1. Binod kumar yadav
E-Mail: binodyadav09@gmail.com ~ Contact: +919589358186,9777443014
Senior level assignments in Project Management / Fabrication / Erection & Commissioning with an
organisation of repute.
Professional Overview
A dynamic professional with nearly 8 years of extensive experience in Project Management, Erection
& Commissioning, Fabrication & Man Management.
Presently Working with JINDAL STEEL & POWER LTD. as an Asst. Manager.
Simulators Training & Plant Operations (2 Months)-Simulators of 135 MW, 250 MW & 600 MW
generating units. Routine Plant start up / shut down operations, cold-warm-hot start-up, coasting down
from full load to a lower load, handling plant emergencies and engineering analysis and some
functional/maintenance aspects of major plant equipments are the salient features of the installed
simulator.
Responsible for fabrication, erection and commissioning of B.O.P. of 4x600MW Power Plant.
Responsible for fabrication, erection and commissioning of Water treatment plant.
Expertise in handling the complete project operations entailing planning, resource utilization,
maintenance, quality management & manpower management.
Skilled in managing Completed various pipeline such as piping, Raw water piping,CW & ACW
fabrication / local manufacturing at different sites as per the requirements including converting
material into finished components.
Proficient in managing erection & commissioning of various equipments and maintenance of the same
for reducing breakdown / downtime & enhancing operational effectiveness of equipment.
Skilled in managing fabrication / local manufacturing at different sites as per the requirements
including converting material into finished components.
An effective communicator with good analytical, negotiation, relationship management and problem
solving skills.
Employment Recital
Since May 2011 with Jindal steel & Power Ltd as Asst. Manager.
1. 4X135MW Power project at Tamnar, Raigarh, Chhattisgarh.
2. 4X600 MW power project at Tamnar, Raigarh, Chhattisgarh.
*Responsible for Fabrication, Erection and Commissioning of B.O.P. of 4x135MW Power Plant.
* Fabrication, Erection of Acw,Cw Pipeline, Intake water pipe line,Fuel handling systems.
*Fabrication, Erection of Pipe rack.
*Fabrication,Erection and testing of various gas pipe line.( Syn gas,Bof gas,Coke oven
gas,Nitrogen gas, Service air,Instruments air
* Fabrication ,Erection of various Tanks (Dm,Hfo,Ldo,Cst,Potable,Fire water storage Tanks)
*Fabrication,Erection of DM Plant,Etp Plant,Cpu Plant,Clarifier etc.
3. From June 2010 to May 2011 with Bgr Energy Systems Ltd. As an Engineer.
*Responsible for Fabrication ,Erection and Commissioning of B.O.P. of 4x135MW Power Plant.
* Fabrication ,Erection of Acw,Cw Pipeline,Intake water pipe line,Fuel handling systems.
* Fabrication ,Erection of various Tanks (Dm,Hfo,Ldo,Cst,Potable,Fire water storage Tanks)
*Fabrication,Erection of DM Plant,Etp Plant,Cpu Plant,Clarifier etc.
2. From Nov 2007 to May 2010 with Triveni Engg. & Industries Ltd.(TEIL) as an Site Engineer.
Some of the major project Executed
2. *Fabrication ,erection of RO Plant(500 MW) Pragati Power Corporation Ltd.(Delhi).
* Fabrication ,erection of DM Plant (50MW) Maheswari Ispat Ltd.(Orissa).
*Fabrication ,erection of DM & RO Plant (15MW) Sukhbir Agro Energy Ltd.(U.P.).
* Fabrication ,erection of CMF & RO Plant (43MW) ksk Energy Ltd.(Chattisgarh)
* Fabrication ,erection of DM and RO Plant (45MW) jsw (Mumbai).
Education
Diploma - 2007 (Full Time) (Mechanical Engineering.)
MBA - 2011(Part Time) (Project Management)
Core Competencies
Project Management
Spearheading project activities involving working out various requirements & monitoring overall
project operations for ensuring timely completion.
Coordinating projects for the set up standards with accountability for strategic utilization &
deployment of available resources to achieve organizational objectives.
Monitoring the project at sites and review of project schedule, ensuring cost control within budget,
planning for cash flow requirements etc.
Fabrication
Finalising basic & layout engineering along with design for the projects.
Testing of the equipments to ensure that they are precise, and meeting the agreed specifications.
Eliminating redundant / obsolete processes involved in the design, development processes and
working towards value-addition.
Installing and commissioning as well as demonstrating the performance tests & inspections to ensure
operational effectiveness of utilities; planning & effectuating maintenance plans for machines and
equipments, including the planning of the spares.
Erection & Commissioning
Ensuring effective site management and discipline to ensure safe execution of the projects.
Erection, testing and commissioning of equipments, also providing utility services to the equipments.
Planning, procurement, erection & commissioning of complete Water treatment plant.
Troubleshooting problems arising in the total execution of job with minimum time lag.
Taking stringent quality measures including preparation / maintaining necessary documents and to
ensure compliance with standards.
Erection of DM Plant, RO Plant, UF Plant, CMF Plant, Clarifier and pumps.
Man Management
Assessing the training needs of the various employees in co-ordination with the various department
heads in the respective departments.
Coaching employees & counselling, appraising & reviewing performance to ensuring optimum
performance & achievement of organisational goals.
Personal Vitae
Name : Binod kumar yadav
3. Father’s name : Ghanshyam yadav
Date of Birth : 1st May 1983
Sex : Male
Marital Status : Married
Nationality : Indian
Language Known : Hindi, English
Address : Room. No. 56/12, Pac Colony Naini, Dist.- Allahabad (U.P.) – 211008
Declaration: I hereby declare that information here provided by me is true to the best of my knowledge
and belief.
Dt:
Place: Binod kumar yadav