1. Puneet Pal Singh
Mobile Phone – 08155050836
Email – puneetnarula3@gmail.com
Mechanical Engineer (Projects): L&T Technology Services.
OBJECTIVE
To excel and add new experiences, learning and mastering those experiences leading to
organizational and individual growth; also to take challenges of any type as an opportunity to boost the career by
putting 100% of myself
CAREER SUMMARY
• 3.5 years’ experience in Green field and brown field projects, Mechanical design, erection and
commissioning of various equipment’s and systems, proposing and implementation of various
improvement Capex’s, Process and utility design, supervision with allocated resource and inventories,
manufacturing production activities of plant to stabilize the plant, and various system development in
production and engineering.
PROJECT HANDLED
Project Name
Mondelez / Cadbury India Ltd. (India )
(Project - WIP)
Duration 26 months
Team Size 12
Description
Brown field expansion project of Chocolate plant- Coordination and Execution.
Role : Onsite Mechanical Engineer (Design, Installation and commissioning of complete
Manufacturing plant including Process lines and Utilities)
Project Name
Unilever- Tea Blending Core Design- SINGAPORE
(Project -WIP)
Duration 1 Months
Team Size 7
Description
Standard Design of Plant for Tea Blending and Packing
Role : Mechanical Engineer (Manufacturing, warehousing and utilities)
Project Name
PepsiCo (-USA )
(Project - WIP)
Duration 3 Months
Team Size 4
Description
Feasibility study for Juice line and Chewy Bar line
Role : Mechanical Engineer (Manufacturing, warehousing and packing)
Project Name Unilever- Tea Processing- Independence USA
Duration 3 Months
Team Size 7
Description
Standard Design of Plant for Tea Processing
Role : Mechanical Engineer (Piping, Material handling and packaging)
Project Name Adani Wilmar Limited Vidisha and Bundi (India)
Duration 6 months
Team Size 8
Description
Brown field project of Soya Bean seed processing for oil extraction - Design and coordination.
Role : Mechanical Engineer (Preparatory, DE hulling, Extraction and Meal)
WORK EXPERIENCE
Larsen and Toubro Ltd
Mechanical Engineer Projects: - July 2011- Till Date
2. • Coordinate with cross functional teams & development of engineering specification for various equipment’s,
equipment capacity and equipment performance requirements.
• Understanding P&IDs and process deliverables, Preparation of bid packages, tenders and cost estimation
• Selection, Design and engineering of process, packing and utility packages.
• Master plan and Layout finalization/optimization
• Feasibility study, Concept designing, Scheme designing and detailed engineering for various green field and
brown field projects.
• Responsible for FAT (Factory acceptance test) on vendor’s site and SAT (Site Acceptance test) on site for Static
and rotating equipment.
• Erection and commissioning of 10 TPH coal/husk fired boiler with all piping and testing like Radiography,
Stress relieving etc.
• Installation and Commissioning of all the Process equipment (both static & rotary) of PERK chocolate line &
kitchen.
• Responsible for Installation and Commissioning of all the Process equipment of 5 Star chocolate line &
kitchen.
• Installation and Commissioning of Packaging lines.
• Coordination and support for Installation and start-up of CIP stations.
• Design, techno-commercial analysis, specification finalisation, FAT, Installation and Commissioning of 150
kg/hr Incinerator.
• Installation and Commissioning of IBR steam line for complete new plant. Input for steam line routing &
review of steam isometric drawing for IBR approval, basic calculations for expansion loops, supports, valve
selection, final BOQ, vendor selection for IBR approved fabricator of the steam line..
• Responsible for Installation and Commissioning of PRS skids & CRS skid & piping. Prepared RFQ & Techno-
commercial bid analysis for PRS skids, CRS skids (overall condensate recovery scheme) and calculation of
condensate load & selection of traps for various areas.
• Design, specification finalisation, Techno-commercial bid analysis for De-humidifier for Powder storage &
conveying area for Chocolate Plant.
• Basic calculation for requirement and technical data preparation for alternate fluid against conventional fluids
for -35°C chiller in order to reduce pump size, reduce toxic quantity, increase efficiency of chiller.
• Responsible for Installation of DG sets (2 nos.) along with their canopies & chimneys.
• Preparing PFD, RFQ & TBA for PHE skid for enhancing life of water cooled air compressors.
• Preparation of water balance, calculations for tanks & de-bottlenecking of existing water system and input in
form of basic scheme/PFD for raw water treatment, water supply and integration with old plant, water
disposal, Effluent treatment (ETP), tertiary treatment for cooling towers.
• Responsible for preparation of specification finalisation & Techno-commercial bid analysis for Water storage
tanks.
• Basic comparison documents for water tanks (5 nos.- 100 kl each) & installation of same (Zn-Al sheet with
rubber bladder).
Achievements:
∗ Awarded “Certificate of Excellence Award” for completion of IBR jobs in the project along with coordination
with government regulatory.
∗ Active team member for complete brownfield Project (Cadbury India Ltd., Malanpur) from Project initiation to
Completion.
∗ Successful & On-time Installation, commissioning and trials along with all IBR approvals and final Handover of
10 TPH Boiler.
∗ Successful & On-time Installation, commissioning and trials and final Handover of Perk and 5-Star Process and
Packaging lines.
EDUCATION
∗ Bachelor of Engineering- Mechanical, UCOE, Punjabi University, Patiala, 2011, 74.80%
∗ HSC-DK Senior Secondary School, 2011, 76.80%
∗ SSC- Panjab Senior Secondary School, 2005, 78.4%
∗ 1 year Certificate course in French, Punjabi University, Patiala, 2010, 70%
ADDITIONAL INFORMATION
3. ∗ 1 month training on Mechanical Engineering in CTTC Bhubaneswar.
∗ 1 month training on Plant Engineering (All fields including chemical, Electrical, mechanical and
instrumentation) in BATU, Raigad..
∗ 6 weeks training at DMW (Diesel –Loco Modernization Works) Patiala.
∗ 6 months training at Ashok Leyland Alwar unit.
EXTRA CURRICULAR ACTIVITIES & ACHIEVEMENTS
∗ Represented PCA at Inter-state level Cricket competition for 2 successive years.
∗ Coordinator for Reception and invitation committee for all cultural and technical fests during engineering.
SKILLS
∗ Self-motivated.
∗ Strong planning and organisation ability
∗ Drive, initiative and commitment
∗ Team player with excellent leadership skill
∗ Learning ability and driven by challenge
∗ Excellent listening, communication and
∗ Interpersonal skills
PERSONAL DETAILS
Date of Birth: 21st September 1990
Marital Status: Unmarried.
Languages: English, Hindi, Punjabi and French