2. SCOPE STATEMENT
I would like to build your garage at your standards.
That will include being built in a timely manner. Your
recommendations will be taken serious. We will try to
accommodate your request of changes to the best of
our ability, without changing the time line. We will
base the cost of the project to be set at around 12,000
dollars and take about 3 months to build giving the
weather is good .
3. Building a Garage step by step
PLANNING
Planning
1. Area
• look for flooding
• sloping of the land
• surveyed
2.Get permits
3.Order material
4.Hire workers
5.Get tools
Development
6.Layout the area with chalk
7.Dig holes (10)
Execution
8.Set poles with concrete
• Smooth put area
• Frame up the footer
• Lay wire mess
• Deliver concert
• Poor concrete
9. Put up trusses
• deliver trusses
• hang trusses
• lay plywood
• lay sheath
• lay felt
• put shingles on
10. Frame up the side
11. Put ply wood on outside walls
Final
12. Install window
13. Install electric
14. Install garage door and man door
5. COMMUNICATION PLAN
Communication Method Meduim Facilitator Participants Purpose Frequency
Weekly status report E-mail Project manager RB and BT
to update the status of
all activities,reports on
those activities
expected to be
accomplished in the
next week
Weekly
Project Meeting
Conference call
/face to face
Project manager
PM/RB
Supervisor/ET
to initiate the
eprojectand the
progress and
resolve any issues
Daily
Notification/Communication
s
E-mail Anyone Anyone
To maintain the
progress of the
implemention and
coordinate project
issues
As Required
End of day Meeting
Face to
Face/Phone call
Project manager Supervisor/ET
to discusse the
issues of the day
and where to start
tomorrow
Daily
6. RESOURCES
Unit of Cost
(hour,day,week
, month Fixed)
Level of
Risk High,
Medium,
or Low
Resource
skill level
or Material
Quality
Associated Tasks
Duration
Required
Available
Time
Required
Cost
HOURS
MIKE 15 yrs.
SUPERVISOR/WORKE
R 2 month 52.00 $20.00
$1,040.00 LOW
DAN 10yrs LEAD MAN 2 month 50.75 $18.00 $913.50 LOW
JOE 1yr LABOR 2 month 50.75 $15.00 $761.25 MEDIUM
JIM 1yr LABOR 2 month 50.75 $15.00 $761.25 MEDIUM
DOUG 1yr LABOR 2 month 50.75 $15.00 $761.25 MEDIUM
Total Labor 255.00 $83.00 $4,237.25
HOMDEPOT 30 yrs. Materials 1 Day $3,892.00 MEDIUM
Grays
Electrical 10 yrs.
Installation
1 Day 8 $55.00 $440.00
MEDIUM
Garage
Doors/Windo
w's R US
15 yrs. Installation 1 Day 8 $1,369.00 MEDIUM
twin city
concret Delivery/Materials 1 Day 2
$1,050.00
MEDIUM
stark trusses Delivery/Materials 1 Day 1 $300.00
MEDIUM
Total $11,288.25
7. RISK ANALYSIS
Risk Analysis
1 funding
2 weather
3 labor
4 on time delivery
likely hood
low med high
effect
low
med 3
high 1 4 2
I am excepting the risk.the highest one is the
weather so I will keep my eye on the weather and
purchase a tarp just in case.
8. WBS PHASE 1
FLOORING PHASE 1
WIRE MESS 6X6 W1.4XW1.4 576.00 sf $10.30 $206.00 576/SF7.25/42*84
POST 4X4 8’ 2.00 ea. $7.77 $15.54
POST 4X4 8’ 2.00 ea. $7.77 $15.54 2/EA7.77
POST 4X4 4’ 1.00 ea. $7.77 $7.77 1/EA7.77
POST 4X4 9’ 1.00 ea. $12.70 $12.70 1/EA12.70
POST 4X4 11’ 1.00 ea. $14.20 $14.20 1/EA
CONCRETE (FOOTING) 12”X6” 1.78 cy $90.00 $160.20
CONCRETE (STEM) 6”X 20” 2.96 cy $90.00 $266.40
CONC. FTING(DOORWAY SLAB)(1) 48”X48”X4” DP 0.20 cy $90.00 $18.00
2*4 2*4 12' 100.00 ft $0.89 $89.00
CONC. FTING (RIDGE SUPPORT)(1) 26”X 26” X 12” DP 0.17 cy $75.00 $12.75
CONC. FTING (GARAGE DOOR)(2) 20”X20”X10” DP 0.17 cy $75.00 $12.75
CONCRETE (FLOOR) 4” 7.11 cy $75.00 $533.25
TOTAL MATERIAL $1,364.10 TOTAL
TOTAL LABOR HOUR 5.00 DAYS 16.00 2DAYS $83.00 $1,577.00 $2,941.10
9. WBS PHASE 2
ITEM: SIZE: LENGTH: NEEDED DESCRIPT PRICE TOTAL
ROOF PHASE 2
H2.5 RAFTER TIE 16’ 38.00 ea. $0.84 $31.92
ROOF SHEATH 1/2” CDX 956.00 sf $0.11 $154.00 700sf roll
ROOF FELT 30# FELT 956.00 sf $0.11 $118.80 216 sf roll
2*4 2*4 12' 50.00 ft $0.89 $44.50
ROOFING shingles 956.00 sf $10.26 $307.80 956/SF/27.0 21/bundle 3bundle per 100sf
BARGE RAFTERS 2X6 19’ 4.00 ea. $6.97 $27.88
HEADER (INT MAIN DOOR) 4X8 1.00 ea. $45.00 $45.00
HEADER (MAIN WINDOW) 4X10 7’ 1.00 ea. $55.00 $55.00
TRUSSES 38.00 ea. $4.50 $171.00
TOTAL MATERIALS $955.90 TOTAL
TOTAL LABOR HOUR 5.00 DAYS 14.00 HRS $83.00 $1,162.00 $2,117.90
10. WBS PHASE 3 &4
ITEM: SIZE: LENGTH: NEEDED DESCRIPT PRICE TOTAL PHASE 3
FRAMING PHASE3
EXT WALL SHEATH ½” CDX 981.00 sf $0.11 $154.00 981/SF.11/700sf
EXT WALL VAPOR 15# FELT 981.00 sf $0.12 $155.52 981/SF15.15 432sf
MAIN EXT STUDS 2X6 95.13 57.00 ea. $2.49 $141.93
UPPER INT PLATES 2X4 144.00 lf $0.15 $21.60
Cement 60lb 10.00 bg $3.99 $39.90
UPPER INT WALL STUDS 2X4 5’ 37.00 EA $4.05 $149.85
PLYWOOD 4*8 150.00 EA $1.25 $187.50
HEADER(MAIN GAR DOOR) 5-1/8X15 GLB 17’ 1.00 EA $54.56 $54.56
2*4 2*4 12' 75.00 ft $0.89 $66.75
JOISTS 16 TJI 360 24’ 19.00 ea. $3.00 $57.00
RIM JOIST 96.00 lf $0.86 $82.56 96/LF19.0
TOTAL MATERIALS $1,111.17 TOTAL
TOTAL LABOR HOUR 5.00 DAYS 19.00 HR $83.00 $1,577.00 $2,688.17
ELECTRICIAN PHASE 4
install electricity and run power 8.00 hr. $55.00 $440.00
install electricity out lets TOTAL
TOTAL LABOR HOUR 8.00 hr. $55.00 $440.00 440.00
11. WBS 4.5
INSTALLATION/WORKERS
Installation PHASE 4.5
Garage door installation $1,030.00
window installation $495.00 TOTAL
Man door $590.00 $2,115.00
WORKERS RATE/HR T/H T/C
SPONSER BT
PM RB
SUPERVISOR/WORKER MIKE $20.00 52.00 $1,040.00
LEAD MAN DAN $18.00 50.75 $913.50
LABOR JOE $15.00 50.75 $761.25
LABOR JIM $15.00 50.75 $761.25
LABOR DOUG $15.00 50.75 $761.25
TOTAL $83.00 255.00 $4,237.25
12. COSTS BREAKDOWN CHART
Task Laborcost Cost of materials Totalprice Share of cost (%)
Roof(asphaltshingles) $1,162.00 $955.90 $2,117.90 19%
Framing $1,577.00 $1,111.17 $2,688.17 24%
Electricity $440.00 $440.00 4%
Delivery $525.00 5%
Other $461.44 $461.44 4%
TOTAL $6,871.00 $3,892.61 $11,288.61 100%
Garage constructioncosts breakdownchart1
Concrete and foundation $1,577.00 $1,364.10 $2,941.10 26%
Garage door (1) window(1)
ManDoor (1)
$2,115.00 $2,115.00 19%