SlideShare a Scribd company logo
1 of 3
Puneet Pal Singh
Mobile Phone – 08155050836
Email – puneetnarula3@gmail.com
Mechanical Engineer (Projects): L&T Technology Services.
OBJECTIVE
To excel and add new experiences, learning and mastering those experiences leading to
organizational and individual growth; also to take challenges of any type as an opportunity to boost the career by
putting 100% of myself
CAREER SUMMARY
• 3.5 years’ experience in Green field and brown field projects, Mechanical design, erection and
commissioning of various equipment’s and systems, proposing and implementation of various
improvement Capex’s, Process and utility design, supervision with allocated resource and inventories,
manufacturing production activities of plant to stabilize the plant, and various system development in
production and engineering.
PROJECT HANDLED
Project Name
Mondelez / Cadbury India Ltd. (India )
(Project - WIP)
Duration 26 months
Team Size 12
Description
Brown field expansion project of Chocolate plant- Coordination and Execution.
Role : Onsite Mechanical Engineer (Design, Installation and commissioning of complete
Manufacturing plant including Process lines and Utilities)
Project Name
Unilever- Tea Blending Core Design- SINGAPORE
(Project -WIP)
Duration 1 Months
Team Size 7
Description
Standard Design of Plant for Tea Blending and Packing
Role : Mechanical Engineer (Manufacturing, warehousing and utilities)
Project Name
PepsiCo (-USA )
(Project - WIP)
Duration 3 Months
Team Size 4
Description
Feasibility study for Juice line and Chewy Bar line
Role : Mechanical Engineer (Manufacturing, warehousing and packing)
Project Name Unilever- Tea Processing- Independence USA
Duration 3 Months
Team Size 7
Description
Standard Design of Plant for Tea Processing
Role : Mechanical Engineer (Piping, Material handling and packaging)
Project Name Adani Wilmar Limited Vidisha and Bundi (India)
Duration 6 months
Team Size 8
Description
Brown field project of Soya Bean seed processing for oil extraction - Design and coordination.
Role : Mechanical Engineer (Preparatory, DE hulling, Extraction and Meal)
WORK EXPERIENCE
Larsen and Toubro Ltd
Mechanical Engineer Projects: - July 2011- Till Date
• Coordinate with cross functional teams & development of engineering specification for various equipment’s,
equipment capacity and equipment performance requirements.
• Understanding P&IDs and process deliverables, Preparation of bid packages, tenders and cost estimation
• Selection, Design and engineering of process, packing and utility packages.
• Master plan and Layout finalization/optimization
• Feasibility study, Concept designing, Scheme designing and detailed engineering for various green field and
brown field projects.
• Responsible for FAT (Factory acceptance test) on vendor’s site and SAT (Site Acceptance test) on site for Static
and rotating equipment.
• Erection and commissioning of 10 TPH coal/husk fired boiler with all piping and testing like Radiography,
Stress relieving etc.
• Installation and Commissioning of all the Process equipment (both static & rotary) of PERK chocolate line &
kitchen.
• Responsible for Installation and Commissioning of all the Process equipment of 5 Star chocolate line &
kitchen.
• Installation and Commissioning of Packaging lines.
• Coordination and support for Installation and start-up of CIP stations.
• Design, techno-commercial analysis, specification finalisation, FAT, Installation and Commissioning of 150
kg/hr Incinerator.
• Installation and Commissioning of IBR steam line for complete new plant. Input for steam line routing &
review of steam isometric drawing for IBR approval, basic calculations for expansion loops, supports, valve
selection, final BOQ, vendor selection for IBR approved fabricator of the steam line..
• Responsible for Installation and Commissioning of PRS skids & CRS skid & piping. Prepared RFQ & Techno-
commercial bid analysis for PRS skids, CRS skids (overall condensate recovery scheme) and calculation of
condensate load & selection of traps for various areas.
• Design, specification finalisation, Techno-commercial bid analysis for De-humidifier for Powder storage &
conveying area for Chocolate Plant.
• Basic calculation for requirement and technical data preparation for alternate fluid against conventional fluids
for -35°C chiller in order to reduce pump size, reduce toxic quantity, increase efficiency of chiller.
• Responsible for Installation of DG sets (2 nos.) along with their canopies & chimneys.
• Preparing PFD, RFQ & TBA for PHE skid for enhancing life of water cooled air compressors.
• Preparation of water balance, calculations for tanks & de-bottlenecking of existing water system and input in
form of basic scheme/PFD for raw water treatment, water supply and integration with old plant, water
disposal, Effluent treatment (ETP), tertiary treatment for cooling towers.
• Responsible for preparation of specification finalisation & Techno-commercial bid analysis for Water storage
tanks.
• Basic comparison documents for water tanks (5 nos.- 100 kl each) & installation of same (Zn-Al sheet with
rubber bladder).
Achievements:
∗ Awarded “Certificate of Excellence Award” for completion of IBR jobs in the project along with coordination
with government regulatory.
∗ Active team member for complete brownfield Project (Cadbury India Ltd., Malanpur) from Project initiation to
Completion.
∗ Successful & On-time Installation, commissioning and trials along with all IBR approvals and final Handover of
10 TPH Boiler.
∗ Successful & On-time Installation, commissioning and trials and final Handover of Perk and 5-Star Process and
Packaging lines.
EDUCATION
∗ Bachelor of Engineering- Mechanical, UCOE, Punjabi University, Patiala, 2011, 74.80%
∗ HSC-DK Senior Secondary School, 2011, 76.80%
∗ SSC- Panjab Senior Secondary School, 2005, 78.4%
∗ 1 year Certificate course in French, Punjabi University, Patiala, 2010, 70%
ADDITIONAL INFORMATION
∗ 1 month training on Mechanical Engineering in CTTC Bhubaneswar.
∗ 1 month training on Plant Engineering (All fields including chemical, Electrical, mechanical and
instrumentation) in BATU, Raigad..
∗ 6 weeks training at DMW (Diesel –Loco Modernization Works) Patiala.
∗ 6 months training at Ashok Leyland Alwar unit.
EXTRA CURRICULAR ACTIVITIES & ACHIEVEMENTS
∗ Represented PCA at Inter-state level Cricket competition for 2 successive years.
∗ Coordinator for Reception and invitation committee for all cultural and technical fests during engineering.
SKILLS
∗ Self-motivated.
∗ Strong planning and organisation ability
∗ Drive, initiative and commitment
∗ Team player with excellent leadership skill
∗ Learning ability and driven by challenge
∗ Excellent listening, communication and
∗ Interpersonal skills
PERSONAL DETAILS
Date of Birth: 21st September 1990
Marital Status: Unmarried.
Languages: English, Hindi, Punjabi and French

More Related Content

What's hot

Hussam Maghrabi curriculum vitae1
Hussam Maghrabi curriculum vitae1Hussam Maghrabi curriculum vitae1
Hussam Maghrabi curriculum vitae1
Hussam maghrabi
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years Exp
SURENDRA BABU
 
JAS Professional Resume092016internal
JAS Professional Resume092016internalJAS Professional Resume092016internal
JAS Professional Resume092016internal
Jeff Sperlbaum
 
amir akhtar cv engineer - Copy
amir akhtar cv engineer - Copyamir akhtar cv engineer - Copy
amir akhtar cv engineer - Copy
amir akhtar
 
CV_S.Athan_2017_01
CV_S.Athan_2017_01CV_S.Athan_2017_01
CV_S.Athan_2017_01
Steve Athan
 
Deepak_CV_2016.doc1
Deepak_CV_2016.doc1Deepak_CV_2016.doc1
Deepak_CV_2016.doc1
DEEPAK REGMI
 
Motiur Rahman_Mechanical_Prjct_Engg_resume,_Resume
Motiur Rahman_Mechanical_Prjct_Engg_resume,_ResumeMotiur Rahman_Mechanical_Prjct_Engg_resume,_Resume
Motiur Rahman_Mechanical_Prjct_Engg_resume,_Resume
rehman1991
 

What's hot (20)

Hussam Maghrabi curriculum vitae1
Hussam Maghrabi curriculum vitae1Hussam Maghrabi curriculum vitae1
Hussam Maghrabi curriculum vitae1
 
Maintenance Engineer
Maintenance EngineerMaintenance Engineer
Maintenance Engineer
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years Exp
 
Resume - Anirvan
Resume - AnirvanResume - Anirvan
Resume - Anirvan
 
Resume Suresh Patel
Resume Suresh PatelResume Suresh Patel
Resume Suresh Patel
 
JAS Professional Resume092016internal
JAS Professional Resume092016internalJAS Professional Resume092016internal
JAS Professional Resume092016internal
 
SUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CVSUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CV
 
CV-Balamurugan.
CV-Balamurugan.CV-Balamurugan.
CV-Balamurugan.
 
amir akhtar cv engineer - Copy
amir akhtar cv engineer - Copyamir akhtar cv engineer - Copy
amir akhtar cv engineer - Copy
 
nazeemres
nazeemresnazeemres
nazeemres
 
Jestin - Resume
Jestin - ResumeJestin - Resume
Jestin - Resume
 
CV_S.Athan_2017_01
CV_S.Athan_2017_01CV_S.Athan_2017_01
CV_S.Athan_2017_01
 
Nitin kr jain
Nitin kr jainNitin kr jain
Nitin kr jain
 
afzal c.v
afzal c.vafzal c.v
afzal c.v
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
THARANG A KUTTY
THARANG A KUTTYTHARANG A KUTTY
THARANG A KUTTY
 
Deepak_CV_2016.doc1
Deepak_CV_2016.doc1Deepak_CV_2016.doc1
Deepak_CV_2016.doc1
 
Motiur Rahman_Mechanical_Prjct_Engg_resume,_Resume
Motiur Rahman_Mechanical_Prjct_Engg_resume,_ResumeMotiur Rahman_Mechanical_Prjct_Engg_resume,_Resume
Motiur Rahman_Mechanical_Prjct_Engg_resume,_Resume
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 
Resume R
Resume RResume R
Resume R
 

Viewers also liked

Russia GRI 2015 Advance Brochure
Russia GRI 2015 Advance BrochureRussia GRI 2015 Advance Brochure
Russia GRI 2015 Advance Brochure
Andreas Schonning
 
West Africa GRI 2016 Advance Brochure
West Africa GRI 2016 Advance BrochureWest Africa GRI 2016 Advance Brochure
West Africa GRI 2016 Advance Brochure
Andreas Schonning
 

Viewers also liked (11)

LA TERCER LEY
LA TERCER LEYLA TERCER LEY
LA TERCER LEY
 
East Africa GRI 2016 Advance Brochure
East Africa GRI 2016 Advance BrochureEast Africa GRI 2016 Advance Brochure
East Africa GRI 2016 Advance Brochure
 
India GRI 2015 Brochure
India GRI 2015 BrochureIndia GRI 2015 Brochure
India GRI 2015 Brochure
 
Russia GRI 2015 Advance Brochure
Russia GRI 2015 Advance BrochureRussia GRI 2015 Advance Brochure
Russia GRI 2015 Advance Brochure
 
West Africa GRI 2016 Advance Brochure
West Africa GRI 2016 Advance BrochureWest Africa GRI 2016 Advance Brochure
West Africa GRI 2016 Advance Brochure
 
Asia GRI 2015 Brochure
Asia GRI 2015  BrochureAsia GRI 2015  Brochure
Asia GRI 2015 Brochure
 
India GRI 2015 Advance Brochure
India GRI 2015 Advance BrochureIndia GRI 2015 Advance Brochure
India GRI 2015 Advance Brochure
 
Africa GRI 2015 Brochure
Africa GRI 2015 BrochureAfrica GRI 2015 Brochure
Africa GRI 2015 Brochure
 
British GRI 2016 - Programme
British GRI 2016 - ProgrammeBritish GRI 2016 - Programme
British GRI 2016 - Programme
 
Cooperative socity software
Cooperative socity software Cooperative socity software
Cooperative socity software
 
East Africa GRI 2016 Programme
East Africa GRI 2016 ProgrammeEast Africa GRI 2016 Programme
East Africa GRI 2016 Programme
 

Similar to Puneet_Singh

Similar to Puneet_Singh (20)

Curriculum Vitae BDP(rev)
Curriculum Vitae BDP(rev)Curriculum Vitae BDP(rev)
Curriculum Vitae BDP(rev)
 
Resume jaseem
Resume jaseemResume jaseem
Resume jaseem
 
Vijai CV
Vijai CVVijai CV
Vijai CV
 
Deepak Resume
Deepak ResumeDeepak Resume
Deepak Resume
 
vijay cv
vijay cvvijay cv
vijay cv
 
RENJITH CVpdf
RENJITH CVpdfRENJITH CVpdf
RENJITH CVpdf
 
kashif( 23-2-15)
kashif( 23-2-15)kashif( 23-2-15)
kashif( 23-2-15)
 
Sasikumar A
Sasikumar ASasikumar A
Sasikumar A
 
Process Design Engineer with 8.0 Years of experience in Oil & Gas and Refinery.
Process Design Engineer with 8.0 Years of experience in Oil & Gas and Refinery.Process Design Engineer with 8.0 Years of experience in Oil & Gas and Refinery.
Process Design Engineer with 8.0 Years of experience in Oil & Gas and Refinery.
 
Hariprasad K V R
Hariprasad K V RHariprasad K V R
Hariprasad K V R
 
Petroleum Engr.R.Murali_CV(1)
Petroleum Engr.R.Murali_CV(1)Petroleum Engr.R.Murali_CV(1)
Petroleum Engr.R.Murali_CV(1)
 
SOURAV LAHA
SOURAV LAHASOURAV LAHA
SOURAV LAHA
 
Ashutosh CV
Ashutosh CVAshutosh CV
Ashutosh CV
 
Mechanical Engineer
Mechanical EngineerMechanical Engineer
Mechanical Engineer
 
Thangamani CV -Sept 2016
Thangamani CV -Sept 2016Thangamani CV -Sept 2016
Thangamani CV -Sept 2016
 
updated CV
updated CVupdated CV
updated CV
 
Vinod Kumar__Process_Engineer-11+ years_Exp
Vinod Kumar__Process_Engineer-11+ years_ExpVinod Kumar__Process_Engineer-11+ years_Exp
Vinod Kumar__Process_Engineer-11+ years_Exp
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
RAJENDRA SHARMA CV
RAJENDRA SHARMA CVRAJENDRA SHARMA CV
RAJENDRA SHARMA CV
 
Bhushan Bhapkar-CV
Bhushan Bhapkar-CVBhushan Bhapkar-CV
Bhushan Bhapkar-CV
 

Puneet_Singh

  • 1. Puneet Pal Singh Mobile Phone – 08155050836 Email – puneetnarula3@gmail.com Mechanical Engineer (Projects): L&T Technology Services. OBJECTIVE To excel and add new experiences, learning and mastering those experiences leading to organizational and individual growth; also to take challenges of any type as an opportunity to boost the career by putting 100% of myself CAREER SUMMARY • 3.5 years’ experience in Green field and brown field projects, Mechanical design, erection and commissioning of various equipment’s and systems, proposing and implementation of various improvement Capex’s, Process and utility design, supervision with allocated resource and inventories, manufacturing production activities of plant to stabilize the plant, and various system development in production and engineering. PROJECT HANDLED Project Name Mondelez / Cadbury India Ltd. (India ) (Project - WIP) Duration 26 months Team Size 12 Description Brown field expansion project of Chocolate plant- Coordination and Execution. Role : Onsite Mechanical Engineer (Design, Installation and commissioning of complete Manufacturing plant including Process lines and Utilities) Project Name Unilever- Tea Blending Core Design- SINGAPORE (Project -WIP) Duration 1 Months Team Size 7 Description Standard Design of Plant for Tea Blending and Packing Role : Mechanical Engineer (Manufacturing, warehousing and utilities) Project Name PepsiCo (-USA ) (Project - WIP) Duration 3 Months Team Size 4 Description Feasibility study for Juice line and Chewy Bar line Role : Mechanical Engineer (Manufacturing, warehousing and packing) Project Name Unilever- Tea Processing- Independence USA Duration 3 Months Team Size 7 Description Standard Design of Plant for Tea Processing Role : Mechanical Engineer (Piping, Material handling and packaging) Project Name Adani Wilmar Limited Vidisha and Bundi (India) Duration 6 months Team Size 8 Description Brown field project of Soya Bean seed processing for oil extraction - Design and coordination. Role : Mechanical Engineer (Preparatory, DE hulling, Extraction and Meal) WORK EXPERIENCE Larsen and Toubro Ltd Mechanical Engineer Projects: - July 2011- Till Date
  • 2. • Coordinate with cross functional teams & development of engineering specification for various equipment’s, equipment capacity and equipment performance requirements. • Understanding P&IDs and process deliverables, Preparation of bid packages, tenders and cost estimation • Selection, Design and engineering of process, packing and utility packages. • Master plan and Layout finalization/optimization • Feasibility study, Concept designing, Scheme designing and detailed engineering for various green field and brown field projects. • Responsible for FAT (Factory acceptance test) on vendor’s site and SAT (Site Acceptance test) on site for Static and rotating equipment. • Erection and commissioning of 10 TPH coal/husk fired boiler with all piping and testing like Radiography, Stress relieving etc. • Installation and Commissioning of all the Process equipment (both static & rotary) of PERK chocolate line & kitchen. • Responsible for Installation and Commissioning of all the Process equipment of 5 Star chocolate line & kitchen. • Installation and Commissioning of Packaging lines. • Coordination and support for Installation and start-up of CIP stations. • Design, techno-commercial analysis, specification finalisation, FAT, Installation and Commissioning of 150 kg/hr Incinerator. • Installation and Commissioning of IBR steam line for complete new plant. Input for steam line routing & review of steam isometric drawing for IBR approval, basic calculations for expansion loops, supports, valve selection, final BOQ, vendor selection for IBR approved fabricator of the steam line.. • Responsible for Installation and Commissioning of PRS skids & CRS skid & piping. Prepared RFQ & Techno- commercial bid analysis for PRS skids, CRS skids (overall condensate recovery scheme) and calculation of condensate load & selection of traps for various areas. • Design, specification finalisation, Techno-commercial bid analysis for De-humidifier for Powder storage & conveying area for Chocolate Plant. • Basic calculation for requirement and technical data preparation for alternate fluid against conventional fluids for -35°C chiller in order to reduce pump size, reduce toxic quantity, increase efficiency of chiller. • Responsible for Installation of DG sets (2 nos.) along with their canopies & chimneys. • Preparing PFD, RFQ & TBA for PHE skid for enhancing life of water cooled air compressors. • Preparation of water balance, calculations for tanks & de-bottlenecking of existing water system and input in form of basic scheme/PFD for raw water treatment, water supply and integration with old plant, water disposal, Effluent treatment (ETP), tertiary treatment for cooling towers. • Responsible for preparation of specification finalisation & Techno-commercial bid analysis for Water storage tanks. • Basic comparison documents for water tanks (5 nos.- 100 kl each) & installation of same (Zn-Al sheet with rubber bladder). Achievements: ∗ Awarded “Certificate of Excellence Award” for completion of IBR jobs in the project along with coordination with government regulatory. ∗ Active team member for complete brownfield Project (Cadbury India Ltd., Malanpur) from Project initiation to Completion. ∗ Successful & On-time Installation, commissioning and trials along with all IBR approvals and final Handover of 10 TPH Boiler. ∗ Successful & On-time Installation, commissioning and trials and final Handover of Perk and 5-Star Process and Packaging lines. EDUCATION ∗ Bachelor of Engineering- Mechanical, UCOE, Punjabi University, Patiala, 2011, 74.80% ∗ HSC-DK Senior Secondary School, 2011, 76.80% ∗ SSC- Panjab Senior Secondary School, 2005, 78.4% ∗ 1 year Certificate course in French, Punjabi University, Patiala, 2010, 70% ADDITIONAL INFORMATION
  • 3. ∗ 1 month training on Mechanical Engineering in CTTC Bhubaneswar. ∗ 1 month training on Plant Engineering (All fields including chemical, Electrical, mechanical and instrumentation) in BATU, Raigad.. ∗ 6 weeks training at DMW (Diesel –Loco Modernization Works) Patiala. ∗ 6 months training at Ashok Leyland Alwar unit. EXTRA CURRICULAR ACTIVITIES & ACHIEVEMENTS ∗ Represented PCA at Inter-state level Cricket competition for 2 successive years. ∗ Coordinator for Reception and invitation committee for all cultural and technical fests during engineering. SKILLS ∗ Self-motivated. ∗ Strong planning and organisation ability ∗ Drive, initiative and commitment ∗ Team player with excellent leadership skill ∗ Learning ability and driven by challenge ∗ Excellent listening, communication and ∗ Interpersonal skills PERSONAL DETAILS Date of Birth: 21st September 1990 Marital Status: Unmarried. Languages: English, Hindi, Punjabi and French