sector (SHAPIMS)
CADVISION Engineering Technologies Recto, Manila
July 07 - 17, 2005
5 | P a g e
 AutoCAD 2002
INTERFACE Computer College Recto, Manila
September 15 - 30, 2003
 Computer Aided Design and Drafting (CADD)
LIT – Information Technology Training and Development Center Tacloban City, Leyte
November 22, 1999 – December 15, 1999
 Computer Literacy Training for Office Executives and Supervisors
EDUCATION: 1995-2000 Leyte Institute of Technology (Now EVSU) Tacloban City
 B.S. Mechanical Engineering
Graduated
October, 2000 Professional Regulation Commission (PRC) Cebu City
 Mechanical Engineer Licensure
License No. 0058270
INFORMATION:
Date of Birth : January 28, 1978 Age : 37
Place of Birth : Matag-ob, Leyte Height : 5’4” (163 cm)
Nationality : Filipino Weight : 176 lbs (80 kgs)
Marital Status : Married SSS Number : 06-1891434-2
Provincial Add. : Kinawa, Sto. Rosario TIN Number : 275554000
Matag-ob, Leyte PhilHealth No. : 13-200755467-6
SRC Number : TC03629-11
LICENSES:
DATE ISSUED DATE EXPIRE
Phil. License Name & No. PRC Licensure : 0058270 January 10, 2001 January 28, 2015
Seaman's Book No. B0950488 January 25, 2011 January 24, 2016
Passport No. EC2878374 December 01, 2014 November 30, 2019
NBI Clearance G625AG2Y87-MA5291095 November 10, 2015 November 10, 2016
Driver’s License H10-09-000408 January 28, 2015
SKILLS: Consulting, Designing (Technical Drawing AutoCAD 2D & 3D Modeling), Microsoft Word and
Excel Application, HVAC Load Calculations (Elite, HAP, and McQuay program), Material and
Manpower Cost Estimation, Repair and Trouble Shooting.
SEMINAR ATTENDED:
 Technical Seminar on Vario Flow Chain Conveyor System Muntinlupa City
(Bosch Rexroth Yearly Product Updates)
 FESTO Pneumatics Seminar (New Products and Displays) Quezon City
 Energy Savings in Pneumatic System, SMC Pasig City
 ISO 9001 / Statistical Process Control Plan Caloocan City
6 | P a g e
 Fall Protection and Ladder Safety Mandaluyong City
 PSME Technical Seminars Tacloban City
 JPSME Technical Seminars Tacloban City
 Seminar-Workshop on Research Proposal Writing ll Tacloban City
7 | P a g e

More Related Content

What's hot (20)

Sami resume new
Sami resume newSami resume new
Sami resume new
 
CVFTCabunoc
CVFTCabunocCVFTCabunoc
CVFTCabunoc
 
Vivencio pachoro cv 2016
Vivencio pachoro cv 2016Vivencio pachoro cv 2016
Vivencio pachoro cv 2016
 
RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015
 
Edumac Resume part 3333333
Edumac Resume part 3333333Edumac Resume part 3333333
Edumac Resume part 3333333
 
Curriculum Vitae lim
Curriculum Vitae limCurriculum Vitae lim
Curriculum Vitae lim
 
Shailesh Pawar Profile
Shailesh Pawar ProfileShailesh Pawar Profile
Shailesh Pawar Profile
 
cv2017rvs - Copy
cv2017rvs - Copycv2017rvs - Copy
cv2017rvs - Copy
 
CV-R.B.Guinir Jr.(01-15-17)
CV-R.B.Guinir Jr.(01-15-17)CV-R.B.Guinir Jr.(01-15-17)
CV-R.B.Guinir Jr.(01-15-17)
 
Omar Al Nadi CV عمر
Omar Al Nadi CV عمرOmar Al Nadi CV عمر
Omar Al Nadi CV عمر
 
Resume_SBA_180515
Resume_SBA_180515Resume_SBA_180515
Resume_SBA_180515
 
Amr. 2015....
Amr. 2015....Amr. 2015....
Amr. 2015....
 
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABD
 
Dale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli Resume
Dale Buzzelli Resume
 
Reda Amin1
Reda Amin1Reda Amin1
Reda Amin1
 
cv
cvcv
cv
 
Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3
 
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh Parmar
 
HARDEO SAFI Resume 1
HARDEO SAFI Resume 1HARDEO SAFI Resume 1
HARDEO SAFI Resume 1
 
Civil Engineer 2
Civil Engineer 2Civil Engineer 2
Civil Engineer 2
 

Viewers also liked

Top 8 pharmacy sales assistant resume samples
Top 8 pharmacy sales assistant resume samplesTop 8 pharmacy sales assistant resume samples
Top 8 pharmacy sales assistant resume sampleschasemalone3
 
Suneel - Material Coordinator
Suneel - Material CoordinatorSuneel - Material Coordinator
Suneel - Material CoordinatorSuneel Kumar
 
Mark adrian r morelos resume 1
Mark adrian r morelos resume 1Mark adrian r morelos resume 1
Mark adrian r morelos resume 1Makoi Morelos
 
detailed resume final-janet-aCCOUNTANT
detailed resume final-janet-aCCOUNTANTdetailed resume final-janet-aCCOUNTANT
detailed resume final-janet-aCCOUNTANTJanet Alcantara
 
MY AUTOBIOGRAPHICAL COMPREHENSIVE DETAIL RESUME CURRICULUM VITAE CONTENTS UPD...
MY AUTOBIOGRAPHICAL COMPREHENSIVE DETAIL RESUME CURRICULUM VITAE CONTENTS UPD...MY AUTOBIOGRAPHICAL COMPREHENSIVE DETAIL RESUME CURRICULUM VITAE CONTENTS UPD...
MY AUTOBIOGRAPHICAL COMPREHENSIVE DETAIL RESUME CURRICULUM VITAE CONTENTS UPD...Edwin Dimaano
 
Jessie F. Roque Updated Resume 07142015
Jessie F. Roque Updated Resume 07142015Jessie F. Roque Updated Resume 07142015
Jessie F. Roque Updated Resume 07142015Jessie Roque
 
Stores management and stock control
Stores management and stock controlStores management and stock control
Stores management and stock controlGabriel Lubale
 

Viewers also liked (13)

Top 8 pharmacy sales assistant resume samples
Top 8 pharmacy sales assistant resume samplesTop 8 pharmacy sales assistant resume samples
Top 8 pharmacy sales assistant resume samples
 
Rachelle Ventura Resume
Rachelle Ventura ResumeRachelle Ventura Resume
Rachelle Ventura Resume
 
Suneel - Material Coordinator
Suneel - Material CoordinatorSuneel - Material Coordinator
Suneel - Material Coordinator
 
Mark adrian r morelos resume 1
Mark adrian r morelos resume 1Mark adrian r morelos resume 1
Mark adrian r morelos resume 1
 
jhon_dechavez resume
jhon_dechavez resumejhon_dechavez resume
jhon_dechavez resume
 
Jacquilyn Fraga.resume
Jacquilyn Fraga.resumeJacquilyn Fraga.resume
Jacquilyn Fraga.resume
 
Resume
ResumeResume
Resume
 
detailed resume final-janet-aCCOUNTANT
detailed resume final-janet-aCCOUNTANTdetailed resume final-janet-aCCOUNTANT
detailed resume final-janet-aCCOUNTANT
 
Liberty Lizardo resume
Liberty Lizardo resumeLiberty Lizardo resume
Liberty Lizardo resume
 
MY AUTOBIOGRAPHICAL COMPREHENSIVE DETAIL RESUME CURRICULUM VITAE CONTENTS UPD...
MY AUTOBIOGRAPHICAL COMPREHENSIVE DETAIL RESUME CURRICULUM VITAE CONTENTS UPD...MY AUTOBIOGRAPHICAL COMPREHENSIVE DETAIL RESUME CURRICULUM VITAE CONTENTS UPD...
MY AUTOBIOGRAPHICAL COMPREHENSIVE DETAIL RESUME CURRICULUM VITAE CONTENTS UPD...
 
Raw material warehouse
Raw material warehouseRaw material warehouse
Raw material warehouse
 
Jessie F. Roque Updated Resume 07142015
Jessie F. Roque Updated Resume 07142015Jessie F. Roque Updated Resume 07142015
Jessie F. Roque Updated Resume 07142015
 
Stores management and stock control
Stores management and stock controlStores management and stock control
Stores management and stock control
 

Similar to Mechanical Engineer's Resume

Similar to Mechanical Engineer's Resume (20)

KIM CV jan2015
KIM CV jan2015KIM CV jan2015
KIM CV jan2015
 
Updated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKHUpdated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKH
 
Abdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C VAbdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C V
 
Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
 
Bill resume
Bill resumeBill resume
Bill resume
 
Eng.ahmed
Eng.ahmedEng.ahmed
Eng.ahmed
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
SASI NEW RESUME
SASI NEW RESUMESASI NEW RESUME
SASI NEW RESUME
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
 
CV-Essam Saadeh
CV-Essam SaadehCV-Essam Saadeh
CV-Essam Saadeh
 
GERRY PANTIG MANICLANG
GERRY PANTIG MANICLANGGERRY PANTIG MANICLANG
GERRY PANTIG MANICLANG
 
CV of Raffy Feliciano
CV of Raffy FelicianoCV of Raffy Feliciano
CV of Raffy Feliciano
 
Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager
 
Peter L. Cabbab.
Peter L. Cabbab.Peter L. Cabbab.
Peter L. Cabbab.
 
harveysarda-curriculum vitae
harveysarda-curriculum vitaeharveysarda-curriculum vitae
harveysarda-curriculum vitae
 
Roberto Guevara-CV
Roberto Guevara-CVRoberto Guevara-CV
Roberto Guevara-CV
 
Abo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & DutiesAbo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & Duties
 
Royce_Brown Resume-82115
Royce_Brown Resume-82115Royce_Brown Resume-82115
Royce_Brown Resume-82115
 
F. CV
F. CVF. CV
F. CV
 
OMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cvOMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cv
 

Mechanical Engineer's Resume

  • 1. Sitio Kinawa, Sto. Rosario E-mail: ggarciano1016@gmail.com Matag-ob, Leyte Mobile No. +966559501532 Gerry I. Garciano OBJECTIVES: To enhance my skills and knowledge thru mechanical trade and operations in constructions and oil & gas industry set-up procedure and challenge the position assign by the management. EXPERIENCE: Present: Project: NKY Architects & Engineers is a Turkish Consultancy firm and working for big scale project since 1980. It has projects in Turkey, North Iraq and kingdom of Saudi Arabia. Nky's new project in KSA is KAP2 (King Abdullah Project second Phase). It is a well-known and prestigious project in Middle East Region. The client is MOI (Ministry of Interior), KAP2 is geographically distributed all over the Kingdom of Saudi Arabia and there will be sites in different cities. The project types are generally building and infrastructure. There are training camps, governmental offices, residential areas and school buildings in the projects. May 27, 2015 - Present NKY Architects and Engineers KSA, Riyadh Senior Mechanical Engineer – Site Consultant  Supervise and control the activities on site assuring compliance with drawings and Specs.  Assure that the contractor and Junior engineers are using the correct version of drawings & specs.  Maintain surveillance of all project activities and if necessary initiates corrective action in conjunction with the Area Manager to meet project quality requirements.  Supervise and coordinate the technical interfaces or clarifications between the different disciplines.  Recommend solution to problems "technical or constructional" and define the means of applying them.  Evaluate the contractors performance, proposes and ways for improvement.  Provide technical support for the junior engineers.  Assure that Junior engineers and supervisors follow their assigned tasks and responsibilities.  Define work plans ahead and distribute jobs to engineers and supervisors on site.  Collect project site activities and information and furnish the Area Manager with necessary information.  Initiate progress and status report.  Insure compliance of contractor to tech. SPECS and quality requirements.  Assure compliance with the required safety & health requirements. Previous: Project: Maskan Arabia Co. - Construction and developing real estate industry. The project is leading in building design, planning and development consulting services of public and private residential building, scope of work involves urban management, infrastructure funding, coordination policy and supervision. October 15, 12 – October 30, 14 NP - Architecture & Engineering Consultants KSA, Riyadh Mechanical Engineer – Site Consultant  Review of shop drawings, materials, mock-up & request as submitted by contractor which is plan for the project.  Inspect and monitor the project site progress and ensure that the work is according to the design, specification, schedule and safety.  Attend testing and commissioning of project elements.  Check and approve mechanical drawings and shop drawings in compliance and accordance to the standard codes.  Prepared detailed Design / Technical drawings by using AutoCAD 2D & 3D modeling application. 1 | P a g e
  • 2.  Coordinate with other disciplines such as Architectural, Civil Structural, and Electrical.  Organize, draft and coordinate technical documents.  Check the materials, manpower and equipment as according to plan.  Report all variation and the delay on site.  Manage the site activities by ensuring that the contractor follow the entire quality control requirement.  Coordinate with all project parties to ensure the requirements are incorporated in the project.  Verify the progress of work at site in coordination with the consultant team at site.  Conduct technical meeting with the consultant and contractor to ensure the approvals are on track.  Verify all approval of materials and shop drawings in addition to suppliers and sub-contractor’s approval. Project: U.S NAVAL STATION, Guantanamo Bay, Cuba The project is the leader in consulting, HVAC/Plumbing design, operation and maintenance, engineering and construction of processing and infrastructure of all public facilities situated at U.S. Naval Station area, scope of work involves supply and installation of labor, materials, tools of trade and engineering supervision. May 25, 11 – May 02, 12 Burns & Roe and DCK North America, LLC Guantanamo, Cuba Mechanical Engineer II  Participates in the site surveys and field measurements.  Prepares mechanical designs with minimum supervision that require calculations (Elite and McQuay program) and coordination with other disciplines.  Coordinates with the client to resolve any scope-related issues that shall be conforms on IMC, SMACNA and ASHRAE.  Checks cost estimates and material take-offs prepared by the planner and estimator(s). If required, also prepares these documents personally using RS Means cost estimating system.  Prepared detailed Design / Technical (35% - 100%) drawings by using AutoCAD 2D & 3D modeling application.  Checks product data submittals and material requisitions prepared by the planner and estimator(s). If required, Also prepares these documents personally.  Coordinates with other discipline, vendors, subcontractors and Purchasing Department during estimate preparation.  Prepares product data and submittals transmittals in conjunction with the design and UFGS for client approval.  Assist in the training of subordinate planner and estimators.  Prepares material requisitions for purchase.  Provides technical assistance to shop personnel during the project construction phase.  Keeps abreast of engineering design practices and estimating techniques. Feb. 09, 11- May 16, 11 Exploration Drilling Corp. (EDCO) Cebu City Safety Officer / Management Trainee  Personally responsible for own safety and conducting one’s self to the standards of Policies and Procedures  Promote and promulgate safety program  Apply safety policies and practices in rig operations and act as a role model to other crew members in all safety matters  Conduct and record Tool Box Talks for the rig crew and achieve the participation and contribution of crew members  Conduct safety inspections of rig equipment.  Ensure that all activities are conducted using safe working practices and using the designated Personal Protection Equipment (PPE).  Facilitate in checking the safety gears of the Rig members before going to their respective workplace  Make accident/incident report.  Attend meeting together with Supervisor at TVI office.  Check accuracy of DDSR data everyday and file them. 2 | P a g e A J o in t V e n t u re o f B u r n s a n d R o e a n d d c k n o r th a m e r ic a , L L C
  • 3.  Make Hole Summary and Chargeable Materials Summary for each operational Rig (cut-off period: 1st -15th day and 16th -30th /31st day of the month / deadline: 1st day after cut-off).  Report/scan DDSRs to Cebu office every morning; send signed DDSRs to Cebu office weekly.  Supervision/Monitoring of concerns for each operational Rig with regards to manpower, additives/materials, tools and equipments.  Conduct Hole Survey (on call).  Assists Admin or Warehouseman when needed. Project: ROYAL COMMISSION for JUBAIL and YANBU. Construction, Modification/Renovation and Maintenance The project is the maintenance of all public facilities situated at Royal Commission area consisting of Schools, Mosques, Recreation Centers, Swimming Polls, Public Parks, Public Toilets, and Beaches, scope of work involves supply and installation of labor, materials, tools of trade and engineering supervision of rehabilitation H.V.A.C and Plumbing. Also includes civil and electrical works. Jan. 23, 08- Nov. 02, 10 Globe Marine Services Co. Al-Sinaiyah, Yanbu, KSA Mechanical Engineer II  Prepared budgeted cost for estimated materials, labor and services required in the project.  Prepared Technical Reports regarding maintenance, Modification, Designing and Renovation of public facilities of mechanical works.  Prepared mechanical work design with calculation proposed (Elite and McQuay program) for construction and rehabilitation.  Prepared the bill of materials and bill of quantity with estimated cost.  Involve in project cost planning and checks practical solution for cost savings.  Responsible in monitoring facilities which were mechanically unsafe and constitute hazardous to safety and health.  Prepare the review and checking of planned and specifications.  Prepared detailed technical drawings by using AutoCAD 2D & 3D modeling application.  Conducted plan-in-hand inspection of proposed project.  Conducted initial acceptance inspection for newly constructed facility/buildings by Royal Commission Construction Department.  Project coordinator including thorough monitoring of project development and site requirements.  Inspecting work on the site to ensure compliance with the drawings and specifications. Aug. 16, 06-Jan. 15, 08 San Miguel Foods Inc. (B-MEG) Tacloban City Operations Assistant  Prepared daily production activities with updated mixing guide.  Performed Daily Production Report which will be submitted to Cebu Office.  Performed System Application Program (SAP) - Materials Management System and Production Planning.  Responsible in preparing SAP - Materials Requirement Plan.  Performed SAP – Goods Receipt, Goods Issue and Summary of Transfer Materials.  Performed SAP – Valuation Debit / Credit Materials and Stock Status Reports.  Prepared Warehouse Entry Slip with updated materials receipt.  Prepared Transfer Documents of Finished Goods in process and Raw Materials to Partnership.  Performed and updated P.O. Raw Materials and Accessories and updates P.O. Balances.  Performed Production Efficiency and Weekly Highlights Report.  Performed Re-processing Feeds and Raw Materials & Slow & Non-moving Materials Movements.  Responsible in preparing maintenance Production Controls (PC) and Micro & Vitamins Usage Monitoring.  Updated and performed Weekly/Month inventory of Raw Materials and Good in Process Materials.  Performed Payment Request Memo of SMC Shipping and Lighterage Corporation.  Performed other related duties and responsibilities that may be assigned by superior. Project: SHANGRI-LA’S MACTAN ISLAND HOTEL & RESORT INC. Renovation (Lobby, Atrium & Shang wing) 3 | P a g e
  • 4. The project consist of 9th floor hotel building composed of 361 rooms, work involved in supply and in installation of labor, materials, tools of trade and engineering supervision of rehabilitation of 361 units Fan coil units (FCU) air-conditioning units. Also includes electrical installations. Feb. 06, 06-Aug 07, 06 Kalayaan Engineerig Company, Inc. Mandaue City Office Engineer  Prepared budget cost and estimated of materials, labor and services required in the project.  Prepared and evaluated progress and final payments in connection with the contract.  Prepared projects of monthly cost report.  Involves in project cost planning and checks practical solution for valued engineering and cost savings.  Assess cost effects when changes occur and agreed on variation with contractor/suppliers  Prepared statements of final account upon completion of contract.  Prepared detailed estimates, quantity take-off and costing for bidding purposes and project implementation.  Reviewed the contract for adherent to stipulate and reviewed the specifications for implementation.  Project coordinator including thorough monitoring of project development and site requirements.  Closely coordinated and finalized the detailed of the contractor technically including timetable with the supplier/trade contractor/sub-contractor.  Coordinated with the project-in-charge as to nature and quantity take-off of all change/variation orders and/or revisions and all additional works between tender/construction and as-built Plan for final quantifications.  Reviewed the sub-contractors final Bill of Quantity (BOQ) for high low price during clarification seasons.  Monitored and inspected of materials delivered on the site as per approved submittals by the consultant prior for the installation at the site.  Inspecting work on the site to ensure compliance with the drawings and specifications.  Prepares progress billing. April 27, 04-Jan. 23, 06 Suncrest Foods Inc. Valenzuela City Maintenance Engineer  Gathered all materials for the daily activities scheduled of maintenance process.  Prepared manpower priority schedule activity by process method.  Trouble shooting, checking-up, dismantling, assembles of machine parts and repair installation of mechanical equipment related to production process.  Performed corrective, preventive and breakdown maintenance.  Responsible in coordinating with production supervisor of equipment scheduled for shutdown.  Responsible in mechanical layout and technical drawing using AutoCAD 2D & 3D of spare parts of equipment/machine.  Fabrication design and modification of machine by using AutoCAD 2D & 3D modeling application.  Performed other related duties and responsibilities as may be assigned by superior.  Directly reporting to the maintenance supervisor. Project: CV-1 and CV-2 INTEL GATEWAY CAVITE, Renovation and Installation of Machine (Retrofit, and Ball-Attach Area.) The project consist of 3rd floor building, work involved in supply and installation of labor, materials, tools of trade and engineering supervision of rehabilitation and relocation of electronic equipment units, Chilled Water pipe- line, Air-conditioning units and structural foundation Jan. 05, 02-April 16, 04 Roblett International Construction Corp. Mandaluyong City Mechanical Engineer  Gathers all personal protection before entering the job site.  Preparation of materials for the daily activities schedule.  Project coordinator including thorough monitoring of project development and site requirements.  Responsible in material tracker’s of incoming and out-going for the Retrofit and Bull Attach project.  Responsible in production monitoring and manpower controlled in both mechanical tasks. 4 | P a g e
  • 5.  Installation and Erection of Chilled Water pipeline, Ducting, Structural Foundation and Sprinkler line.  Prepared reviewed and checking of planned and specifications.  Installation of Air Handling Units (AHU) and Fan Coil Units (FCU).  Take-off and Hook-off both structural and mechanical drawing.  Responsible in encoding the production and daily activities reports.  Performed other related tasks or responsibilities as may be assigned by superintendent.  Directly reporting to the mechanical superintendent. January 24, 01-Dec. 15, 01 Innodata Mandaue Inc. Mandaue City Quality Assurance  Gathered all documents for daily audit schedule.  Responsible in auditing the quality of the documents and finding the natural errors of the texts from final process.  Sees to it that all audited documents must get the batting average of 99.9% were secured for endorsement to client.  Performed other responsibilities in a quality assurance department that may be assigned by team manager of Q.A. Department. COMPLETION: DOLE Regional Office No. IX – ZAMPEN OSHNET INC. Zamboanga City February 28, 2011 – March 04, 2011  Basic Occupational Safety and Health Training Course Oilwell Drilling Technology Development Center Inc. Mandaue City, Cebu November 08, 2010 – December 04, 2010  Basic Training Program for Drilling Personnel  Introduction to Basic Oilwell Drilling Technology  IADC Rigpass Orientation and Basic Safety Awareness (Including Slinger and Bankman Safety Measure)  IADC Rig Pass ID  Orientation on the Prevention of Marine Pollution by Oil pursuant to MARPOL  Introduction to Hydrogen Sulfide (H2S) / SCBA  First Aid at Oil and Gas Drilling Rig  Official Transcript of Records Technical Education and Skills Development Authority (TESDA) Lahug, Cebu December 27, 2010  CAV (R-VII) No. 00061 - Certificate of Trainings / Diploma and Transcript of Records ABESAMIS Construction and Drilling Corporation Mandaue City, Cebu November 22, 2010 – December 21, 2010  On – The – Job Training functions of ROUSTABOUT National Maritime Polytechnic (NMP) Tacloban City, Leyte January 10 - 21, 2011  Basic Safety Training (BST)  Gender Sensitivity Training for Seafarers (GSTS)  Prevention of Alcohol and Drug Abuse in the Maritime Sector (PADAMS)  STD/HIV/AIDS Prevention in the Maritime Sector (SHAPIMS) CADVISION Engineering Technologies Recto, Manila July 07 - 17, 2005 5 | P a g e
  • 6.  AutoCAD 2002 INTERFACE Computer College Recto, Manila September 15 - 30, 2003  Computer Aided Design and Drafting (CADD) LIT – Information Technology Training and Development Center Tacloban City, Leyte November 22, 1999 – December 15, 1999  Computer Literacy Training for Office Executives and Supervisors EDUCATION: 1995-2000 Leyte Institute of Technology (Now EVSU) Tacloban City  B.S. Mechanical Engineering Graduated October, 2000 Professional Regulation Commission (PRC) Cebu City  Mechanical Engineer Licensure License No. 0058270 INFORMATION: Date of Birth : January 28, 1978 Age : 37 Place of Birth : Matag-ob, Leyte Height : 5’4” (163 cm) Nationality : Filipino Weight : 176 lbs (80 kgs) Marital Status : Married SSS Number : 06-1891434-2 Provincial Add. : Kinawa, Sto. Rosario TIN Number : 275554000 Matag-ob, Leyte PhilHealth No. : 13-200755467-6 SRC Number : TC03629-11 LICENSES: DATE ISSUED DATE EXPIRE Phil. License Name & No. PRC Licensure : 0058270 January 10, 2001 January 28, 2015 Seaman's Book No. B0950488 January 25, 2011 January 24, 2016 Passport No. EC2878374 December 01, 2014 November 30, 2019 NBI Clearance G625AG2Y87-MA5291095 November 10, 2015 November 10, 2016 Driver’s License H10-09-000408 January 28, 2015 SKILLS: Consulting, Designing (Technical Drawing AutoCAD 2D & 3D Modeling), Microsoft Word and Excel Application, HVAC Load Calculations (Elite, HAP, and McQuay program), Material and Manpower Cost Estimation, Repair and Trouble Shooting. SEMINAR ATTENDED:  Technical Seminar on Vario Flow Chain Conveyor System Muntinlupa City (Bosch Rexroth Yearly Product Updates)  FESTO Pneumatics Seminar (New Products and Displays) Quezon City  Energy Savings in Pneumatic System, SMC Pasig City  ISO 9001 / Statistical Process Control Plan Caloocan City 6 | P a g e
  • 7.  Fall Protection and Ladder Safety Mandaluyong City  PSME Technical Seminars Tacloban City  JPSME Technical Seminars Tacloban City  Seminar-Workshop on Research Proposal Writing ll Tacloban City 7 | P a g e