SlideShare a Scribd company logo
1 of 23
OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
BIDDING DOCUMENTS
•Bidding Requirements
•Contract Forms
•Contract Conditions
•Specifications
•Drawings
OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
CONTRACT DOCUMENTS
•Contract Forms
•Contract Conditions
•Specifications
•Drawings
OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
PROJECT MANUAL
•Bidding Requirements
•Contract Forms
•Contract Conditions
•Specifications
OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
•Bidding Requirements
• invitation
• instruction
• information
• bid form
• bid bond
OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
•Contract Forms
• agreement
• performance
bond
• payment bond
• certificates
OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
•Contract Conditions
• general
• supplementary
DOCUMENTS
OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
•Specifications
• general
• siteworks
• concrete
• masonry
• metals
• wood and plastics
• thermal&moisture
protection
• doors&windows
• finishes
• specialties
• equipment
• furnishings
• special construction
• conveying systems
• mechanical
• electrical
DOCUMENTS
OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
BIDDING DOCUMENTS
•Bidding Requirements
•Contract Forms
•Contract Conditions
•Specifications
•Drawings
• architectural
• structural
• sanitary
• mechanical
• electrical
CONTRACT DOCUMENTS
 Contract Forms
- agreement
- performance bond
- payment bond
- certificates
 Contract Conditions
- general
- supplementary
 Specifications
 Drawings
AGREEMENTS
OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
 Contracting Parties
 Scope of Work
 Architect’s Services
 Architect’s Fee and Manner of Payment
 Owner’s Responsibilities
 Expenses Chargeable to both parties
 Project Supervision
 Estimates
 Ownership of Documents
 Successors and Assigns
 Arbitration
 Acknowledgement and Jurat
BASIC PROVISIONS
PLANS
OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
• architectural
- Perspective
- Location Plan
- Vicinity Map
- Floor Plans
- Elevations
- Sections
• structural
- Foundation Plan
- Footing Details
- Beam & Column Details
- Floor Slab Details
- Floor Framing & Details
- Roof Framing & Details
• sanitary
- Water Distribution System
- Drainage System
- Liquid and Solid Waste
• mechanical
- air-conditioning system
- movement systems
• electrical
- lighting system
- power distribution system
OWNER-GENERAL CONTRACTOR AGREEMENT
UAP DOCUMENT NO.402
The Parties
Art.1. Scope of Work
Art.2. Time of Completion and liquidated damages
Art.3. The Contract Amount
Art.4. Payments
Art.5. The Contract Documents
Art.6. Performance and Payment Bonds
Art.7. Taxes, Licenses, Permits and Fees
Art.8. Insurance and other Conditions
SPECIFICATIONS
PRACTICAL SPECIFICATIONS WRITING
UAP DOCUMENT NO.307
a written document that provides
information required for proper
construction or material and equipment
procurement, which cannot be placed in
the drawings
• purpose&importance
of specifications
• architect as
specification writer
• qualifications of a
specifications writer
• types of specs
• 16-division uniform
construction index
• 3-part format
• elements of specs.
composition
• spec. language
• step by step
specification writing
SPECIFICATIONS
PRACTICAL SPECIFICATIONS WRITING
UAP DOCUMENT NO.307
• scope of work
• materials to be used
• method of installation
• quality of workmanship
•purpose&importance
of specifications
• architect as
specification writer
• qualifications of a
specifications writer
• types of specs
• 16-division uniform
construction index
• 3-part format
• elements of specs.
composition
• spec. language
• step by step
specification writing
SPECIFICATIONS
PRACTICAL SPECIFICATIONS WRITING
UAP DOCUMENT NO.307
The 16-division uniform construction index:
1- General Requirements
2- Sitework
3- Concrete
4- Masonry
5- Metals
6- Wood and Plastics
7- Thermal and Moisture Protection
8- Doors and Windows
9- Finishes
10- Specialties
11- Equipment
12- Furnishings
13- Special Construction
14- Conveying Systems
15- Mechanical
16- Electrical
SPECIFICATIONS
PRACTICAL SPECIFICATIONS WRITING
UAP DOCUMENT NO.307
the three-part section format:
part 1: general
-scope
-description of systems
-reqts of regulatory agencies
-qualifications
-submittals
-mock-up
-product handling
-environmental conditions
-protection
-operating instructions
-extra stock
-alternates
-measurement and payment
part 2: product
-materials
-mixes
-equipment
-fabrication
-source quality control
part 3: execution
-condition of surfaces
-preparation
-installation
-field quality control
-adjusting
-patching
-cleaning
-schedules
SPECIFICATIONS
PRACTICAL SPECIFICATIONS WRITING
UAP DOCUMENT NO.307
types of specifications:
• performance specifications
• descriptive specifications
• brand name specifications
- closed
- open
• reference specifications
• combination
scheduling techniques
• bar chart
• s-curve
• linked bar chart
• line balance
• critical path method
importance of time management
• contract stipulations
• labor paid by hour/day
• equipment rental by hour/day
• liquidated damages
PROJECT SCHEDULE
pert-cpm
• activity
• network
• duration
• event
• dummy activity
• critical path
• float/slack
• early start
• late start
• late finish
A B
I
E
C
D
F
J
K
H
J
2 2 4 6 3
.5
3
3
2
.5 1
G
1
I
1
bar-chart
COST OF TOTAL COST
DESIGN & WITH LABOR MONTH 0 MONTH 1 MONTH 2 MONTH 3 MONTH 4 MONTH 5 MONTH 6
MATERIALS & ADD-ONS
DESIGN PREPARATION 1,000,000 1,000,000 1,000,000
PRE-CONSTRUCTION 332,000 332,000 332,000
SITEWORKS 100,000 168,231 168,231
UTILITIES 222,800 374,820 374,820
CONCRETE 1,012,494 1,703,333 1,277,500 425,833
MASONRY 488,640 822,046 822,046
METALS 3,831,600 6,445,955 2,148,652 2,148,652 2,148,652
WOOD AND PLASTIC 252,500 424,784 212,392 212,392
THERMAL AND MOISTURE PROTECTION 3,261,800 5,487,373 1,829,124 1,829,124 1,829,124
DOORS AND WINDOWS 696,000 1,170,891 390,297 780,594
FINISHES 5,375,954 9,044,044 2,214,681 3,414,681 3,414,681
SPECIALTIES 239,790 403,402 403,402
EQUIPMENT 87,000 146,361 146,361
FURNISHINGS 287,410 483,514 483,514
MECHANICAL AND ELECTRICAL 1,430,411 2,406,401 601,600 1,203,200 601,600
18,618,399
11,794,756
PROJECTED MONTHLY ACCOMPLISHMENT 30,413,155 30,413,155 1,332,000 2,466,312 5,202,420 5,359,970 6,192,457 5,647,208 4,212,788
PROJECTED CUMULATIVE ACCOMPLISHMENT 1,332,000 3,798,312 9,000,732 14,360,702 20,553,159 26,200,367 30,413,155
% ACCOMPLISHMENT 4.38% 12.49% 29.59% 47.22% 67.58% 86.15% 100.00%
17,286,399 29,081,155
ITEMS
s-curve
S-CURVE
0
20
40
60
80
100
120
MONTH
%
ACCOMPLISHMENT
Series1
Series1 4.38 12.49 29.59 47.22 67.58 86.15 100
1 2 3 4 5 6 7
line balance

More Related Content

What's hot

What's hot (20)

Tenders for construction
Tenders for constructionTenders for construction
Tenders for construction
 
EPC and other types of contracts
EPC and other types of contractsEPC and other types of contracts
EPC and other types of contracts
 
Unit-2_Tender
Unit-2_TenderUnit-2_Tender
Unit-2_Tender
 
Tenders and procedure of tendering
Tenders and procedure of tenderingTenders and procedure of tendering
Tenders and procedure of tendering
 
The pathway to documenting successful contract claims..
The pathway to documenting successful contract claims..The pathway to documenting successful contract claims..
The pathway to documenting successful contract claims..
 
Construction material management_Construction Management (2180611) (Semester-...
Construction material management_Construction Management (2180611) (Semester-...Construction material management_Construction Management (2180611) (Semester-...
Construction material management_Construction Management (2180611) (Semester-...
 
Tender evaluation procedure
Tender evaluation procedureTender evaluation procedure
Tender evaluation procedure
 
Composite slab
Composite slabComposite slab
Composite slab
 
RIBA plan of work
RIBA plan of workRIBA plan of work
RIBA plan of work
 
DEFECTS LIABILITY AND TAKING OVER CLAUSES
DEFECTS LIABILITY AND TAKING OVER CLAUSESDEFECTS LIABILITY AND TAKING OVER CLAUSES
DEFECTS LIABILITY AND TAKING OVER CLAUSES
 
Detailed specifications
Detailed specificationsDetailed specifications
Detailed specifications
 
Variations in works contracts
Variations in works contractsVariations in works contracts
Variations in works contracts
 
Bills of quantities
Bills of quantitiesBills of quantities
Bills of quantities
 
01_Introduction_to_Estimation.pdf
01_Introduction_to_Estimation.pdf01_Introduction_to_Estimation.pdf
01_Introduction_to_Estimation.pdf
 
Construction contract
Construction contract Construction contract
Construction contract
 
Fundamentals of Construction Contracts - English, ver. 2021
Fundamentals of Construction Contracts - English, ver. 2021Fundamentals of Construction Contracts - English, ver. 2021
Fundamentals of Construction Contracts - English, ver. 2021
 
Types of tenders & stages for successful tendering
Types of tenders & stages for successful tenderingTypes of tenders & stages for successful tendering
Types of tenders & stages for successful tendering
 
Epc contracts.
Epc contracts.Epc contracts.
Epc contracts.
 
TENDER DOCUMENT
TENDER DOCUMENTTENDER DOCUMENT
TENDER DOCUMENT
 
Construction Contracts: Basics of Contracts and Contract Administration
Construction Contracts:  Basics of Contracts and Contract AdministrationConstruction Contracts:  Basics of Contracts and Contract Administration
Construction Contracts: Basics of Contracts and Contract Administration
 

Similar to ContractDocsHandouts.ppt

Mauli Engineering Services Presentation
Mauli Engineering Services PresentationMauli Engineering Services Presentation
Mauli Engineering Services Presentation
Mauli Engineering
 
Company Presentation-R4
Company Presentation-R4Company Presentation-R4
Company Presentation-R4
Naitik Desai
 
Construction Documents
Construction DocumentsConstruction Documents
Construction Documents
Allan Berry
 
Praneshkumar QC Supervisor
Praneshkumar QC SupervisorPraneshkumar QC Supervisor
Praneshkumar QC Supervisor
Pranesh Kumar
 
Renovate Repair Legal Issues Owner View
Renovate Repair Legal Issues Owner ViewRenovate Repair Legal Issues Owner View
Renovate Repair Legal Issues Owner View
Construction Cicerone
 

Similar to ContractDocsHandouts.ppt (20)

Mauli Engineering Services Presentation
Mauli Engineering Services PresentationMauli Engineering Services Presentation
Mauli Engineering Services Presentation
 
Company Presentation-R4
Company Presentation-R4Company Presentation-R4
Company Presentation-R4
 
Specification writing
Specification writingSpecification writing
Specification writing
 
Project Management
Project ManagementProject Management
Project Management
 
Curriculum Vitae Of Khalid
Curriculum Vitae Of KhalidCurriculum Vitae Of Khalid
Curriculum Vitae Of Khalid
 
ANAND CV
ANAND CVANAND CV
ANAND CV
 
Construction Documents
Construction DocumentsConstruction Documents
Construction Documents
 
Resume
ResumeResume
Resume
 
Praneshkumar QC Supervisor
Praneshkumar QC SupervisorPraneshkumar QC Supervisor
Praneshkumar QC Supervisor
 
BGAS_RESUME_2-2
BGAS_RESUME_2-2BGAS_RESUME_2-2
BGAS_RESUME_2-2
 
Ici & itd pj1
Ici & itd pj1Ici & itd pj1
Ici & itd pj1
 
Documentation
Documentation Documentation
Documentation
 
Model Format for Building Services Specifications
Model Format for Building Services SpecificationsModel Format for Building Services Specifications
Model Format for Building Services Specifications
 
Renovate Repair Legal Issues Owner View
Renovate Repair Legal Issues Owner ViewRenovate Repair Legal Issues Owner View
Renovate Repair Legal Issues Owner View
 
R.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.docR.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.doc
 
Session 25 - Documentation
Session 25 - DocumentationSession 25 - Documentation
Session 25 - Documentation
 
Specification- Contracts, Accounts and Tenders.pptx
Specification- Contracts, Accounts and Tenders.pptxSpecification- Contracts, Accounts and Tenders.pptx
Specification- Contracts, Accounts and Tenders.pptx
 
Procurement of bulk materials handling machines
Procurement of bulk materials handling machinesProcurement of bulk materials handling machines
Procurement of bulk materials handling machines
 
Documentation
DocumentationDocumentation
Documentation
 
CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
 

Recently uploaded

SPLICE Working Group: Reusable Code Examples
SPLICE Working Group:Reusable Code ExamplesSPLICE Working Group:Reusable Code Examples
SPLICE Working Group: Reusable Code Examples
Peter Brusilovsky
 
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
中 央社
 

Recently uploaded (20)

TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
 
MOOD STABLIZERS DRUGS.pptx
MOOD     STABLIZERS           DRUGS.pptxMOOD     STABLIZERS           DRUGS.pptx
MOOD STABLIZERS DRUGS.pptx
 
Spring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community PartnershipsSpring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community Partnerships
 
SPLICE Working Group: Reusable Code Examples
SPLICE Working Group:Reusable Code ExamplesSPLICE Working Group:Reusable Code Examples
SPLICE Working Group: Reusable Code Examples
 
OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...
 
male presentation...pdf.................
male presentation...pdf.................male presentation...pdf.................
male presentation...pdf.................
 
VAMOS CUIDAR DO NOSSO PLANETA! .
VAMOS CUIDAR DO NOSSO PLANETA!                    .VAMOS CUIDAR DO NOSSO PLANETA!                    .
VAMOS CUIDAR DO NOSSO PLANETA! .
 
Book Review of Run For Your Life Powerpoint
Book Review of Run For Your Life PowerpointBook Review of Run For Your Life Powerpoint
Book Review of Run For Your Life Powerpoint
 
diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....
 
Graduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptxGraduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptx
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 
Observing-Correct-Grammar-in-Making-Definitions.pptx
Observing-Correct-Grammar-in-Making-Definitions.pptxObserving-Correct-Grammar-in-Making-Definitions.pptx
Observing-Correct-Grammar-in-Making-Definitions.pptx
 
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
 
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjjStl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
 
Sternal Fractures & Dislocations - EMGuidewire Radiology Reading Room
Sternal Fractures & Dislocations - EMGuidewire Radiology Reading RoomSternal Fractures & Dislocations - EMGuidewire Radiology Reading Room
Sternal Fractures & Dislocations - EMGuidewire Radiology Reading Room
 
Supporting Newcomer Multilingual Learners
Supporting Newcomer  Multilingual LearnersSupporting Newcomer  Multilingual Learners
Supporting Newcomer Multilingual Learners
 
ANTI PARKISON DRUGS.pptx
ANTI         PARKISON          DRUGS.pptxANTI         PARKISON          DRUGS.pptx
ANTI PARKISON DRUGS.pptx
 
When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...
 
The Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDFThe Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDF
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
 

ContractDocsHandouts.ppt

  • 1. OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401 BIDDING DOCUMENTS •Bidding Requirements •Contract Forms •Contract Conditions •Specifications •Drawings
  • 2. OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401 CONTRACT DOCUMENTS •Contract Forms •Contract Conditions •Specifications •Drawings
  • 3. OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401 PROJECT MANUAL •Bidding Requirements •Contract Forms •Contract Conditions •Specifications
  • 4. OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401 •Bidding Requirements • invitation • instruction • information • bid form • bid bond
  • 5. OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401 •Contract Forms • agreement • performance bond • payment bond • certificates
  • 6. OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401 •Contract Conditions • general • supplementary
  • 7. DOCUMENTS OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401 •Specifications • general • siteworks • concrete • masonry • metals • wood and plastics • thermal&moisture protection • doors&windows • finishes • specialties • equipment • furnishings • special construction • conveying systems • mechanical • electrical
  • 8. DOCUMENTS OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401 BIDDING DOCUMENTS •Bidding Requirements •Contract Forms •Contract Conditions •Specifications •Drawings • architectural • structural • sanitary • mechanical • electrical
  • 9. CONTRACT DOCUMENTS  Contract Forms - agreement - performance bond - payment bond - certificates  Contract Conditions - general - supplementary  Specifications  Drawings
  • 10. AGREEMENTS OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401  Contracting Parties  Scope of Work  Architect’s Services  Architect’s Fee and Manner of Payment  Owner’s Responsibilities  Expenses Chargeable to both parties  Project Supervision  Estimates  Ownership of Documents  Successors and Assigns  Arbitration  Acknowledgement and Jurat BASIC PROVISIONS
  • 11. PLANS OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401 • architectural - Perspective - Location Plan - Vicinity Map - Floor Plans - Elevations - Sections • structural - Foundation Plan - Footing Details - Beam & Column Details - Floor Slab Details - Floor Framing & Details - Roof Framing & Details • sanitary - Water Distribution System - Drainage System - Liquid and Solid Waste • mechanical - air-conditioning system - movement systems • electrical - lighting system - power distribution system
  • 12. OWNER-GENERAL CONTRACTOR AGREEMENT UAP DOCUMENT NO.402 The Parties Art.1. Scope of Work Art.2. Time of Completion and liquidated damages Art.3. The Contract Amount Art.4. Payments Art.5. The Contract Documents Art.6. Performance and Payment Bonds Art.7. Taxes, Licenses, Permits and Fees Art.8. Insurance and other Conditions
  • 13. SPECIFICATIONS PRACTICAL SPECIFICATIONS WRITING UAP DOCUMENT NO.307 a written document that provides information required for proper construction or material and equipment procurement, which cannot be placed in the drawings • purpose&importance of specifications • architect as specification writer • qualifications of a specifications writer • types of specs • 16-division uniform construction index • 3-part format • elements of specs. composition • spec. language • step by step specification writing
  • 14. SPECIFICATIONS PRACTICAL SPECIFICATIONS WRITING UAP DOCUMENT NO.307 • scope of work • materials to be used • method of installation • quality of workmanship •purpose&importance of specifications • architect as specification writer • qualifications of a specifications writer • types of specs • 16-division uniform construction index • 3-part format • elements of specs. composition • spec. language • step by step specification writing
  • 15. SPECIFICATIONS PRACTICAL SPECIFICATIONS WRITING UAP DOCUMENT NO.307 The 16-division uniform construction index: 1- General Requirements 2- Sitework 3- Concrete 4- Masonry 5- Metals 6- Wood and Plastics 7- Thermal and Moisture Protection 8- Doors and Windows 9- Finishes 10- Specialties 11- Equipment 12- Furnishings 13- Special Construction 14- Conveying Systems 15- Mechanical 16- Electrical
  • 16. SPECIFICATIONS PRACTICAL SPECIFICATIONS WRITING UAP DOCUMENT NO.307 the three-part section format: part 1: general -scope -description of systems -reqts of regulatory agencies -qualifications -submittals -mock-up -product handling -environmental conditions -protection -operating instructions -extra stock -alternates -measurement and payment part 2: product -materials -mixes -equipment -fabrication -source quality control part 3: execution -condition of surfaces -preparation -installation -field quality control -adjusting -patching -cleaning -schedules
  • 17. SPECIFICATIONS PRACTICAL SPECIFICATIONS WRITING UAP DOCUMENT NO.307 types of specifications: • performance specifications • descriptive specifications • brand name specifications - closed - open • reference specifications • combination
  • 18. scheduling techniques • bar chart • s-curve • linked bar chart • line balance • critical path method
  • 19. importance of time management • contract stipulations • labor paid by hour/day • equipment rental by hour/day • liquidated damages
  • 20. PROJECT SCHEDULE pert-cpm • activity • network • duration • event • dummy activity • critical path • float/slack • early start • late start • late finish A B I E C D F J K H J 2 2 4 6 3 .5 3 3 2 .5 1 G 1 I 1
  • 21. bar-chart COST OF TOTAL COST DESIGN & WITH LABOR MONTH 0 MONTH 1 MONTH 2 MONTH 3 MONTH 4 MONTH 5 MONTH 6 MATERIALS & ADD-ONS DESIGN PREPARATION 1,000,000 1,000,000 1,000,000 PRE-CONSTRUCTION 332,000 332,000 332,000 SITEWORKS 100,000 168,231 168,231 UTILITIES 222,800 374,820 374,820 CONCRETE 1,012,494 1,703,333 1,277,500 425,833 MASONRY 488,640 822,046 822,046 METALS 3,831,600 6,445,955 2,148,652 2,148,652 2,148,652 WOOD AND PLASTIC 252,500 424,784 212,392 212,392 THERMAL AND MOISTURE PROTECTION 3,261,800 5,487,373 1,829,124 1,829,124 1,829,124 DOORS AND WINDOWS 696,000 1,170,891 390,297 780,594 FINISHES 5,375,954 9,044,044 2,214,681 3,414,681 3,414,681 SPECIALTIES 239,790 403,402 403,402 EQUIPMENT 87,000 146,361 146,361 FURNISHINGS 287,410 483,514 483,514 MECHANICAL AND ELECTRICAL 1,430,411 2,406,401 601,600 1,203,200 601,600 18,618,399 11,794,756 PROJECTED MONTHLY ACCOMPLISHMENT 30,413,155 30,413,155 1,332,000 2,466,312 5,202,420 5,359,970 6,192,457 5,647,208 4,212,788 PROJECTED CUMULATIVE ACCOMPLISHMENT 1,332,000 3,798,312 9,000,732 14,360,702 20,553,159 26,200,367 30,413,155 % ACCOMPLISHMENT 4.38% 12.49% 29.59% 47.22% 67.58% 86.15% 100.00% 17,286,399 29,081,155 ITEMS