CURRICULUM VITAE
Name : MD. SAIDUL ISLAM Date of Birth : 18th
February 1964
Profession : Civil Engineer Nationality : Bangladeshi
Proposed Position : Resident Engineer/QC Engineer
Contract Address : Md. Saidul Islam, House # 29, Road # 7/D, Sector# 9, Uttara, Dhaka-1230, Bangladesh.
E-mail: sayeed_m@yahoo.com
Mobile: +88 01711 169 417(O), +88 01711 573 888 ®
Permanent Address : C/O Mr. Siddique, Atiare Colloney, PO+PS – Saidpur, Dist – Nilphamari, Bangladesh
Education : B.Sc Engineering (Civil), Engineering College, Rajshahi, Bangladesh, 1985.
MBA (Executive), Dhaka International University, Dhaka, Bangladesh, 2001
Language : Bangla – Mother tongue,
English – Fluent in speaking and writing.
Hindi – Fair level
Special Project : - Jamuna Multipurpose Bridge Project, Bangladesh.
- Water Treatment Plant, Water Reservoir, Libya.
Computer Skills : MS Excel, MS Word, Microsoft Project, AutoCAD, etc.
Others : Passport No- BA 0632268, License of light vehicle, No- SJAP9F20083, Date : 03-01-1996
Professional : Institute of Engineers, Bangladesh, Fellow – F 7266
Membership
Major tranning/workshops relevant to assignment :
• Public Procurement Regulation (PPR) 2003 at RRMAIDP, LGED, Barguna in 2007.
• Construction Management and Quality Control at RRMAIDP, LGED, Patuakhali in 2008
• Computer Training on Software used in LGED e.g RSEPS, EVCS & RSDMS at RRMAIDP, LGED, Barguna in 2009
• Health & safety awarness at project site by Mr. Pat Parkinson, RPT, UK at JMBP in 1997.
• Fundamentals of Asphalt Concrete Mixes by Mr. Gyame L Mc Millan of RPT Ltd, UK in 1997.
• Basic of FIDIC by Mr. Bob Goodyear of Mott Mc Donald Ltd, UK at BCL Training center in 2000.
• Importance of Basic Communication in English by Mrs. Ramana Rahman, HRM specialist, Bangladesh at BCL Training center in
2006.
Countries of Work : Bangladesh and Libya.
Key Qualification:
Thirty years experiences in construction management of National Highway, Bridges including rural & urban infrastructure development
works. They include:
♦ Planning & budgeting, Quality Assurance Manual and its objectives.
♦ Supervision and Quality Control of Roads and Structural works including materials testing in home and abroad.
♦ Assist counterparts (Govt. Deptt.) to execute the project according to Contract documents for achieving its objectives
♦ Conduct training/workshop for capacity building of Local govt. institution & CBOs on technical & Quality Control issues.
Page 1 of 7
Employment Records Briefly
Sl. No. Duration Employer Description of Assigned
Project
Positions held
1 April 2015 to till
date
SARM Associates Ltd. Dhaka Construction of 5200m long PC
Girder Flyover from Muradpur
to Lalkhanbazar,via gate no 2
Under CDA, Chittagong.
Resident Engineer
2 May 2014 to
March 2015
SARM Associates Ltd. Dhaka Construction of 1132m long PC
Girder Flyover at Kadamtoli
Junction, Under CDA,
Chittagong.
Resident Engineer
3 Feb/13 to April
2014
Project Director, GRDP, LGED,
Dhaka
850m long Tista Bridge with
River Training & Approach
Road under LGED,
Lalmonirhat. Funded by GoB
Resident Engineer
4 July/09 to Jan/13 Resource, Planning and
Management Consultants
(RPMC), Bangladesh JV with
Hifab international, Sweden &
SMEC Ltd, Australia
Rural Infrastructure
Improvement Project (RIIP-II)
under LGED in Rangpur
Division (for 8 district). Funded
by ADB, Kfw
1)Sr.Resident
Engineer (Expatriate
in-charge)
2)QC Engineer
5 Sept/07 to
Jun/09
Senior Advisor, RRMAIDP
under LGED & Danida
Rural Roads & Market Access
Infrastructures Dev. Project
(RRMAIDP) under LGED at
Patuakhali. Funded by DANIDA
Resident Engineer
6 Feb/04 to Aug/07 Bangladesh Consultants Ltd
(BCL), Bangladesh JV with
WSA, USA & SMEC Ltd,
Australia
Rural Infrastructure
Improvement Project (RDP-25)
under LGED in Patuakhali.
Funded by ADB, Kfw
Resident Engineer
7 April/02 to
Feb/04
Abdul Monem Ltd., Dhaka Construction of National
Highway in/c Structures from
Kashiany ~ Mollarhat bridge
under SRNDP, RHD. Funded by
ADB
Project Manager (PM)
8 Jan/98 to Mar/02 Bangladesh Consultants Ltd.
(BCL) JV with JOC, Japan,
Mott McDonald Ltd., UK &
SMEC, Australia
Jamuna Bridge Access Road
Project (Tangail ~ Mirzapur
road), RHD. Funded by JBIC
Assistant Resident
Engineer (ARE)
9 Feb/95 to Dec/97 Bangladesh Consultants Ltd.
(BCL) JV with RPT (UK),
NEDECO (Netherland)
4.8Km long Jamuna
Multipurpose Bridge Project
(JMBP), Funded by WB, ADB,
JICA, Others
Asst. Materials
Engineer
10 Feb/93 to Feb/95 Africa Engineering Company,
Libya
Misurata Water Supply Project,
Libya
Senior Construction
Manager (Civil)
10 May/92 to Jan/93 Engg. Science Ltd., Engg.
Consultants Assoc. Ltd. &
Desh Upodesh Ltd.,
Bangladesh JV with Renardet
SA, Switzerland, TPO Sulivan
& partners, UK.
Feeder Road Improvement
Project, RHD in Tangail District,
financed by ADB.
QC Engineer
11 Jan/90 to
April/92
DDC Ltd, Bangladesh JV with
CES (India) Pvt Ltd., Roughton
and partners (UK) JV
Road Improvement Project,
RHD (Daulatdia~Kushtia road),
financed by ADB.
Structural Engineer
12 Mar/88 to Dec/89 Development Design
Consultants Ltd. (DDC),
Dhaka. & CES (India) Pvt Ltd.
Flood Damage Rehabilitation
Project, RHD Project in
Chittagong financed by ADB,
Junior Engineer
13 July/85 to
Mar/88
M/S Lovely Corporation, a
construction company, Dhaka.
Infrastructures Dev. In Dinajpur
Polytechnic Institute under PIU
Project Engineer
Page 2 of 7
Project
Professinal Experiences : Working experiences under different construction and consulting Firms in country and abroad.
Period From April 2015 to till date
Employer SARM Associates Ltd., Dhaka, Bangladesh
Position held Resident Engineer (RE)
Job Description Construction of 5200m long PC Girder Flyover at Muradpur to Lalkhanbazar,via gate no 2 Under CDA,
Chittagong. This flyover is 5200m long and 4 lane, major works are cast-in situ piles, pile cap, pier column, pier
cap, pre-stressed concrete I girder(span-30-45m) with deck slab and approach slab And same legth highway
reconstruction by improving the pavement layers(Sub-Base, Base, Bituminous wearing course). This project is
implementing by Chittagong Development Authority (CDA) and financed by Govt. of Bangladesh. Total Project
cost is BDT 550 crores/USD 68.75 Million.The flyover is being constructed by MAX(BD)-RANKEN(China)
JV,Dhaka, Bangladesh.
Working as RE for supervision of sub & super structure construction works ensuring overall quality control as per
design & specification by maintaining sequence including Prepared Concrete mix design & implementing by using
Batching plant & Pump, certify all type of construction work in/c survey. payment certificate, checking & certifying
variation order and preparing & submitting monthly progress report, etc
Period From May 2014 to March 2015
Employer SARM Associates Ltd., Dhaka, Bangladesh
Position held Resident Engineer (RE)
Job Description Construction of Kadamtoli Junction Flyover Project is Box & PC girder flyover at Kadamtoli junction near
Chittagong Railway Station with road approach on both side of flyover. This flyover is 1132m long
and 8.54m wide (2 lane), major works are cast-in situ under reamed piles, pile cap, pier column, pier
cap, pre-stressed concrete girder & box girder with deck slab and approach slab.This project is
implementing by Chittagong Development Authority (CDA) and financed by Govt. of Bangladesh (Taka
55 crores).The flyover is being constructed by Development Construction Ltd.,Dhaka, Bangladesh.
Working as RE for supervision of sub & super structure construction works ensuring quality control as per design
& specification by maintaining sequence including Prepared Concrete mix design & implementing by using
Batching plant & Pump, certify all type of construction work in/c survey. payment certificate, checking & certifying
variation order and preparing & submitting monthly progress report, etc
Period From February 2013 to April 2014
Employer Project Director, GRDP, LGED, Dhaka
Position held Resident Engineer
Job Description The Bridge Project is 850m long PC girder bridge over Tista river at Mohipur(Gongacara, Rangpur) ~ Kakina
(Kaligonj, Lalmonirhat) road and drainage structures on 5km long road approach on both side of
bridge, river training works and bridge end facilities. This project is implementing by LGED,
Lalmonirhat district under Greater Rangpur-Dinajpur Infrastructure Improvement Project (GRDP),
LGED and financed by Govt. of Bangladesh (Taka 145crores).The main bridge project was being
constructed by WMCG & NAVANA Construction JV Co. Dhaka.
Working as SBE in the LGED’s GRD Project with the longest fixed road crossing of 850m for supervision of sub &
super structure construction works including:
- Cast-in-situ piles boring & casting of 1000mm & 1200mm dia, average pile length 41m
- Prepared Concrete mix design & implementing by using Batching plant, Pump, etc.
- Setting bridge lay-out and pile Location with construction sequence
- Assist and advise LGED with supervision of all type of constrution in/c river training works and north &
south approach road for ensuring quality control as per design & specification and construction
methods
- Monitored sub-soil investigation report and compared with previous reports
- Certify all type of construction work in/c survey and payment certificate
Period From July 2009 to January 2013
Employer Resource, Planning and Management Consultants (RPMC)
Page 3 of 7
Position held Senior Resident Engineer (SRE), In Charge (From May ‘12 to January ‘13)
Quality Control Engineer (QCE) in Rangpur Zone. (From July ‘09 to April ‘12)
Job Discription Worked as SRE & QCE in RIIP-II Project of LGED. Mainly construction of Road, Bridge, Culverts & Market
development. Responsibilities include to ensure quality assurance for the project by guiding a group of
professional Engineers and Technicians. Reponsibilities also include routine checking of quality control of all
aspects of road and structural work undergo testing to check the acceptibility vis-a-vis the specifications and their
interpretation, checking of work done, certification of Running and Final bills, preparation of quality control
reports, presentation of the works to Client/ADB in Review Meetings.
As a QCE, working under Project Engineering Advisor (PEA) to provide technical supervision and advisory
supports to the LGED for ensuring projects are executed with high degree of Quality Control including
testing of matrials, mix design of Concrete and Asphalt. My duties & responsibilities include but not limited to
sampling & testing of materials, setting out of works, concrete mix design, casting of pre-cast & cast-in-situ
pilling, different components of bridge.
Preparing training materials for LGED Laboratory and field supervision staff on testing & quality control
procedures as well as contribute to the training of LGED staff and contractors.
Period From September 2007 to June 2009.
Employer Senior Advisor, RRMAIDP, under Embassy of Danish (EoD)
Position held Resident Engineer & SME. RRMAIDP, LGED-DANIDA for Patuakhali District
Job Discription Worked as RE (for Patuakhali district) under Rural Roads & Market Access Infrastructure Development Project
(RRMAIDP) as a Technical Assistance staff (National) of DANIDA for advisory works. This is a grant aid
project of DANIDA for US $ 50 million (approx). The Project aim at improved the efficiency and
sustainability of the rural roads and markets infrastructure in/c LGED’s maintenance management. The
expected outputs are capacity building of Local Govt. Engineering Department (LGED) and Union
Parishads for managing rural road network, employment generation for the poor peoples, private sector
development and finally, train up the rural peoples in different aspect for improving their lives.
In this project, main duties include: to manage and supervise the RRMAIDP activities like construction of 8 nos
bridges (sizes-120m, 100m, 90m, 60m, 54m, 48m 42m & 36m) of different dia (0.60-1.1m) cast-in-situ piles in/c
setting lay-out, preparation of construction sequence, checking the fabrication of re-bar & casting of different
component of bridges, Cyclone shelters and different classes of roads of the two district as well as maintain the
laboratory by testing, maintain and keep all reports related to testing. In addition to that, establish the field
laboratories, assure compliance with the LGED specifications on materials and quality of works by frequent site
visit. Above that, assisting for train up the lab technicians & other staff of LGED, Contractors and Labour Contract
Society (LCS) as deemed necessary, particularly in quality control, reporting, etc.
Period From February 2004 to August 2007
Employer Bangladesh Consultants Ltd (BCL)
Position held Resident Engineer, RIIP(RDP-25), LGED,Patuakhali.
Job Discription Worked as Resident Engineer (for Patuakhali district) under a Design and supervision consultancy joint venture
that consists of expatriate firms, WSA, USA (lead firm)and SMEC Ltd, Australia and three local firms including
BCL for an ADB financed (US $ 117.00 million) Rural Infrastructure Improvement Project (RDP-25) of Local Govt.
Engineering Department (LGED). I, as a key personnel, played vital role at the district for the preparation of 18
nos. Sub-Project Apraisal Report (SAR) approval from ADB. In addition to, guided 6 nos survey and soil
investigation teams to collect engineering data/information for about 75Km road, 430m structures, 6 nos Growth
centres, 6 nos Union Parishads and 6 nos Ghats. Following completion of survey and collection of final data’s, I’d
to select the location, type, size and fixation of different parameter of the project components, viz. road, structure,
GC, UPC, Ghat etc. Now, as the Key personnel from the consultants at the district, I’ve prepared with the
assistance of LGED engineers detail estimate of 38 nos contracts worth Tk. 400 million. Besides, being a
member of Tender Evaluation Committee from D&S Consultants, I had to play my role for the preparation of
tender documents, evaluation of tenders, TEC resolution reports and finally for submission the same to PMO. I
was also responsible from consultant’s side to supervise all construction activities of 38 nos contract and to
ensure the qualities of the work in compliance with the requirements of Employer and Donor. Apart from this job, I
had to prepare monthly, quaterly, annual reports for compilation of zonal office and to attend monthly meeting
with the Deputy Team Leader and Team Leader and also LGED meetings with high officials. Besides from
Page 4 of 7
engineering job, I had to monitore the guideline of Gender Action Plan, a condition of ADB. As a counterpart, I
had to advise the Executive Engineer, LGED and his Engineering staff to resolve of site problems and to expedite
the progress as required
Period From April 2002 to February 2004
Employer Abdul Monem Ltd.
Position held Project Manager (PM)
Job Description During this period, I worked as PM for managing and implementing of South-West Roads Network Development
Project (SRNDP) from Dhaka-Maowa-Gopalgonj-Noapara (Khulna), Length 162.39km in/c. different type of
bridges and culverts. The ADB funded project, worth US $ 125m. Under my supervision, the project road length
was 41.76km, structure length 350m, with contract sum of US $ 28m. I as PM was responsible for project
planning, preparation of work schedule, materials procurement schedule, budgeting, equipments schedule
including and maintenance, arrangement utilization with own labour force and engaging & managing of different
sub- contractors and to ensure that the works are done with high degree of Quality Control. It is noted that the
whole SRNDP Project was mechanized, used effectively & efficiently various heavy equipments like Excavator,
Payloader, Bull Dozer, Grader, Vibratory Roller, Pneumatic tyre roller, Dump Truck etc. On the other hand,
concreteing work for structures were accompanished by using of concrete batching plant, pump, Transit mixture
truck etc confirming to the standard as per specifications. In execution of this project, I had to guide my
engineering and technical staff, deployed for different assignments such as set up survey team for taking pre-
section level and completed other survey related works providing formation levels, super elevation etc. on the
road and structure as per geometric design, calculate the volume of different works, materials etc. Besides,I had
to look after the project laboratory owned by my company and explored various trial mix design for asphalt
concrete in order to comply with the specifications for confirming the asphalt mix design in the batching plant as
well as at field and it was responsiblity to arrange and fix the different component of designed Asphalt mix in the
batching plant and laid in a trial areas before going to verify the Asphalt mix design and normal production for the
road work.
Period From January 1998 to March 2002
Employer Bangladesh Consultants Ltd. (BCL)
Position held Assistant Resident Engineer (ARE)
Job Description On Jamuna Bridge Access Road Project (JBARP), I was responsible for construction supervision of 66km
national highway from Dhaka to Tangail which was financed by JBIC, Japan at the cost of US $ 28m. In this joint
venturey, consisting the international consulting firms, JOC, Japan, Mott Mc Donald Ltd. UK, SMEC, Australia
and local BCL and I had to manage all engineering, financial and administrative matters with the help of my
engineering staff to execute a part of the whole project (40km) by complying the international standard, Which
was executed by an international Koreans company (M/S. SUNGJEE Construction Ltd.). In this project, I, as ARE
assisted for setting the rate of the non-tender items by analysing the market price and to prepare the supporting
documents in a bid to the variation order (VO) for the client in the light of contract document and FIDIC.
Period From February 1995 to December 1997
Employer Bangladesh Consultants Ltd. (BCL)
Position held Assistant Material Engineer (AME)
Job Description Worked as AME in the country’s most prestigious project, “Jamuna Multipurpose Bridge Project” (JMBP) with the
longest fixed road crossing of 4.8km length and my responsibility for one of the four contracts, contract no.4 was
for connecting west approach to highway. In this co-financed project (US $ 900m) by the world Bank, ADB, OECF
and Govt. of Bangladesh, Which invloved international consulting firms: RPT (UK), NEDECO (Netherland) and
the leading local consulting firm, BCL. My job was construction supervision of 17 Km approach road & to lead a
quality control team of 25 (twenty five) personnel of various discipline in/c 2(two) B Sc Engr, to carry out
exploration of various trial mix design of Asphalt concrete for Bituminous binder & wearing course, different grade
of cement concrete and special type of concrete called as, `No-fines concrete’ which was used at embankment
slope protection around the viaducts of Jamuna Bridge and to execute different type of quality test of international
standard like Clay-lumps content, Mica contents, Hydrometer test, CBR test, abrasion test, Extruction test of
bitumen, core cutting test of cement & asphalt concrete. It may be mentioned here that some of the special tests
were carried out in abroad under our guidence. In addition to that I was responsible for taking payment
certificate,prepared monthly report,liason with department & contractor etc
Period February 1993 to February 1995
Page 5 of 7
Employer Africa Engineering Company, Libya (one of the biggest construction company in Africa)
Position
Job Description
Senior Construction Manager (Civil)
As a Senior Construction Manager (Civil) was soley responsible for the construction of Water Treatment
Plant, Water Reservoir ( Capacity: 5000 cu.m) and various types of concrete structures, 45km long road along
water pipe lines, setting water pipe line of different dia(600mm, 400mm) Ductile iron pipe in 60Km in the rocky
areas by the different countries workers. Install & commissioning different types of soil, asphalt concrete
equipments for the laboratory.
Responsible to the Director (Libyan) for constructions management included setting out of structures layout,
foundation, columns, walls, beams, slabs and concreting as per contract drawing & specications and ensuring
that works were carried out in accordance with the specifications. In addition to that I, as a section chief, played
vital role for mobilization including men, materials and machineries, prepared the construction programme,
finalization of alignment, workmanship control measures on line and levels, measurement of material and works with
reference to quality control norms and tests, interpretation of general and special condition of contracts under FIDIC
& specifications, check extra claims, assessment of additional works and preparation of variation orders, project cost
control, documentation of measurement records, preparation of monthly progress reports and project completion
report. Conducted training on preparing the various grades of cement & asphalt concrete mix design in the
field & laboratory to a group of newly graduted Libyan engineers. Also responsible for checking of works and plant
and equipment and maintenance of site/camp establishments in Misurata, Libya
Period May 1992 to January 1993
Employer Engineering Science Ltd. /Engineering Consultants & Associates Ltd./ Desh Uppdesh Ltd., Dhaka, joint
venture.
Position Quality Control Engineer (Materials)
Job Description Responsible to the Resident Engineer for the construction supervision of i) Tangail-Madhupur Road, length 45Km
in/c 18 nos. pre-stressed girder bridges and culvets (contract-5), ii) Porabari- Gopalpur road, length 7.75Km in/c
11 nos. pre-stressed girder bridges and culverts (Contract-9) and iii) Bhatkura-Basail road, length 10Km in/c 8
nos. pre-stressed girder bridges and culverts Contract-10) at different location in the “Feeder Road improvement
Project” financing of ADB under RHD, Tangail Roads Division.
Period May 1990 to April 1992
Employer Development Design Consultants Ltd (DDC), Consulting Engineering Services (India) Private Ltd.
Roughton and partners, UK joint venture.
Position Junior Engineer
Job Description Worked as a Junior Engineer, on Road Improvement Project (RIP), a National Highway from Daulatdia~Kushtia,
RHD, funded by ADB ( US $ 55.00 million), length 144.74 km in/c 16 nos bridges and 110 nos culverts, awarded
to M/S China National Complete Plant Export Corporation (COMPLANT) and my responsibility for one of the four
contracts, contract no.2 from Faridpur to Kamarkhali Ghat, length 32Km.
Responsible to the Senior Materials & Quality Control Engineer for maintaining the quality of contruction works by
different tests in laboratory and field viz. CBR, MDD, PI, AIV, LAA, Gradation, water absorption test, etc.
Period March 1988 to December 1989
Employer Development Design Consultants Ltd. (DDC), Dhaka.
Position held Junior Engineer.
Job Description Responsible to the Resident Engineer for the construction supervision of Keranirhat~Satkania Bazar road in/c 5
nos. Box culverts at different location in the “Flood Damage Rehabilitation Project” financing of ADB under RHD,
Cox’s bazar Roads Division.
Period July 1985 to March 1988
Employer M/S Lovely Corporation a construction company, Dhaka.
Position held Project Engineer.
Job Description Responsible for construction of a 3-storied office building, a Laboratory building, Internal road (900m), boundary
wall of Dinajpur Polytechnic Institute including preparation of tender, estimating, preparing progress report, etc.
under ADB financed PIU Project.
References :
1. Engr. Nirmal Basu 2. Karl Hans JOERES
Page 6 of 7
Project Engineering Advisor (PEA)
Rangpur Zone, RIIP-II, LGED
(An Employee of SMEC International (Pvt.) Ltd
of Austrila)
Mobile: +88 01730 046 251
E-mail: nirmal_basu@yahoo.com
Team Leader, RIIP-II, LGED
Hifaab International Limited
Mobile: 01730046250
E-mail: dsmcriip2@gmail.com
3. Mr. Wijitha Paranamana
Regional Project Engineer, Khulna Division
RIIP (RDP-25), LGED, Jessore
(An employee of SMEC International Pvt. Ltd,
of Australia)
Mobile : 01713 400 556
E-mail: wijitha@khulna.bangla.net
I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describes me, my qualifications and my
experiences.
Signature :............................................. Date: 17 / 04 /2016
Day/ Month/ Year
Page 7 of 7

More Related Content

What's hot

CV of Rafi jadeed01
CV of Rafi jadeed01CV of Rafi jadeed01
CV of Rafi jadeed01RafiUllah U
 
C v surveyor( Mumtaz )
C v surveyor( Mumtaz )C v surveyor( Mumtaz )
C v surveyor( Mumtaz )Mumtaz Ahmad
 
Planning Engineer Resume-mech
Planning Engineer Resume-mechPlanning Engineer Resume-mech
Planning Engineer Resume-mechMohammed Maqsood
 
Naveed shahzad land surveyor cv
Naveed shahzad land surveyor cvNaveed shahzad land surveyor cv
Naveed shahzad land surveyor cvNaveed Shahzad
 
GM CV-Nov16
GM CV-Nov16 GM CV-Nov16
GM CV-Nov16 Babu Mama
 
Site engineer zak
Site engineer zakSite engineer zak
Site engineer zakZishan khan
 
civil engineer Cv
civil engineer Cvcivil engineer Cv
civil engineer CvRinu Chacko
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Amir Mohammed
 
Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)RAJA KUMAR .R
 
Project Manager CV -Rev
Project Manager CV -RevProject Manager CV -Rev
Project Manager CV -RevThanki M.L
 
Civil finishing engineer(2)
Civil finishing engineer(2)Civil finishing engineer(2)
Civil finishing engineer(2)ahmed sirajuddin
 
Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)S Ajith
 
CIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorCIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorabdul shukoor
 

What's hot (20)

CV of Rafi jadeed01
CV of Rafi jadeed01CV of Rafi jadeed01
CV of Rafi jadeed01
 
C v surveyor( Mumtaz )
C v surveyor( Mumtaz )C v surveyor( Mumtaz )
C v surveyor( Mumtaz )
 
Planning Engineer Resume-mech
Planning Engineer Resume-mechPlanning Engineer Resume-mech
Planning Engineer Resume-mech
 
Naveed shahzad land surveyor cv
Naveed shahzad land surveyor cvNaveed shahzad land surveyor cv
Naveed shahzad land surveyor cv
 
GM CV-Nov16
GM CV-Nov16 GM CV-Nov16
GM CV-Nov16
 
Site engineer zak
Site engineer zakSite engineer zak
Site engineer zak
 
Civil Engineer - CV
Civil Engineer - CVCivil Engineer - CV
Civil Engineer - CV
 
civil engineer Cv
civil engineer Cvcivil engineer Cv
civil engineer Cv
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
 
Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)
 
Zafarullah CV.doc-001
Zafarullah CV.doc-001Zafarullah CV.doc-001
Zafarullah CV.doc-001
 
Project Manager CV -Rev
Project Manager CV -RevProject Manager CV -Rev
Project Manager CV -Rev
 
Civil engineer
Civil engineerCivil engineer
Civil engineer
 
Tanveer Sr Planning Engineer
Tanveer Sr Planning EngineerTanveer Sr Planning Engineer
Tanveer Sr Planning Engineer
 
Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)
 
Civil finishing engineer(2)
Civil finishing engineer(2)Civil finishing engineer(2)
Civil finishing engineer(2)
 
Infrastructure engineer. CV
Infrastructure engineer. CVInfrastructure engineer. CV
Infrastructure engineer. CV
 
Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)
 
CIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorCIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoor
 
IMRAN PROJECT ENGINEER CV
IMRAN PROJECT ENGINEER CVIMRAN PROJECT ENGINEER CV
IMRAN PROJECT ENGINEER CV
 

Viewers also liked

Viewers also liked (7)

CV_Mohammad Golam Sarowar _Civil Engineer
CV_Mohammad Golam Sarowar  _Civil EngineerCV_Mohammad Golam Sarowar  _Civil Engineer
CV_Mohammad Golam Sarowar _Civil Engineer
 
MCA UNIVERSITIES LIST OF INDIA
MCA UNIVERSITIES LIST OF INDIAMCA UNIVERSITIES LIST OF INDIA
MCA UNIVERSITIES LIST OF INDIA
 
Duet syllabus
Duet syllabusDuet syllabus
Duet syllabus
 
Diploma eee curriculum-09
Diploma eee curriculum-09Diploma eee curriculum-09
Diploma eee curriculum-09
 
BUET_BSc
BUET_BScBUET_BSc
BUET_BSc
 
CV_Nurul_Huda Latest CV_LeMeridien
CV_Nurul_Huda  Latest CV_LeMeridienCV_Nurul_Huda  Latest CV_LeMeridien
CV_Nurul_Huda Latest CV_LeMeridien
 
Md._Habibur_Rahman_CV
Md._Habibur_Rahman_CVMd._Habibur_Rahman_CV
Md._Habibur_Rahman_CV
 

Similar to CV of M Saidul Islam.os (20)

Resume
ResumeResume
Resume
 
MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
 
CV Sriinivas 1i doc
CV Sriinivas 1i docCV Sriinivas 1i doc
CV Sriinivas 1i doc
 
resume_ajaysingh2926_rediffmail.com_-1__2_new__1_
resume_ajaysingh2926_rediffmail.com_-1__2_new__1_resume_ajaysingh2926_rediffmail.com_-1__2_new__1_
resume_ajaysingh2926_rediffmail.com_-1__2_new__1_
 
CV_Faraz
CV_FarazCV_Faraz
CV_Faraz
 
PK_Thakore_New_CV
PK_Thakore_New_CVPK_Thakore_New_CV
PK_Thakore_New_CV
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
JAMES -CV -
JAMES -CV -JAMES -CV -
JAMES -CV -
 
Engr.riyaz cv 02 11-15-2
Engr.riyaz cv 02 11-15-2Engr.riyaz cv 02 11-15-2
Engr.riyaz cv 02 11-15-2
 
Sharma cv
Sharma  cv Sharma  cv
Sharma cv
 
CV_Gursharan Choudhary
CV_Gursharan ChoudharyCV_Gursharan Choudhary
CV_Gursharan Choudhary
 
Giri - CV
Giri - CVGiri - CV
Giri - CV
 
CHVR CV
CHVR CVCHVR CV
CHVR CV
 
GDRPL Company Profile - .pptx
GDRPL Company Profile - .pptxGDRPL Company Profile - .pptx
GDRPL Company Profile - .pptx
 
Curriculum Vitae-Zuber
Curriculum Vitae-ZuberCurriculum Vitae-Zuber
Curriculum Vitae-Zuber
 
narasimha gupta updated cv
narasimha gupta updated cvnarasimha gupta updated cv
narasimha gupta updated cv
 
imran syed
imran syed imran syed
imran syed
 
Resume for Sr.Land Surveyor
Resume for Sr.Land SurveyorResume for Sr.Land Surveyor
Resume for Sr.Land Surveyor
 
Updated C.V of water & sewerage
Updated  C.V of water & sewerageUpdated  C.V of water & sewerage
Updated C.V of water & sewerage
 

CV of M Saidul Islam.os

  • 1. CURRICULUM VITAE Name : MD. SAIDUL ISLAM Date of Birth : 18th February 1964 Profession : Civil Engineer Nationality : Bangladeshi Proposed Position : Resident Engineer/QC Engineer Contract Address : Md. Saidul Islam, House # 29, Road # 7/D, Sector# 9, Uttara, Dhaka-1230, Bangladesh. E-mail: sayeed_m@yahoo.com Mobile: +88 01711 169 417(O), +88 01711 573 888 ® Permanent Address : C/O Mr. Siddique, Atiare Colloney, PO+PS – Saidpur, Dist – Nilphamari, Bangladesh Education : B.Sc Engineering (Civil), Engineering College, Rajshahi, Bangladesh, 1985. MBA (Executive), Dhaka International University, Dhaka, Bangladesh, 2001 Language : Bangla – Mother tongue, English – Fluent in speaking and writing. Hindi – Fair level Special Project : - Jamuna Multipurpose Bridge Project, Bangladesh. - Water Treatment Plant, Water Reservoir, Libya. Computer Skills : MS Excel, MS Word, Microsoft Project, AutoCAD, etc. Others : Passport No- BA 0632268, License of light vehicle, No- SJAP9F20083, Date : 03-01-1996 Professional : Institute of Engineers, Bangladesh, Fellow – F 7266 Membership Major tranning/workshops relevant to assignment : • Public Procurement Regulation (PPR) 2003 at RRMAIDP, LGED, Barguna in 2007. • Construction Management and Quality Control at RRMAIDP, LGED, Patuakhali in 2008 • Computer Training on Software used in LGED e.g RSEPS, EVCS & RSDMS at RRMAIDP, LGED, Barguna in 2009 • Health & safety awarness at project site by Mr. Pat Parkinson, RPT, UK at JMBP in 1997. • Fundamentals of Asphalt Concrete Mixes by Mr. Gyame L Mc Millan of RPT Ltd, UK in 1997. • Basic of FIDIC by Mr. Bob Goodyear of Mott Mc Donald Ltd, UK at BCL Training center in 2000. • Importance of Basic Communication in English by Mrs. Ramana Rahman, HRM specialist, Bangladesh at BCL Training center in 2006. Countries of Work : Bangladesh and Libya. Key Qualification: Thirty years experiences in construction management of National Highway, Bridges including rural & urban infrastructure development works. They include: ♦ Planning & budgeting, Quality Assurance Manual and its objectives. ♦ Supervision and Quality Control of Roads and Structural works including materials testing in home and abroad. ♦ Assist counterparts (Govt. Deptt.) to execute the project according to Contract documents for achieving its objectives ♦ Conduct training/workshop for capacity building of Local govt. institution & CBOs on technical & Quality Control issues. Page 1 of 7
  • 2. Employment Records Briefly Sl. No. Duration Employer Description of Assigned Project Positions held 1 April 2015 to till date SARM Associates Ltd. Dhaka Construction of 5200m long PC Girder Flyover from Muradpur to Lalkhanbazar,via gate no 2 Under CDA, Chittagong. Resident Engineer 2 May 2014 to March 2015 SARM Associates Ltd. Dhaka Construction of 1132m long PC Girder Flyover at Kadamtoli Junction, Under CDA, Chittagong. Resident Engineer 3 Feb/13 to April 2014 Project Director, GRDP, LGED, Dhaka 850m long Tista Bridge with River Training & Approach Road under LGED, Lalmonirhat. Funded by GoB Resident Engineer 4 July/09 to Jan/13 Resource, Planning and Management Consultants (RPMC), Bangladesh JV with Hifab international, Sweden & SMEC Ltd, Australia Rural Infrastructure Improvement Project (RIIP-II) under LGED in Rangpur Division (for 8 district). Funded by ADB, Kfw 1)Sr.Resident Engineer (Expatriate in-charge) 2)QC Engineer 5 Sept/07 to Jun/09 Senior Advisor, RRMAIDP under LGED & Danida Rural Roads & Market Access Infrastructures Dev. Project (RRMAIDP) under LGED at Patuakhali. Funded by DANIDA Resident Engineer 6 Feb/04 to Aug/07 Bangladesh Consultants Ltd (BCL), Bangladesh JV with WSA, USA & SMEC Ltd, Australia Rural Infrastructure Improvement Project (RDP-25) under LGED in Patuakhali. Funded by ADB, Kfw Resident Engineer 7 April/02 to Feb/04 Abdul Monem Ltd., Dhaka Construction of National Highway in/c Structures from Kashiany ~ Mollarhat bridge under SRNDP, RHD. Funded by ADB Project Manager (PM) 8 Jan/98 to Mar/02 Bangladesh Consultants Ltd. (BCL) JV with JOC, Japan, Mott McDonald Ltd., UK & SMEC, Australia Jamuna Bridge Access Road Project (Tangail ~ Mirzapur road), RHD. Funded by JBIC Assistant Resident Engineer (ARE) 9 Feb/95 to Dec/97 Bangladesh Consultants Ltd. (BCL) JV with RPT (UK), NEDECO (Netherland) 4.8Km long Jamuna Multipurpose Bridge Project (JMBP), Funded by WB, ADB, JICA, Others Asst. Materials Engineer 10 Feb/93 to Feb/95 Africa Engineering Company, Libya Misurata Water Supply Project, Libya Senior Construction Manager (Civil) 10 May/92 to Jan/93 Engg. Science Ltd., Engg. Consultants Assoc. Ltd. & Desh Upodesh Ltd., Bangladesh JV with Renardet SA, Switzerland, TPO Sulivan & partners, UK. Feeder Road Improvement Project, RHD in Tangail District, financed by ADB. QC Engineer 11 Jan/90 to April/92 DDC Ltd, Bangladesh JV with CES (India) Pvt Ltd., Roughton and partners (UK) JV Road Improvement Project, RHD (Daulatdia~Kushtia road), financed by ADB. Structural Engineer 12 Mar/88 to Dec/89 Development Design Consultants Ltd. (DDC), Dhaka. & CES (India) Pvt Ltd. Flood Damage Rehabilitation Project, RHD Project in Chittagong financed by ADB, Junior Engineer 13 July/85 to Mar/88 M/S Lovely Corporation, a construction company, Dhaka. Infrastructures Dev. In Dinajpur Polytechnic Institute under PIU Project Engineer Page 2 of 7
  • 3. Project Professinal Experiences : Working experiences under different construction and consulting Firms in country and abroad. Period From April 2015 to till date Employer SARM Associates Ltd., Dhaka, Bangladesh Position held Resident Engineer (RE) Job Description Construction of 5200m long PC Girder Flyover at Muradpur to Lalkhanbazar,via gate no 2 Under CDA, Chittagong. This flyover is 5200m long and 4 lane, major works are cast-in situ piles, pile cap, pier column, pier cap, pre-stressed concrete I girder(span-30-45m) with deck slab and approach slab And same legth highway reconstruction by improving the pavement layers(Sub-Base, Base, Bituminous wearing course). This project is implementing by Chittagong Development Authority (CDA) and financed by Govt. of Bangladesh. Total Project cost is BDT 550 crores/USD 68.75 Million.The flyover is being constructed by MAX(BD)-RANKEN(China) JV,Dhaka, Bangladesh. Working as RE for supervision of sub & super structure construction works ensuring overall quality control as per design & specification by maintaining sequence including Prepared Concrete mix design & implementing by using Batching plant & Pump, certify all type of construction work in/c survey. payment certificate, checking & certifying variation order and preparing & submitting monthly progress report, etc Period From May 2014 to March 2015 Employer SARM Associates Ltd., Dhaka, Bangladesh Position held Resident Engineer (RE) Job Description Construction of Kadamtoli Junction Flyover Project is Box & PC girder flyover at Kadamtoli junction near Chittagong Railway Station with road approach on both side of flyover. This flyover is 1132m long and 8.54m wide (2 lane), major works are cast-in situ under reamed piles, pile cap, pier column, pier cap, pre-stressed concrete girder & box girder with deck slab and approach slab.This project is implementing by Chittagong Development Authority (CDA) and financed by Govt. of Bangladesh (Taka 55 crores).The flyover is being constructed by Development Construction Ltd.,Dhaka, Bangladesh. Working as RE for supervision of sub & super structure construction works ensuring quality control as per design & specification by maintaining sequence including Prepared Concrete mix design & implementing by using Batching plant & Pump, certify all type of construction work in/c survey. payment certificate, checking & certifying variation order and preparing & submitting monthly progress report, etc Period From February 2013 to April 2014 Employer Project Director, GRDP, LGED, Dhaka Position held Resident Engineer Job Description The Bridge Project is 850m long PC girder bridge over Tista river at Mohipur(Gongacara, Rangpur) ~ Kakina (Kaligonj, Lalmonirhat) road and drainage structures on 5km long road approach on both side of bridge, river training works and bridge end facilities. This project is implementing by LGED, Lalmonirhat district under Greater Rangpur-Dinajpur Infrastructure Improvement Project (GRDP), LGED and financed by Govt. of Bangladesh (Taka 145crores).The main bridge project was being constructed by WMCG & NAVANA Construction JV Co. Dhaka. Working as SBE in the LGED’s GRD Project with the longest fixed road crossing of 850m for supervision of sub & super structure construction works including: - Cast-in-situ piles boring & casting of 1000mm & 1200mm dia, average pile length 41m - Prepared Concrete mix design & implementing by using Batching plant, Pump, etc. - Setting bridge lay-out and pile Location with construction sequence - Assist and advise LGED with supervision of all type of constrution in/c river training works and north & south approach road for ensuring quality control as per design & specification and construction methods - Monitored sub-soil investigation report and compared with previous reports - Certify all type of construction work in/c survey and payment certificate Period From July 2009 to January 2013 Employer Resource, Planning and Management Consultants (RPMC) Page 3 of 7
  • 4. Position held Senior Resident Engineer (SRE), In Charge (From May ‘12 to January ‘13) Quality Control Engineer (QCE) in Rangpur Zone. (From July ‘09 to April ‘12) Job Discription Worked as SRE & QCE in RIIP-II Project of LGED. Mainly construction of Road, Bridge, Culverts & Market development. Responsibilities include to ensure quality assurance for the project by guiding a group of professional Engineers and Technicians. Reponsibilities also include routine checking of quality control of all aspects of road and structural work undergo testing to check the acceptibility vis-a-vis the specifications and their interpretation, checking of work done, certification of Running and Final bills, preparation of quality control reports, presentation of the works to Client/ADB in Review Meetings. As a QCE, working under Project Engineering Advisor (PEA) to provide technical supervision and advisory supports to the LGED for ensuring projects are executed with high degree of Quality Control including testing of matrials, mix design of Concrete and Asphalt. My duties & responsibilities include but not limited to sampling & testing of materials, setting out of works, concrete mix design, casting of pre-cast & cast-in-situ pilling, different components of bridge. Preparing training materials for LGED Laboratory and field supervision staff on testing & quality control procedures as well as contribute to the training of LGED staff and contractors. Period From September 2007 to June 2009. Employer Senior Advisor, RRMAIDP, under Embassy of Danish (EoD) Position held Resident Engineer & SME. RRMAIDP, LGED-DANIDA for Patuakhali District Job Discription Worked as RE (for Patuakhali district) under Rural Roads & Market Access Infrastructure Development Project (RRMAIDP) as a Technical Assistance staff (National) of DANIDA for advisory works. This is a grant aid project of DANIDA for US $ 50 million (approx). The Project aim at improved the efficiency and sustainability of the rural roads and markets infrastructure in/c LGED’s maintenance management. The expected outputs are capacity building of Local Govt. Engineering Department (LGED) and Union Parishads for managing rural road network, employment generation for the poor peoples, private sector development and finally, train up the rural peoples in different aspect for improving their lives. In this project, main duties include: to manage and supervise the RRMAIDP activities like construction of 8 nos bridges (sizes-120m, 100m, 90m, 60m, 54m, 48m 42m & 36m) of different dia (0.60-1.1m) cast-in-situ piles in/c setting lay-out, preparation of construction sequence, checking the fabrication of re-bar & casting of different component of bridges, Cyclone shelters and different classes of roads of the two district as well as maintain the laboratory by testing, maintain and keep all reports related to testing. In addition to that, establish the field laboratories, assure compliance with the LGED specifications on materials and quality of works by frequent site visit. Above that, assisting for train up the lab technicians & other staff of LGED, Contractors and Labour Contract Society (LCS) as deemed necessary, particularly in quality control, reporting, etc. Period From February 2004 to August 2007 Employer Bangladesh Consultants Ltd (BCL) Position held Resident Engineer, RIIP(RDP-25), LGED,Patuakhali. Job Discription Worked as Resident Engineer (for Patuakhali district) under a Design and supervision consultancy joint venture that consists of expatriate firms, WSA, USA (lead firm)and SMEC Ltd, Australia and three local firms including BCL for an ADB financed (US $ 117.00 million) Rural Infrastructure Improvement Project (RDP-25) of Local Govt. Engineering Department (LGED). I, as a key personnel, played vital role at the district for the preparation of 18 nos. Sub-Project Apraisal Report (SAR) approval from ADB. In addition to, guided 6 nos survey and soil investigation teams to collect engineering data/information for about 75Km road, 430m structures, 6 nos Growth centres, 6 nos Union Parishads and 6 nos Ghats. Following completion of survey and collection of final data’s, I’d to select the location, type, size and fixation of different parameter of the project components, viz. road, structure, GC, UPC, Ghat etc. Now, as the Key personnel from the consultants at the district, I’ve prepared with the assistance of LGED engineers detail estimate of 38 nos contracts worth Tk. 400 million. Besides, being a member of Tender Evaluation Committee from D&S Consultants, I had to play my role for the preparation of tender documents, evaluation of tenders, TEC resolution reports and finally for submission the same to PMO. I was also responsible from consultant’s side to supervise all construction activities of 38 nos contract and to ensure the qualities of the work in compliance with the requirements of Employer and Donor. Apart from this job, I had to prepare monthly, quaterly, annual reports for compilation of zonal office and to attend monthly meeting with the Deputy Team Leader and Team Leader and also LGED meetings with high officials. Besides from Page 4 of 7
  • 5. engineering job, I had to monitore the guideline of Gender Action Plan, a condition of ADB. As a counterpart, I had to advise the Executive Engineer, LGED and his Engineering staff to resolve of site problems and to expedite the progress as required Period From April 2002 to February 2004 Employer Abdul Monem Ltd. Position held Project Manager (PM) Job Description During this period, I worked as PM for managing and implementing of South-West Roads Network Development Project (SRNDP) from Dhaka-Maowa-Gopalgonj-Noapara (Khulna), Length 162.39km in/c. different type of bridges and culverts. The ADB funded project, worth US $ 125m. Under my supervision, the project road length was 41.76km, structure length 350m, with contract sum of US $ 28m. I as PM was responsible for project planning, preparation of work schedule, materials procurement schedule, budgeting, equipments schedule including and maintenance, arrangement utilization with own labour force and engaging & managing of different sub- contractors and to ensure that the works are done with high degree of Quality Control. It is noted that the whole SRNDP Project was mechanized, used effectively & efficiently various heavy equipments like Excavator, Payloader, Bull Dozer, Grader, Vibratory Roller, Pneumatic tyre roller, Dump Truck etc. On the other hand, concreteing work for structures were accompanished by using of concrete batching plant, pump, Transit mixture truck etc confirming to the standard as per specifications. In execution of this project, I had to guide my engineering and technical staff, deployed for different assignments such as set up survey team for taking pre- section level and completed other survey related works providing formation levels, super elevation etc. on the road and structure as per geometric design, calculate the volume of different works, materials etc. Besides,I had to look after the project laboratory owned by my company and explored various trial mix design for asphalt concrete in order to comply with the specifications for confirming the asphalt mix design in the batching plant as well as at field and it was responsiblity to arrange and fix the different component of designed Asphalt mix in the batching plant and laid in a trial areas before going to verify the Asphalt mix design and normal production for the road work. Period From January 1998 to March 2002 Employer Bangladesh Consultants Ltd. (BCL) Position held Assistant Resident Engineer (ARE) Job Description On Jamuna Bridge Access Road Project (JBARP), I was responsible for construction supervision of 66km national highway from Dhaka to Tangail which was financed by JBIC, Japan at the cost of US $ 28m. In this joint venturey, consisting the international consulting firms, JOC, Japan, Mott Mc Donald Ltd. UK, SMEC, Australia and local BCL and I had to manage all engineering, financial and administrative matters with the help of my engineering staff to execute a part of the whole project (40km) by complying the international standard, Which was executed by an international Koreans company (M/S. SUNGJEE Construction Ltd.). In this project, I, as ARE assisted for setting the rate of the non-tender items by analysing the market price and to prepare the supporting documents in a bid to the variation order (VO) for the client in the light of contract document and FIDIC. Period From February 1995 to December 1997 Employer Bangladesh Consultants Ltd. (BCL) Position held Assistant Material Engineer (AME) Job Description Worked as AME in the country’s most prestigious project, “Jamuna Multipurpose Bridge Project” (JMBP) with the longest fixed road crossing of 4.8km length and my responsibility for one of the four contracts, contract no.4 was for connecting west approach to highway. In this co-financed project (US $ 900m) by the world Bank, ADB, OECF and Govt. of Bangladesh, Which invloved international consulting firms: RPT (UK), NEDECO (Netherland) and the leading local consulting firm, BCL. My job was construction supervision of 17 Km approach road & to lead a quality control team of 25 (twenty five) personnel of various discipline in/c 2(two) B Sc Engr, to carry out exploration of various trial mix design of Asphalt concrete for Bituminous binder & wearing course, different grade of cement concrete and special type of concrete called as, `No-fines concrete’ which was used at embankment slope protection around the viaducts of Jamuna Bridge and to execute different type of quality test of international standard like Clay-lumps content, Mica contents, Hydrometer test, CBR test, abrasion test, Extruction test of bitumen, core cutting test of cement & asphalt concrete. It may be mentioned here that some of the special tests were carried out in abroad under our guidence. In addition to that I was responsible for taking payment certificate,prepared monthly report,liason with department & contractor etc Period February 1993 to February 1995 Page 5 of 7
  • 6. Employer Africa Engineering Company, Libya (one of the biggest construction company in Africa) Position Job Description Senior Construction Manager (Civil) As a Senior Construction Manager (Civil) was soley responsible for the construction of Water Treatment Plant, Water Reservoir ( Capacity: 5000 cu.m) and various types of concrete structures, 45km long road along water pipe lines, setting water pipe line of different dia(600mm, 400mm) Ductile iron pipe in 60Km in the rocky areas by the different countries workers. Install & commissioning different types of soil, asphalt concrete equipments for the laboratory. Responsible to the Director (Libyan) for constructions management included setting out of structures layout, foundation, columns, walls, beams, slabs and concreting as per contract drawing & specications and ensuring that works were carried out in accordance with the specifications. In addition to that I, as a section chief, played vital role for mobilization including men, materials and machineries, prepared the construction programme, finalization of alignment, workmanship control measures on line and levels, measurement of material and works with reference to quality control norms and tests, interpretation of general and special condition of contracts under FIDIC & specifications, check extra claims, assessment of additional works and preparation of variation orders, project cost control, documentation of measurement records, preparation of monthly progress reports and project completion report. Conducted training on preparing the various grades of cement & asphalt concrete mix design in the field & laboratory to a group of newly graduted Libyan engineers. Also responsible for checking of works and plant and equipment and maintenance of site/camp establishments in Misurata, Libya Period May 1992 to January 1993 Employer Engineering Science Ltd. /Engineering Consultants & Associates Ltd./ Desh Uppdesh Ltd., Dhaka, joint venture. Position Quality Control Engineer (Materials) Job Description Responsible to the Resident Engineer for the construction supervision of i) Tangail-Madhupur Road, length 45Km in/c 18 nos. pre-stressed girder bridges and culvets (contract-5), ii) Porabari- Gopalpur road, length 7.75Km in/c 11 nos. pre-stressed girder bridges and culverts (Contract-9) and iii) Bhatkura-Basail road, length 10Km in/c 8 nos. pre-stressed girder bridges and culverts Contract-10) at different location in the “Feeder Road improvement Project” financing of ADB under RHD, Tangail Roads Division. Period May 1990 to April 1992 Employer Development Design Consultants Ltd (DDC), Consulting Engineering Services (India) Private Ltd. Roughton and partners, UK joint venture. Position Junior Engineer Job Description Worked as a Junior Engineer, on Road Improvement Project (RIP), a National Highway from Daulatdia~Kushtia, RHD, funded by ADB ( US $ 55.00 million), length 144.74 km in/c 16 nos bridges and 110 nos culverts, awarded to M/S China National Complete Plant Export Corporation (COMPLANT) and my responsibility for one of the four contracts, contract no.2 from Faridpur to Kamarkhali Ghat, length 32Km. Responsible to the Senior Materials & Quality Control Engineer for maintaining the quality of contruction works by different tests in laboratory and field viz. CBR, MDD, PI, AIV, LAA, Gradation, water absorption test, etc. Period March 1988 to December 1989 Employer Development Design Consultants Ltd. (DDC), Dhaka. Position held Junior Engineer. Job Description Responsible to the Resident Engineer for the construction supervision of Keranirhat~Satkania Bazar road in/c 5 nos. Box culverts at different location in the “Flood Damage Rehabilitation Project” financing of ADB under RHD, Cox’s bazar Roads Division. Period July 1985 to March 1988 Employer M/S Lovely Corporation a construction company, Dhaka. Position held Project Engineer. Job Description Responsible for construction of a 3-storied office building, a Laboratory building, Internal road (900m), boundary wall of Dinajpur Polytechnic Institute including preparation of tender, estimating, preparing progress report, etc. under ADB financed PIU Project. References : 1. Engr. Nirmal Basu 2. Karl Hans JOERES Page 6 of 7
  • 7. Project Engineering Advisor (PEA) Rangpur Zone, RIIP-II, LGED (An Employee of SMEC International (Pvt.) Ltd of Austrila) Mobile: +88 01730 046 251 E-mail: nirmal_basu@yahoo.com Team Leader, RIIP-II, LGED Hifaab International Limited Mobile: 01730046250 E-mail: dsmcriip2@gmail.com 3. Mr. Wijitha Paranamana Regional Project Engineer, Khulna Division RIIP (RDP-25), LGED, Jessore (An employee of SMEC International Pvt. Ltd, of Australia) Mobile : 01713 400 556 E-mail: wijitha@khulna.bangla.net I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describes me, my qualifications and my experiences. Signature :............................................. Date: 17 / 04 /2016 Day/ Month/ Year Page 7 of 7